Material to be packed in HUM

Hi All,
I am creating in handling unit in HU02. I am able to create handling unit successfully but the thing is after creating HU material still existing in Material to be packed though I created HU for the respective material.
Please find the screen shot of HU. As per my under standing material has to removed after creating HU for the material full quantity.
Regards,
Chand

Hi Sridhar,
In our process we are not using WM. My basic question is after creating HU material still exists in the 'Material to be packed ' level.
Is it standard process?
why because when I select the material line item again and click on PACK icon the system is giving proper message as "material quantity is to be packed is Zero" and only empty HU is creating.
Please let me know is it standard process.
Regards,
Chand

Similar Messages

  • Material to be packed is not copied into packing screen

    Hi Gurus,
    In delivery packing screen material to be packed area ( bellow screen) material ( original line item)  is not automatically displayed.
    so user unable to select the material to pack with packing material.
    I checked material groups, material types, all assigned correctly.
    Is i misssed any area to check, pls let me know how to solve this.
    Thanks in advance
    arshad

    Hello Nisha Sarma,
    I have checked all the above settings which you have mentioned.
    All are perfectly maintained.
    Still I am not getting material to be packed on the screen.
    do I need to check any other thing? Please reply
    Arshad

  • Material master for packing materials for based on customers

    Dear all,
           can any one tell me how to maintain material master for packing materials based on customers to whom finished goods r supplied.
    Regrds
    harish

    Hi Harish,
    Option : 1
    Create your packing (VERP) material as per the Customer.
    E.g.
    Packing material   Product   Customer
    200000000            ABC         XYZ
    200000001            ABC         YZX
    200000002            ABC         XZY
    200000003            BCD         XYZ
    200000004            BCD         YZX
    200000005            BCD         XZY
    Option : 2
    If you are batch managed then and then only this option will work.
    Create Characteristic "Customer"
    - Assign it a Batch Class (023)
    - Assign this batch class to the material
    - Now as and when any transaction will be done on this material, you can apply the relevant customer to the batch and separate that particular by customer.
    Regards,
    Shyamal

  • No item generated for packaging material in delivery - packing (how?)

    Hi all,
    I am trying to customize packing for deliveries. I would like to have the packaging material as a line item in the delivery. I know this is possible but I can't seem to make it happen.
    I have already ticked "Gen. pack.matl item" in my delivery type. Also, I have selected in the packaging type "B Item generation in first packed delivery" for "generatedlvItms" option.
    Now, in the delivery after I packed the items, no line item was generated in the delivery for the packaging material. The "No. of Packages" in item overview is correct and the status is "C" completely packed. Btw, I am using manual packing here.
    Is there some more configurations I missed here?
    Thanks in advance for all your help.
    Edited by: Ritchie Caleb Chua on Aug 9, 2011 3:53 AM

    I assume that your basic HU configuration and master data have to be ok because you are able to pack your goods.
    1) Are you able to add your item w/o HUM (=not by creating a HU, just adding the material as a simple item) to the delivery? /For this you need define a record in T184L (where usage "PACK" is not there)/.
    If you are able it means that e.g. your delivery copy control settings are ok (V_TVCPLAK; delivery type: LF and sales doc type: DL --> HUPM/DLN item categories in your case)
    2) If you are able to
    - create the handling unit manually in the delivery
    - add the packing item to the delivery (w/o HUM) and also have the T184L with usage "PACK"
    - item generation is maintained for your packing material time "A" or "B" in field V_TVTY-KZPGN
    - plant determination for packing material type ("A" or "B" in field V_TVTY-WERFD)
    it should work in my opinion (for delivery type LF).
    Edited by: Csaba Szommer on Aug 9, 2011 1:37 PM

  • Ordering more than one material from Vendor in a group or packs.

    Hi All,
    We are into Apparel business and we have a business scenario in PTO (Purchase to Order) ,, where the customer places order for more than one finish product in a packed condition - means more than one material to be packed as a single PACK and to be delivered to him.
    We take the order and transfer the order to our vendor who will directly  delivers it to customer.
    My requirement is - is there a method in the PO where we can mention to the vendor that item 1 & 2 as single pack , 4 & 5 in a seperate pack , we do not want to mention to the vendor in the header text or item text.
    Can some one provide me a solution.
    Thanks,
    Vengal Rao.

