Material Shelf life report

Hi Gurus
Want to know if there is any standard report available with the below fields to download.
PO NO, Line NO, Material NO, Quantity,Batch NO, shelf life Expiry date. Any table name which holds this data will also be useful.
Regards
Kumar

Dear Kumar,
There has no standard report available in SAP. You have to take help of ABAP and create Z report as per your requirement.
Regards,
PK.

Similar Messages

  • Material shelf life expiry

    Hi All,
    While Making GR for an Material (10001) I am not getting the date Date of Manufacture and Shelf Life Expiry Date under the BATCH TAB in MIGO Screen.
    For that i need to activate anywhere?
    IF yes Please guide me the path where I have to activate?
    Note:
        1. I just created the shelf life expiry days in Month under plant data/storage 1 View against the material.
        2. Only the field is not displaying while making the GR.
    Thanks in Advance,
    Priya

    Hi,
    Yes Mr Ravi. You are right I given full points to u.. I just made tick on
    "Indicates that the shelf life expiration date check at the time of goods receipts in the plant is active"
    Now its displaying those fields.
    Thanks.
    By
    Priya.

  • Any Config Option to Remove Shelf Life from Material Spec Summary Tab?

    Hi All,
    We are on PLMv6.1 and have been using a custom section for Shelf Life for both Trade and Material specs to meet our business needs while we were on 6.0. At this time, we would like to remove the "internal" Shelf Life section from Material Trade specs Summary tab and not have it included in eQ. We have found that having two instances of Shelf Life confusing for users. Is there any method for us to config the Material Shelf Life Section "Off" as there is in the Trade Spec?

    At this time, there is no config to turn this off. You may want to consider submitting an enhancement request. you could try utilizing section level editing to disable it, however, it will still be visible. this would not affect eQ, however.

  • GR posting date is being considered as Shelf life expiry date

    Following settings made in material master:
    In Purchasing view: Batch management check box ticked.
    In Plant data / stor.1 view: (Shelf life data): Max storage period is 1, Time unit: YR
    Min remaining shelf life:1, Total Shelf life: 365, Period Ind for SLED: D
    Following data entered in GR:
    Document date: 10.03.2011, Posting date:10.03.2011
    In batch management tab of GR: Date of Manufacturing is :01.12.2010, SLED/BBD is appearing as 01.12.2011
    While taking shelf life report (on 12.03.2011) for the said material following output is displayed:
    Remaining shelf life             SLED / BBD
    -2 days                                10.03.2011
    In  batch display (MSC3N) Shelf life exp. date is appearing as 10.03.2011 where as in GR document it is showing as 01.12.2011.
    Kindly help where is the problem.
    regards,

    Hi,
    It is interesting.
    I understood the problem but for getting solution, you have to get ABAPeru2019s help. 
    In calculation in report, the report date 12.03.2011(DD.MM.YYYY) is taken by system as 03.12.2011(DD.MM.YYYY) and SLED is as per GR document 01.12.2011(DD.MM.YYYY). So 1-3= -2 days. Now, for calculating SLED date, system is deducting 2 days (or you can say adding -2) in report date 12.03.2011 (DD.MM.YYYY). So this is 10.03.2011.
    So in batch display (MSC3N), it is showing calculated date 10.03.2011.
    Please explain it to ABAPer & debug it, you will get solution.
    Before that try one thing. Check your user profile for date format. If it is MM.DD.YYYY, change it to DD.MM.YYYY, or vice versa. Then take report again , also check in MSC3N.
    BR.

  • I want the report which gives the material having Shelf life.

    I want the report which gives the material having Shelf life, but without batch management in the master .
    Thanks in adavnce...
    Vikrant

    Hi,
    Report MB5M can be used for this.

  • Requirement to develop New report to display material self life details

    Hi,
    I have a requiement to develop a report to find material Expiry date susing total self life:
    My selection screen:
    warehouse number
    storage location
    storage type
    material
    material type
    total shelf life
    My list should display the material number, description,material type, material group, storage unit, total stock, goods receipt date, expiry date.
    Please tell me what are the table to be used to fetch these details.
    Thanks,

    Hi,
    For your requirement use the below Table,
    material number : MARD-MATNR
    description       : MAKT-MAKTX
    material type  : MMARA-MATKL
    storage unit - MARD-LGORT
    Total stock - MARD-LABST
    goods receipt date MSEG -DATE
    expiry date MSEG - DATE
    Regards
    Thiru

  • Report for recieved, expiry dates of shelf life of materials

    Dear Gurus,
    I did nt find the solution in MB5M, because i want report for shelf life of materials based on recived date, expiry date, please share.

