Materials reservation in a subcontracting order

Hi:
I have a question... we are working with a subcontracting order, when we create it trough CO01 the components are not reserved automatically by order, so  when we consult MMBE we do not see the quantity reserved in the column Reserved of the material, but if consult in the RESB table we can see the code numer, quantity, and position.
The Movmement Type that moves the material is Part Provided 543.
Any idea of the solution.
Thanks in advanced.

Hi Rupesh:
What happens  is that the materials are assigned in the operation of subcontracting  in the Route of the order, we generate a purchase order for the subcontractor, and is related to the production order.
But we do not see the reservation of the material.
Thanks.

Similar Messages

  • Subcontracting order

    Hi,
    We have one reservation for a material (BOM component of a Purchase order item) was originally created via a subcontracting PO. Then deletion indicator was set to PO line item. Then the component assigned to PO line item was deleted. But now we can not delete the reservation.
    If you have faced similar situation, could you please suggest me how delete the reservation(identified as Subcontract Requirement in MD04) in this case?
    Thanks and Regards,
    Nataraj

    Hi ,
    We have faced a similar situation wrt to Sales order and Production order where the dependent reservations were seen in MD04 after the deletion of sales order and also the TECO for production order .
    Try using  MBVR / mb22 and check , if not OSS would be the approach .
    Regards
    Lokesh

  • How to create a Reservation for my production order

    Hi,
    I have a production order for that I need to purchase 2 materials. but my problem is when the material come there is no reservation for my production order. someone can take it for another production order. How can I do that the system create a  reservation after the GR
    Thank

    Dear,
    When you create and release production order, the reservation is created for that order. Now you should first activate the Avelability check in production order.
    It is PP configuration
    Then you need to activate dynamic aveailability check in goods issue in MM configuration.
    Hence if the stock is reserved for your production order, then no one can issue and system will give error message.
    please come back if required.

  • Material reservation deleted into maintenance order

    Dear,
    I'm facing with strange issue with some maintenance order... The users have created some maintenance order, done material reservation and released these order... After that they are trying change these materials reservation and then when they go until the reservation they can see the material with status "item is deleted".
    However no changes was done these reservation. The components items is maintaned with gray scale.
    Wagner S.

    Wagner
    Can you please post the full message text including message number.
    Are you using any developments that might delete these components?
    Also, can you send a screen-shot of the following:
    Components tab with deletion indicator shown
    Order header - so we can see the statuses
    Double-click into one of the material items to view the General Data sub-tab
    PeteA

  • Delivery for Subcontracting Orders - SC

    Hi,
    I have create a subcontracting PO.
    I would like to ask which should be the proper way of creating the outbound delivery?
    I've seen that in a ME2O there is a button to make the post Good Issue and another to create the delivery, but as the transaction is called "Stock Monitor for Vendor" I believe it must be another place to create the delivery.
    Nevertheless, when I try to create the delivery I'm getting the message: "Essential transfer parameters are missing in record:  000001"
    Thanks

    Hi,
    To create a delivery (against Subcontracting PO), the following data has to be maintained in the system:
    1. The plant must be assigned a sales organization, a distribution channel, and a division. You can define this in Customizing for Purchasing, in the step Set Up Stock Transport Order.
    2. A delivery type has to be defined for the plant from which the items are to be delivered. You can define this in Customizing for Purchasing, in the step Set Up Subcontract Order.
    3. If you want to reference a reservation when you create a delivery, you also have to set the Predecessor necessary indicator to L (Provision to subcontractor necessary) when defining the delivery type. This means that the requirements generated by the reservations can be correctly offset against the deliveries created. You can define this in Customizing for Shipping, in the step Define Delivery Types.
    4. The vendor for the stock with subcontractor must be entered as the customer in the organizational units in the delivering plant, such as sales organization, distribution channel, and division.
    5. The material to be provided has to be entered for the organizational units in the delivering plant, such as sales organization, distribution channel, and division.
    6. The combination of shipping condition (from the subcontractoru2019s customer master record), loading group (from the material master record for the components to be provided), and the plant have to be assigned to a shipping point. You can define this in Customizing for Shipping, in the step Assign Shipping Points.
    To create a delivery (in ME2O), choose Edit ® Create delivery. A dialog box appears, in which you can enter the data required to post the delivery. The system posts the delivery in the background and, after posting, it informs you in a dialog box how many items were posted.

  • Stop Creation of reservation while creating process orders....

