Material revision level

Hi,
What is the procedure to assign Revisin level to already existing Material .
and tables where Revision level is reflected
Thanks

My requirment is to   assign new  Revision level to material and change revision level of already existing revision levels of material.  and to display Purchase order with material with revision level.
for already existing material with  revision level , Purchase Order and Delivery Schedule is showing Revision level.
(Revision level is assigned using CC11 and stored in table AEOI).  it is updated to table ekpo.
for PO and Delivery schedule , m picking data field from EKPO-REVLV.
and it is working fine. PO an DS shows REVISION LEVEL field.
( above case was during implementation )
but for last one year no one updated the revision level  of material.
now requirement is to update the material with revision level.
But the Problem when i try to assign new revision level to material or want to change the already existing revision level of material then ,it is assigned to material with CC11 and CC12 and  shown in table AEOI . but revision value is not updated to table EKPO for field REVLV . so by thins  PO and Delivery schedule is coming without  revision level.
how to reflect revision level assigned to material to table EKPO ? may be m missing some step ...
i checked OS54 table
my OS54 settings are
REV LEV ACT                   (active)
Ext. Revision Level            (inactive)
Higher REV Level              (Active)
Rev Lev Automatically      (inactive )
Effect  Profile                    ECN00001
Please give me kind suugestions ....
Thanks

Similar Messages

  • How can i attach a document to a specific material revision level ?

    Dear guru.
    I manage a material with revision level.
    I need to attach a specific document , created using DMS , for every revision level of this material.
    How can I do that ?
    Thanks.

    Hi Cris,
    This cannot be achieved through std process.
    Alternate way is, As soon as you create material with different revisions better to create document with material no as document no with different versions.
    In SPRO->Document Management->Define document types->Define Object links,for object MARA set document version            as 1:Default:current version ,so that whenever you view material in MM02/MM03 of different version you can see document with current version only.
    Regards
    Bhanu

  • Open PR Material Master Revision Level

    Hi,
    I am working on upgrade from 4.5b to ecc6.0.In this Project Material Revision Level and Change Number is assigned with Z Program.
    The Requirement is the Program has to check the Open PR 's and that particular Material  needs to be updated with Change Number and Revision Level.
    Now the Functional Specification to be prepared for the Technical Team -Based on the Open PR condition  -Now what are the fields to be specified in EBAN table in order to fullfill the open PR.
    As per my understanding Open PR means PO is not created and PO is created means that PR is closed.
    Or any other fields are to taken into consideration for preparing Functional Specification
    Please reply me ..
    Thanks for the reply.

    It is very much possible. You can try this use case. It's pretty simple. But Vice-versa is not possible.
    ~ Guru

  • Multiple Revision Levels for a Material

    Today, Tyco Electronics has many manufacturing sites located around the world.  A given material may be manufactured in multiple locations.  When Engineering determines that a given material must change revision level, they determine a date that this new revision level becomes effective.  Unfortunately, not all manufacturing sites can be ready to manufacture to that new revision level.  In fact, based on tooling, one manufacturing site may manufacture to both the old and new revision level for a period of time until all of their tools/dies have been switched over.  In addition, customers may require that only the latest revision be sold to them.  Does anyone else have this requirement/issue today?  If so, how are you handling this within the SAP R/3 system since material revision is at a global level and there is no component revision level field on the bill of material.  Requirements are to sell at a material/revision level, plan to a particular material/revision level, stock at a material/revision level.  Any input you have would be greatly appreciated.

    Which strategy shall I use for picking?
    Can you please guide me what material master data fields are required for these strategies.
    regards,
    VS
    Edited by: vs on Jan 12, 2008 7:01 PM

  • How to map revision level materials to already created inspection plan?

    Dear All,
    I have created single inspection plan for many existing raw materials. Now it has been found that each raw material have different revision level as well as valid from date.
    My inspection plan is created on 02.07.2014 and each raw material has different revision level with valid from date which is also very old (like 11.03.2012 for revision level 09).
    My Requirement is:  how to correct my inspection plan?,  so that it will work for each assigned raw material and there will not be any material revision level wise problem created for the inspection lot so that my inspection lot should be created in REL status in QA32 transaction i.e. inspection lot is assigned automatically as per standard SAP functionality.
    Thanks,
    Narresh

