Material short text difference
Hi Gurus,
my client has created a Po having 2 line items with the same material no. (packing material)
the short text of the material is differ for the one line item.the confusion is how it will happens coz.. the material code is same for the both line items.it should be the same.
I checked in the item changes of the Po.. but no data is appearing regarding the short text changes
please help me how to find out the route cause of the issue..
regards
subbu
Hi,
It is possible to change the Material Description while creating PO (ME21N), which will not get recorded as changes for that document. User might have changed during PO creation (in ME21N).
Or check whether 2nd line item has been added later in PO, in change mode and check Material master changes in MM04. It might also happen that before adding 2nd line item in PO, somebody would have chnaged material description in MM02.
Similar Messages
-
Making material short text grade out while creating PR
dear all
while making pr for materials,by t-code me51n, the system does not make the material short text diable/grade out.
eg if i select material from material master say material code 1000055-----& short text is --cement 53 grade.
then at the time of creating pr i can change the short text cement 53 grade to any off my choice.
logically this should not happend, as then their will not be any trace of PR in system.
pls let me know how to come out of this problems.
as we want that when ever we select the material from MM master, the system should make the short text grade out while creating the PR, so that further complication can be avoided.
thanks in adv
regards
pairkshithi manohar
this process does not work. beacause with this process the system disable the entire coloumn of short text in ME51N.
which is not our requirement.
the system should only grade out the material short text cell while we create the PR for material, so that one could not able to change the material short text which has come from MM master
is their any other solution for this.
regards
parikshit -
Copy Purchase Requisition - Material Short Text
When creating a new purchase requisition by copying an existing purchase requisition using the document overview in ME51N, the material short text is always copied from material master (makt-MAKTX) instead of the line item (eban-TXZ01) from the source purchase requisition.
Is there a way to set up copy control for short texts as there is for long texts ?
using ECC 6.0
thanks in advanceHello Thomas,
Unfortunately no, when you copy the PR from another PR the System redetermined some fields from the material master,these fields are :
Planned Delivery Time,
Unit of Measure,
Material Short Text
Goods Receipt Processing Time,
Material Category,
MRP Controller...
This system behaviour is intended since many companies more often change the data in the material master rather than copying a purchase requisition that contains changed material data.
Regards,
Mauro -
Sir,
i am facing a issue when we put material code & enter it it will pull data from material master.
but when you just put material code and dont enter it and write any short text it will not take from masters.
i want to restrict this
ply helphi,
> I strongly recommed you to not to change the field settings for the requirement....Because if you this, then you may face problem in near by future...
> For eg:
> If you wanna do procuement for consumables, then its necessary to use this field...at that time to can > face a problem...
For your requirement, i think you shd take the help of ABAP consultant...
This is because, you can ask the ABAP consultant to make the new field to enter the general text for the normal standard PO and even when you press enter this field will not affect...and don't make the above field as display...
Regards
Priyanka.P
hi Diptasya,
I think for consumable PO ie. with account assignment catagory, we can NB document type and Do use NBF indirectly i suppose....
Make me correct if anything wrong...
Regards
Priyanka.P
Edited by: Priyanka Paltanwale on Apr 21, 2009 10:53 AM -
Search help for Material long text ?
Hello,
A given material code MATNR is linked a material short text ( MAKT_MAKTG for example) which is on max 40 characters.
Where can i maintain the material long text ( around 100 characters) which is available in a search help in standard SAP ?
Note : in the material master data, i know the view Purchase order text, but is there any search help for this ?
Or do you have to develop an own search help ?
Thank you in advance,
IsabelleThank you Jürgen,
OK, i understand that a search help on long text is not a good idea
Nevertheless, 40 characters to name a material is too short for our users. Do you know any other text field that we can use ? because i imagine it is not possible to extend MAKTG to more that 40 char.
Our issue is that we upload our material data from some manufacturer material file, and their material description (even the one called " short text" is often more than 40 char.
Do you see any possible solution ?
Thank you,
Isabelle -
Short Text/Material Description in PRs and POs
Hi Freinds
My client has a requirement that except for Item cat. D for all others the text feild should be greyed out and Material no. is mandatory. How to go about in customising.
RegardsFirst you need to define Z* doc type & in the Allowed Item Categories only allow "D".
and create new field selection key and assign it to Z* doc type..
and for Standard Doc type in in the Allowed Item Categories remove "D", then Pls do as below
Spro>Materials Management>Purchasing>Purchase Order>Define Document Types
Here check the "Field Selection Key" against the PO doc type
(ex: Standard NB doc type the "Field Selection Key" would be "NBF")
Then go to
Spro>Materials Management>Purchasing>Purchase Order>Define Screen Layout at Document Level
Select the " Field Selection Key" of ur doc type..Just Double click on that
then click on "Basic Data, Item", there you can see the "Short text" field..
and make it Display.
