MB1B - Bulk material issue for sub-con PO

Hi All,
For a subcon PO, the user has by mistake done a transfer of a bulk material using MB1B. The vendor has used this material as well. Now when i receive the material from the vendor, this bulk material is not consumed by this PO with a 543 mvt, which is normal.
But the issue is, this item is now shown as lying with sub-contractor, & there is no way i can post a 543. I can post a 542 & reverse the issue, but then how do i treat this stock?
Hope my question is clear, await inputs.
Regards,
Vivek

Hi Vivek,
Thanks for your explanation.
Still I have doubts. Are you speaking of bulk material in terms of BOM?
I haven't got experience with them BUT SAP help definetly says that bulk material is not 'withdrawn specially for the order' and 'a bulk material item is only for information'.
http://help.sap.com/saphelp_46c/helpdata/en/b1/c043f4439a11d189410000e829fbbd/frameset.htm
Considering this, we cannot expect consumption by mvt 543 of bulk material when GR against subcon-PO takes place.
It's only my opinion so please think about this yourself as well.
BR
Csaba
Re: Items with Bulk Indiactor in subcontracted assembly.
http://www.sapfans.com/forums/viewtopic.php?f=9&t=289342&p=869693&hilit=bulkmaterialconsumption#p869693
http://www.sapfans.com/forums/viewtopic.php?f=6&t=310542&p=938766&hilit=bulk+material#p938766

Similar Messages

  • Issue with Sub-Con PO (543 O movement)

    Hi All,
    I find that system is not posting 543 O movement for individual components when i do a GR for sub-con PO Material. I am following the steps below.
    1. GI of components to Sub-Con PO thru' ME2o (System records a 541 movement for the components).
    2. GR of Sub-Con PO thru' MB01 (101 mvt.) But the system does not post a 543 O movement for the components.
    3. Also in ME2o when i check for these components, i notice the output still shows these components, although the stock is '0'.
    Await inputs.
    Vivek

    Hi All,
    Sorry for the late response. But after a detailed study, i notice this error is because, the user has actually transfered items which have bulk material indicator using MB1B by mistake, so when a GR for the material is done, system is not considering these bulk materials & hence no 543 O is posted.
    Also these stocks are shown as lying with the vendor.
    Now the dilemma is how to ensure these items are actually transferred to the respective finished assy & ensure that the costing of the assy is revised. If it is not possible, can i just post a 542 & reverse back these postings, will it have any financial impact? In terms of costing of the finished assembly which we received from sub-contractor will it have any impact?
    Also would like to know any standard tx which displays stock @ sub-contractor by PO or any user-exits available for this?
    Anyone to help on this?
    Edited by: Vivek on May 7, 2008 3:02 PM

  • GR for Sub con SA

    hi
    when am taking Gr for sub con SA
    its showing document does not have any selecatable items
    even i maintained
    1.GR date is after Sch lines date
    2.No confirmation control is there
    3 SA released
    when am searching open SA in MB01 with ref to mat, vendor its showing that SA
    but when am selecting adopt
    its showing this error
    still its giving same error
    still is there any thing to check
    thanks
    nani

    hi
    i raised this issue to SAP also.
    they are suggesting solution as
    The proposed quantity for the goods receipt results from the open quantity until the current date. The exception to
    this is on the first goods receipt for a scheduling agreement
    that no lines are currently due. In this circumstance it will
    suggest the total quantity. Subsequent goods receipt for this
    scheduling agreement will propose open quantity to current date
    or the M7064 error will be received. The 'Proposed All Items'
    flag ( in Settings - Default Values - Proposed All Items )can be used to bypass this error and no quantity will be proposed but the line item(s) will be available for selection. The first goods receipt of a
    scheduling agreement with deliveries due, will only propose the quantity due and not the total of all lines.
    Please also refer note 53161 for additional information.
    actually y system is not suggesting open qty as proposed qty
    for the current date.
    he is suggesting to select suggest zero lines check box
    if i select this system will not propose qty i need to enter qty manual.
    how can i do
    can any one through light on this.
    thanks
    nani

  • Multiple times Issue of material against same Sub. con. PO

    Hi,
           I have one issue,  we have created one Sub contract PO, and we have done MB1B ref. to PO and Challan is created by one user,  and when another user comes he has also issue the material in MB1B against same PO and created Challan  even thpugh  the full PO qty. is transfer in first MB1B and challan,  so How to set error message for this onece the full qty. of material issue against one order next time when user try to issue material gainst same PO user should get the error message.
    regards,
      zafar

    It can be restricted to some extent  if child materials in BOM is batch activated.
    or
    Restrict p.o authorizatin to single user,he should lock p.o line items once materials are issued using challan.
    Since there is no control in MB1B/Challan creation until material is goods receipted.

