Dear experts,
I have run into a business process that I cannot find a good solution in SAP for, it's regarding the following flow:
1. We have a return receipt on a material A (this is an assembled item that consists of e.g. B, C & D)
2. After return it turns out that component D has not been returned
3. The stock needs to be adjusted in order to reflect this (Remove article A from stock and add B & C to stock)
4. The preferred solution direction would be similar to the 309 movement type (which does not work)
5. Our customer wants a very easy solution (because the work volume is quite high)
I'd appreciate your input on solving this issue,
Thanks, Mark

HI
First thing you want return stock to whom and from where means you want return to vendor or else?
second you are saying 309 not working can you explain which problem you are getting for same?
309 is material to material transfer and prerequisite for same is
1) Both material should have same base unit of measure ( material D and can say material X)
2) you can transfer from unrestricted stock to unrestricted stock only in this 309 movement type
Regards
Kailas Ugale
Edited by: kailasugale on Dec 13, 2011 9:45 AM

Similar Messages

  • SAP SCM Upgrade to 5.0, Material Master Initial Transfer Issue

    Dear Folks,
    We are doing an upgrade to SCM 5.0 for a client and are facing the issue of material master initial transfer. The changes to exising material like Proc type etc. travel seamlessly but while we try to create a new material in R/3 and transfer it to APO or if we delete an existing product in APO and re-transfer the material from R/3, it simply doesn't happen. We donot get any kind of errors also. We have tried various suggestions and solutions but all have failed. To summarize the activites that we have done to check the issue, please see the track below.
    Action                                                              Observation
    1. Observed queue blocks on R/3 and APO sides:            No blocks.
    2. “Important” logs on R/3 as well as APO side:                No error logs on CIF observed.
    3. Check material master data fields in R/3 relevant and necessary for APO: Done
    4. Check the APOKZ flag in MARC Table:                        Done
    5. Check OSS relevant notes for the issue:                      Done
    6. Check CIFMAT and MATLOC tables in APO:                Done
    7. Check the TRFCQIN and TRFCQOUT tables in APO     Done; nothing relevant to CIF observed.
    8. Debug CIF and find the issue                                       No breakthrough.
    9. Check location and location pre-requisites for CIF         Done
    Now we have raised OSS notes to SAP and are awaiting a solution.
    I request all Gurus to pitch-in and suggest possible issue here and perhaps a solution too. I am very hopeful that some one might have faced similar issue and have found a solution to the same.
    Warm Regards,
    Chandra

    This required packaging materials to be CIFed first before transferring the other materials. Issue resolved, SAP issues a note on this.

  • Change of material master during transfer between SRM and R/3

    Hi,
    I have a question for modifying material master data between R/3 and SRM.
    I would like to know if it is possible to change the material number during the transfer. The reason is:
    I have 2 R/3 backends and 1 SRM system. The material codes in the 2 R/3 systems are different but some materials having different numbers in R/3 are referring to the same material. I want to see such materials with the same material number. Is it possible to do this with Middleware plus some interruption in between? The "translation" should be bi-directional.
    Thanks

    Hi,
      No probs if the field is not replicated.No idea how to bring that through replication though.
      Coming to the Product Search...Although the number of such materials is less...You will have to modify the Product search which will take care of the  display of other products as well.
      The Std product search(<b>bbph_product</b>) uses the the search help exit "<b>BBP_F4IF_SHLP_EXIT_PRODUCT_GEN</b>".So you need to replace this one with your custom FM.
      In your custom FM,you will have to check for the HARMINIZED code field for all such materials and accordingly while selecting the Material select the HARMONIZED code as the Material number and in the Product search display that HARMONIZED code as the "PRODUCT ID". Also,you  will have to develop RFC enabled FM which will actually fetch all the Materials from the BAckend at runtime. Also are you displaying the Product List Plantwise?
      Pls give me ur mail ID where i can mail you the  sample code.
    BR,
    Disha.
    Pls reward points for helpful answers.

