Material warranty in ECC 6.0 with EHP 4

Till previously, warranty is limited to equipment and FLOC but with EHP 4 material warranty is also included. This I heard from SAP trainer. If any body worked in ECC 6.0 with EHP 4 has this feature, please let me know how it works and send any links to doc. Our requirement is like this. We are using Fleet management and some parts of the Fleet are under warranty. Parts are coded as Material. There are other ways to address the issue using enhancements. i would like to know if this issues is addressed in EHP 4.
Thanks In advance for your help.
Sudhakar

Hi Denis,
You can install EHP7 for ECC6. You should 1st check Service Market place for PAM(product availability matrix) for combinations of DB and OS. You should understand your usage type and learn more about SWP/SUM/740 kernel/System Preparations and other knows prerequisites
1737650 - EHP7 for SAP ERP 6.0 SP Stacks - Release & Information Note
1865866 - SAP EHP 7 for SAP ERP 6.0 - Release Information
Divyanshu

Similar Messages

  • ECC 6.0 with EHP 7

    Hi,
    Is ECC 6.0 available with EHP 7 for the installation. Can we directly install ECC 6.0 EHP7 or do we need to install ECC 6.0 first and then upgrade to EHP 7.
    regards

    Hi Denis,
    You can install EHP7 for ECC6. You should 1st check Service Market place for PAM(product availability matrix) for combinations of DB and OS. You should understand your usage type and learn more about SWP/SUM/740 kernel/System Preparations and other knows prerequisites
    1737650 - EHP7 for SAP ERP 6.0 SP Stacks - Release & Information Note
    1865866 - SAP EHP 7 for SAP ERP 6.0 - Release Information
    Divyanshu

  • ECC 6.0 with NetWeaver Ehp 1 without Ehp 4

    Hello
    Is this combination possible?
    ECC 6.0 with NetWeaver Ehp 1 without Ehp 4
    Thank you very much!

    That combination is not possible.  The information below is taken from http://www.sdn.sap.com/irj/sdn/nw-70ehp1.
    Regards,
    John
    What is the implementation strategy for SAP Business Suite?
    With the unrestricted shipment of enhancement package 1 for SAP NetWeaver 7.0, only implementations within standalone installations of SAP NetWeaver 7.0 are supported (e.g. for BI, EP, etc.).
    For existing installations of SAP Business Suite systems (i.e. SAP ERP 6.0, SAP CRM/SRM/PLM, ...) etc.) that are based on SAP NetWeaver 7.0, the SAP enhancement package 1 for SAP NetWeaver 7.0 shall not be installed separately, as it will result in malfunctioning of the installation procedure and/or the final system state.
    Business Suite 7 (generally available since May 5th, 2009) is technically based on the SAP enhancement package 1 for SAP NetWeaver 7.0. All relevant parts of enhancement package 1 for SAP NetWeaver 7.0 are included in the respective SAP Business Suite 7 installation routines and will be installed automatically underneath the SAP Business Suite systems when an upgrade to SAP Business Suite 7 is performed. More information is available in this overview presentation, more details can be found at the service marketplace quick- link /ERP-EHP (SMP login required).
    General note on the relation of enhancement packages for SAP Busiess Suite and SAP NetWeaver:
    Customers who have implemented certain enhancement packages for SAP Business Suite might have to implement a certain enhancement package for SAP NetWeaver 7.0 as well. Please refer to the respective documentation of the SAP Business Suite for details.

  • Material confirmation in ECC based on service confirmation in CRM

    The scenario is Service order & confirmation is in SAP CRM & the billing is in ECC
    The Issue is about material ( spare parts) issue in ECC based on the service confirmation in CRM. In ECC the spare parts are batch managed.
    So to do an automatic goods issue in ECC, we need to enable a BAPI for batch determination.
    Now we are contemplating of doing the goods issue in ECC manually.
    Request you to see if the below scenario works or a better solution is possible
    Can we assign a normal sales order type instead of a debit memo so that delivery of spare parts & then billing can take place.
    The menu path I am talking about is  ( ECC- SPRO- Integration with other mySAP components-CRM-Settings for service processing-billing integration-map transaction types & item categories)

    Hi Madhu G
    I have defined the confirmation profile in Opk0. I know that I can assign a different profile with reference to user.
    I dont want confirmation profile based on Storage location
    I want the confirmation screen to be different for different materials -plant combination. Does anyone have any idea how this can be achieved?
    regards
    PK

  • Improvements and Changes in ECC 6.0 with 4.6/4.7 Version

    Hi All,
    Can any body tell me what are the Improvements and Changes made in ECC 6.0 with 4.6/4.7 Version, in Configuration, Master data, Transactions and other new functionalities.
    Please let me know the above details with reference to MM Module perspective.
    Regards,
    SAP MM

    Hi,
    Go through the documentation in the library for ECC6.0SAP ERP central componentRelease notes for ERP central component.In that check Chapter13 Material management.
    Or check the link below.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
    Regards,
    Rambhupal reddy

  • What is the difference in SAPS requirement for ECC 6.0 (No EhP)  vs ECC 6.7 (EhP 7)?