You need to use Z* doc type for Services , there you can enter short text.
and for Standard the Short text will be in Display mode. -
Hello,
When I enter a material in the sales order it throws the following error:
Material ABCD is not defined for sales org XXXX, dist ch. YY, language EN
Please check whether
A short text with the appropriate language exists in the material master record (a short text must be available in the language of either the customer or the sales org)
I have entered the correct material and have maintained the material in the correct sales org, dist. ch. The problem is due to this short text in material master.
The question is where is this short text in the material master?
Thanks,
ShankarDear Shankar,
Please go to MM02 transaction enetr your material number then select the Basic data 1 view go in to that from here you click on Additional data Tab or Cntrl+F6 here you can maintaion the Language for that material under Discriptions tab.
Once again the check the material master is maintainig for sales org XXXX, dist ch. YY or not.
I hope it will help you,
Regards,
Murali. -
Avoid users can change Short Text of Material Id in Purchase Requisitions
Hi
We have a problem with purchase requisitions.
Users create a purchase requisition. In the field material, type the ID of the Material but then, change the description in Short Text, for example Material 1000 is a Bearing, and the user can change this description for Nut for example, causing problems and confusion in the following steps.
We want that if the user use Material ID can´t change the Short Text
Thank You very much
SergioHi,
You can control this via tcode OLME. go to Purchase Requisitions and then 'Define Screen Layout at Document Level'. Select appropriate field selection key (NBB if using standard one), go to basic data, item and maintain required settings. -
Guideline for Using 40 Char in Short Text Field of Material Master
Dear Experts & Forum Members,
In MM01 while creating a Material Master record (spare part) we need to fill in Basic Data. It has a field known as "Short Text Field " This Field has limitation of 40 characters. This is the same field which has Searched associated with it. This description is what we see when we look for Stock Overview of Material in the Stores through MEMBER.
To use this 40 characters efficiently people usually come up with a guideline so that maximum and meaningful information crucial information for identification of spare part/material is VIEWED when we see it.
For example for an AC Motor the description may look like
*MOTOR AC SQ 100KW 1500 RPM 8P CLA FRXYZ
which describes AC Motor, Squirrel Cage Type, 100 KW, 1500 RPM, 8 Pole, Class A, Frame Size XYZ
Request the forum members to provide / share any guideline they might have come up with to use these 40 characters to describe different spare parts.
Thanks in advance for your help.
Regards
Vinay
Edited by: VINAY MAITHANI on Jul 15, 2010 6:51 PMHi Vinay,
We are also doing the same activity and we are arranging the material description in a manner which is almost simlar to you.
But, except one thing which is Classification. We have classification feature mapped with material master for the details of Dimension,Brand,Color and Orgin.
For further commets, rever back.
Regards,
NAK
Edited by: abdul kader on Jul 28, 2010 9:36 AM
Edited by: abdul kader on Jul 28, 2010 9:38 AM -
Difference betwen short text and long text
Hi,
what is the difference between short text, long text and variant.Hi,
Short text is the short description you give for an object or field simlarly long text is the long description for a object or field.
Short text cannot have lenght more than 20 and long text more than 60.
Variant means for example if you give certain values as an input in one of your transaction for testing and you want the same values to be used every time you test in that particular screen, then instead of inputting the values again n again you call the variant.
Hope this helps
Assign points if useful
Regards,
venkat -
Message ME095 No short text is mantained, update material master
Hi,
While creatin a Preq in ME51N I'm Getting an error message if I log on in Spanish saying there is no short text for that material in Language ES; mantain material master and the error message is ME095 but I'm sure that I already mantaines correctly in MM02 this material, and I don't get this error if create the Preq logged in English.
Any ideas?
ThanksHi,.
GO to MM02 -> Basic view --> additional data --> desctription language .
set the EN & enter.
Save. After that error won't come for this.
SAM
Edited by: Saminathan Gopalan on Jul 28, 2010 10:04 AM -
No short text maintained in language ZH (please re-maintain material)
Hi,
I was trying to create a PO for the material that I have created, however, system prompted that "no short text maintained in language ZH (please re-maintain material" error. Please advise us on how to resolve the error.Dear Jacqline,
This message is because you have not maintain the language ZH in material master
Step 1: Go to Tr. code: MM02, enter your material and select few Views and inter
Step 2: Click the Additional data field top above
step 3: Maintail the language ZH and material desciption and save it
Youe Query will resolve -
How can I avoid the modification of short text of a Material ?
Hello Experts, I want to prevent the situation in which the user choose a Material number when creates a Purchase Requisition (ME51N) and the system uses the Material Master description. But before save this document, the user change the short text of the material. This cause a lot of confusion on purchasing department. I would like to have this field as only display screen layout, but the issue here is that we need to procure another materials without material master number.
Any Suggestions?Hi,
You can use Version Management for Purchase Requisitions to avoid Changes.
You can set the fields for Version Managemnt. Such that if any user changes the relevent field it will ask reason for change and Modifier.
There is one more option called Copying rules for Purchase orders. Plz have a look in it.
