I am trying to carry out product allocation check at component level during sales order creation.
But during the allocation check system is checking allocation quantities of the parent material (sales order material).
What is the governing factor (e.g. product allocation procedure) at component level which triggers the consideration of allocation quantities maintained at component level (in DP planning book).
e.g. In APO availability check shows following
ATP / material A
       >> schedule line 0001
            >> Components of ATP
                  >> material B              >>  Product allocation  = 100.
As mentioned, here the allocation quantity 100 is maintained against parent material A where as as per my understanding it should consider allocations maintained at component material B which is required.
For information : The same allocations are getting considered when I create sales order for the component. (Check Mode is 011) just to ensure if the settings are correct.
Regards,
RS

Hi,
In the allocation DP planning book, you maintained the allocation quantity at material A level and you have maintained the product allocation procedure at material B level....right?
Then the allocation is actually to the component material for the production of material A. So, the system behavior is correct only.
Also please check whether is CTP is active in the check instruction of the header material A.
Please check and revert.
Regards,
Manimaran M.

Similar Messages

  • Product hierarchy and Product allocation

    Dear SD Gurus,
    Can I have some good docs on Product hierarchy and Product allocation related to SAP SD.
    my mail id is [email protected]
    Regards,
    Rakesh

    Hi
    Product allocation helps in allocating prodects based on customer requirement.
    Please go through this link for product allocation
    http://www.sap-img.com/sap-sd/implement-the-product-allocation-functionality.htm
    For product hierarchy go through this link
    http://help.sap.com/saphelp_46c/helpdata/en/77/1a39516e36d1118b3f0060b03ca329/frameset.htm
    give points if this useful
    Thanks
    Anil

  • Issue with Product Allocation Scenario

    I am Trying out Product Allocation in APO (SCM 5.0).
    Relevant setup in SPRO - Product Allocation Object, Group, Procedure, Sequence etc., Planning Object Structure, Planning Area, CVC generation, Connection between Planning Area and Product Allocation object in GATP, assignment in Location Product Master (at Customer Location) Product Allocation Procedure, Check mode, ATP Group has been done in APO.
    After entering data in appropriate keyfigures (Allocated Qty) it shows up under GATP>> Reporting >> Product Allocations >> Time Series per CVC
    Have carried out ATP Simulation to check that for a given product at Customer the Product Allocation against a Required Quantity takes place correctly.
    Now trying to carry out the Product Allocation check by creating a Sales Order in ECC. In that case during the material availability check screen in APO, the product allocation does not show up.
    I believe it is related to master data settings for the product in ECC. My questions are as follows:
    1. In ECC the product exists at the manufacturing plant only (and not at customer as in APO). There in MRP3 tab Strategy Group is maintained. Is this along with Availability Check field responsible for determining the check instruction (combination of check mode + business event) in APO for the Product Allocation check.
    2. If so (which I guess it is) I can see the check instruction picked up in APO while creation of sales order in ECC is different from the check instruction I ran simulation with. How can I ensure the same check instruction is chosen (in which case I believe the availability check result will be same as the ATP Simulation carried out in APO).
    3. In APO I ran simulation for the product at customer location (and maintained the required ATP settings in the product master). In case of Sales Order creation in ECC how does system pick up the Check Mode and Business Event for the product (having Sold-to as customer and Supply Plant as the plant code) and use it in APO.
    4. Any other setting/configuration that is missed causing this behaviour.
    I guess some of the questions is a bit hazy but I would appreciate if someone can outline the Product Allocation Scenario. I am trying out based on Building Block S59 Demand Planning for Product Allocation but of course it does not detail out enough.
    Disclaimer: My knowledge of GATP is almost nil but am exploring.
    Thanks,
    Somnath