    Hi Amol,
    Thanks for your reply.
    In this business scenario, we are not creating inspection plan for each raw material because there is similarity in inspection for 40-50 raw materials and total number of raw materials are around 500. This will be very difficult and unnecessarily data creation in the system.
    As per my understanding revision level is for material master revision and if material master changes then how it affect so much on inspection plan? also is it means that for every revision in future we will have to create new inspection plan?  hence I believe that if I will make back dated inspection plan for raw materials then it may work. Is my understanding is correct?
    Expecting much better solution from QM experts.
    Thanks,
    Narresh

  • Revision Level not coming

    While creating a Material using T-Code MM01 in Basic data 1 there is
    one button Create Material Revision Level : change Number
    My requirement is ,While creating PO , when u give part number,
    Revision Level is given A,B.
    Print out of the PO is showing Matrerial number and Revision Level.
    Ex M1234 B
    But when u create a schedule Monthwise in that case it is not showing
    Revision Level.
    Ex M1234  ( in this case B is missing )
    How to get the Revision Level in schedule.

    Hi,
    When u press the F1 key on Create Revision Level / display Revision Level
    The technical information (F1)  is    :
    Function data
    Program         SAPLMGMM
    Function        RLVA
    Where  is SAPLMGMM FunctionPool (System-defined Include-files.)
    and when u double click on RLVA the it dispaly
    User interface                 SAPLMGMM                       Active
    Menu bar                         Main Screens (Except Long Text Screens) (Without "Goto")
    Application toolbar          Main Screens (Except Long Text Screens) (Without "Goto")
    Function keys                 Data Screens Except Long Text Screens
    not getting the point. My problem is while creating Purchase Order Revision Level is coming with Material like ( M100  B)
    while creating Scheduling agrrement Revision Level is not coming ( M100    )

  • Function Module for Revision Level.

    Hi all,
    Is there any function module to retrieve details of MM and PO Revision Level..
    In MM it is present in basic View..in AEOI table..,but i still go for function module.
    Thanx in advance

    Hi,
    BAPI_PO_DETAIL1
    REVISION_LEVEL_SELECT
    CCAP_REV_LEVEL_MAINTAIN
    Also,
    1.You can see this revision changes history in the version tab itself.
    2.You can also get from PO - Environment - Header changes details.
    3.Check the table EREV Version in Purchasing in SE16. This will give all the required details for the PO.
    4.You can fetch the data from this table to appear in the PO print out.
    If you want to know the material revision level as of some date then you can use function module REVISION_LEVEL_SELECT. Pass material & date and it will tell you the active revision on that date.
    If you want to know the table, then AEOI where you can enter the material no in field OBJKT & AETYP as 41 (Material). You will get the list of revision levels for the material.
    thanks & regards,
    ShreeMohan

  • Problem with Revision level for a Material

    Hi All,
    I have a problem with Revision Levels for a Material.
    I want to know the Revision Level for a particular Material for BOM Creation.
    Can anyone please let me know from which Table or Funtion Module can I get the Rev Level, once I pass MATNR (Material) and AENNR (Change Number).
    <REMOVED BY MODERATOR>
    Thanks and Regards,
    Harish Kalla
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

    HI,
    You can use table AEOI.
    Hope this helps.
    <REMOVED BY MODERATOR>
    Regards,
    Sipra
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

  • Revision level not appearing in material tab of purchase order

    hi
    I have matained revision level in material master but it is not appearing in material tab of purchase order and print preview of purchase order
    regards
    Badari

    Hi, If u have created proper change no in CC01 with assigned object material with proper validity period u can give revision level to material.
    In order to reflect the current revision level on PO printout, the coding in PO print program should be designed accordingly to pick the latest revision level. PO output needs to be re-issued so that the new output can pick the latest information like PO revision level from the master.
    Refer below link also for more information,
    [Revision level in purchase order|Revision level in purchase order]

  • Synchronizing Material Master revision level across multiple plants

    Hello,
    If an organization uses material master revision level to maintain the details of material's validity across different plants then we see a material master with different revisions in that organization. Now I  would like to understand the impact of this practice in big organizations , is it advisable to have a material master with different revisions in different plants? , if not then which is the best way to synchronize these material masters ( with different revision level ), which are already in use?
    Bets Regards,
    Avinash
    Message was edited by: Ulf Petzel

    Hello Ulf,
    Thanks for your reply, the actual issue is..
    There are two companies; both are using the same material.
    We are building a central system and synchronizing the materials from all companies.
    While synchronization, we found that revision level are different across companies.
    1.      Should we avoid using revision level in our organization?
    2.      If I can find the validity of a material with change no + material + plant, then what is the purpose
             of the revision level?
    3.     What will be the impact, if we remove the entire revision level across all companies?
    4.     In real world, across different organizations, how revision level is synchronized across companies or at least in the central system.
    Please let me know your valuable inputs.
    Thanks
    Sridhar  

  • Revision level of material automatically assign to purchase order

    Hello all,
    when I create a new purchase order for a material, is it possible to assign the latest revision level of that material (material master - basic data 1) automatically to the Revision level field on item level - Material data for the material in the PO? Meaning when I create the PO with this material, SAP automatically fills this field with the revision information from the material master?
    Thanks
    Anne

    It should pick latest revision level.Becuse PO get all data from material master.