    Hi Team,
    Hope you are doing well, Can you please explain the below points.
    1)      What is the difference in SAPS requirement for ECC 6.0 (No EhP)  vs ECC 6.7 (EhP 7)?
    2)     What is the split of SAPS between Core and RAM?
    Thanks in advance.

    Hi Deepak,
    We are not partner/ customer with SAP, so don't have access to tools.
    Can you please give theoretical idea about
    1)      What is the difference in SAPS requirement for ECC 6.0 (No EhP)  vs ECC 6.7 (EhP 7)?
    2)     What is the split of SAPS between Core and RAM?
    Thank you,
    Gopi Reddy

  • Material Replication from ECC to SRM 7.0

    Hi Experts,
    I am working on Extended classic scenario SRM 7.0 with ECC 6.0, I have created the Material Group and Master data in ECC system. While doing replication via R3AS i am getting the following error msg( I have applied Note 720819 & 330401in ECC ).
    Errors:
    Hierarchy for material types does not exist
    (Before materials are imported from the ERP system, the material types from the  ERP system must exist as categories in CRM/EBP. When the Customizing object DNL_CUST_PROD1 is imported, the material types are imported automatically and created under the category MAT in the category hierarchy R3PRODSTYP (product subtype).)
    MATERIAL: Object will not be loaded
    Pl do the needful.
    Regards
    Mohan

    Hi  Pl check whether you follwed these steps are not.
    Hi find below for the product cat
    Steps to create the product category in SRM:
    1) Create MM material groups in ECC client. This will create a transport. Go to SRM Tcode R3AS and select the object u201CDNL_CUST_PROD1u201D from the list and run it. You can monitor the job using R3AM1 in SRM. This will bring the material group into SRM. This can be seen in TCode u201CCOMM_HIERARCHYu201D in SRM.
    2) Once it is done. Go to IMG in SRM and go to path SRM> SRM server> Cross app biz settings> Account aassigmnet> Define GL code for Acc *** Cat and Prod Cat. Maintain the GL code against this prod cat for all the account assignment codes. This is client specific setting and need to be done in every client by opening it. This GL code is given in the form in ticket.
    3) Do a test and check if the product category is available for procurement in SC.
    Regards,
    Satish

  • ECC 6.0 with EHP4 fresh Installation

    Hello Gurus,
    A fresh ECC 6.0 with EHP4 needs to be installed on Wnidows + Oracle Platform, please let me know which of the following path should be followed?
    1. SAP NW 7.0 installation (without EHP1)  --> EHP 1 installation --> EHP4 Installation
    2. SAP NW 7.0 with EHP1 installation --> EHP4 installtion
    3. SAP NW 7.0 installation --> EHP4 installation
    The other way to ask this questions is what are the dependencies between NW7.0 (ECC 6), EHP1 and EHP4?
    Please let me know which of the above options is feasible and recommended. Please let me know a better option if its not present in the above options.
    Regards,
    Saurabh.

    Hi,
    refer the following SAP note 1143022.
    Regards
    Manohar

  • REplication of Material Master from ECC to CRM - NO_STRUCT_DEFINITION Error

    HI CRM Experts,
    I am trying to replicate master data for material from ECC to CRM. I have done the required customizing downloads. Done with downloading of DNL_CUST_PROD0 and DNL_CUST_PROD1. I have got the Material types in CRM with categories R3PRODSTYP, R3PRODHIER & R3MATCLASS. There is no filter setting in R3AC1 for MATERIAL. Now when I am trying to do initial down load for Material through R3AS and monitoring in R3AM1, the status shows running with Block = 0. Having checked in SMQ1, am getting error as System Fail with error Exception Condition with "NO_STRUCT_DEFINITION" raised.
    I have checked with the Product structure in ECC and compared with R3PRODHIER in CRM. They are same.
    Kindly let me know what am I missing out.
    Regards,
    Ravindra Valy

    Hi,
    I had applied the not earlier itself.
    Lateron I realized that the note I had applied at CRM end. I have to apply at ECC end aswell.
    After applying at ECC end, the problem is resolved.
    Thanks
    Ravindra Valy