    Hi Somnath,
    It will be a pleasure to help you out.
    Firstly I will list out all the steps which I can think of:
    (1) R3-You have moved all the ATP customizing from R3 to APO via ATP integration model.
    (2) APO- goto SPRO>APO>GATP>General Settings>Maintain Check Instructions
    Here go to Check Mode- 041 and Business Event- A and maintain the following settings manually in development and migrate it all the way to Production
    I am assuming here that you want to first do an allocation check and then availability check**
    Product Allocation: Change from NO CHECK to First Check
    Product Check: Change from First Check to Second Check
    This check mode and business event is the most common one which is triggered while placing a sales order
    See the following blog for DETERMINATION OF CHECK MODE
    http://solution-timezone-issue.blogspot.com/
    There might be other check modes( 030, 050) which might also require this change. However you can judge that while placing a sales order and when you go to the availability screen, You have the tab - SCOPE OF CHECK CONTROL where you can see the Check Mode + Business Event
    Following guidelines can be used to modify Check Instrctions after Customizing Import from R/3 –
    1.     Business Event A*  is Sales Order Entry (The main scope of GATP) so define check instructions for all check modes since it is not possible to identify the requirement class that may come over on an order. For Business Event A* if availability check was being done in R3, then define check instructions with Allocation as first step, then Availability check as second step. Else if no availablity check in R3 then define check instructions with no availability and no allocation checks.
    2.     Business Event B* is  normally for deliveries but is also required for Rush Sales Orders. An R/3 configuration showed that 041 is the only requirement class that will come across for this business event. Hence defined only for 041 check mode. For Business Event B* if availability check was being done in R3, then define check instructions with Allocation as first step, then Availability check as second step. Else if no availablity check in R3 then define check instructions with no availability and no allocation checks.
    3.     Business Event 03 required for Inventory Transaction availability check such as MB1C. For such transactions, the APO Product Master Check Mode is used. Hence check instructions for all Check Modes are maintained. For Business Event 03 if availability check was being done in R3, then define check instructions with Availability check as first step. Else if no availablity check in R3 then define check instructions with no availability checks.
    (3) Maintain the Product Alllocation Procedure:
    <b>a-</b> Create a Product Alloc Object -- Example: PAO-001
    In this step, we define the product allocations objects - product allocations are saved per object for a characteristics combination in the product allocation group.
      Product Allocation Procedures can be used to maintain different Product Allocation Objects for different time validity periods.
      Generally Product Allocation Objects are used to model the different ‘reasons’ for the need for allocation – material shortage, capacity constraint, etc.
    <b>b-</b> Product Alloc Group--PAO-1234
    A product allocation group defines a group of characteristics against which allocation checking is done.
       Creating a Product Allocation Group creates a characteristics directory in the APO database and an area in Live Cache where the key figures are maintained.
       If ‘Check Planning Area’ is set to No then allocation and incoming order quantitiy data can be seen in table /SAPAPO/QTTAB. If the ‘Check Planning Area’ is set to Yes then no data is stored in this table and the allocation check is done directly against the data in the Planning area.
       Detials of allocationconsumption by sales orders are maintained in table /SAPAPO/QTVB in APO and in QTVB in R/3.
      If ‘Check Planning Area’ is set to ‘Yes’ and if there are users are in the change mode in the Planning Book, Sales Order Entry can get locked out.
      If ‘Check Planning Area’ is initially set to yes and then deactivated later you will no longer see data in /SAPAPO/AC42.
    Settings:
    Check Planning Area – Yes. The reason being that users are not expected to lock planning books as they would be defaulted into the display mode (through a development object). Also most allocation uploads will be through batch jobs. Setting it to ‘Yes’ reduces one step of moving data between the planning area and the allocation group.
    Check Date - Material Availability Date. Consumption of allocation quantity and checking of available allocation quantities is determined by the check date.
    Time Bucket Profile – Week
    Characteristics – Product Allocation Object (1), Product (2), Plant(3), Customer(4)
    Consumption Period – Bwd Consumption 1  
    Meaning that first the order will consume from current week allocation and then go 1 week backward to consume.
    <b>c-</b> Product Allocation Procedure --- PAO-4567
    Step Sequence:
    <i>Step</i> -
    <i>Step Name-</i> -
    Prod Alloc Group -
    Wild card
    1                      First Step             PAO-1234                     9
    <i>Alloc Procudure</i> - PAO-4567
    <i>Prod Alloc Step</i> -1
    <i>Control</i>
    <i>Valid from -
    Valid to---- -
    Object -
    Active -
    Factor</i>
