Material With Different Makes

Guys ,
The client where our Implementation is going on , has material like motors , pumps etc. of different makes like Siemens, Kirloskar etc. in his stock.
What I would like to know , should we maintain Material Master  for different makes.
If I do that, than I  end up making   lot of Material Masters.
Kindly suggest solution

Hello Friend
This suggestion is from different perspective hence think which ever is viable for your requirement.
How about going with Split valuation using one material code
The SAP R/3 System allows you to valuate stocks of a material either together or separately, that is, according to different valuation criteria. Split valuation is necessary if, for example:
1. Stock from in-house production has a different valuation price than externally procured stock.
2. Stock obtained from one manufacturer is valuated at a different price than stock obtained from another manufacturer.
3. Different batch stocks of a material have different valuation prices.
4. Value damaged and repair part differently from a new part.
BR
SE

Similar Messages

  • Same  Material with different itemcatagory groups

    We have 3rd party manufacturers that make product for company and sometimes they send the finished product back to company and other times they will drop ship it to one of our customers.
    this scenario we need to have the same material with different itemcatagory groups
    i tried to create same material with different storage locations, but it's possible but the thing is when i change the item catagory group for the material , the same is applicable for 2nd same material, my requirement is i need 2 different itemcatagory for the same material,  hope u understand my requirement
    i will be expecting your possible replys.
    Thanks & Regards
    Venkat.Dhanemkula

    Hi Venkat..
    Please explain it more clear manner..
    With whatever i have understand, i think you scenerio is manual 3rd party order processing.
    In that case the material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing.
    Keep only one material and specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    hope it helps you.
    Regards
    Harry

  • Putaway Strategy I, not allowing second material with different batch

    Hi all,
    Can someone please help me to understand where is the problem
    My config is
    Strg Typ 401
    Putaway Strategy I
    Capacity check - 4
    Mixed storage: X
    Addition to existing stock: X
    Storage section check -active
    Storage bin created for the storage section in the storage type 401
    Maximum capacity maintained in Storage bin
    In material master WM view 1- maintained capacity.
    When system is correctly finding Bin for First material / Batch combination
    But when I am trying to create TO for same material with different batch it does not find storage bin - even the storage bin capacity is still remaining
    Also it is not accepting second material in same bin.
    The only requirement to have startegy I is that same materials can be placed in same Bins (sorry but dont need fixed bin)
    Thanks

    Hi Hiren,
    You are correct I forgot to mention that in my earlier reply. Actually with out storage unit you can store only one quant in a Bin. So it can add stock to the same quant if we use addition to existing sock feature. If the material batch combination changes it cannot use the same quant, so it wont be able to add the stock to existing quant. If a new quant is to be stored in the same BIN it has to be storage unit managed. To in nutshell multi material multi batch your scenario can be achieved with storage unit managed storage type.
    For storage unit setup you can refer below link.
    Storage Unit Management - Warehouse Management System (WMS) - SAP Library
    If you find this useful please close the tread.
    Regards
    Abhishek

  • Tcode MB1B (Transfer Postings) material with different Valuation class

    Hi,
    is it possible to avoide tcoce MB1B for material with different valuation class?
    Materia1 (001000) has valuation class: 3000
    Materia2 (300000) has valuation class: 7900
    I don't want allowed MB1B with Material1 (3000) to Material2 (7900).
    Thanks.
    regards, Dieter

    Hi,
    Yes, It is possible to avoide tcoce MB1B for material with different valuation class.
    Regards
    Md.MahaboobKhan

  • Follow up material with different base unit of measure

    Hi all,
    I have the BOM with material Mat1 as a component. The base unit of measure of Mat1 is KG.
    Is it possible to replace Mat1 with Mat 2 material in MRP once the Mat1 warehouse stock is depleted.
    The base unit of measure of Mat 2 is KGK.
    The required quantity of MAT1 should be recalculated from KG to KGK accordanly unit ratio.
    Please, expain, where does it maintain?
    Thanks,
    Peter

