Material routing inspection characteristics.

Hi everybody,
I just wanted to ask whether don't you somebody know some function or bapi, that allows to change the material routing inspection characteristics listed in CA02.
Thanks a lot.
Jan.

Check it here Re: bdc problem ca02

Similar Messages

  • How to progammatically get Inspection Characteristics from Inspection Plan

    How do I programmatically get Inspection Characteristics from an inspection plan? I am currently getting inspection characteristics from inspection lots via a QM-IDI RFC call (QIRF_SEND_REQUIREMENTS_GET_DAT2), but if the Inspection Characteristic is not in an inspection lot, I don't get it via the RFC call. What BAPI/RFC/IDOCS mechanism can I use from an external subsystem (VB.NET app) to get inspection characteristics (Spec Limits, Target, Operation, Activity) associated with a material in an inspection plan?
    Thanks,
    Ed

    The problem is the SAP system that my external subsystem (VB.NET application using QM-IDI) is interfacing with does not have inspection lots (and the customer is not willing to add inspection lots), so the QM-IDI RFC that I'm using (QIRF_SEND_REQUIREMENTS_GET_DAT2) does not return the inspection characteristics (spec limits, etc) that I require. My customer creates a reference (QP11) with inspection characteristics, then attaches the reference to a Material (QP01). When I try to get the inspection characteristics for the material via QIRF_SEND_REQUIREMENTS_GET_DAT2, I don't get the inspection characteristics because there is no inspection lot associated with the material and inspection characteristics.
    The design is for my external subsystem to do the Material Inspection Characteristic valuation, and then send the valuation results back to SAP. Is there a way to get Material Inspection Characteristics and then send the results back given the SAP setup I described above?
    Thanks,
    Ed

  • Inspection characteristics based on material and goup counter

    Hi,
        Do we have some function module which would give us inspection characteristics based on material and group counter. I have gone through many posts in this regard but find answers to get inspection characteristics based on inspection lot number.
    I do not want to get into quality at all. Is there a FM to get the inspection characteristics based on material and group counter or any related tables would be of gr8 help. T-code QP03 takes material and group counter as input and displays the inspection characteristics. Any input in this regard would be of great help.

    Hi,
    Use tables MMAPL , MAPL and PLMK as per your requirement.
    Thanks,
    Vijay

  • Unplanned Inspection Characteristics in Routing - Operation

    Hi experts,
    What is the use of  the function Unplanned Inspection Characteristics in Routing - Operation ? Its normally grayed off.
    I am aware of the same in RR of the Inspection Lot.
    Thanx
    George

    Hello Jomy,
    Ok so you were asking the same for Production order. You wrote routing operation and my mind stuck there since I read it. I was searching for it. You make good exercised to me. LOL!!!
    Anyways, in the production or process order the unplanned MIC does the same task of job what it used to de in QE51N or any other RR work sheet. And you can assign the Unplanned MIC to Pro. Order itself to the relevant operation. Let it be gray there, you just follow the steps to attach an unplanned MIC to Operation in the Order, and the same will be reflated to RR screen also.
    - Select the operation line item.
    - Now follow the path,,, Operation->Function for phase / for operation->Unplanned Inspection characteristics.
    - Now it will lead you to the same screen for unplanned characteristic as you can have in other RR work lists.
    Pls revert if there is any query.
    Regards,
    Shyamal

  • Link between PRT and inspection characteristics in Rate Routing

    I am creating an Z report to show the details of the PRT and the inspection carried out by the same.(inspection characteristics)
    Suggest me any table link between two.

    got the solution

  • MIC changes in routing/inspection plan

    Hi, we have created qualitative inspection characterisics (without characteristics attribute control indicator) with incomplete copy model type. This is already assigned in inspection plan and in routing. Now our users want to assign characteristics attribute.  We changed the MIC control indicators. this is not reflecting in the routing/inspection plan.
    Could anyone suggest the best way to update the inspection characteristics in inspection plan as well as in routing.