    Hi,
    When ever a material is having a shelf life , based upon the manyfactring date and the receiving date , the remaining shelf life can be found . If you want have a report which says the shelf life and receve date of a perticular batch and what should be the remaining shlef life or whather expired , once come into the plant , if not utilized , can be done through a ZREPORT or a query for the same .
    Regards,

  • Shelf life in material master

    Dear Experts,
    My one mateiral total shelf life is 360 days ( from date of manufacture to exipary date ) what setting I fill in material master and in receving if this material expiry is pending only 10 days . I fill the manutature date in migo.
    RC

    u fill the sled data at nMigo means u already configured the SLED config.
    now mat master is plant data/stor 1 - Total shelf life 200 days as per ur req.
    now do the Gr date , the staem will check GR - sled manufc date u mentioned and 200 days to find the xpiry date .
    reports are there to gethe details 50 days pending list , 100 days pending list etc
    regwdz

  • Packing Material with Batch Management and Shelf life expiration date check

    Dear All,
              I created a packing material and activated batch managemnt with shelf life.
                At the time of GR the batch should be created automatically or if i want to create a batch manually for some materials how to do it in the system.
                         Help me

    Before going ahead with the batch creation,
    you need to activate the batch mngmnt level (i.e.Client,plant,material level)
    And also activate the Nor.ranges.
    Then Create the Classification,Characteristics and assign the Chrctstics to Class.
    Then create the batch
    T Code:
    CT04 create Char.
    CL02-Create Class
    CL24N:Assign class to material
    MSC1N:Create Batch

  • Shelf life from material master not flowing into purchase order

    Hai friend
    I have set a shelf life value in material master ( both minimum & Total shelf life). 
    But while creating purchase order, values are not flowing from material master to purchase order.
    The field is empty.
    How to configure, please help.
    Regards
    Rammohan

    1.activate batch management
    2.to calculate SLED production date/date of goods receipt is mandatory during GRN
    3.Maintain characteristic for production date MCH1 - LFWRT
    4.assign this to class
    5.Maintain this class to material
    6.Now do GR ,it will prompt for production date .based on this ,sytem will calciulate SLED
    hope it helps

  • Shelf Lif of a material

    Dear ALl
    System should not allow to issue a material whose shelf lie is expired?
    Can you suggest any soultion for this?
    Pl update ASAP
    Manoj

    Hi,
    During creation of  Material in MM01.....In Gen Plant data/storage 1 view, Maintain required values in the Field of .....Total Self Life ( lets say 90days) and in Min. Remaining shelf life  ( is 60days).....
    When you do GR for this material the System will ask for Date of Production of material( u enter here0 ...from that the system automatically calculates it SLED....and it checks the Remaining shelf life Expiry Date also...and if it falls earlier than that...the system will give you Error message and will not allow you to Post the GR...(example:1, If ur receiving today ie..27.03.2008 and production date is 29.01.2008{  falls within 60days, then system will post GR, example:2, If ur receiving today ie..27.03.2008 and production date is 12.01.2008{ not falls within 60days} , then system will not post GR.
    Regards,
    Biju K

  • Shelf Life of the Batch Material

    Hi,
    The shelf life is maintained for the batch material during GR process .IF the shelf life expired how to bring the stock under quality inspection for re-checking?
    Thanks in Advance.
    Regards,
    Renuga.A

    Hi Renuga,
    Kindly go through these threads it will surely solve your query.
    [Link - 1|Re: Inspection type 09 process]
    [Link - 2|Recurring inspection problem;
    Regards,
    Shyamal

  • Shelf life field in material master

    Hi,
      For some raw material we want to maintain thta with shel life concept, along twith bacth management,  I have check in M01 for materila type ROW  but in out exisitng settings I have not found fields for entring the shelf life data in material master, so what settings to be check for this , which screen to be add.
    regards,
    zafar

    There is no settings for this.
    For any material, you can find the fields for Shelf Life data in "Plant Data/Storage 1" View.
    Please select this view
    Regards,
    Shetty

  • Shelf Life Expired Material will automatically be transferred to block stk

    Hi,
    We have purchased a material, RM u2013 XYZ, Qty u2013 5000 kg, Mfg date u2013 01.06.2010 and Expire date is 30.09.2011. The material was received on 25.06.2010. Presently the stock of material is lying as unrestricted type.
    I want to know that when the shelf life of the material will be expired, the material will atomically be transferred to block stock. How do I configure the same?
    Further, is there any standard alarming system as to know the shelf life of material is going to be expired?
    Regards,
    Amit