    Hello Peter,
    You can use follow-up setting (set Mat2 as follow-up of Mat1 in MRP 4 view of material master if this follow-up scenario is valid for all BOM) with discontinuation indicator '1', w/o effective-out date. In this case Mat1's stock will run out (no PldOrd, PR, etc) will be created, and from the date, when Mat1's stock runs out, MRP will calculate with Mat2.
    As I told you, according to my best knowledge, you cannot realize this with different base unit of measures. (you have to change the buom of one of the related material masters or create a new material master if you cannot cope with buom-change).
    Follow-up group scenario can also be used but I guess different buoms will be a problem in that case as well.
    Maybe there are better solution but I'm not aware of it...
    BR
    Csaba

  • Same material with Different qualities

    Dear Experts,
    Please give me the solution for mentioned issue ....
    I have to maintain the same material which has different qualities (grades) and according to these qualities, the material rate is different. i have near about 50 different qualities for the same material and 50 different rates.
    My every vendor is supplying this material for 50 different qualities and rates. So in this case to maintain the individual material prices is big challenge.
    If i will maintain Info records, i have to maintain 200000 info record. and also there is possibility of price change for every three months.
    So please give me any other alternative solution for the problem.

    Hi Vijay,
    Variant Configuration may work in your case. I collected some links, please go thru the links:
    http://help.sap.com/saphelp_47x200/helpdata/en/92/58d455417011d189ec0000e81ddfac/plain.htm
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    http://sap-img.com/sap-sd/steps-for-sd-variant-configuration.htm
    http://www.slideshare.net/arun_bala1/variant-configuration-overview
    http://www.sap-topjobs.com/VARCONFG%5B1%5D.pdf
    Purchasing:-
    1. MATERIAL MASTER
    Create Material with material type as HALB – Transaction code MM01
    Enter Material code as ZMAL.
    Select the following views – Basic data1, Basic data2, Purchasing, MRP1, Storage1, Storage2, Accounting1, Accounting2, Costing1, Costing2.
    Basic Data1 – Select General Item Category Group as “0002”
    Basic Data2 – Activate the field Material Configurable
    Remaining fields data is as applicable.
    2. VENDOR MASTER
    Create Vendor Master – Transaction code XK01
    Enter Vendor code as ZVEN
    3. Classification Characteristics
    Create Characteristics – Transaction code CT04
    Characteristics created as
    i) ZMALCOLOURRED after entering the description click on the tab Addnl data & then fill up the data in Table name = MMCOM & Field name = VKOND then save the characteristic.
    ii) ZMALCOLOURBLUE enter the description & save the data, do not enter any data on Addnl data tab strip.
    Save the data
    4. Classification
    Create Class as ZMALCLASS – Transaction code CL01
    Class as ZMALCLASS, Class Type as 300
    Assign the above two characteristics ZMALCOLOURRED & ZMALCOLOURBLUE to class ZMALCLASS.
    Save the data
    5. Configuration Profile
    Create Configuration Profile – Transaction code CU41
    Enter the material code as ZMAL,
    on the next screen enter Priority – 10, Profile Name – ZMALPROFILE, Class – 300. Select the line & click on the push button Class Assignment, assign the class ZMALCLASS come back to main screen
    Select the profile line item & click on the “Profile Detail”
    then click on the push button “dependency assignment”
    on the screen input dependency as “ZMALDEPENDANCY” &
    then click on the push button “Dependency editor”
    input the syntax as
    $self.ZMALCOLOURRED = 'RED' IF ZMALCOLOURBLUE = 'BLUE'
    save data
    6. Pricing Procedure ( SPRO )
    Pricing condition types like VA00 - Variants/Quantity & VA01 – Variants % is included in the pricing procedure with following settings
    Sr. No. DATA VA00 CONDITION VA01 CONDITION
    Control Data 1
    Condition Class A A
    Calculate Type C A
    Condition Category O O
    Changes can be made
    Manual Entries C C
    Item Condition Active Active
    Delete Active Active
    Amount / Percent Active Active
    Scales
    Scale Basis C C
    Control Data 2
    Variant Condition Active Active
    Access Sequence Variants Variants
    These conditions will appear in the pricing when variant configuration is made active in vendor Info Record.
    7. Vendor Info Record
    Create Vendor Info record – Transaction code – XK01.
    Input Fields like Vendor, Material, Purchasing Organisation and Plant.
    Click on the push button “ Variant Configuration “ In the pop-up window input the variant condition.
    Select the line & click on push button “ choose “ the pop-up window will display the two condition “VA00 “ & “VA01”, select the relevant condition, click on “choose” then save the data.
    Input all other relevant data for creation of vendor info record
    8. Purchase Order
    Create Purchase Order – Transaction Code – ME21N.
    Input all relevant like Vendor, Material, PO quantity, price etc.
    Select the Material Data tab strip in Item & click on the push button “configuration” the characteristic of variant configuration will appear input the required value,
    Go to the condition tab you will find variant configuration condition has appeared in pricing condition.
    Save the purchase order.
    Reg,
    Ashok

