MD01 and MD03

Dear Experts,
I have run Total Planning using TCode MD01 , it has created a lot of PRs for a lot of Materials , BUT some materials where not listed in those PRs however when I have run TCode MD03 for a Material it created A PR , So what is the reason of not creating it using MD01 ????
Please Advice
Best Regards

Hi,
This may be due to the problem with planning at plant level MD01 id the planning at plant level and MD03 is the planning at material level. Planning file entries will be created for the newly created materils. Please check in MD20/MD21. For detailed analysis please go through the link. This will definetely resolve your issue. Thanking you.
PR not created while running MRP plant level

Similar Messages

  • MRP Run in MD01 and MD03 is different

    Dears,
    I am new to MRP processes. Maybe the problem is trivial maybe not.
    We have a 9 000 spare parts and would like to use a limited MRP to help operators to know which number of spare parts is coming to shortage.
    I set material master and made some settings in customizing for the plant I use.
    After that I choose one material which stock is below reorder point.
    I run MD03 and system works fine - it creates a planned order.
    However when I run MD01 (or se38 ->RMMRP000) with the same parameters as for MD03 , the system creates nothing. Only telling that MRP was run and which parameters I choose.
    I run MD16 to see maybe there are some planned order that system created and did not tell me, but nothing as well.
    Only MD03 works if I choose the material. However, collective run MD01 is not working.
    Any ideas?

    Hi Zhargal,
    Could you pls provide some more info on MRP control parameters you use while running MRP with MD01?
    Also refer the following thread for more info on MRP
    MRP: Frequently Asked Questions
    Regards
    Mangesh S

  • Problem in MD01 and MD03

    Dear Experts,
    Please guide me to understand the following issue:
    When I run MD01 for a plant, there are no materials planned. No purchase reqn. are generated.
    However when I run MD03, the MRP results for the given material (in the same plant) are coming and purchase reqn. is generated.
    Shouldn't this material (used in  MD03) be reflected in the MRP results generating in MD01 also?
    Pls guide me, where I am missing something.
    Thanks & Regards,
    Rohit.

    Dear Sir,
    But it is not happening, I am running MD01 after ticking the "Display Material List", then also the material is not reflecting in the results.
    However when I run MD03, by giving the material code, the purchse reqn. is generated there.
    Pls guide me.
    Thanks & Regards,
    Rohit.

  • Differences between MD01 and MD02.

    Dear SAP Experts,
    Please tell me the various differences between MD01 and MD02.
    In which specific cases, MD01 should be used??
    Thanks and regards,
    Kaushik Basu.

    Hi,
    1. Md01 is the MRP Run for  plant by giving planning scope.
    2. Md02 is the mrp run for single Material from plant .
    Also refer following T code for your information
    Menu Nodes
    Transaction
    Activity
    Master Data
    MD25
    Create planning calendar
      MD26
    Change planning calendar
      MD27
    Display planning calendar
      MDSA
    Display BOM explosion number
      MDSP
    Edit BOM explosion number
      MEQ1
    Maintain quota file
      OPPP
    Explode BOM by date
      MDUS
    Display project assignment
      MDUP
    Process project assignment
      MDL1
    Create production lot
      MDL2
    Change production lot
      MDL3
    Display production lot
    Planning
    MD20
    Create planning file entry
      MD21
    Display planning file entry
      MDAB
    Set up planning file entry in background
      MDRE
    Check planning file entry
      MD01
    Total planning online
      MDBT
    Total planning in background
      MD03
    Single-item, single-level planning
      MD02
    Single-item, multi-level planning
      MD43
    Interactive single-item planning
      MD50
    Multi-level, make-to-order planning
      MD51
    Multi-level project planning
      MF52
    Display planning table
      MF50
    Change planning table
      MF57
    Planning table by MRP lists
      MF51
    Planning table by production list
    Evaluations
    MD04
    Stock/requirements list
      MD07
    Collective access of stock/requirements lists
      MD05
    MRP list
      MD06
    Collective access of MRP lists
      MDLD
    Print MRP list
      MD45
    Planning result
      MD46
    Collective access of planning result
      MD44
    Planning situation for a material
      MD47
    Planning situation for a product group
      MD48
    Cross-plant planning situation
      MD4C
    Order report
      MD09
    Pegged requirements
      CO46
    Order progress
    Planned Order
    MD11
    Create planned order
      MD12
    Change planned order
      MD13
    Individual access of planned order
      MD16
    Collective access of planned orders
      MD14
    Individual conversion of planned order into purchase requisition
      MD15
    Collective conversion of planned orders into purchase requisitions
      MDUM
    Convert planned order into purchase requisition in background
      CO40
    Convert individual planned order into production order
      CO41
    Collective conversion of planned orders into production orders
      CO48
    Partial conversion of planned order into production order
      COR7
    Individual conversion of planned order into process order
      COR7_PC
    Collective conversion of planned orders into process orders
      COR8
    Partial conversion of planned order into process order
      MDVP
    Collective availability check
      MDAC
    Execute action for planned order
    Hope it clear to u.
    Edited by: Atul Zod on Nov 21, 2008 6:59 AM