  • Non-SAP to SAP Material Master Data Transfer

    Hi Experts,
    Please indicate any standard tools in SAP and how to use it wherein we can migrate non-SAP material master data to SAP.
    Points will be awarded.
    Regards,
    LM

    Hello Leo,
    There are a number of options to do this. You can use the standard SAP tool named LSMW - Legacy System Migration Workbench (transaction LSMW) as a starting point.
    Also please read this [Documentation|http://help.sap.com/saphelp_47x200/helpdata/en/0d/414538bc0fe927e10000009b38f8cf/frameset.htm] before undertaking the data migration activity via LSMW.
    Additionally, there is also a Direct Input program available named RMDATIND - please go through the program documentation before you use it. You can use this program to transfer material master data to SAP but
    make sure you assign this program through LSMW for mapping structures etc. The internet link above will give
    more details and step-by-step instructions to follow.
    Hope this helps,
    Cheers,
    Sougata.
    p.s. It is sad to see useful answers remain unrewarded such as this one!
    Edited by: Sougata Chatterjee on May 9, 2008 10:13 PM

  • Material and vendor transfer to GTS sytem

    I am using GTS 8.0. We have a very peculiar issue. Newly cretaed vendor & material doesnot get transferred to GTS. Please provide the step by step configuration settings to transfer material and vendor master to GTS using rbdmidoc.eg. change pointers activation, message type, reduced message type, Distribution model, Idoc partner profile

    In Transaction BD60, make sure that the Function Module /SAPSLL/CREMAS_DISTRIBUTE_R3 is assigned for Message Type /SAPSLL/CREMAS_SLL.  And in Transaction BD52 for that Message Type, make sure that fieldname 'KEY' is assigned for table LFA1, object KRED.
    If those settings are already correct, then try to check whether the Change Pointer record is not being created, or if the CP record is not being sent to GTS.  To do that; for a new Vendor not received in GTS, check for a corresponding entries in tables BDCP / BDCPV.
    And of course, check for log entries in GTS (System Monitoring > Transfer Logs > Business Partners), and also check in SM58 for any RFC failures.
    Hope that helps.
    Regards,
    Dave

  • Material to Materials conversions

    Dear Team,
    Client is procuring a material in a set.  That comprises of some child
    components.  PR/PO/GRN will be done for the main parent material.  On
    some occassions the Goods Issue will be done for the parent material as
    a set and other occassions the parent material will be split into child
    components.  Then goods issue will be done for child components. 
    Presently material to material conversion is possible only for one to
    one relation ship.  How to break a main material in to child materials
    with one to many relationship.
    Regards,

    The scenario is like procuring a KIT and split it into components. There is no standard SAP solution for this.
    There is a related thread. Have a look : [KIT purchase and stock updation of individual components;

  • STO and Plant to plant materials transfer

    Hi,
      We have three plant in three different compnay code we are doing material transfer with MB1B  and it is working fine  now we want configure the STO ,  what is the advantage of STO  comparing to simple plant to plant material transfer  and in case of STO how accounting entry wil be generate  , also can u give the steps for customizationn setting for STO  and some links for the same.
    regards,
      zafar

    Hi,
    Confg steps for STO.
    1. Define shipping points for plants
    2. Create checking rule.
    3. Define checking rule.
    4. Assign deliery type to che. rule.
    Create Customer in Suppling plant for receiving plant
    Create vendor at receiving plant  for supplying plant.
    maintain material with Sales view for shipping point,
    create PO ME21n with Doc tyoe NB.
    Outbound delivery  Vl10B
    PGI --VL02N
    GR --- MIGO
    Acounting doc. at PGI.
    Move type: 643 &101  2 step
                       645 & 101 1 step
    Acc key
    BSX -
    GBB (VKA) +
    Billing
    Customer +
    Other sales dedution -
    Hope this will help.
    SAM