  • How to Upload different Material with Different Selection View

    Hello Experts!
    Iu2019m new in ABAP and trying to understand methods of LSMW. Now I get a question for you guys. Let say I need to upload 10 different materials. Now for instance.
    1st material has Basic data 1 and Basic data 2.
    2nd material has Basic data 1, Purchasing and Purchase Order text
    3rd material has Basic data 1, Classification, Purchasing, MRP 1, MRP 2 & MRP 3.
    4th material has Basic data 1 & Basic data 2.
    5th material has Basic data 1, Classification, Purchasing, MRP 1, MRP 2 & MRP 3.
    And so on. Now here Iu2019ve notice that every material has different INDUSTRY SECTOR, MATERIAL TYPE AND SELECTION VIEWS. I understand that Industry Sector, Material Type and other data I can specify in my file but how I can control SELECTION VIEWS for different materials. Because for different Selection view coming screens will become different accordingly.
    So can somebody can please tell me how I can control different select views for different material and upload it in SAP.
    Thanks.

    Hi
    I understand that you are performing LSMW on MM01 transaction code..and are uploading through batch input in LSMW.
    Actually, for a tcode like MM01 I dont think you should use LSMW, instead you can go with the BAPI: BAPI_MATERIAL_SAVEDATA.
    The views is a serious problem with MM01 when performing using batch input..
    So, go through the documentation in SE37 tcode for the BAPI...
    The information you get there will help you on how to proceed.
    Regards,
    Vishwa.

  • Material with Different grades

    Dear Guru's,
    Here in my client, for one material they are having 5 different grades based on the quality, Like A,B,C,D & E
    How we need to maintain them in single mmr, because they are procuring @ different prices based on the quality.
    My PP guy dont want different material #, based on grades, due to problem in BOM, can i maintain these grades in single mmr or is there any better way to manage this ?
    pls suggest
    Regds,
    Channa

    hi,
    Use split valuation...by this you can procure same materials with different valuation type...
    Split valuation refers to the valuation type on a material master. Typically, organisations will want to track material costs, for example, for new, used or repaired stock. The valuation type field on the material master allows you to track this stock separately, and specify what type of stock is being moved or purchased, and charge appropriately. There are follow-on effects, of course, in finance account assignments etc.
    [SPLIT VALUATION|http://help.sap.com/erp2005_ehp_04/helpdata/EN/47/61017149f011d1894c0000e829fbbd/frameset.htm]
    Hope it helps..
    Regards
    Priyanka.P

  • Handling material with different spec.

    Hello
    We have a product with different specification. But I have only created 1 material number. How can I distinguish the product for different spec. in stock ?
    BRs
    Steve

    Dear Steve
    Please used different Batch,
    Maybe you can try
    I am not sure.
    Benny

  • Material with different concentration in one storage location

    We are working in a chemical industry that make caustic soda they are selling two material of caustic soda with two different concentrations (33% and 50%). Problem is that they move caustic 33% (one material) in to one storage location at the same time the move caustic 50%(second material) in the same material tank. In this way the concentrations of caustic change say 45%. If they want to increase the concentration they move caustics with greater concentration to make this stock to 50%. How to handle this situation. Every time the move these two materials in a same tank materials concentration changes.
    Regards
    Ahmed

    Ahmed,
    Can you please let us know,
    1. Is your material batch managed? If yes would you have multiple batches in the storage location?
    2. How is the material transferred to the tank? Is it through manual 311 movement?
    Regards,
    Prasobh