    Hi All,
    THe requirement is to stop creation of reservations on creation of process order.
    have done the configuration in order type dependent parameters to stop creation of reservations on creation of process order.
    After this configuration the reservations have stopped appearing in the MMBE for components although there are reservation created.
    The above case appears only when i am creating process orders manually through transaction COR1....But when process orders are created by converting Plann order then in this case although the order type is same there are reservations visible in the MMBE transaction for the components.
    Request you to please guide through the reason for creation of reservations when a process order is created by converting a plan order.
    Thanks in advance for your help.
    Vinit

    Hi All,
    We are using the planning strategy 40 where in we produce only when the sales order is received.
    For a material we are using SPK as stock transfer from other plant.
    The requirement for this material is triggered due to 1)dependent reservation(as this component is used as a component to manufacture other material 2)Sales requirement for this material.
    On MRP the requirement is transferred to the supplying plant and we receive the stock in our plant.
    Now this stock is the total of requirement generated to fulfill the sales requirement and the consumption requirement.We cannot differentiate which stock was called in for sales order and which for fulfilling the production requirement of the superior material.
    Whenever a production order for the superior material is created reservation for this material are created because of which the stock will not be available for creation of deliveries for sales orders.(This is because of the av checking rule)
    Is there a way to differentiate these stocks.
    We thought about creating MRP areas to manage the requirements differently but this will lead to creation storage locations and thus affect our global template.
    Thus we thought of blocking of creation of reservations......this we thought as all the materials are already available by the time the process order is created so there is no point in creating reservations for the same.
    Let m know if you need any further information .......Help me providing a proper solution to the issue.
    Thanks in advance

  • Batch determination in MIGO of subcontracting orders

    Hi guys,
    We are using batch determination for raw materials and internal batch will be assigned at the time of Goods REceipts.  This particular material will be sent to subcontracting  vendor for producing another end-product.  While doing transfer posting of this item, we have given the batch no also.
    While doing MIGO for the end-product against the subcontracting order, the system should consume the raw material with 543 movement.  While doing this, the batch no has to be selected automatically from the transfer posting document.  But it is  not picked up automatically and we are giving the batch no while doing MIGO for the end-product.  Can we get the batch no from the transfer posting document directly. 
    Do we need to do any config settings for this?
    Please suggest me the solution
    Thanks in advance

    A Question here - can automatic batch determination trigger at MIGO? Since we only set it up for :
    > Automatic Batch Determination for Sales Order Items
    > Activate Automatic Batch Determination for Delivery Item Cat
    I have an external warehouse system with no batch management. I also have an external sales system interfaced with SAP. Hence no sales documents in SAP - just inventory and FI postings. When I will be posting inventory (iDoc) from this external WM and Sales system to SAP - can I trigger an automatic batch determination in order to post inventory with batch????
    BONUS POINTS FOR ANSWER!

  • Open the reservation for the Production order

    Hi,
    I have post the GI for Production order MB1A with movement type 261 from 100 peaces components. I would like to cancel a partial quantity of components from this posting (about 30 peaces). After cancel it the reservation for the production order has to be open for 30 peaces of components.
    I've canceled it through MB1A and mtype 262 but the reservations weren't open and in the PO (component overview there is always the sign"the Final Issue for This Reservation").
    Which T.code and mtype could I use.
    Thanks
    Dede

    Hi,
    Have you cancelled the movement (of 30 pieces) by selecting the "with reference" option from the menu?
    If not, then reverse the current cancellation document. Then again cancel the 261 movemtn by selecting the with refernce button from the menu. It will sove the problem.
    Check & revert.
    Regards,
    Rohit.

  • Cancelling of a subcontracting order

    Hello
    I am trying to find out how to cancel a subcontracting order and also all the documents generated by the creation of a subcontracting order.  Do we have to receive the goods from the SC PO, delete the line item, cancel the SC PO and that's it or is there more??
    Thanks in advance
    Valerie

    Hi
    Usethe TOCODE :MD4C
    Give input  Planned order number & Execute.
    Regards
    YMREDDY

  • Goods receipt for subcontracting order! BAPI_GOODSMVT_CREATE

    I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    What can i do to solve it?
    thanks in advance.