                            12/31/2037      PAO-001    Check the Box                  1
    <b>d-</b> Maintain Connection to Planning Area (APO) 
    In this step, we maintain the assignment of the planning area to the product allocation group. We must make this assignment because characteristics of the product allocation group have different names from the info objects of the planning area.
      All characteristics of a product allocation group must be assigned to an info object. But multiple info objects can be assigned to one info object. It is not always necessary to assign every info object to a characteristic. It is possible for aggregation and disaggregation (depending on the direction of transfer) to take place with info objects that are not assigned.
    <i>Product Alloc Group -
    Planning Area -
    Version -
    Time Buckets</i>
    PAO-1234                         xxxxx                     000             W
    <i>Characteristic</i>
    KONOB - Prod Alloc Obj
    MATNR --- Material
    WERK -
    Plant
    XXXXX---- Customer
    <i>Key Figures</i>
    Order Qty - AMENGE
    Alloc Qty - KCQTY
    <b>e-</b>  Check the Product Alloc Settings
    This is only a check- Everything should be green and OK .
    (4) You have planned the Characteristic Combination on which you want to do ALLOCATION.
    <b>Create a new POS-</b> Which has your chracateristics as PRODUCT, PLANT,CUSTOMER, Product Alloc Object ( 9AKONOB)
    <b>Planning Area,-</b> Key figures required are Alloc Qty, Order Qty( Sales Order Qty)
    <b>PLannig Book, Data View</b> which has the following characteristics- Product, PLant
    Assuming you are allocating at the following CVC level- Product, PLant,Customer
    Step 1:
    /n/sapapo/MC62-Create Time Series- Basicallly your CVCs -
    Example: Product 1234, Plant INDIA, CUstomer WALKART
    Step 2:
    Move Characteristic Values Combination to Allocation Group (APO) 
    /SAPAPO/ATPQ_PAREA_K
    INput :
    Planning Area: xxxx
    Prod Alloc Group: PAO-1234
    (5) In the INtegration MOdel - Activate the ATP CHECK Integration model for the Plant and material
    THis is the KEY which decides whether availability should be done in R3 or APO
    Material Active in the integration model -- Means Availability( GLOBAL AVAILABILITY: Prod Alloc+Prod Availability) is done in APO
    Material not active in the integration model --- Means Availability Check is done in R3
    (6) APO MASTER DATA SETTINGS:
    Material Master:  On the ATP Tab, Assign Loc Dep Procedure ( Prod Alloc Procedure)
    Location Master: Calendar Tab> Create a shipping time stream calendar
    Additional Info: Please contact your R3-SD people as this involves a lot of understanding and I have not listed all the details here.
    This config shown here is a very basic one which not even 25% of the companies might be using.
    If you have any questions on this part- please see my business card and email me**
    (7) SCHEDULING: This is a major task which determines the route and transit times for calculating the
    Material Availability date
    Goods Issue Date
    Delivery Date
    on the sales order line item- schedule line
    I dont know whether you need info on this**There are many ways of doing this
    a- Configurable Scheduling
    b- COndition records
    c- User Exit
    You can find documentation in SPRO or else let me know*
    For simplicity- Let me take the easiest to create and difficult to maintain master data- Condition Records
    Step1 --Define Field Catalog for Condition Table (APO) 
    /SAPCND/AU01
    Require Plant and Route defined here in the field catalog
    Step 2- Define Condition Table for Scheduling (APO) 
    /SAPCND/AU03
    Create a new table- 901
    901 -  Pick Time based on Route with key as Route
    902- Route Time based on route
    Step 3- Maintain Access for Scheduling (APO) 
    /SAPCND/AU07
    Take the important ones- PICK and TRAN
    I am assuming again as I dont know what kind of Scheduling is maintained on R3 Side. Mostly 80% companies have only two lead times- Pick and Route Transit time.**
    PICK- Select pick and click on accesses > <i>Acno</i>-10-- <i>Table</i>-901
             >> Then save it > and go in again
    Select PICK and click on Fields> A popup will appear > Enter the access sequence as PICK--- Enter the access as 10  and click on the GREEn ARROW and save it
    TRAN- Select TRAN and click on accesses > <i>Acno</i>-10-- <i>Table</i>-902
             >> Then save it > and go in again
    Select TRAN and click on Fields> A popup will appear > Enter the access sequence as TRAN--- Enter the access as 10  and click on the GREEn ARROW and save it
    Now coming to maintaining the Condition records in APO EASY ACCESS
    /SAPCND/AU11
    Create  SCheduling Step for PICK : Enter condition type- PICK
    <i>Enter Route</i>- USCAN --- <i>Duration</i> -24:00 (Hrs)
    Create  SCheduling Step for TRAN: Enter condition type- TRAN
    <i>Enter Route</i>- USCAN --- <i>Duration</i> -48:00 (Hrs)
    Now Let me answer your questions:
    (1) Question 1- <i>In ECC the product exists at the manufacturing plant only (and not at customer as in APO).</i>     
    I did not undertsand what you mean here. As we can create a Material at the following locations in APO( Dist Center(DC), Manu Plant(PL), Cusomter, Vendor, etc)
    For GATP all we need is the material at a PLant location
    STrategy Group on MRP3 tab: This is purely used for determining the CHECK MODE value on APO Product Master.