    Hi,
    You please create IDOC for this additional information and sent it to him. There is a alternative way to in clude in footer text of document by changing in the smart form. But every time mentioning like this is not recommendable and looks not nice. Footer text generally ment for address. I hope this will resolve your issue. Thanking you.

  • Packing material consumsion

    Hi ,
    I am doing packing at the time of delivery. When i do PGI the packing material stock is not reduce. if the packing material is not present it also not giving any error.When I checking the Handling Unit " status " tab it is showing the field " HU storage location " is showing "Handling unit without inventory management".
    That field is non editable . But i also want the inventory of the packing material .
    Guide me . Where is the setting for that .
    Thanks In Advance .
    Regards,
    Abhijit ...............

    Dear Abhijit
    For Packing materials, you need to ensure certain criterias. 
    Please check the following:-
    1)  Go to *VHAR,* you create the packing material type say carton
    2)  In IMG -- Logistics-Execution --> Shipping --> Packing --> Define Material Group for Packaging Material.  Here create a group, say PACK
    3)  Choose the next- Define Allowed Packaging Materials.  Here for Material Group PACK, assign carton (as stated in point 1)
    4)  Now create packing material in material master with type VERP and also Item Category Group VERP.
    5)  In Sales: General/Plant tab, you need to maintain the following
                 a)  for Matl Grp Pack.Matls   as PACK
                 b)  Packaging mat. type        as Carton
                 c)  Allowed Pkg weight
    Save the master.  Now while creating delivery, after selecting Goto -- Pack, ensure that you block both the "Pack material" and "Material to be Packed".  Once you do this, click on "Pack" which is above Material to be packed (left top).  Once clicked the pack button, system will show a message material packed.  Now select "Back" button so that you will come to the main screen of delivery.
    Now do pgi and check the stock of packing material.  The stock will get reduced to the extent of you posted goods issue.
    thanks
    G. Lakshmipathi

  • Packing how do u configure in sap for any material

    Pls let me know
    1.The process of packing for any material in sap
    2.If a project is going live on 1/06/07 and if delivery , billing takes place in the legacy system on 30 and 31/05/07 how do u activiate it in the prod system
    3.what is the exact role of migo and miro process in third party sales

    Process of packing
    Path: IMGLogestics executionshipping--packing
    1)  Define Number ranges for Handling Units
         Here we define the number ranges for packing the units.
    2) Packing control by item categories:
        Here we define if the items categories that we use can be packed or not.
    3) Define requirements for Packing in the delivery
        Here the requirement for packing is set. We are using std requirement. We can create our own requirement for example saying that the packing is not possible if credit block exists.
    4) Define packing materials
    Here we define the packing materials that we use. the material master for  materials must be created and the material type is VERP. In the sales: general/ plant view in packing material data the corresponding packing material has to be enterd in the packing material type field. Ex: you create packing material Z003 and call it wooden box, then you must enter Z003 in the material masters sales: general plant view in the packing material type field.
    5) Define material group for packing material
    This group has to be mentioned in the material master of all the materials that have to be packed. Ex You define a material group grp1, then you must mention this in the material master sales: general plant view in the packing mat grp pack matls field.
    6) Define Allowed Packaging Materials
    Here we define all the materials that are allowed for packing along with the respective mat group. Ex: You have created three packing materials (step 4)
    a) z001: Plastic trays
    b) z002: corrugated box
    c) z003: wooden box
    you have also created a packing material group grp1 (step 5)
    Now you must assign z001, z002, and z003 to the packing group grp1

  • How to pack material (linked to a delivery) with BAPI_SHIPMENT_CHANGE ?