    >
    Julia Nikiforva wrote:
    > I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    > But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    >
    > What can i do to solve it?
    >
    > thanks in advance.
    Might work
    report zbapi_goodsmovement.
    parameters: p-file like rlgrap-filename default
    'c:\sapdata\TEST.txt'.
    parameters: e-file like rlgrap-filename default
    'c:\sapdata\gdsmvterror.txt'.
    parameters: xpost like sy-datum default sy-datum.
    data: begin of gmhead.
    include structure bapi2017_gm_head_01.
    data: end of gmhead.
    data: begin of gmcode.
    include structure bapi2017_gm_code.
    data: end of gmcode.
    data: begin of mthead.
    include structure bapi2017_gm_head_ret.
    data: end of mthead.
    data: begin of itab occurs 100.
    include structure bapi2017_gm_item_create.
    data: end of itab.
    data: begin of errmsg occurs 10.
    include structure bapiret2.
    data: end of errmsg.
    data: wmenge like iseg-menge,
    errflag.
    data: begin of pcitab occurs 100,
    ext_doc(10), "External Document Number
    mvt_type(3), "Movement Type
    doc_date(8), "Document Date
    post_date(8), "Posting Date
    plant(4), "Plant
    material(18), "Material Number
    qty(13), "Quantity
    recv_loc(4), "Receiving Location
    issue_loc(4), "Issuing Location
    pur_doc(10), "Purchase Document No
    po_item(3), "Purchase Document Item No
    del_no(10), "Delivery Purchase Order Number
    del_item(3), "Delivery Item
    prod_doc(10), "Production Document No
    scrap_reason(10), "Scrap Reason
    upd_sta(1), "Update Status
    end of pcitab.
    call function 'WS_UPLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    if sy-subrc <> 0.
    message id sy-msgid type sy-msgty number sy-msgno
    with sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    exit.
    endif.
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '01'. "01 - MB01 - Goods Receipts for Purchase Order
    loop at pcitab.
    itab-move_type = pcitab-mvt_type.
    itab-mvt_ind = 'B'.
    itab-plant = pcitab-plant.
    itab-material = pcitab-material.
    itab-entry_qnt = pcitab-qty.
    itab-move_stloc = pcitab-recv_loc.
    itab-stge_loc = pcitab-issue_loc.
    itab-po_number = pcitab-pur_doc.
    itab-po_item = pcitab-po_item.
    concatenate pcitab-del_no pcitab-del_item into itab-item_text.
    itab-move_reas = pcitab-scrap_reason.
    append itab.
    endloop.
    loop at itab.
    write:/ itab-material, itab-plant, itab-stge_loc,
    itab-move_type, itab-entry_qnt, itab-entry_uom,
    itab-entry_uom_iso, itab-po_number, itab-po_item,
    pcitab-ext_doc.
    endloop.
    call function 'BAPI_GOODSMVT_CREATE'
    exporting
    goodsmvt_header = gmhead
    goodsmvt_code = gmcode
    TESTRUN = ' '
    IMPORTING
    goodsmvt_headret = mthead
    MATERIALDOCUMENT =
    MATDOCUMENTYEAR =
    tables
    goodsmvt_item = itab
    GOODSMVT_SERIALNUMBER =
    return = errmsg
    clear errflag.
    loop at errmsg.
    if errmsg-type eq 'E'.
    write:/'Error in function', errmsg-message.
    errflag = 'X'.
    else.
    write:/ errmsg-message.
    endif.
    endloop.
    if errflag is initial.
    commit work and wait.
    if sy-subrc ne 0.
    write:/ 'Error in updating'.
    exit.
    else.
    write:/ mthead-mat_doc, mthead-doc_year.
    perform upd_sta.
    endif.
    endif.
    FORM UPD_STA *
    form upd_sta.
    loop at pcitab.
    pcitab-upd_sta = 'X'.
    modify pcitab.
    endloop.
    call function 'WS_DOWNLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    endform.

  • Stop creation of reservations against the sales order

    Hi
    I have a situation here can any body help me out?
    For a single material there are two types of sales orders like export and local sales.
    Now as the sales orders are large enough and can deliver over the six month or more.
    This sales order creates large quantity reservation and due to this other sales order not confirmed although stock is available.
    Now we want to stop creation of reservations against the sales order as well as availability check in sales order (availably check may be able to by pass using item category).
    But we still want reservation against other production orders.(where the material as BOM component)

    Hi,
    check below options
    1. You can maintain Reason for rejection
    2.. you can maintain BN in sales order schedule line category
    Let's wait other experts to answer this
    Regards,
    Sankaran

  • Batch determination in Subcontracting order

    Hi,
    Can any one of you explain me the steps for doing batch determination for subcontracting orders. i am facing the same issue, but i dont know what steps to follow.
    our scenario is:  we do a GR against a Sub contracted PO using 101 mvt type and when i am trying to post the document, it's asking me to enter the batch for few components which are maintained as vendor consigned stock and in batches.
    is it possible to automate the process? can any body explain how to setup the customization for batch determination?
    thanks in advance,
    Kanth