  • Excess material issue for subcontract should not be add in GR

    Hi,
      I have one problem,   we have one Finish materia   X   for making one    X we use three raw material  A,,B & C to make one X 1 qty of each A,B,C required  so while we make the GR for one X  we issue One A and B  but as C is having std. packing of 5  so we want to issue the 5 qty of C to vendor,  now    when we make the GR   for X  with MB01,  first we ahve to give the Qty. of X material  so we ahve given  1  as the PO is for 1 qty  X , then we ahve to give the qty. of raw materials for A,B,C   here sytem first automatically taking qty. 1 for A  one for B  and 5 for C  but we want that as only one C is required to make one X  so sytem should take only one C qty  and remaining 4 qty. of C should be with vendor  stock  that we wil adjusct in next PO for X materail  and challna should be close properly,
        How we can handle this.
      regards,
        zafar

    Hi,
            I want to transfer the material with ref. to purchase order only, so that all the material which are present in that PO should automatically conme in the MB1B for transfer of material,
            Is there any other way such that while making GR the qty. will come as per BOM only for consumptio.
      regards,
       zafar

  • Bulk material issue to cost centre by KANBAN

    I have a problem for bulk item issues to cost center.
    I have a material defined as bulk item and given cost center and storage type in the control cycle.
    I'm using 'Stock transfer strategy' in which control type is "Transfer requirements from a storage location controlled by WM".
    When I used to scan there is no MM movement and the stock from MMBE screen is not transfering into cost center.
    Thanks for your early reply.
    Kind Regards
    Mayur Kshirsagar

    Hi Mayur
    I have done some further work on this - and after digging myself into a hole, I think I have found some further details.
    A better setting for the Customisation is 'Direct transfer posting'.
    The option of using a reservation cretaes a reservation which then needs confirming and so adds transactions to the process which add no value in a WM environment (at least for this transaction).
    When set as 'Post withdrawl to cost center', on setting the kanban to empty, the set of 3 movements, 311 out, 311 in, 201 out are posted.  A TR is created to understand where the stock from the WM controlled storage location 'was' taken.  This then becomes the TO to support the physical movement of the stock
    My preferred option would be 'Procurement for cost center' however in this case I am only seeing the 311 movements. When the TO is confirmed and the kanban goes to full, the 201 movement (which I expect from the documentaion) does not occur.  I'm not sure if I'm missing something here - any ideas?
    Regards
    Adrian R

  • Different exchange rate on each material issued for order

    Hi all,
    I have strange situation like this. Controlling area currency is USD and object/company code currency is THB. When i do Good Issue for production order, system use different exchange rate for each material although all of these material are posted on the same posting date for good issue.
    Example :
    I do Good issue material A and material B for production order 100000 at posting date 01.03.2008. When i look into cost analysis and look for USD currency, i found that exchange rate for material A is 30 THB/USD and exchange rate for material B is 25 THB/USD. FYI i use exchange rate type m. How can this happen?? How can each material have different exchange rate although its transaction at the same posting date??
    I'm waiting your advice.. Maximum point will be given.
    Best regard,
    Yudha

    I think its a bit misleading...The requirement is to post an Invoice with a base taxable amount of  Exchange Rate A and a tax amount of Exchange Rate B. The Base Currency is JPY and the System Currency is SGD. So the Report S_ALR_87012357 should see the amount in SGD there. The Issue is caused by the different exchange rate on the tax amount submitted by the Vendor Invoice.
    Example: Vendor Invoice Amount: 926,413.00 JPY, then we created PO to Invoice with Base Currency JPYalso amounted 926,413.00 JPY. However, in the Vendor Invoice Amount, the Tax Chargeable is 923.00 SGD (based on their exchange rate 65.66 JPY per SGD). But our Exchange Rate (System Rate) is 63.49 JPY per SGD. How can we reflect the Tax Amount as 65.66 JPY but still the correct SGD amount is based on the Vendor Original Invoice Exchange Rate 65.66 and not the System Exchange Rate, 63.49 in the same Invoice Creation (MIRO)?

  • Material issue to sub-contractor

    Sub-contractor needs 2 qty of X raw material to manufacture our finish product. instead of 2 qty sub-contractor needs 4 raw materials. how to handle the extra  qty for sub-contracting?