    When this is blank on R3, the check mode will be blank on APO.
    However SAP recommends Putting in a strategy group value on R3 Material Master
    or
    a default Check MOde value for all those Products who have blank check mode-   041 is the best value * This piece SAP hasnt recommended but I found that there is No harm in anyway and it is MANDATORYfor inventory transactions like GOODS ISSUE otherwise you will get a QUEUE in SYSFAIL **
    Even if this is blank this has no effect on the GLOBAL ATP as the Check mode for a SD transaction is determined as follows
    98% of the SD transactions will generate a CHeck mode of 041 and Business Event- A ***
    Through the item category and the MRP type in the MRP view
    The item category is derived from the item category group in the Sales view of the material master record and from the order type of the sales document. Together with the MRP type in the MRP view of the material master record, the item category determines what requirements type is selected. The advantage of this method is that the selection of the requirements type depends on the business process (such as quotation, sales order, or repair).
    (2) Question 2 - I guess now you must have understood why when you do a simulation in APO, it is taking the Check mode from APO product Master
    and when you do a ATP Check from R3, the check mode(041) is different
    You dont need to ensure that they are the same- It doesnt matter in anyway.
    (3) Question 3- <i>In APO I ran simulation for the product at customer location (and maintained the required ATP settings in the product master).</i>I
    When you run ATP simulation- AC04, you generally run it for the plant as that is the supplying location and not the customer.
    <i>In case of Sales Order creation in ECC how does system pick up the Check Mode and Business Event for the product (having Sold-to as customer and Supply Plant as the plant code) and use it in APO.</i>
    PLease look above for this answer.
    (4) Question 4 - <i>Any other setting/configuration that is missed causing this behaviour.</i>
    To my best knowledge, whatever I could remember I have listed out. However there are some more steps which might be needed.
    Follow all the steps as I have mentioned and whenever you get struck somewhere, shoot me a message and I will help you.
    ONe more pointer here to what you have mentioned
    Relevant setup in SPRO - Product Allocation Object, Group, Procedure, Sequence etc., Planning Object Structure, Planning Area, CVC generation, Connection between Planning Area and Product Allocation object in GATP, assignment in Location Product Master (at Customer Location) Product Allocation Procedure, Check mode, ATP Group has been done in APO.
    After entering data in appropriate keyfigures (Allocated Qty) it shows up under GATP>> Reporting >> Product Allocations >> Time Series per CVC
    <u><i>Have carried out ATP Simulation to check that for a given product at Customer the Product Allocation against a Required Quantity takes place correctly.</i></u>
    Somnath, I believe you might have a wrong picture here. The concept of allocation is  Controlling Supply against huge Demand which is in this case coming from SALES ORDER
    When you place a sales order, the supplying location is your plant and that is where you would like to put in allocation quantities
    Say for example for a material 12345 - You have stock of 100 Qty in Plant KING fo this week and it shows as follows in the planning book
    Customers say are WALKART, GE-FUG, MACROGUN
    The CVCs which we have to create are as follows
    Similar to Demand PLanning**
    Material 12345 -PLant KING-Cust WALKART-Prod Alloc Obj
    Material 12345 -PLant KING-Cust GE-FUG-Prod Alloc Obj
    Material 12345 -PLant KING-Cust MACROGUN-Prod Alloc Obj
    And this is how it appears in the planing book when you go into DETAILS ALL
    You basically enter the Allocation Quantities just as how you enter forecast quantities in DP Book*
                            Wk1   |  WK2     WK3   WK4  WK5
    Alloc Qty                     |
    Material 12345                |
    Plant KING                    |
    Cust WALKART            50    |
    Cust GE-FUG             30    |
    Cust MACROGUN           20    |
    Incoming Order Qty               |
    Material 12345                   |
    Plant KING                       |
    Cust WALKART           <u>50</u>|
    Cust GE-FUG            <u>25</u> |
    Cust MACROGUN          <u>20</u> |
    <u>50</u> : Say the Cust WALKART has ordered 250 for this week, however only the allocated quantity -50 will be confirmed for him and the remaining 200 qty will be confirme at a later week when he is given the allocated amount.
    <u>25</u> :Similarily say this customer GE-FUG has ordered 20 qty. So his remaining allocation is basically 5 which cannot be used by any other customer.
    <u>20</u> : Say this customer MACROGUN has ordered exactly the allocated amount of 20. So his remaining allocation will be 0.
    This is the basic idea of how Allocation Concept is used in GATP.
    Ofcourse you can add the other functionalities like
    Rules Based ATP(LOcation Substitution, Product Substitution)
    Multi ATP( BOM-COmponents)
    Check Aginst Forecast
    Etc Etc
    Like any other module of SAP- this module has much to offer which unfortunately I cannot list here**
    GOOD LUCK and let me know If you need additional help.
    Regards
    KUMAR AYYAGARI
    Message was edited by:
            Kumar P Ayyagari

