Material Staging for manufactoring order

Dear experts,
I have following scenario:
The Source - Storage and the Production Supply Area are assigned to the same Storage Location.
When performing material staging  for an manufacturing order, how can I AVOID that the stoch in the PSA will be considered as availible stock?
Thank you very much in advance.
BR
Denis

Dear Freddy,
It is the standard SAP behaviour,if already reservation exists for the same material and same storage location the system will
not propose anything to stage,instead I would suggest you to mention some other differents torage location for the second
production order for the same component and then check what is the result in MF60.
Either you clear the existing stock transfer reservation or else meniton a different storage location for the second order and
check.
Check and revert back with your findings.
Regards
Mangalraj.S

Similar Messages

  • Automate WM material staging for release order parts.

    Hi all,
    We use LP12 for monitoring WM Material Staging of Release Order parts.Is there a way to automate the process of WM Material Staging for Release Order parts?
    Is there is any Standard SAP Program which can be run in the background or user exit to achieve this?
    Pl suggest
    Regards
    SB

    Hi Arunachalam,
    You can configure WM staging settings in Production Scheduling Profile (OPKP)
    You need to update WM Request field and the available options are:
         No creation of transfer requirements on order release
    X   Only creation of transfer requirements on release
    1   Transfer requirement and transfer order on release
    Hope this will solve your problem.
    Please check and Revert.
    Regards
    Suri

  • Material staging for process order

    Dear All,
    Can we use material staging for process orders.
    If possible pls brief the procedure.
    Subbu.

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • Material staging for production orders- NO TR

    Dear Experts,
    I have created a Planned Order for which Component materials are to be supllied.
    I am not able to see the Transfer request for the same.
    Kindly help.
    Please also let me know if there are any configurations for this?
    regards,
    Shetty

    Any suggestions pls?

  • Material Staging for Pick part from MF60

    Hi,
    I would like to do material staging for a Pick part from MF60.
    During staging I get the error as
    WM material staging for production order reservation not possible
    Message no. RMPU311
    Kindly can you tell me how is it possible to perform tthis action using MF60.
    Using LP10 I am able to perform this staging for pick part. But Business requires to perform if from MF60.
    Thank You

    HI,
    It is possible to do staging for pick parts using MF60.
    I am setting up this for a plant, and the existing plants are able to do staging with MF60 for Pick Parts.
    Do you know the configuration that are required for doing staging using Pull List..

  • In DP50 Error during material determination for service order

    Hi,
    While doing Resources-Related Billing request,the following error is displaying..
    Kindly Help
    Error during material determination for service order
    Message no. AD01156
    Diagnosis
    An error occured during material determination for a dynamic item.
    System Response
    The system cannot perform the function.
    Procedure
    Check in the profile being used whether its characteristic allows the assignment of a material to each dynamic item.
    501384
    Message no. AD01156
    Diagnosis
    An error occured during material determination for a dynamic item.
    System Response
    The system cannot perform the function.
    Procedure
    Check in the profile being used whether its characteristic allows the assignment of a material to each dynamic item.
    Thanks,
    Mohit

    Hi mohit,
    You need to check DIP profile setting if profile is attached to your order type or not please check this
    Thanks and regards
    Sachin Kadam

  • WM staging for Prod Order

    Hi,
    Gurus,
    Can any1 explain me how to do WM staging for Production order?
    From , Co02 menu, I selected WM staging fro Menu List. After that I gave quantity for BOm matrerial. is it the correct way?

    Denish,
    You would need WM relevant components in production order inorder to get this activated. It will work if WM is active for the component materials.
    Hope this helps give you an insight.
    Thanks,
    Ram

  • Material staging during Process Order..TR issue

    Hello,
    For creating a TO I am going to transaction LB13 for a Process Order but I am not able to see the TR.
    When I went in the Process Order and manually clicked WM staging I found that there is an error as mentioned below. The problem is it is an issue for only some Process Order as most of the other Process Orders are getting the WM staging(TR created automatically) and I can see in the LB13.
    Can you tell me based on the error what the issue would be.
    Is it something to do with the config in Production Scheduler Profile for TR creation?
    No picking request was generated for operation 0020 due to incompleteness
    Message no. LP133
    Diagnosis
    The pick requirement created for the pick parts ( material staging indicator "1") is incomplete. Errors occurred while the system was staging goods for WM. Therefore, the system could not convert all the relevant components into pick requirements. For this reason, no pick requests were created since material staging of only part of the components would cause problems in production.
    Let me know ASAP
    Thanks
    SAP Fans...