  • MIRO, enter one material with different price

    Hi Experts,
    i have one PO and the material number is 20MTF70301, the quantitiy is 3. Because of the material price is different(same material number) i need the enter them line by line. For example;
    Material                     Plant         D/C        Amount      Quantity
    20MTF70301     1015     S Debit     1917,30     1
    20MTF70301     1015     S Debit     794,55     1
    20MTF70301     1015     S Debit     249,39-     1
    But the system warning is like that "Double entries for material 20MTF70301 1015 are deleted". After this warning , system automatically delete last 2 line.
    How can i enter same material line by line.
    Thanks,

    Hi
    It will naturally delete the two last items, just understand, You have the same material same vendor but want to have 3 different prices in three lines in One PO, are you not contradicting the basic idea which SAP follows, how do the in-fo recoprd will get updated? with which price?
    It is not that you can not do , but for that you have to go for another PO for a different price and the vendor but not in the same PO.
    Regards

  • Creating a Material with different values for fields in Transaction MM01

    Hello All,
    While creating a material i will be giving a Profit Center in Sales:general/plant view, which i can see in Costing1 View. If i change this in this View it automatically changes in the other View. Is there any way to give different values in the two views or then what is the significance in showing the same field again in two different views.
    Thanks,
    Shashidhar.

    Hi,
    Its just a way of showing the data in different views for user. It doesn't have any significance.
    Regards,
    Sudheer.

  • Same Material with Different G/L Account

    Hi Everybody,
    I have  a material X is for HALB .I want use X is for Stock Material and as well as  Special Procurement Q i.e Project stock.Those stock should be posted to different G/L account.Is it possible can anyone put me on this.
    BR
    govind

    Hi,
    1.
    Generally, split valuation is to valuate the same material differently based on various criteria (external/internal procurement, country of origin, etc)
    http://www.sap-img.com/mm025.htm
    http://www.sap123.com/showthread.php?t=29
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63314d43a211d189410000e829fbbd/frameset.htm
    2.
    However, (independently form the topic of split valuation), you can maintain separate valuation class for project stock. Check Accounting1 view of material master and you will find a separate field for this purpose (MBEW-QKLAS, 'Proj. stk. val. class')
    Regards,
    Csaba

  • Material with different Valuation types in WM Stock status

    Hi
    If we are maintaining stocks of different valuation types in a Plant , and the Storage Location in the Plant is Warehouse Managed,  then how can we see the stocks in different valuation types in the Warehouse stock?
    thanks
    Raj

    Hi Keerthan,
    It will not be possible to change or add valuation type after the material movement is performed for the material. Only option is to create new materials.
    In case if the materials are not involved in any material movement, then you can change valuation type. Best thing will be executing via LSMW.
    Regards
    Terence

  • MF60 scenario - same material with different orders

    Hello,
    I am using MF60 to transfer the stock from raw material location to Production location. I transfers the goods based on each production order.
    Now the scenario is: I have two tins of paint each weight 20 kg.
    My current order needs  8 kg of paint and it would take 3 days to finish the order(on Machine A). It means rest of the 12kg would be available after 3days.
    Now I am creating 2nd order(on Machine B) of smaller qty and that order requires 2 kg of the same paint. I have to use the 2nd tin of paint. Now when I try to use MF60, system does not propose me qty (as 12 kg paint is already available in Production location but canu2019t be used as it is on machine A).
    So please suggest me, how I can transfer the material to production location using MF60. I donot want to use the MB1B.
    kind regards,
    JPS

    Hello Mangalraj.S,
    I have checked with workcenter also (removing the selection date) and set the 'all requirements' in global setting.
    But it does not showed the particular components (against the order in question) but does showing those other which needs higer quanties
    Can you please explain more in detail regarding your requirement?-- The requirement is that If I have two tins of paint (20kg each), if first order require needs 8kg (but rest of the 12kg won't be available physically), Now in the 2nd order which needs 5kg. System does not propose the requirement in MF60 (I believe because of there is 12 kg already available in prod location on the system)
    Also please execute the pull list by giving the work center as the input and do not specify any date in the selection horizon for
    requirements.Include the check for include all requirements under global settings.---- I did opt the same settings but it is not propsing 2nd order requirements
    In the second tab production/process orders,just give the input as the work center and check for the same.---- In the 2nd tab I did try with workcenter but..... (I am not a PP expert, this is the first time I am working on PP, So I have created the routing without workcenter and assings the workcenter in prod order only)
    Regards,
    JPS