  • Unable to use SCAT to upload material master in ECC 6

    HI
    I am unable to use SCAT to upload material master in ECC 6,
    an error is triggering
    "Releases higher than 6.40 are not permitted
    Message no. TT005
    Diagnosis
    With Web Application Server Release 6.40, you cannot create new automated CATT test cases. However, you can create manual CATT test cases"
    canany body please help me to use SCAT
    Sreeram

    you have to read yourself:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/1b/e81c3b84e65e7be10000000a11402f/frameset.htm
    I certainly do not use SCAT or SECATT to load master data, especially not material master.
    A material master has  dynamic screens, based on the material type the view selection will be different, based on entries made in MRP view fields become hidden or mandatory. Such things canot be done with a static recording.
    SAP provides batch input programs and BAPIs for material master load and additonally loading per IDOC in LSMW (which offers as well batch input and Bapi methods)

  • Material Susbsitution in ECC Sales order ATP Check

    Hello all,
    I have used GATP and implemented Material susbtitutions.
    Now i am looking to achieve the following in ECC:
    1) During ATP check, ECC should first look for availability on the material in the sales order item
    2) If enough supply is not found(ATP Check fails), then system should substitute this material with another material; this substitution should happen only if the ATP check on the customer ordered material fails;
    Is ECC capable of doing this? I already tried Material determiantion and all reason codes; But material determination is directly replacing the customer ordered material with the substituted material even though there is enough stock on the sales order material.
    thanks

    In std, you can achieve this.
    In Material Determination, while Creating Condition records in VB11,
    maintain appropriate Substitution reason ( for eg:0001)
    enter Customer Ordered Material in "Material Entered" field & substitute Material in " Material" field.
    now Goto- Alternative materials or Press F2, Enter the another material to substitute Material if the first Substitute material doesnt have enough Stock , Tick the "MRP Indicator" & save the record.
    ( ref: Help doc of MRP Indicator,
    MRP indicator for alternative material in product selection
    Material requirements planning (MRP) indicator for automatic product selection.
    Use
    The MRP indicator displays the alternative material for which a subitem can be created in case a requirement can't be met. Material requirements planning uses the subitem to determine the requirement shortage.
    Note:
    Only one alternative material can be indicated as relevant for materials planning.)
    Test & revert.

  • Table for GL account and Material group in ECC

    Hi
    I would like to know what are the parameters needs to be take care while creating new Material Group in ECC ?
    Financial integration data are more welocme
    like GL account / material group/ material type information
    table inforamtion GL account / Material group.
    any help /linlk info is appreciated.
    Muthu

    Dear,
    if i am right may be in ur legacy system finance posting are happening based on ur material group
    if that is the case u can create valuation class based on material group (with same description) and assign G/L account to ur valuation class.
    valuation class and G/L account combination table T030
    Regards,
    Gopal.S

  • Material creation in ECC Frm MDM

    Hi Gurus,
    Has any one tried creating  new Material records in ECC frm MDM?
    I have a scenario wherein a user  logins from EP and creates a new material record.This triggers the MDM workflow and the enrichment of the record happens.
    Finally this material needs to be posted in ECC using XI.
    I have tried doing this but however, the idocs fails saying that the Material Does not exists or is not activated..
    Can any one guide me on this.
    Helpful answers will be rewarded
    Thanks
    Simona

    Hi Harrison,
    I am entering the material number from MDM which comes under the external number range for that material type.
    I have also checked with the settings and found that,the material type that i am using excepts both internal and external numbering.
    So the material number should not be a problem rite?
    But the error message says something abot activating the material,how can that be done from MDM?
    Thanks & Regards
    Simona

  • Is SAP BI reporting is possible in ECC 6.0 with same client

    Hi all,
                             My requirement is, we need to design SAP BI data flow in ECC 6.0 with same client only.  Now I am designing the BI data models as per the requirement of SD sales reports in ECC 6.0.For this, when i was extracting the data from SD datasource(2lis_11_vahdr) in RSA3 its showing 0 records,actually  as per VA01 some records are available but its not showing in the RSA3.
                              My doubt is , is it possible to extract the data from ECC 6.0 and load the data to the datatargets  and get the SAP BI reports in ECC6.0 with the same client.
                              Please suggest as soon as possible.
    Thanks

    It is possible to load the data from the same client. It all depends on the source system and the client which has been connected in the RFC connection.
    Let me know if this helps.
    Regards,
    Avinash