    The problem is that the section of the program (QA07) that blocks the stock  runs first.  Therefor all "expired" stcok within the time frame specified is moved.  When the program runs the section to create inspection lots, it will only take into consideration stock that is in unrestricted stock.  Since the stocks have already been moved to blocked stock, there is no stock in unrestricted inventory and hence no inspection lots.
    In your case, in the section "Batch status change when expiration date is reached"  you need to untick the "Block batch" and remove and values iin "Initial run in days" in this section.
    In the section above that tick on "Block batch at inspection date" and maintain a value in "Initial run in days".
    This will have the effect of creating lots when the next inspection date falls within the window specified and will move the material to blocked stock on the inspection date.
    Keep in mind that this is all working on the "Next Inspection Date" of the batch.  Not the expiration date.  So you should have a process to keep the next inspection date and the expriation date in sync.
    To cover yourself and make sure that batches are blocked if the expriation date is reached, set up QA07 to run again immediately after the above job.  In the varinat for this run, tick back on the "Block batch" and set a value in the "Initial run in days".  This will then block any stocks missed in the inspection lot creation process above.
    Also see the folowing threads which explain the deadline mointoring program.  There is a lot of info on this process on the net.
    http://sapfans.com/forums/viewtopic.php?f=27&t=334825&p=1016796&hilit=Deadline+monitoring#p1016796
    http://sapfans.com/forums/viewtopic.php?f=27&t=250686&hilit=+deadline
    FF

  • Shelf life view not coming in material master

    Hi,
      I have one issue, we want to create some material with shelf life  as per presernt setting  in OMT3E  it is as below
    01     *     *     *     T1                             
    01     *     HAWA     M     21     Std ind.(short) tab pages
    01     *     HERS     *     T1                             
    01     *     LEER     *     BE     Std Ind Tabs for Empties
    03     *     *     *     23     Std retail: tab pages
    03     *     COUP     *     R1     Retail Coupons
    03     *     PLAN     *     R2     Retail Articles (Planned)
    i have check in the transaction for the first screen sequence  T1 is not present in our system but in OMT3E  i am not getting any error msg.  then i hva echeck for screen sequence 21  in this the shelf life fields are there in the OMT3  transaction ,  but when i am creating material master  I am not getting shelf life fields in material master I have also check in MM01 debugging in the field it is T1 in the field V_T133S-REIHF-BILDS, but this screen sequence is not present in OMT3  so in which screen sequence i have to do the required modfication so that the shelf life field will come in the material master.
    regards,
    zafar
    Edited by: zafar karnalkar on Jul 4, 2011 2:06 PM

    Are you in a ERP system or in a industry solution?
    is it a standard material type like ROH and FERT, or a customized own material type?
    I have rarely been im OMT3, which I usally need to do when adding own subscreens with Z.fields.
    You are talking about standard SAP fields, so the screen sequence should not really be the place to check.
    I think it is pure customizing of field selection.
    What is your material type?, what is its industry, what is the transaction you use for maintenance?

Maybe you are looking for

  • Object in import-file header does not correspond to the migration object

    Hi Forum, I have loaded Business partner successfully with the file created in Workbench with test data. Now I want to load the data from Application server. But i am getting the error "Object in import-file header does not correspond to the migratio

  • Struts-Faces

    Hello, does someone knows how the validation model works when i am using struts and struts-faces. Example code: <h:input_text id="msg" valueRef="LM3800.msg" size="20" style="color:blue">      <f:validate_required/>      <f:validate_longrange minimum=

  • Officejet 6000 E609n prints on USB. I am unable to get it to run wireless

    HP Officejet 6000 E609n Win 7 64 bit My printer works on a USB connection but I have not been able to get it to function on a Wireless to router connection. Router is Linksys WRT160N V3. I have used all the recommended solutions in HP's instructions.

  • Lost settings of SQL Developer

    Hi Buddies; I'm using SQL Developer, and inadvertently, I changed the configuration. By this, I mean, initially when I enter to SQLDeveloper I got the window with the conections at the left, and at teh right i got the windows to execute queries or to

  • User-Exit for material

    Hi! I have to create an user-exit for a material to force a water content value to be added to it. Can anyone tell me what user-exit should I be using for it please. Thanks