Material  valuation strategy U in valuation variant

Dear All,
We r trying to use the material valuation strategy U in the valuation variant.
We have also activated the project with the user exit
COPCP005 : User exit for material valuation (strategy U)
Component :EXIT_SAPLCK21_002
INCLUDE ZXCKAU08
However we r not able to get the desired result.
Could you please guide.
Thanks and Regards,
Anand

Hi Ram
During first costing run planned prices entered thru MR 21 will be updated as standard prices.  Which means planned prices = std prices. 
If you wish to change the prices 6 months down the line = u need to MR 21 upload again and over the earlier planned price.  Then u do costing run again. with this costing run, if there is diff in standard prices, system posts revaluation entry.
For Raw materials
Create a simple query which gives u moving avg price, current std price.  Analyze the variances and consider revised prices as planned prices for the next 6 months.  Next, do costing run and system revaluates the inventory values for raw materials. 
If the situation is that prices of raw materials are highly volatile, do costing run level by level as earlier suggested.
But give a word of caution to client on how dynamically variances get recorded and revaluation entries get posted.  Also tell them how it impacts not only raw material valuations but also finished and semi finished stock valuations. 
Pls assign points if the above clarifies your requirement.

Similar Messages

  • Valuation strategy for Split Valuation.

    Dear SAP Experts,
    We have split valuation for some of the raw materials.
    Whaile running Std Cost estimate system gives following errors even if we have maintained the price under valuation type.
    CK465: No price could be determined
    CK240: Cost component split costed with value of zero
    CK168: Cost estimate for material is Incorrect.
    In Valuation varriant we have strategy 7 & 4 (ie price control as per material master & as per planned price). We dont want maintain any planned price.
    I would like to know is there any Standard Valuation strategy exist in the valuation variant.
    Best Regards
    Nikhil

    If you have maintained price at valuation type level then to consider them you will have to activate mixed costing for costing type and valuation variant you are using in configuration. You will also need to create a qty structure type for this. Once this is done, you will have to maintain procurement alternatives ( T code CK91N - process category BBV) and maintain mixing ratio (CK94). This will ensure correct costing.
    Assign points, if useful.
    Regards
    Rakesh Pawaskar

  • About Material Cost Estimatite Valuation Strategy

    Material PPC001 have three purchase info record, it's price is 4.27/CNY,3.68/CNYand 2.56/CNY. Price 4.27/CNY and 2.56/CNY have invalid. Material of moving average price is 3.14/CNY. When I create the material cost estimate,in the material valuation, system use moving average price to calculate cost price. But in last month, I create the cost estimate, the material vaulation is use Price form purchase info record. I dont know what the material still has valid price 3.68/CNY, why system use moving average price to calculate cost price? How to work about the material valuation Strategy?
    My material valuation variants priority strategy sequence is 1.Price form Purchasing Info Record,2.Moving Average Price,3.Standard Price in Previous Period.

    Hi Jack,
    This forum is specific to SAP Master Data Management and your query is related to MM I guess. Post your query on below link to get it solved quickly.
    SAP ERP - Logistics Materials Management (SAP MM)
    Regards,
    Jitesh Talreja

  • Costing variant with a valuation strategy

    Hello all,
    I have the following issue:
    In PM I have defined a costing variant with a valuation strategy first u201Cstandard priceu201D and second u201CMoving Average priceu201D, and assigned this costing variant to the plant and order type.
    When I create a PM order (PM01) with a planning plant and enter the components in the order with a different plant and determine the cost, the system determines the correct plan costs based on the Costing variant for planned costs. The planning plant and the plant where the components are reserved are belonging to the same company code.
    When I create the same order with a planning plant and a different plant for component reservation and both plants belong to different company codes and determine the costs, the system doesnu2019t take the Costing variant into account. The costs are determined based on the price control assigned to the material type and not based the valuation strategy. In this case always the moving average price is taken.
    Can anyone help me with this issue?
    Thanks in advance

    Hi
    In OIOF you can specify the valuation variant for plant and order type, system determines the same . for your second case kindly check in the order which valuation variant system has determined.
    regards
    thyagarajan

  • Material Valuation-Easy Cost Planning Using Valuation Strategy U(Userexit)

    Hi Experts,
    I am implementing a userexit for <b>CJ20N</b> for <b>Valuation Price with Valuation Strategy U: COPCP005</b>, in that i activated the function exit <b>EXIT_SAPLCK21_002</b> and wrote my logic in that, i want to use project wise material price instead standard price which is stored in a Z table.
    For that i need to identify the project ID inside the function exit, i can get it using the input parameter <b>IMP_AUFNR</b> for WBS with Network, for Easy Cost Planning the same exit is triggered but iam not getting the <b>IMP_AUFNR</b> there, so i want to know how to identify the project inside that function exit.
    Could someone suggest me a way to find out the <b>Project ID or description or WBS elemen</b>t inside the function exit.
    Thanks in Advance.
    Regards
    Karthik D

    Not answered....i did it using enhancement point....