  • Create Material Master Revision Level using CC02

    Dear oss ,
    Using CC02 for a change number I can view object material and I can insert a new material. The revision level field is greyed.
    Can I have a chance to create  revision level for a material directly using CC02 ?
    Thanks.

    If you want to create revision level of Material then use t-code CC11. I hope it would help you.
    Thanks!!!

  • ECM revision level in material master record

    Hi experts
    I need to remove the last revision-number (REVLV) in a a material master record.
    The ECM is not relesead and we have used tcode MM02.
    I have seen that the tcode CCUNDO check the planned changes with tcode MM12.
    Thx in advance
    Marco

    Hello Rahul ,
    Please see the following link for more information regarding the Revision Level in Material Master.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/ff/5160a249d811d182b80000e829fbfe/frameset.htm
    A revision level identifies a specific change status of a material with reference to a change number. It is used, for example, to identify changes affecting other areas such as Production.
    You generally assign a revision level when processing a material BOM (bill of material created with reference to a material master record). However, you can also assign a revision level when processing a material master record.
    You can display a revision level assigned to a material by choosing Display revision level on a departmental data screen in a material master record.
    I hope this information has been helpful for you.
    Best Regards,
    Frank

  • Revision Level in Material Master

    Hi All,
    What's the purpose of Revision level in Material Master and some times we see it in PO material tab.
    What's the Business Application of this.
    Please help.
    Thanks

    Hello Rahul ,
    Please see the following link for more information regarding the Revision Level in Material Master.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/ff/5160a249d811d182b80000e829fbfe/frameset.htm
    A revision level identifies a specific change status of a material with reference to a change number. It is used, for example, to identify changes affecting other areas such as Production.
    You generally assign a revision level when processing a material BOM (bill of material created with reference to a material master record). However, you can also assign a revision level when processing a material master record.
    You can display a revision level assigned to a material by choosing Display revision level on a departmental data screen in a material master record.
    I hope this information has been helpful for you.
    Best Regards,
    Frank

  • Stock of material at different revision levels

    Hi,
    We are planning to have revision levels (from Engineering Change Management) for a material. There will be different revision levels of the material (for each minor enhancement) and there can be stocks of the material at each of these levels. Can I get the stock of the material for each revision level?
    Please note that I will not create new material for each minor enhancement.
    Regards,
    Lakshman

    Thanks for the replies.
    Workarounds are fine... (I have already considered these workarounds) but my question was whether I can see the stock at different revision levels.
    To rephrase with an example, I have a material 1001 with the current revision level 03. Can a standard report show me the following:
    material 1001, revision level 01 stock 100 ea
    material 1001, revision level 02 stock 300 ea
    material 1001, revision level 03 stock 700 ea
    I am looking for an answer to this specific question.
    Thanks
    Lakshman

Maybe you are looking for

  • Windows 7 on iMac experiencing frequent screen-wrap?

    I installed Windows 7 on my iMac with no issues, and the first few times it loaded up just fine.  However now I experience frequent screen-wrap, or screen issues in general when booting up into windows.  I'll start up the computer, and sometimes the

  • Server definition goes suddenly wrong with Wordpress site and DW CS5

    Let me explain this simply. I install a worpdress site, normally, on my local server (xampp). After setting up the site with the web-install thingy, I start DW. I set a definition site with the new (not at all improved) site definition dialog-box. //

  • How to unistall maverick.

    Hi, after I've installed Maverick on my iMac 27 -late 2012, I have expirienced some problems and I've decided to take a step back to Mountain Lion but, even if the Apple support confirmed that I could re-install the previos OS via the CMD-ALT-R proce

  • Single question slide issue in captivate 6

    Hi, I am new to captivate 6. I need to achive following functionality: 1. Single check point question slide without result page which will be MCQ or any type of question. Consider the sinario for MCQ question 2. If user doesnot select any option, he

  • Mail photo attachments embedded vs files

    How can I attach photos to email so that they show up as a file rather than embedded?