  • VMI order check against Product Allocation

    Hi
    We are setting up VMI where we are to plan the supply to one of our customers.
    During our tests we have dicovered that the TLB orders are not checking against Product Allocation.
    An ATP check does takes place when creating the TLB order (we are not using Deployment!!) but check against Product Allocation does not take place!!!
    If we do an online ATP check from R/3 after
    Does anybody knows how to enable check against Product Allocation during TLB order creation ?

    Unfortunately there is not a tool to make diagrams in here or do we have..
    To depict ATP check against Product Allocations, we can have two big blocks representing R/3 and APO.
    Then in each block we can have smaller blocks to represent
    a sales order creation(in R3 block) and Product Allocations in Planning area (in SCM block).
    You can depict ATP call by making an arrow from sales order block to product allocation block. Then to add further details you
    can have a time series(bar graph) showing product allocations for time buckets( say months) getting offset by incoming orders in a separate diagram.
    to represent BOP, a block for SD ( in R3 block) and a block for BOP (in APO) and a link between them to trigger BOP process. A line from BOP back to R3 block connecting a smaller blocks "process event" and then connecting to "update".
    This update block should be linked to another smaller block in APO  named as "update time series". then this update time series can lead to "delete temporary quantity assignments" block( in APO).
    Hope this helps..
    Mohan Chunchu

  • Add a custom field for Product Allocation

    Hi experts,
    I have copied S140 to S501 to add a custom field for product allocation.
    I have added the custom field in MCVBAKUSR, so it is visible in MCVBAK.
    However, I don't know whether I can populate data into custom field. I searched in forum, someone said it can be done in SAP enhancement MCS10001. But it can't work. I have tried to place a break-point in the code, and seems that throughout the order creation and product allocation check, it hasn't get into the codings in enhancement MCS10001.
    Can anyone give me some idea on it? Thanks.

    You should have simply extended VBAK table. It would've taken care of extending MCVBAK, etc. Then VBAK field would have to be populated in a user exit USEREXIT_CHECK_VBAK in MV45AFZB, when a document is being created/changed.

  • Availability check against product allocation

    Hi gurus,
    I'm trying to figure out how depict in a diagram the process of availability check against product allocation.
    The process includes the sales order creation in R/3, the availability check in APO (SCM 5.0) ,  returnig the delivery date.
    We are also planning a backorder process
    I think the diagram is very simple ... just 1 box for the sales order creation, one box for the availability check and 1 exit to the back order processing.
    Any help  will bee appreciated
    -Italo

    Unfortunately there is not a tool to make diagrams in here or do we have..
    To depict ATP check against Product Allocations, we can have two big blocks representing R/3 and APO.
    Then in each block we can have smaller blocks to represent
    a sales order creation(in R3 block) and Product Allocations in Planning area (in SCM block).
    You can depict ATP call by making an arrow from sales order block to product allocation block. Then to add further details you
    can have a time series(bar graph) showing product allocations for time buckets( say months) getting offset by incoming orders in a separate diagram.
    to represent BOP, a block for SD ( in R3 block) and a block for BOP (in APO) and a link between them to trigger BOP process. A line from BOP back to R3 block connecting a smaller blocks "process event" and then connecting to "update".
    This update block should be linked to another smaller block in APO  named as "update time series". then this update time series can lead to "delete temporary quantity assignments" block( in APO).
    Hope this helps..
    Mohan Chunchu