  • Valuation Strategy for Sales Order Costing

    We are currently using valuated sales order stock in ECC 6.0. The "without valuation strategy field" on the requirements class is not checked. However, the valuation strategy varies for a material and for a sales order. Sometimes it is using valuation strategy 2 - cost from the production order cost estimate - which is desired and other times valuation strategy 3 - cost from the standard price field in the material master - which is not desired. When is the valuation strategy determined for a production order for valuated sales order stock?

    Costing Variant is assigned to Requirement class
    Requirement class is assigned to Requirement type
    Requirement type is assigned to Planning Strategy
    Planning strategy is assigned to strategy groups
    Strategy group is assigned to MRP3 tab in Material Master
    System picks the costing sheet in requirement class
    In this way product will be costed for Make to Order sale order costing.
    Srinivas

  • COPA Valuation Strategy Issue

    Hi,
    When posting the Billing document,I am getting Direct Material cost 2 times in COPA line item document in KE24.
    I guess this is beccause problem in Valuation strategy configuration for COPA in the system.Kindly advice me why i am getting Material Costs 2 times,one is From KWMAEK value field,it is getting updated from Stadard  Cost estimate.
    if it is having problem with Valuation Strategy in COPA,kindly advice me what are the necessary settings that i need to make.It  would be a great help for me.
    Why it is taking material cost 2 times,kindly advice me as it is very very critical issue for me.
    I will assgin points
    Thanks
    Sunitha

    Hi Thanks for your  reply.
    System is posting differant amounts one with value field VVMAT material Cost and one with KWMAEK direct material cost.
    Can you suggest me
    Thanks
    Sunitha

  • Copa valuation strategy - doubt

    Dear experts,
    Pls guide me on the below.
    Need to use copa valuation strategy in order to transfer cost to copa through cost componenet wise.
    So i have assigned cost component to value field and i m using standard costing key with standard setting.
    but need to define valuation strategy material,material type or any other characterstics.
    which valuation strategy i will use?.
    Which  record type and point of valuation i will use.i am not doing actual costing and material ledger.
    What are sequence of step in order to t/f cost to copa through valuation strategy not through vprs.
    regards
    RR

    Hi
    a. Select Valuation Strategy 001 in KE4U
    In DETAILS tab: Assign it to Appl = KE, Check Mat Cstng, and Qty Field = ABSMG
    In Assignment tab: Assigning 001 to Point of valuation 01 and Record Type = F
    b. Creating a costing key in KE40
    Check : Transfer Std cost estimate
    Period indicator =Current Cost estimate acc to entry in mat master
    c. assigning costing key to material types in KE4J or KEPC and
    d. assigning Cost Comp Structure to Value field in KE4R
    br, Ajay M

  • He material is not displayed as valuated Sale Order Stock

    Sale Order has been created and MRP execution is done at MD04.
    The Sale Order is released as Production Order.
    But when I am executing T Code  MBBS I am getting error message syaing
    The material is not displayed as valuated Sale Order Stock.
    Diagnosis
    The system has not found any stock that satisfies the selection criteria entered.
    Possible reasons for this are:
    The material does not exist. Have you entered the right material number?
    Your selection is too restrictive. The system was not able to find any stock that satisfies all selection criteria.
    The stock balance is zero.
    Procedure
    Check all the selection criteria you entered.
    Stock overview has displayed enough stock for material.
    Please adivse me how Material  can be displayed as valuated Sale Order Stock at MBBS.
    Regards

    Hi,
    Check whether the Production order execution is done and any GR has been done against the Order.
    Once the above is done, check in MBBS, the stock will sit in the Valuated SO stock.
    Even wait for any other replies.
    Thanks & Regards,
    Ravi Kumar

  • Transfer the material from one plant(non valuated) to another plant valuat

    Hi All,
    How to transfer the material from one plant(non valuated) to another plant valuated.
    Which Goods Movement type we required to use.
    Regards,
    Amit Shah

    Hello,
    Please refer the link below. hope it could be a help.
    stock transfer plant to plant
    split valuation
    Regards,
    Jana

  • Material transfer procedure from Valuated Plant to Non- valuated plant

    Material transfer procedure from valuated plant to Non valuated plant through MIGO - MVT. 303 (Remove from Storage ) & reveiving through MIGO - Mvt. 305 (stock in Place )
    By using above method can we indetify stock of same material in cost centre wise and WBS - Project - code wise in MMBE.