Reg,
Ashok
Rewards welcome. -
Please specify short text more precisely
Hello All
when i create a free text sc and reffered a material group GOA item text are same.
sc description text = goa item text same (product category GOA)
i get this error "Please specify short text more precisely" while creating a PO (classic)
SAP options to make error message to warning message in ECC Version = 00
Appl.A = 06
No. = 474
Cat = W
what are the business impacts will be there if i make E to W.
Br
muthuHi
06474 is a MM-PUR error . It will also have effection to MM prochase order process.
Error message 06 474 with item category W and M contracts occurs if the
material on the PO has the same short description (text) as a non-stock
item from the referring contract.
If you change the description of your short text on the PO item (ex.
text1) or you insert a material master with a description the error
message will not appear.
The error message that is generated is part of standard functionality.
It is designed to prevent you from having a duplicate material.
LMEPOF2B
IF ekpo-ematn IS INITIAL. "371796
IF ekpo-txz01 NE space AND ekpo-konnr NE space AND
ekpo-txz01 EQ kekpo-txz01 AND
( kekpo-pstyp EQ pstyp-munb OR kekpo-pstyp EQ pstyp-wagr ).
PERFORM enaco_2(sapfmmex) USING '06' '474'. "371796
mmpur_metafield mmmfd_short_text. "431879
CASE sy-subrc. "371796
WHEN 1. "371796
MESSAGE w474 INTO gl_dummy. "371796
mmpur_message 'W' '06' '474' '' '' '' ''. "371796
WHEN 2. "371796
MESSAGE e474. "specify the short description of the item
WHEN 3. "< message not customized "371796
MESSAGE e474. "371796
ENDCASE. "371796
ENDIF.
ENDIF. "371796
The code listed above is where the error is generated. When there is no
material master (EKPO-EMATN) and the short text on the PO (EKPO-TXZ01)
is the same as the short text on the contract (KEKPO-TXZ01) and the
contract is item category M (PSTYP-MUNB) or W (PSTYP-WAGR) then the
error is generated.
You can set the message to 'W' in SPRO t-code:
SPRO > Materials Management > Purchasing > Environment Data >
Define Attributes of System Messages
I hope this information will help you. -
Short text vs contract item text-Please specify short text more precisely
Hello all
1. creating free text PO w.r.t material group for reference to material group contract
2. miselanious - SHORT TEXT vs Contract MATERIAL group miselanious SHORT TEXT are same
now i get error Please specify short text more precisely
Why SAP set as E . if i make W . what are the impacts.
-> Purchasing
-> Environment Data
-> Define Attributes of System Messages
-> System messages (double click on it)
Add a new entry
Version = 00
Appl.A = 06
No. = 474
Cat = E
if i set W , i could create PO successfully. ..
Why SAP KEPT ERROR for this matter?
thanks
MuthuThanks Jurgen
Note 371796 - Msg 06474: Please specify short text more precisely
ME21N, ME22N, ME23N
Message 06474: "Please specify short text more precisely" for a purchase order with reference to a material group contract.
Additional key words
ME21, ME22, material description
Cause and prerequisites
In the new transactions for the purchase order, the system displays the message for a material group contract with reference, which is correct, if there is an assigned material without a material number and the short text, which was copied to the purchase order from the contract to help you, was not changed to the actual material text. In this case, the short text of the material should be more specific in the purchase order than that for the material group in the contract.
For situations in which the specification of the purchase order text does not need to be checked, the message could be made adjustable in Customizing.
In Transaction ME21 and ME22, the text is not copied and must be entered manually. However the system then no longer carries out a check.
Solution
For situations in which the specification of the purchase order text for contracts with the item category material group should not be checked, this note enables you to set error message 06474 in Customizing.
See the advance corrections.
any impacts what itcause damage to business.
bullet points. i will freeze the thread.
Muthu
Maybe you are looking for
-
WLM Not playing videos, says I need Flash, but I have it installed
Okay, I originally had a topic going in Microsoft Tech Support, and was told to come here, so I'll copy my original post there. Which version of Windows Live Messenger are you using ? Version 2011 (15.4.3538.513) Choose your Operating System version
-
Subcontracting: Act as vendor
Hi all, everything I find in documentation and forum about subcontracting is if a company gives something out for subcontracting. But how is the process in SAP if we get a material from a customer, add some components (with a process order) and then
-
How to upgrade Robohelp X5 to Robohelp 7 (or some later version)?
(Searched the forum but didn't find an answer. I apologize if it has been covered already.) We've been using Robohelp X5 and are now considering an upgrade due to the incompatibility with current versions of MS Word. On Adobe's product page there see
-
ACE: ifmgr process spiking every 15 seconds
The following output is the command sh proc cpu | i ifmgr run every second for 1 minute. 896 6154 1923109 3 0.0 0.0 % 7.20% 7.54% ifmgr 896 6648 1923494 3 0.0 22.55% 8.43% 7.79% ifmgr 896 6648 1923494 3 0.0 22.55% 8.43% 7.79% ifmgr 896 6648 1923494 3
-
Hi, Where i can find SP16 Theme Editor and Themes. I couldn't found SAP Note 854870 which is suppose to have link to downlod Theme Editor for different SP. Thanks Rahul