    Hi,
    First please search on SAP online help and on MM forum in connecton with subcontracting, there's huge amount of threads...
    My suggestio:
    1. You can modify the PO item's component list from 2 pcs to 4 pcs (ME22N > "Material" tab of subcon PO item > "Components" icon) nad after that you can do the GR.
    2. Subsequent adjustment - here first you post GR by consuming 2 pcs and after that you
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b908943ad11d189410000e829fbbd/frameset.htm
    You can use both MIGO and MB04 for this purpose.
    Please also read the pdf attachment of OSS note 205454 that has many useful information on subcontracting.
    Regards,
    Csaba

  • Material issue for subcontracting PO

    while issuing the material for subcontracting PO with TCode MB1B mov type 541 when i am giving more quantity then the subcontracting PO it is posted how it is possible. Please help...
    For an instance i am giving quantity 10 in Subcontracting PO and giving 12 quantity in MB1B, its posted...

    Hi,
    Yes , With MB1B if your sending materials to Subcontractor you can send more qty then then PO qty system will allow you , there is no controle.If you want to send as per po qty then use ME2O transaction.

  • Material Issue for both MTO & MTS

    Dear Guru's
    I have to do REM Backflush for a MTO scenario.
    The corresponding raw material are available in stock which was not purchased over a period of  time.
    When I try to do post with correction the system is not allowing me to do the posting, the system is giving error as sales order item is not available.
    Can anyone help me consumming the raw material available in the stock .
    Is there any settings to be done to consume the material which is available in the stock for bothe MTO & MTS.
    Kindly do the needful.
    Helping hands will be appreciated with good points.
    Thanks & Regards,
    Arul.

    Hi Arul
    Please check the below in your DEV server.
    If you put the Individual/coll indicator to 2 in MRP 4 view in material master the raw materials can be taken from unrestricted use stock while back flushing.
    Or
    IN MB1B you can use mvmt type 412E to convert unrestricted use stock to sales order stock.
    SO u can do the backflushing after the conversion.
    Cheers
    JOJI

  • Material issuing for an operation

    Dear Gurus
    Can we issue material for a particular operation in a production order ?
    Regards
    Sandip Sarkar

    Hi
    As our forum members told, assign the particular component to the particular operation.
    so when ever you issue the component for the production order.
    (you cannot issue the component for every operation. normally GI will take place for as per the production order) .
    so when we do the confirmation operation wise, the operatio consume the component which assign to the operation.
    this what happened in the sap.

  • Material issues for equipment from already issued materials for FL(Func Loc

    Hi,
    At my client place, the working nature is 24x7. Store is closed by 3:00PM and no material is issued after that. So, Departments get issued materials for the Functional location at once and distribute(consump) materials for Equipments as per requirement under that Funcitonal location. Our client wants that when material is consumped for equipments it should be issued from functional location issued materials.
    E. g. : For the funtional location "SSSL-1000-DG" 50,000 litre oil has been issued. Now, for lubrication of Equipments under this Functional location, Oil should be issued(debited) from this functional location. suppose, 1000 litre has been consumped for "ABC" Equipmnets. So, balance Oil of Functional location will be 40,000 litre.
    Please help me.
    Dinesh.

    Hi Dinesh,
    Generally material/consumption booking is done thorugh warehouse only.
    Once you issue the material from warehouse against F.L. cost center it will get updated with that F.L only.
    If you want that material to be booked against equipment then you need to issue against equipment only.
    You can create another store at maintenance side. Or just take the material from store and on next day book against required equipment.
    Sundar