    Hello All,
    i would like to pack material into Handling Unit with the BAPI_SHIPMENT_CHANGE like in transaction VT02N
    i have created my shipment with BAPi_SHIPMENT_CREATE  : i see material with delivery reference in part of screen
    "Material to ba packed" and my Handling Unit in part of screen "All existing Hus available for packing".
    i want to pack the material into the Handling Unit but i don't know how to fill BAPI_SHIPMENT_CHANGE to pack the material.
    is it possible with this bapi ?
    Thanks a lot for your answers
    Regards,
    My

    Hello
    i think i make a mistake when i fill the tables :
    i 'm going to try again but with which values have i to fill the actions table ? (i think i have to fill alsot these two tables :
    IT_HUN_HDR_ACTION
    IT_HUN_ITM_ACTION  
    and i don't understand the difference between these fields in table HDUNITEM ?
    HDL_UNIT_INTO and HDL_UNIT_NO
    HDL_UNIT_EXID_INTO and HDL_UNIT_EXID ?
    i don't find a field like VEPO-VEPOS  in table HDUNITEM  ?
    Thanks a lot
    Regards,
    MY
    Edited by: MY on May 7, 2010 12:29 PM
    Edited by: MY on May 7, 2010 12:31 PM

  • Packing Material Functionality

    Dear All,
    Description of Scenario:
    I have BOM for FG(Finished Goods) with RM(Raw material) and PM(Packing Material), where Packing Material Being BOX.
    In BOX we can pack 15 nos of FG, thus in BOM the quantity of BOX would be (1/15 = 0.067) to manufacture 1 nos of FG
    But the production is not fixed to manufacture for 15 nos always, they can manufacture 5nos n pack in ONE BOX, thus when I do my receipt from production BOX consumed would be (5/15 = 0.333) wherein it supposed to be consumed ONE BOX.
    How can I tackle this scenario.
    Thanks in Advance.
    Regards.

    Hi,
    We created a FMS which is working as we required.
    Thanks Again.
    Regards,

  • Can't create Inbound Delivery for PO with Packing type material  -- HU

    Hi friends,
    I create a new packing material, and maintain packing material type. And then create a PO but I can't create an inbound delivery by VL31N.
    The error message:
    No item category exists (Table T184L EL VERP V )
    Message no. VL320
    Diagnosis
    There is no item category available in item category determination in the delivery (table T184L) for the following entries: EL VERP V
    I tried to add new item by SM30 with T184L, but still more errors. So it doesn't mean there are erros with delievery type determination.
    Any help?
    Thanks,
    Bruce
    Edited by: Bruce Hu on Jan 10, 2008 7:53 AM

    Hi Anil,
    Welcome to SCN for your first post. Did you check with your functional people about this.
    Regards,
    Madhu.

  • What next??  Delivery packed and HU created in VL02N - packing

    Dear Experts,
    My Storage Location is HU managed buth without WM
    Now, Created an Outbound delivery.
    Packing done using Pack option from VL02N. I created a Handling Unit by entering Packaging material and saved the Delivery.
    Please suggets me the what is the next step before I can make PGI?
    I found an error message when I tried to do PGI for Delivery ("No HUs have been transferred for material XXX YYY ZZZ)
    Please advise.
    Regards,
    Shetty123

    if the picking  storage location is HUM managed then it means the material there is already packed and is in form of HU.
    and when u are picking the goods from there i guess u r packing the material again by using the packaging material and the material to be packed and packing function in the Packing screen and then u just need to do PGI nothing else as I presume there is no Shipment doc
    It seems the packing has not done properly in ur case. r u sure that handling unit is created ?

  • Packing materials that are in batches

    Hi,
    This is Vikrant. I have created a delivery document that contains a material that is manufactured in batches. Now when I go for packing, the quanities to be packed apper batch wise. For example if the total quantity is 20000 but it is manufactured in 20 batches, then all those 20 batches apear to be packed that is I get 20 line items of the same material to be packed. Is there any way by which the only 1 line item that is the sum of all the 20 batches can be genrated, so that packing can be carried out more effieiently ?
    thanks for your help

    Hi Vikrant,
    Go to IMG - Logistics General - HUM - Delivery - Packing Control By Item Category . In that Check the indicator for Automatic Packing Control for Delivery Item category.
    Pack accumulated batches / movement type item
    Specifies if for a batch material only the main item with the accumulated batch quantity is to be packed in the delivery, or if only items in which the batch is recognized can be packed.
    If the field is not set to its initial value, only the main item will be packed.
    When this indicator is set, deliveries can be packed automatically, even if no automatic batch split occurred.
    If a storage location is HU-managed, that characteristic overrides this indicator. It is not possible to pack anything in the delivery regardless of its batch if handling-unit inventory management is in use.
    Awards Points if it useful
    Rgds
    Siva yepuri