  • Material master data transfer error

    Hi experts,
    I am getting errors in transfering some materials from R/3 to GTS.
    The errors are:
    Of 1 selected material(s), 0 were processed successfully. Message no. /SAPSLL/PLUGINR3112
    ===
    The error log mentions that:
    Internal error in program object /SAPSLL/NUMBER_GET_NEXT (RC = 1) - processing terminated
    Message no. /SAPSLL/CORE_PRODUCT205
    Diagnosis
    Processing of the current product was suspended due to a processing error. The error occurred in program object /SAPSLL/NUMBER_GET_NEXT with return code 1.
    ==
    Internal error in program object /SAPSLL/API_6850_SYNCH (RC = 2) - processing terminated
    Message no. /SAPSLL/CORE_PRODUCT205
    Diagnosis
    Processing of the current product was suspended due to a processing error. The error occurred in program object /SAPSLL/API_6850_SYNCH with return code 2.
    =====
    The number ranges are maintained in GTS.It is also maintained in R/3.
    Is this a patch issue?

    Thanks Vasantha.
    We are using the ECC 6.0 and GTS 7.1.
    The present patch levels are
    PI_BASIS          2005_1_700       0013     SAPKIPYJ7D    PI_BASIS 2005_1_700
    ST-PI    2008_1_700       0000          -      SAP Solution Tools Plug-In
    SLL-LEG           710       0012     SAPK-71012INSAPSLL  SLL-LEG 710 : Add-On Installation
    ST-A/PI 01L_ECC600     0000          -      Application Servicetools for ECC 600
    As per sap note 858706, the PI 2004.1 Support Package 13 will be required.
    Our Basis guys are unable to confirm the PI patch level at this time.
    Do you think,we need this patch?

  • Report on Material received through Transfer posting for Receiving Plant

    Hi,
    I have one bussiness requirement, I want a reoprt on Inventory ie
    If the material is transfered from One plant to another plant via 301 movement. Can a report be generated with the receiving Plant and Sloc

    Please use T code MB5B,  enter movement type 301, receiving plant & selection date.
    Regards
    Bhavesh
    Edited by: Bhavesh Mistry on Jul 10, 2009 11:19 AM

  • Material Master data transfer to external system

    Dear All,
    We are creating the Interface between SAP and MES system for transfering the material master. The plan is to use the standard Idoc type/message type i.e is MATMAS05.
    I have done basic settings like defining parnters, port, partner profile etcc. and trying to trigger the IDoc using transaction code POIM. I am getting a message called " "0 Idocs were generated (According to the selection and filter)". I could not findout why system is throwing this message.
    Please help in this issue.
    Regards,
    Senthilraja

    Thanks Uwe,
    I tried to create IDoc with BD10 for material master and I am getting two error msg as below.
    Msg one
    1 master IDocs set up for message type MATMAS
    then Msg two
    0 communication IDoc(s) generated for message type MATMAS
    Is it able to get why this msg is comng and no IDoc's were generated..
    Regards,
    Senthil

  • R/3 To APO , customized material master data Transfer

    Hello All,
    i am having an issue , that we need to add two customized fields (PUP price and Std Price) in /SAPAPO/MAT1, Extra Tab.
    i have added these fields on screen and the output structure for them is assigned as /SAPAPO/MATIO-zverpr, and /SAPAPO/MATIO-zstprs.
    in R/3 Side -I have added these two fields as in CIFMTLCCUS structure, with Include CI_MTLCCUS (custom structure to transfer data).
    also i have fteched these filds from table MBEW and have mapped to Table ot_cif_matloccus of Include ZXCIFU01 of Enhancement CIFMAT01.
    In APO side -but the thing left is that i am not able to find the Mapping Structure in APO side for these fields.
    i have added these fields to Structure /SAPAPO/CIF_MATLOCCUS (Customer Enhancement Structure for /SAPAPO/CIF_MATLOC), but i didnt find any custimzed place to retrieve and Map to /SAPAPO/MATIO.
    please suggest the necessary/missing steps.
    Thanks in Advance.
    Nitin
    Edited by: wisetak on Jun 24, 2011 2:54 PM

    Check these three thigns
    /n/sapapo/CCR
    /n/sapapo/CQ
    Check what type of stock has active IM, and what type of stock went in after you created the GR.
    Still if you have any problem let us know.
    My