  • Can I use the fields Product allocation and Basic material for bifurcation of material

    Dear Users,
    We have a requirement for bifurcation of material so we need two field in material master for fulfilling the requirement. First requirement is material category like insurance or revenue etc., second requirement is department wise like electrical, maintenance etc, so i have choosen the fields 'Product allocation' in basic data 1 screen in material master for fulfilling department requirement and then in basic data 2 i have choosen 'Basic Material' field for fulfilling material category requirement. My doubt is whether this change will effect the reports and i need to know the effects of such changes.
    Thanks,
    Manoj

    As you are trying to use the standard fields, so you can read the F1 help for these fields.
    Also check in which table and program, the fields are used.
    Read the F1 help and find the table and program by using this document How to find Table name for a Field which is shown structure name on press F1.
    After reading this, If these fields are suitable for your requirement, then you can continue.
    Regards
    Dev

  • GATP Product allocation status report and backorder processing

    Dear Experts,
    We are using product allocation as the first and only step in GATP check.
    The scenario is like this:
    Sales order total quantity = 200
    Planned allocation quantity=150
    Thus
    Confirmed sales order quantity=150
    Questions:
    1.Now how can see the confirmed/unconfirmed situation for all sales orders.
    Is there any standard report.
    I understand that this report need to show the planned allocation quantity,total sales order quantity and the confirmed sales order quantity may be bucket wise.Also this report can show the details of all sales orders in the bucket.
    The GATP planning book only shows confirmed sales orders in the "sales order" keyfigure until you have introduced another order series key figure for sales order(not related to GATP) which has sales order/scheduling agreement category group assigned to it.
    2.Can I do backorder processing of sales orders assuming that after the above report is run,I have changed the planned allocation quantity from 150 to 200 and I need that the sales order can be confirmed now by this program rather than by going into ECC and triggering the GATP check again.
    Note that the stock availability situation may remain the same.
    Request you to kindly suggest if this is possible in backorder processing.If yes,then what are the settings and the transactions to execute this.
    Thanks,
    Chandan

    Thanks so much Michael for a prompt reply.
    Couple of points.
    1./sapapo/ac42-This report is helpful but this has 2 issues.
                                                 It has to be run at individual CVC level.Thus it is not a comprehensive report.
                                                 It does not provide sales order original quantity.It just provides the planned allocation quantity,confirmed sales order quantity and the remaining quantity.This is normally already available in interactive planning of GATP planning area.
    What we need is a report which must say what is the original sales order quantity and how much has been confirmed and how much is the bucket planned allocation quantity.
    2.Running ATP in product view or interactive backorder processing view may not help as they seem to be working with ATP group and not with check mode.Note that product allocation gets triggered when check mode comes into play.
    Do you know if we can make it work with check mode.
    3.The batch backorder processing is working when I am using the "update changes" option.I am still evaluating the results as I don't understand many settings here.It will be nice if you can elaborate on some of the settings used in this transaction please.
    Thanks again.
    Regards,
    Chandan

  • Daily and Monthly Production Allocations

    Does anyone out there have experience with using PRA for daily production allocations?
    I know there are lots of companies using PRA for their monthly production allocations but I was hoping to get some feedback as to why companies have avoided doing their daily allocations in PRA.  Any feedback would be greatly appreciated.
    I am working on a project that is considering moving their daily and monthly allocation from TOW (Landmark Graphics) to SAP.

    Hi Polaris,
    Instead of hard coding the HRS as 8 in PCR please try to read the hours from Info type 0007. Sample PCR is as below.
    where EG-1 is intern
    Z105-Time type
    For permanent employee complete calculation will be based on the IT0008.
    Please explain with an example if you still have any queries.
    Hope this helps:)
    Regards
    Rakesh KM