    Hi,
    For the operation 0020 check what is the resource used. Now check what is the supply area you have maintained for that resource or in material master.
    use transaction LPK3 and check out the control cycle set-up. the staging indicator should be 1.
    Also check the component screen of the process order and make sure the storage location is the same that is used in production supply area.
    Also make sure the material has been correctly assigned to that operation for which you are getting issue.
    Once you do these changes....you might have to create a new order to test this.
    Try and revert back.
    Swapnil

  • Material Staging against planned order

    Hi Gurus,
    We are using mf60 material staging issue material to production storage location against planned order.
    If we select particular planned order to issue the material through MF60 material staging which is issuing correctly. But when if we select other planned order to issue material and for common material system considering the stock laying at production location and netting off further not showing for staging which is incorrect the material which is already issued is reserved for some other planned order.
    please advice..
    Regards
    cs

    Hi,
    In planned order bom, materials are under dependent requirement, and not in reservation.
    Unless you convert it to production order, the dependent requirement will not be converted to reservation.
    I think its okay,
    If you have any special stock indicator for this then it will not consider the stock,
    Regards
    Raghu

  • Material Code for Process Order Settlement document

    HI,
    When Process Order to a material having Standard Price is settled, the following entry is passed.
    Inventory Change A/C Debit/Credit
    Price difference A/C Debit/Credit
    It is being obeserved that in the line item of FI document for the Inventory Change the material code appears in the Price difference line items whereas for Inventory Change line item the material code does not appear.
    I want to know why this happens ?
    Regards
    Partha

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • Material block for sales orders

    Hello, people.
    How can I block a given material only for inputting sales orders?
    Regards,
    Adriano Cardoso

    hi 
    with reference to question i wil tel u exact answer.
    step1:  goto MM02->
    enter material  -> goto SALES ORG1 tab  , in this u have the option called  DCHAIN SPECIFICATION STATUS filed --- select the option   " sales not allowed".
    save the material.
    step2:  goto  img screen
    logistic general->material master->setting for key field->data relevant for SD->define sales status
    goto order option  select B-error.
    any doubt please reply i wil tel u
    regards
    murali
    Note:  without solving ur answer donot select option like my question is solved option.

  • Material Posting for Refurbishment order

    Hii MM Gurus,
    I am going to take external service for making repair of the pump. For repair i am going to send pump & some bearing out for repair of the pump. I am following the process as follows which is out of SAP (Not yet configured). The process is as
    1. I make refurbishment order for pump & also assign other material.
    2. I make goods issue from store  on order & then sends goods to supplier.
    3. I am making issue to order but the next operation that is sending material to vendor after goods issue is out of sytsem as for doing 541 material should be in stock & i have already posted it on order.
    So what should i follows or how i should post the material sothat it will get issue to order & also post the movements sothat it will allow me to send it out to vendor?
    What process i should follow sothat i can show the material is received from vendor & then Repaired pump is available in store for use?
    Regards
    Makarand

    I am using IW81 for creation of refurbishment order.
    IW32 to change order for updating other material & external service so that PR should get generated.
    Then I am using MIGO for issue of goods to order sothat i can show consumption of material for the order.
    We are making PO from PR generated.
    Then i am sending material out for repair to supplier on some mannual challan no SAP movement is posted after above MIGO.
    Then we receive the material from supplier this is also manual process.
    then we do IW8W to return the Pump to store with some other Valuation type say C2.
    But when we are sending material out to supplier for repair we cannot having accountability of material through SAP as it is not having any posting through SAP.
    Pl guide I want to show that the material is first issued to order then it sent out against the PM order out to vendor for repair.
    By PM module it is possible with User status to show the equipment or serial number is at vendor but how to show it through MM.
    Regards

Maybe you are looking for

  • Extended Withholding Tax Configuration for USA

    Hi Friends, Any one of you upgraded from Classic to Extended Withholding Tax for USA? Could you give me a head start or if possible send me configuration docs. We are currently in ECC 6.0. Also how do you configure withholding tax for Foreign Vendors

  • Enhancement at Purchase Order

    Hi, I need some help regarding User Exit. For the shake of development, A ZTable will be poped up when user will click on the Explode BOM icon for sub-contracting P.O. User will select some data from that ZTable and Explode BOM Screen will be populat

  • Checksum

    Hi All, *smspdu:ch,ix,sts,len,pdu,csum ch - GSM module number ix - index number of saved SMS message 0..255 sts - status of SMS Message len - length of SMS Message pdu - content message in PDU format csum - Checksum of all PDU bytes (2 hexa digits) c

  • No Firewire 400 on the new Mac Pro's

    So anyone out there have experience using Firewire 400 to 800 cables with audio interfaces? Are there any known performance issues?

  • IPad NOTES app crashing since 7.0.1 update

    I updated my iPad to iOS 7.0.1 yesterday, and am finding that the Notes app crashes every time I try to update certain notes that I created today on my iPad 3.  I use Notes more than a few times a day, and have over 700 notes in one notepad which con