  • Packing instructins not picked during Handling Units

    Hi all
    I had created the packing instructions with the packaging material and the material to be packed .
    when i tried to create the HUM's with reference to the packaging instructions the material to be packed is not getting picked .
    can some explain what could be the possible reasons .
    I simulation tab of the packing instructions the status of the packaging material is " ? "
    thanks ,
    ksr

    Hi Vishal ,
    thanks for the reply .
    the steps i followed are
    1) created packaging instructions using POP1 for a material .
    2)  Maintained POF1 - Create Packing Instruction Determination Record during this i checked and able to see the packaging instructions assigned to it too  for STOC .
    3)  Non-Assigned Packing profile with STOC condition type exists .
    still i am not able to pick the automatic packing instructions while using HU02 .
    please correct me if i am wrong somewhere .
    thanks ,
    ksr

  • Packing is not done

    Dear Friends,
    I am not able to do the packing. I have configured the Packaging Material as CARTON and I have given VERP as packaging type. I did not do anything in the Material Master of 1482 which is to be packed. I have configured  the  HU also. In VL01N  I have gone to Packing and then made two Packets. But after that when I am clicking to create HU, it is giving error message :
    "No material to be packed found, or quantity to be packed equals zero
    Message no. VHUPD026
    Diagnosis
    No HU proposal could be created, as no material to be packed was entered.
    Procedure
    Specify a material and quantity to be packed."
    And the material and my Pacage Materials are all vanished.
    Is there any other configuration to be done or what is the mistake.
    Please guide me.
    Thanks,
    Jans

    Hi Reazuddin,
    Thank you for your reply. I have configured whatever you have suggested including output determination procedure in the shipping. Even then I am not able to pack the material.
    Hi Balajia,
    I did not understand what you mean by "have you configured HUM or not.".  I have configured for the Mannual Handling Unit so that I can pack the material at the time of delivery. Please guide me if any other configuration steps are there or not. I got this guidance from the past thread of this Forum. I did not understand the "because you are using multi level pacing.". What is multi level Pacing?
    As far as the OSS note number 420184 is concerned I could not understand the solution.
    Please guide me how to solve this.
    Thanks,
    Jans

  • Regarding- Packing Line Item Not Displayed in the Delivery Document.

    Hi,
    I have 2 queries
    1) Have  created separate Material Type Packaging for my packing material and the item category group used is VERP, my Orginal Material is getting packed in the Delivery Document, however the packed item is not coming as a separate line item in the Delivery document, I have maintained the item category settings for the Delivery Packing Material and also the packing Material contains stock,
    2) The Plant and Storage Location for my handling unit need to get defaulted autmatically in the delivery document what settings should I configure for the same.
    Kind Regards
    Atul Keshav

    Hi,
       Find the below threads, which is explained in context with returnable packaging, same will be useful for you.
    [Re: returnable packaging]
    [Returnable packaging process;
    Regards,
    Reazuddin MD

Maybe you are looking for

  • No startup after update from 10.6.3. to 10.6.8

    Hey there, I started with the 10.5.8 system combined with an bootcamp installation of WIN 7 and installed a complete clean (formated whole disk with help of boot-DVD in front of installation) Mac OS X 10.6.3 system. After installation it works fine.

  • PI 7.1 to Sharepoint 2010

    Hi Experts, we have a requirement where we need to connect to sharepoint through PI and save documents there. sharepoint had provided the webservice and we consumed it in PI. here i am getting the unauthorized error while testing in runtime. i can up

  • BBM Group Chat Question

    BBM group chat question - from time to time, additional chats show up in our group that have no messages in them. When someone posts in one, the whole group sees it and the admins can delete it, but otherwise they tend to be localized to one or two m

  • JAXB:  NPE on high load in Coordinator.java:112

    Hello, I'm using JAXB 2.0 and when running high load tests I get NPE. In my code I have a static marshaller (initialized in a static initializer) and the method which makes use of it is synchronized. Once every few (~10) invocations of my method I ge

  • How to prevent problematic charaters in file names

    I'm working in a network where I often have to exchange files with PCs and web designers. Often, I have found out that the use of accented letters and even punctations like the slash in file names can lead to much problems when sharing or backing up