  • Global ATP with product allocations and SD returns

    Dear all,
    We have  been setting up an implementation scenario with an ECC 6.0 and SCM 5.0 system which verifies SD orders versus SCM product allocations.
    With SD orders and SD contracts everything works fine. But we have a problem with using SD returns (same material and plant used like the SD orders): We would expect the system also to check the returns for product allocation quantities but it seems that the SCM availability check does not enter the product allocation procedure at all (we have some user-exits in use but these are only accessed when we go via SD orders, no access at all for SD returns).
    Is there any special setting which we have to activate in order to have the SD returns properly processed with product allocations? (Customizing "Set the Transfer of Returns to SAP APO" within ECC is activated) The system somewhere gets stuck during the check within the SCM system.
    Thanks for providing assistance regarding this matter.
    Kind regards,
    Klemens

    Hi folks, did you resolve your issue here? I assume what you are wanting is for the Returns order to free up allocations qtys that had previously been consumed by the originating sales order, that is, incoming orders qty should be reduced by the amount of the returns order. I know that when a sales order line item is rejected the incoming order qty is reduced, but I'm not sure it is possible for a returns order to do this.
    ATP Man, are you saying that as category BZ is not supported by Allocations that it is therefore not possible for the Incoming Orders Qty to be reduced  by a Returns Order? I have a business reequirement to do exactly that.
    If it is not possible to do this through the automatically via the ATP check, the only way I can think to address this, would be to try and transfer the Returns qty to SCM after the order is saved and then to have a macro that reads the returns qty and reduces the Incoming Orders qty by the qty of the return.
    Paul.

  • Third Party Drop ship and availability check against Product Allocations.

    Dear All -
    We are facing a situation where we need to create a third party drop ship Sales Order with an item category which still reaches out to APO and confirms against the product allocation quantities. This is not supported by standard SAP.
    Has anyone come across such a requirement and how has it been handled. I would really appreciate any suggestions.
    Regards
    Mandar

    Vladimir,
    I want the drop ship in which when you create SO, before selecting the vendor, system should perform availability check for plants. If material is not available in the plants ( nearest plant) then system should select the vendor who will ship the material to customer directly.
    _pat

  • APO product allocation and customer hierarchy groups

    Hi,
    we have customer hierarchy groups. In the future we want to use product allocation in APO.
    The values of the customer hierarchy groups will be changed often.
    How can we map the customer hierarchy group to a product allocation group?
    Thanks,
    Michael

    Hi Michael,
    Not sure it is the only way but you can try the following,
    1. maintain the field catalogue and the product allocation group in APO
    SPRO
    Advanced Planning and Optimization
    > Global Available-to-Promise (Global ATP)
    > Product Allocation
    2. Maintain the planning area accordingly
    (+ the connection to the PA - still in SPRO...)
    Now start the real thing:
    3. pass the customer hierachy to the sales order in R/3
    You can use exit: MV45AFZZ u2013 form USEREXIT_MOVE_FIELD_TO_VBAK
    4. Pass the information to APO
    A new exit: FV45VFZY form USEREXIT_CATALOG_VALU - Adding to the APO field Catalogue
    Now you mentioned frequent hierarchy changes... that I don't know how to handle. When you change the hierarchy how do you want the consumption to happen? I guess the new sales order should consume the new hierarchy, but what about the old assignment?
    If somebody know ho the system handle that, that would be great!
    Thanks and Regards
    Julien

  • Updating product allocations

    Hi,
    Product allocation is maintained at component. When I create sales order at parent material, allocation check takes place at component level (MATP is used). e,g ,incoming quantity (allocation) is 20 units.
    When I delete the corresponding ATP tree, the allocation quantities from the DP planning book in which allocations of the component are maintained is not getting updated.
    But when I delete sales order, the allocation situation in DP planning book is getting updated i.e. incoming order quantity (which was 20 units earlier) becomes 0.
    Query - so what is the element based on which the allocation quantity in DP planning book is getting updated when sales order is created ?
    Is it not based on ATP tree structure?
    thanks in advance..
    Regards,
    RS

    Hi Michael,
    Thanks for your response,
    So sales order is the element which controls the updation of the allocation table.
    If ECC is already working and allocation functionality is to be started using APO. Are the following steps correct ?
    1. Maintain allocations in APO
    2. Transfer only sales orders (existing) from ECC to APO
    3. Carry out availability check based on sales order priorities, in order to consume allocations. This is for initial consumption of allocations.
    4. Tranfer receipt elements data (e.g. stock, SNP planned orders)
    5. Re-ATP check for the sales orders in order to give the cofirmation dates based on receipt elements.
    The scenario is MTS....
    Insights in this area will be appreciated.
    Regards,
    RS
    Edited by: sap_apo31 on Dec 13, 2011 9:41 AM