    Hi
    same material but Qty. wise post  in defferent project code (two or three )  and cost centre. but in MMBE we can see only Qty. not project code wise or cost centre wise.
    After few days If we want ot issue mateiral against Prioject then how can we identify the project code.

  • Extend Material to another plant with Valuation CAtegory X

    Hi All,
    I have a Material in Plant 1, with Valuation Category H.
    I want to extend this material to Plant 2 with Valuation Category 'X' (Auto Batch)
    Its not accepting X, any other entry would be possible
    It says "With Single batch valuation, batch management must be defined. The following plants have no batch management requirement: Plant 1"
    If i activate batch management in Plant 2, it is working.....but i dont want Batch management for this material.
    How do i solve this.
    Pls help.
    Thanks

    Hi,
    We can not remove Batch management thru MM02, once it is set in MM01. Its a gray field.
    can any one let me know whats the reason for not accepting valuation category x while extending the material?

  • What it the Tcode for COPA valuation strategy

    Hi,
    Kindly give me the Tcode for COPA valuation strategy
    Thanks
    Sunitha

    Hi
    Check This Tcode
    KE4U. Create a valuation strategy
    Ranga

  • Valuation strategy 2 rejected by activity valuation

    Dear all,
    I wish to close the PM order.Balance of the PM order is ZERO.
    System displays the error
    Valuation strategy 2 rejected by activity valuation
    Message no. CK295
    Diagnosis
    Price strategy 2 is not allowed for the application.  It is not possible to find average standard rates with an actual cost estimate.
    Kindly suggest any possible solution!
    Thanks and regards,
    Satyajit

    Satyajit,
    I'm fairly sure it just cannot find a rate to use that is valid for the time period in which the posting date falls. Long text of your message says:
    It is not possible to find average standard rates with an actual cost estimate
    Look at KP26 but maybe another transaction. Also check with your CO people.
    -Paul

  • Two Valuation Class for one material type which is split valuated

    hi , I have a material number which is split valuated like Capital & Revenue. There are seperate inventory GL accounts for both Capital & Revenue. So whenever material is procured based on the nature either Capital or Revenue , Corresponding Inventory GL account gets debited. How t

    It is very much possible. Material type is linked with Valution class by account category reference and has many to many relationships. Valution type is linked with account category reference.
    1 You create the material at valuation category level in MM01
    2 Extend the material for Val type 1 with Val cls 1 in accounting view
    3 Extend the material for val type 2 with val cls 2 in accounting view
    for example
    If you have valution type IN & EX linked with ROH material type via account category reference then you have the option to selecte valution classes 3000, 3001, 3002, 3003 in Std SAP. You have to make sure that Automatic account determination setting are correct for the valustion classes selected in OBYC.
    Hope it helps
    Karthi

Maybe you are looking for

  • Organizing a chaotic library with some duplicates

    Over the past few years, due to glitches and clumsiness on my part, I have multiple folders that have my music, and some of these folders have overlapping music (i.e: Folder A has songs 1-500, Folder B has songs 300-700, Folder C may have some new so

  • Problem with the imported video clips

    Hi! I'm very new to Premiere Pro, so please don't scold me :) I have a video file (.AVI) that I want to remove the audio from, and insert a new audio track. Here's my problem: When I import the AVI file into Premiere, and double-click it to preview i

  • Keeps asking for password

    Why doe my iPad keep asking for my password frequently?  Can someone please help?

  • My computer is INCREDIBLY slow after Yosemite install

    I recently installed the latest operating system Yosemite for my Apple Mac Pro and ever since it has been installed, my computer has been INCREDIBLY slow!  Everything from starting up to applications opening to the **** internet!  I'm ready to punch

  • How to update the Artwork column in Itunes 8?

    I had to correct some embedded album covers in some MP3 files and Itunes picked this up correctly if I Get Info and look at the album art now. However, the Artwork column in list view will not pick up the change. I had re-added the files to the libra