    Dear !!!!
    Please Follow this steps
    1.Check Inspection Setup What u have given
    2.Create a Quality Work center with control Key QM01
    3.Create Master Inspection Characteristic in QS21
    4.Create Quality Plan QP01 make sure your usage type 5 0r 6
    5.Assign inspection characteristics in master inspection whatever u have created in QS21 save
    6.Go to QA32 check with selection by material or by plant
    7.Then go to QE51n and run by selection condition by material or by plant Results recording starts
        Then click on the Inspection lot make the inspection and save it will prompt saying that results save under operation
    9.Then go to Usage decision QA32
    10.Move Material From Quality To Unrestricted.
    Thatu2019s all the Steps
    With Regards
    Pushpalas

  • Inprocess inspection characteristics missing

    Dear all
    i assigned 03 inspection to a material but forgot to assign inspection characteristics, lot has been created at the time of the creation of production order. now i want to do the inspection but there is no assigned characteristics. i have assigned characteristics to that material in routing but how to get the effect on that lot to get the characteristics without changing order
    is there any option plz guide me

    Dear Nasir,
    You have to try to read the Production Order master data through Production Order --> Functions --> Read Master Data. This is the way you can reset your lot Because In process inspection lot is attached with Production / Process Order. Other wise cancel the production order and create the new one. I hope this will work.
    Best Regards,
    Ibne Khalil

  • Add inspection characteristics to production order created via CO07

    Hi, all.
    We're creating production orders to perform production rework on assemblies using transaction CO07. 
    We have a requirement to inspect and make a usage decision on the reworked assembly.
    Since there is no material at the header level for CO07 orders, the system isn't allowing us to do an inspection because it has no material master QA view to reference.  Although the control key is marked for in-process inspection, the production order still won't allow it.
    I can't add "unplanned inspection characteristics", not can I manually create an inspection lot using QA01. 
    Is there a way to manually force in an inspection for an operation on a CO07 order?
    Thanks.
    Sarah

    Hi,
    We cannot do a inspection for a production order unless it has material assigned to it and the material got QM inspection type relevant to that.
    regards,
    Lenin. A

  • Revision no of Routing/Inspection plan in Purchase order

    Hi MM friends,
    I have two requirements from client
    1. Is it possible to update the revision number of Routing/inspection plan or attaching any document in Purchase order to inform the vendor the relevant changes.
    2 Also the Routing changed revision number can be made as
    mandatory field in P.O?
    Regards,
    Anil

    It should pick latest revision level.Becuse PO get all data from material master.

  • Date format in Master inspection characteristics

    Hi All
    I have a requirement where my user wants to enter the date format in the master inspection characteristic. For example we want to add date of manufacture and the date of expiree as a inspection characteristics and during the results recording they want to enter this characteristics in a date format.
    MY question is can we have a master inspection characteristic with a date format, if so what all the settings are required.
    Please suggest.
    Thanks,
    Quantum.

    >
    quantum wrote:
    >Can i use characteristics in the inspection plan instead of the master inspection characteristics. I am using Work bench transaction code CWBQM to create an inspection plan.
    Direct characteristic you can't use in inspection plan. If you want to use characteristic in IP then create chara. (CT04), then assign this charac. as class chanr.(QS21) in MIC. Now you can use this MIC in inspection plan.
    Hope this helps.
    Thanks!!!

  • LSMW to Load - Equipment Task List/Operations/Inspection Characteristics

    Hello Experts,
      Any suggestions on standard LSMW load program for this. The Standard batch Input - 0470/IBIP program does not have the option to load Maintenance Package and Inspection characteristics.
    Any other suggestions please.
    Thanks

    Hi Ananthram,
    instead of using the standard batch input program, you could also create a new recording that performs exactly the tasks you need. Mark "Batch-input-recording" and click on Overview. From there, you can start recording your transactions.
    I hope this helps and solves your issue.
    Marc

  • Create Inspection Characteristics

    Hello Gurus,
    I'm developing a program to create Inspection Characteristics from a file (excel).
    I'm using the BAPI <b>BAPI_INSPECTIONPLAN_CREATE</b> but i don't know how to fill the parameters.
    Anyone can help me, please.
    Thank in advance.