  • Restrict Product Allocation if Planned order is not getting created

    Hello All,
    We have a scenario that when ever a Sales Order is getting created, Product allocation assignment will be done automatically and planned orders will be created for that requirement in APO.
    There are some cases where in because of wrong Variant Configuration, Planned orders wont be created. Our requirement is to delete the Product Allocation automatically or to stop the product allocation assignment if the planned orders are not created.
    Do we have any standard setting for doing so or Kindly suggest me some BADI's which can be used for it.
    Thanks in advance.
    Best Regards,
    Srinivas.D

    Srinivas,
    A rather odd requirement.
    Have you tried in SCM APO 'Maintain check instructions' to perform the product check first, then allocation?  I would think that if the product check failed, then allocation would not be consulted, and no allocation therefore assigned.
    IMG > APO > GATP > General Settings > Maintain check instructions
    Best Regards,
    DB49

  • Adding new field to product allocation catalog?

    We are configuring product allocations in SCM 7.0 and have a requirement to add a new field to the standard field catalog for the allocations check.  We have followed the procedure outlined by SAP to add our new field to the structure /SAPAPO/KOMGOZ, add the field to the field catalog, and copied the source code to ERP.
    The issue that we are having is that new custom field that we added to the field catalog is not being populated when we execute /SAPAPO/ATPQ_PAREA_K - Characteristics Combinations from Planning Area.  The product allocations group that is being used in /SAPAPO/ATPQ_PAREA_K has three characteristics. The first two which are SAP provided fields are being populated correctly, but the last custom field we added to the field catalog is not. It is just blank.
    Is there a step that we missed during the configuation.  We are only using this field for the product allocations check (we do not use Rules Based ATP).

    Hi Arnel,
    I was expecting with examples but anyway.
    consider the examples of your CVC
    Country Region brand SO DV DC mat plant  etc...
    now you want to first get confirmation on SO and DV  , Prd allo group with these 2 characteristics
    same goes for all other combinations.
    now if you want to go with Either Or   /And.. decides if you need to go with one product allocation procedure with many prod allocation group  /or/ a sequence product allocation procedure.
    Its very straight forward as such... if you come up with examples, i can give better details.
    Looking at point 3 it looks like you want to go with 'OR' so you will have to go with sequence.
    (tcode: /SAPAPO/ATPCQ_GENER)-  is to check the customizing,  sometime you might move the Prod allocation from dev system and just to make sure there is no issue in transport /missing config.. it will check with transaction code.  I don't think you have to run this every time. After every transport..may be you have too as a caution check.
    Imp:  just to check @ different levels i dont think you will have to create different planning area.  If all the characteristics on which you want to (combinations) is available in one planning area , you should be good with one planning area only.
    Hope this is helpful.  I would suggest to follow what we have discussed so far and then you can create another message after the configuration/approach you finalized  with new issues/concerns you will be facing.
    If issue are really bothering you much, you can reach out to me directly. Let me know
    Pravin M

Maybe you are looking for

  • Error deploying Crystal Report XI R2 to Enterprise - Failed to read paramet

    Error deploying Crystal Report XI R2 to Enterprise - Failed to read parameter object. I know this issue has been addressed several times and the solution recommended was to install Service Pack 2. I have done that. It started working for me too; howe

  • HT4890 where are my photos on iCloud?

    I've been backing up photos from my iphone 4 to iCloud (previously Moblle Me) and now I can't find them. Where are they? Thanks

  • As of today, no services except "Computer" and "Settings" show up

    Apple TV 2. Listened to music via iTunes Match last night, watched some YouTube videos.  All set to watch some Netflix today.  However, I have *no* services showing up now on my Apple TV (second gen) except 'Computer' and 'Settings'...  I restarted t

  • Font in File Info dialog

    How do I change the font used in the PS CS4 "File Info" dialog? The type on my Vista 64 machine is unreadable. All of the menus and everything else are okay; it's just this one dialog box. It's hard to keyword images. The same dialog box on my Window

  • MDM Syndication Automation Issue.

    Hi               Iam practising MDM asyndication process automation. As part of this I have created Syndication Map and assigned this map to Outbount port in MDM console. BUt i can not see any syndicated Files in outboud ready folder in MDM Server.