  • How to CREATE MATERIALIZED VIEW LOG (MV fast refresh) with some JOINS

    Hi @ all,
    i'm trying to create a MATERIALIZED VIEW LOG for a fast refresh of a MATERIALIZED VIEW.
    It works fine with a simple Request in the MATERIALIZED VIEW:
    CREATE MATERIALIZED VIEW MV_ZOTD43_P
    TABLESPACE GDII
    BUILD IMMEDIATE
    REFRESH FORCE AS
    SELECT * FROM ZOTD43_P;
    COMMIT;
    CREATE MATERIALIZED VIEW LOG ON ZOTD43_P
    TABLESPACE "GDII"
    WITH PRIMARY KEY, ROWID, SEQUENCE INCLUDING NEW VALUES;
    call DBMS_MVIEW.REFRESH('MV_ZOTD43_P', 'f');
    But when I use a complex SQL-Request with some JOINS (one of the Table with spatial Data) in the MATERIALIZED VIEW, I get an error:
    CREATE MATERIALIZED VIEW MV_TEST
    TABLESPACE GDII
    BUILD IMMEDIATE
    REFRESH FORCE AS
    SELECT lptd04_p.sst_nr AS sst_nr,
    lptd03_p.aaaa AS aaaa,
    lptd04_geom.geom as geom
    FROM lptd04_p lptd04_p
    JOIN lptd01_p lptd01_p ON lptd01_p.cre_nr = lptd04_p.sst_nr
    JOIN lptd04_geom ON lptd04_geom.sst_nr = lptd04_p.sst_nr
    JOIN lptd03_p lptd03_p ON lptd03_p.lief_nr = lptd04_p.lief_nr;
    COMMIT;
    CREATE MATERIALIZED VIEW LOG ON LPTD04_P
    TABLESPACE "GDII"
    WITH PRIMARY KEY, ROWID, SEQUENCE INCLUDING NEW VALUES;
    call DBMS_MVIEW.REFRESH('MV_TEST', 'f');
    Error report:
    SQL Error: ORA-12004: REFRESH FAST kann für Materialized View "GDI"."MV_GDI_SST_STAMM" nicht benutzt werden
    ORA-06512: in "SYS.DBMS_SNAPSHOT", Zeile 2255
    ORA-06512: in "SYS.DBMS_SNAPSHOT", Zeile 2461
    ORA-06512: in "SYS.DBMS_SNAPSHOT", Zeile 2430
    ORA-06512: in Zeile 1
    12004. 00000 - "REFRESH FAST cannot be used for materialized view \"%s\".\"%s\""
    *Cause:    The materialized view log does not exist or cannot be used. PCT
    refresh is also not enabled on the materialized view
    *Action:   Use just REFRESH, which will reinstantiate the entire table.
    If a materialized view log exists and the form of the materialized
    view allows the use of a materialized view log or PCT refresh is
    possible after a given set of changes, REFRESH FAST will
    be available starting the next time the materialized view is
    refreshed.
    Am I doing something wrong or is it not possible CREATE MATERIALIZED VIEW LOG when the MATERIALIZED VIEW got some JOINS?
    Regards,
    Greq

    Thanks for the link Alessandro ,
    the error seems something to do with the Column-Type SDO_GEOMETRY, so
    i create a new thread in the Spatial Discussion forum:
    FAST REFRESHing of Oracle Materialized Views containing SDO_GEOMETRY column
    Regards,
    Greq

Maybe you are looking for

  • Vendor Master Data change (VENDOR_ADD_DATA)

    Hi experts, I implemented the badi's VENDOR_ADD_DATA_CS and VENDOR_ADD_DATA to create the subscreen in XK01 but i created the Z table for storing the data based on vendor and company code i placed table control on the screen, because  for single vend

  • How can i fix minor LED damage on 2011 macboor air 11"

    i recently got to do a little damage on my MBA and it gave my LED screen a crack i wonder if there's still something i could do with it and if the only thing i can do with it is have a screen replacement how much does it cost???? is it too expensive

  • Notes doesn't work

    Ipad 3 64 gb. Notes application opens but won't do anything. I can't write a new note or anything.

  • 0ra-01033 - Oracle initialization shutdown process

    When i click the SQLPLUS and enter the username,password and host string..I got this error message.Why it happed?And how to solve it? Hope someone can help me.. I am newbabies.

  • Problem when another user update record.

    Hi All, i am using jdev 11.1.1.5.0 use case: i have create one adf table which is based on vo where a column claimed_by. i have add a where clause in vo where claimed_by is null. default value of claimed_by is null. when user claimed particular recor