    Kindly go to SE37.Enter the name of BAPI n then execute.
    Click on each field coming  and execute. This was you can test your inputs. You can also save your test data .
    This will validate that ur BAPI is o.k n you can ask you Technical team to write a program n assign a transaction to it.

  • QM Inspection Characteristics table

    Hi,
    I am designing Inspection Report for QM Module, the thing is i am unable to find the tables for the data
    1. Characteristic Specifications
    2. Characteristic Results 
    like Characteristic Related complete data. And also can any one tell me what is the relation between Operation & Charaterisitics in the Inspection Processing?
    Like the table used for that !!
    Waiting for ur reply....
    Regards,
    Srinath

    Hi,
    Following is the list of related tables.
    QALS - Inspection lot record : This is the table where you can get all the inspection lot numbers
    QAMV - Characteristic specifications for inspection processing
    QAMR - Characteristic results during inspection processing
    QASR - Sample results for inspection characteristics
    QASE - Results table for the sample unit
    QASE and QASR give the results for individual samples and partial samples
    To get the operation for the particular characteristic, call function module QEEA_READ_SINGLE_OPERATION
    Pass AUFPL from QALS, VORGLFNR from QAMR and PRUEFLOS from QAMR to the function module as shown below.
    The FM returns the value of operation VORNR in structure e_qapo.
    call function 'QEEA_READ_SINGLE_OPERATION'
         exporting
              i_aufpl            = <fs_qals>-aufpl
              i_plnkn            = <fs_qamr>-vorglfnr
              i_prueflos       = <fs_qamr>-prueflos
         importing
              e_qapo_wa    = e_qapo
         exceptions
              not_found       = 1
              others             = 2
    Hope you'll find this useful.
    Regards
    Radhika

  • Material without inspection setup goes to quality inspection

    Hello Gurus
    We have material without inspection setup, but the system say the stock type is Quality Inspection.
    Then we get problems in the goods receipt. We checked the PO has stock type quality inspection, how can we solve this situation?, please give advice.
    Best Regards
       Jimmy

    Hello,
    No changes like you mentioned, the problem is if you create a PO with some materials the system says the stock type is Quality inspection , then at GR we are dealing with problems, but the material do not have flag for inspection and also the PO has the stock type Quality inspection, so if you create a new PO it will go to Quality inspection...

  • Config settings for Decimal places in Master Inspection Characteristics

    Hi,
    can any body tell me where to do the configuration settings for decimal places  in master inspection characteristics
    i want my limits to be 1.234
    i want 3 decimals after point
    Regards,
    Raj

    Hi,
    Please go through the below link.
    http://www.freesaptutorial.com/how-to-create-master-inspection-characteristic-in-sap-qm-module/
    While creating the MIC in QS21 after entering the control indicators you will get Quantitative data screen.
    In that screen you can enter the decimal places, UOM, target, lower limits etc
    Regards
    Hari

Maybe you are looking for

  • Bullet and Full Stop formatting in right to left languages?

    I am copying and pasting text from an arabic document to Captivate 7.  This has been translated for us as I don't speak the language.  The formatting in Word is perfect, bullets appear on the right, full stops appear on the left. When it pastes into

  • Exchange 2010 SP2 Public Folders Stubborn Replicas (OAB)

    I migrated to a new server with 2010 SP3 all is working good, I am able to see all Public Folders and their contents fine. Now I need to delete this stubborn Public Folder on the older 2010 SP2 server to decommission it. But I get the dreadful 'you c

  • Bit Torrent Ports

    Hi, I am a new Mac user and have recently purchased a Powerbook G4. I would like to use Bit torrent more efficiently on my Mac. I would be greatful to anyone who can guide me on how to allow access to Bit torrent and other applications to specific TC

  • Buttons, links, and Interactivity in PDFs - emailing

    I work for a local printshop and we regularly send out PDF proofs, exported from InDesign CS3, to customers for approval. I've been tasked, if possible, to make these PDFs interactive in the sense that they can have notes added, changes made, and the

  • Issues opening DB after restore.

    10g R2 RH4 Howdy all. I am attempting to do my first restore and having a tough time with it. I somewhat follow the instructions here: http://download-west.oracle.com/docs....htm#sthref673 The main difference being that I am telling Enterprise Manage