  • Material Master data transfer using IDOC

    Hi,
    I am working on integration scenario with SAp ECC. we are using SAp PI wherein SAP PI is posting data In SAP ECC using standard IDOC for Material master i.e MATMAS05
    You might be aware that while material master creation if we pass Plant value then we can activate all Plant related views i.e. Purchasing, sales plant general, MRP views and Accounting etc...
    I have a scenario where I want to activate only Sales plant general view...donot want MRP and purchasing views to get activated
    I tried passing only Plant and profit center value which required for sales plant general data view and keeping all other fields blank but it doesnot work.
    can you suggest a way.
    Cheers
    Rc
    P.s - I am using xml file which will be converted into IDOC by PI.

    you must not create all segments in the IDOC  if you dont want the views.
    e.g. E1MBEWM is used for the accounting data. without this you wont get that view.

  • Material ledger and transfer pricing

    Hi
    Is it amndatory that I need to activate ML for configuring transfer pricing?

    Yes. ML activation is a mandatory settings for transfer pricing.

  • BOM material transfer from ECC 6.0 to GTS 10.0

    We are trying to transfer BOM (Bill of Material) type materials through sales order from ECC to GTS system. However we need to classify in GTS system both parent iteam and child items else the sales order containing BOM material will remain in "blocked state".
    We want to know the configuration setup in ECC for those type of materials wherein we control their sucessful transfer to GTS10.0. If possible could you guys shrae some config document for BOM in both ECC and GTS systems. WOuld really appreciate your help.

    Hello Chetan,
    see ECC IMG:
    Sales and Distribution --> Foreign Trade/Customs --> SAP Global Trade Services - Plug-In --> Control Data for Transfer to SAP Global Trade Services --> Control Transfer of Bills of Product for Preference and Re-Export
    here you can specify your criteria. From your message is not really clear which scenario you trying to run. With sales order you are simply transferring material unless you have preference KMAT scenario implemented. Maybe you can give more information.
    Cheers,
    Gabriel.

  • Transfer price records for materials

    \We have activated transfer pricing for profit centres.  However, all materials transfer between profit centres are not subject to transfer pricing. 
    But while doing any strock transfer between plants & profit centres of materials, system is error messaging that no transfer price records are maintained.  It is obviously not possible to maintain price records for all materials which may be around 4000.  What is the way out ?

    hi..
    Goto Profit Centre Accounting > Tools > Customer Enhancement > Develop Enhance for PCA
    Here you will find
    Document changes for data transfer (PCA00001)
    Assignment of a representative material (PCA00002)
    Determination of transfer prices (PCATP001)
    Enhancement in the authorization check (PCAAUTHO)
    Change to selection criteria for data transfer (PCASELEK)
    For additional information about this enhancement, see Choose Actitvies for Exit PCASELEK
    Apply as per your requirement.
    kkumar

Maybe you are looking for

  • Windows XP professional on K7T266 Pro 2

    I just installed Windows XP professional on my computer.  Previously I was dual booting Windows 98 and windows 2000 Professional, but I decided to just do one system.  The problem is, I can't use the windows update.  I get to the point where it says

  • CS4 Master Edition & Snow Leopard all crash when saving and exporting

    Add this one to the list of suffering CS4 users. My first ever post in my life. The details - CS4, Master Edition Mac Pro, all did run well on old leopard system. The story, upgrading and updating to 10.6.1 all CS4 programmes instantly crashed when u

  • Terminating Event Generate an Error

    Hi All. My custom workflow has asynchronous task where the terminating events trigger from ABAP program and passed some data. This task will completed upon custom event "ACCEPTED" raised in the system based on certain keyfield and continue next steps

  • Right click on a tab used to have a bookmark this tab option, now gone! why? and how do I get it back?

    In FF 3x right-click on a tab to get menu with "bookmark this tab option". Gone in 4.0! Can I have it back please? Also right click a link would have "open in new tab" 2nd in list, now changed to 1st.I have accidentally opened loads of windows.It is

  • Using the client result cache without the query result cache

    I have constructed a client in C# using ODP.NET to connect to an Oracle database and want to perform client result caching for some of my queries. This is done using a result_cache hint in the query. select /*+ result_cache */ * from table As far as