  • Spry Menu Bar 2.0 auto-width issues for sub items

    I am testing the spry menu bar 2.0 and it displays perfectly in IE 9.0/8.0 but the auto width is not working for Firefox (testing 3.6.16), Chrome (testing 10.0.648.205), or Safari for windows.  Content is being driven by PHP and MySQL.  This is the first time I have come across something working better in IE than the other browsers.  Great job on the IE patch script.  How do I get the other browsers to cooperate?  I moved the in page CSS generated by the widget browser to it's own CSS (called spry_menubar2_horizontal_sample_layout.css) and am including the files below in the head.  The links below point to an exact copy of the files as the working copy of the files is located elsewhere.
    SpryMenuBasic.css - link
    SpryMenuBasicSkin.css - link
    spry_menubar2_horizontal_sample_layout.css - link
    SpryDOMUtils.js - link
    SpryDOMEffects.js - link
    SpryWidget.js - link
    SpryMenu.js - link
    SpryMenuBarKeyNavigationPlugin.js  - link
    SpryMenuBarIEWorkaroundsPlugin.js - link
    the in page script is loacated directly under the <ul> lists.
    Similar example with php removed:
    <div id="navigation">
        <ul id="MenuBar">
          <li> <a href="http://www.videoonpointe.com/">Home</a> </li>
          <li> <a href="#">Gallery</a>
          <ul>
            <li> <a href="#">View Gallery</a></li>
            <li> <a href="#">Select Gallery</a>
              <ul>
            <li> <a href="#">Main Gallery</a>
              <ul>
                <li> <a href="#">a gallery</a></li>
            </ul>
            </li>
          </ul>
          </li>
            <li> <a href="#">Edit this Gallery</a></li>
            <li> <a href="#">Create Gallery</a> </li>
            <li> <a href="#"  onClick="return confirm('This action cannot be undone. Are you sure?');">Delete this Gallery</a></li>
          </ul>
          </li>
                <li> <a href="#">Photo</a>
              <ul>
                <li> <a href="#">Edit Photo</a> </li>
                <li> <a href="#"  onClick="return confirm('Deletion of this image cannot be undone. Are you sure?');">Delete Photo</a> </li>
                <li> <a href="#">Set as Gallery Thumbnail</a> </li>
                <li> <a href="#">Change Watermark</a> </li>
              </ul>
              </li>
          <li> <a href="#">Pricesheet</a>
            <ul>
              <li> <a href="#">Pricesheet Admin</a> </li>
        </ul>         
          </li>
       </ul>
    <script type="text/javascript">
      var MenuBar = new Spry.Widget.MenuBar2("#MenuBar", {
               widgetID: "MenuBar",
               widgetClass: "MenuBar  MenuBarLeftShrink",
               insertMenuBarBreak: true,
               mainMenuShowDelay: 100,
               mainMenuHideDelay: 200,
               subMenuShowDelay: 200,
               subMenuHideDelay: 200
    </script>
    </div>
    Has anyone encountered this issue before?  Any thoughts on how it can be fixed?  Thank you for your help.

    I am surprised no one has responded yet.  Surely someone has encountered this before.  Any thoughts?

  • Raw material issue for inspection from inspection lot

    Hello friends,
    My sample size is fixed i.e.75 gm for all  raw material quality testing. I have defined sampling procedure with sampling type "fixed sample". I want that this amount should be decreased from total lot quantity when i am posting it to unrestricted use. i.e. for 10 kg inspection lot quantity, 9.925 kg quantity should be posted .Now, system propose whole quantity for stock transfer from quality to unrestricted after usage decision.
    Waiting for reply!
    Thanks in advance!!

    Dear Kiran
    1)  System doesnot take decimal in samples. if your basic unit is KG and you procure 10kg material system will consider sample amount as 1 kg. it will not take 0.075kg as the sample.
    2) Other option is make the procurement in GMs but that  will be difficult for purchaser to handle
    3) or esle make use of this exit and do the posting based on that
    QEVA0009 - UD: Predefinition of quantity to be posted to sample stock 
    This will help
    Regards
    Gajesh

  • Issue in Sub con PO

    Dear All,
    I am facing the issue
    User created the Subcon PO with the two bill materail.
    Next he for to issue materail to subcontractor
    then he made GR for that particular PO.
    I checked the GR document there is no BOM materail that child item Mvt 543 .
    How system is allwing . what i ahve todo now.... if the BOM is there for that particular materail.
    Regards
    Murugan

    Dear Umakanth,
    Yes i check in that parent materail only is there that 101 mvt only no child item is there .
    That is Mvt 543 is niot there. But BOM is there for the Materail.
    Why the System is not picked the BOM items
    Regards
    Murugan
    Edited by: murugan jayaraman on Jan 3, 2011 9:09 AM
    Edited by: murugan jayaraman on Jan 3, 2011 9:09 AM

Maybe you are looking for

  • Cannot backup my files / copy my files and folders due to error message " The operation can't be completed because an item with the name ".DS_Store" already exists. "

    Hi Apple community! I have a [rather worrying] problem. When I try to copy all my files from my documents on my mac [or the entire documents folder] into an external drive, I get this error message " The operation can't be completed because an item w

  • License Problem in Abap+java stack

    Hello, I have installed my SAP XI/PI System with ABAP+JAVA Stack. I have applied SAP license at ABAP Stack using slicense for web as abap+java, so is there any need to apply license again for java stack, because when i am checking in Visual Admin und

  • Using packages in flash

    hello all I am trying to develop a away3d project to learn away3d. i searched internet and found some sample codes but all of them are including packages like package but i could not integrate the packages into flash action script panel. I copied and

  • E-Mail settings in Lion gone awry

    I use ATT UVerse for Internet, and today all of my email programs have gone crazy. First the programs I use on my MAC and on a PC: MAC: Mail and Thunderbird PC: Thunderbird, Opera, SeaMonkey I had not changed any settings, so today when I kept gettin

  • Kernel continually generating SIGSEGV messages

    in my system log there keeps appearing an error message, generated by the kernel: "unknown SIGSEGV code 0" This is generated at very regular 20 second intervals, 2 at a time. SIGSEGV is a memory allocation error - how do I track down what is generati