    Follow the below steps.
    01. For movement type 543 "O" assign your search procedure T code : OMCG
    02. Maintain conditions record or strategy record.
    A1) Normaly we use batch determination at delivery level, because at the time of order material may or may not be created.for this material should be configured with batch and batch determination should be checked in sales views of material.
    A2) Batch Determination during order Creation.
    For this you need to maintain a Classes d for you Material. Depending on the Manufacturing process you can define the characteristics for your material.
    Ex: Purity for Medicines,  Resistance for Electric Items.
    You need to create a class (You might have to create a new class type) which incorporates the characteristic.
    First Create the Characteristic Using Ct04 and then using Cl02 create the Class  including this characteristic.
    Then in your material master Classification View Enter this class.
    Then Create a Batch for the particular plant and Stor Loc using MSC1N.Give the value of the characteristics in this batch.
    Then go to SPRO ->Logistics General ->Batch Management and maintain the Condition Technique (Procedure, Strategy Types and assignment to sales docs etc).
    Then Create the Batch Determination Record using VCH1.

  • Purchase price variance in subcontracting order

    Our customer has the following scenario:
         Purchase account is posted with the value of stock subsequently purchase price variance is a legal account
         Material ledger is active
         Inventories are managed with standard price for each material code
         Latin method management of inventories post stock values on managerial account
    In good receipt with a subcontracting order, in case of purchase price variance, legal account of purchase price variance is posted generating a wrong reconciliation between managerial and legal posting.
    Example
    The subcontractor is a co packer that assembles material A to produce material B
    Material  A has a standard price of   3
    Material B has a standard price of     5
    If Co packer fees have a value     of     2 no purchase price variance occurs during good receipt, as a matter of fact :
    (Co packing fees) 2 + (Material A)  3 = (Material B) 5
    Else if co packer fees have a value of 3 a purchase price variance of 1 occurs and itu2019s posted using transaction key u201CPRDu201D. On FI the following document is posted:
    Legenda  : L stands for legal account , M stands for managerial account
    (L) Co packing Fees                                         3
    (L) Invoice to receive                                     3
    (L)Purchase price variance                            1
    (M) Consumption Material A                           3
    (M) Stock  Material              A                            3
    (M) Stock Material               B                            5
    (M) Production Confirmation  Material B       6
    In this scenario Purchase price variance should be a managerial account, but  transaction key is PRD  and  changing the account would affect every posting.

    This is the answer from OSS
    Dear Customer,
    the system works as designed.
    When Material Ledger is activated, price differences are always
    generated under the circumstances you have described. The reason is
    that when material ledger is activated, price differences must not be
    included into the stock changes value, otherwise the system would
    not be able to calculate an actual price.
    When Material Ledger is activated, the customizing setting
    for handling price differences in the subcontracting process has no
    effect.
    Best regards,
    Santiago Lorite
    AGS Primary Support, Business Suite & Technology u2013 Logistics

  • How to transfer posting with reference to Subcontracting Order?

    Hi, Experts,
    Regarding to the SAP SCM510 handbook, in the section of subcontracting,it mentions 3 ways to post the provision of components from own company to stock for vendor:
    1.) Transfer posting with reference to subcontracting order
    2.) Monitoring of Subcontracting stock(using t-code ME2O)
    3.) Transfer posting without reference to PO(using movement tyep 541 + O)
    For the items 2 and 3, I can understand the processes but for item 1, I don't know how I can perform Transfer posting with reference to subcontracting order?  Anyone can explain me on the processes?
    Thanks in advance.
    Fanghua

    Shetty,
    Thank you for your help. I am really a new SAP learner. I wasn't aware of the transaction code MB1A, MB1B and MB1C etc. But I tried the way you mentioned, it works.
    My initial conern on this is really from the Enjoy transaction - MIGO. I tried to select the tranaction - Transfer Posting but it doesn't have Purchase Order(or subcontracting Order) as reference.
    How can I transfer posting with reference to subcontracting order in the transaction - MIGO?
    Thanks.
    Fanghua

  • BOM explosion in subcontracting order according to revision level

    Hello experts
    I have different revision levels available for a subcontracted material, e.g. the BOM of this material has different versions depending on the validity date.
    When a BOM explosion is carried out in the subcontracting order (either in the purchase request or in the purchase order) the selected version of the BOM is done accordingly to the delivery date. It does NOT take into account the revision level even when I change it manually.
    Do you have any idea if it is possible to force SAP to consider the revision level instead of the delivery date for the BOM explosion ? (custo, user exit, BAdI, ...)
    Many thanks
    Amaury

    Hi
    BOM explosion in Subcon PO will be carried out automatically when you select the item category L.
    If you want to control the BOM selection based on the Alternative then you can go with Production version option and get the help from PP consultant to create the production version.
    Assign the production version in Subcontracting Inforecord.
    Click the BOM explosion button the switch to alternative BOM during the PO creation.
    Hope it helps
    Thanks/Karthik

Maybe you are looking for