  • Detail diffierence between MD01 and MD02

    Dear all
    Detail diffierence between MD01 and MD02
    one material under Plant 1000, material master all ready
    currently  we have one planed order against this materaial as following:
    25.12.2009     PlOrd.     0242458238/Stck          0050          7.400,000      3.000,000-     4491     23.12.2009     23.12.2009
    run MD01
    Parameter setting in MD01
    Scope of planning
    Plant                     1000    **********
    Processing key              NETCH   Net change for total horizon
    Create purchase req.      2       Purchase requisitions in opening period
    Schedule lines               3       Schedule lines
    Create MRP list             1       MRP list
    Planning mode              3       Delete and recreate planning data
    Scheduling                    2       Lead time scheduling and capacity planni
    Planning date                23.12.2009
    after run MD01, I guess the planned order number should be changed since I setting Planning mode as "3", also scheduling of planned order should be carried out, but the planned order number and scheduling are not changed.
    but, I run MD02 by single material,  the parameter setting as MD01 screen.
    This time, planned order number changed as well as scheduling of new planned order is carried out.
    so I confused what the exactly diffierence btw MD01 and MD02
    Thanks for your suggestion
    Benny

    Benny,
    MD01 requires a planning file entry, MD02 does not.
    Check/create appropriate Planning file entries in MD20.
    To create planning file entries for all materials in background, use MDAB. Depending on the history of your system, you might also have to fix inconsistancies using MDRE.
    Planning Process
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/5c/33b8371a2c9912e10000009b38f889/frameset.htm
    Setting up a planning file
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/f4/7d279044af11d182b40000e829fbfe/frameset.htm
    Rgds,
    DB49

  • Defaults for MRP parameters in MD01 and MD02

    How do I set a default for the 'MRP parameters' on MD01 and MD02 screens without using MRP groups? Can this be defined in configuration?
    thanks  a lot

    hi John Mastram 
    1 Go to Transaction Put the parameter in the Transaction which you need as default,
    2 then Go to Menu Click SETTING and then Save.
    3 The Parameter you have saved will saved for the User.
    awd if usefull
    rgds
    BV

  • Use of MRP Planning mode 2 and 3 in MD01,MD02,MD03

    Hi
    I am aware of Planning mode 1,2 and 3. . Planning file entry does the job of updating appropriate planning mode like Net change or Net change in horizon, BOM re-explode or reset proposal. But,I want to understand in what circumstances we prefer to go with planning mode 2 or 3 other than 1 in MD01 or MD02 or MD03 as anyway this is covered for all necessary items in planning file entry by system. I am fully aware of the functions of all three planning modes. Just I want to understand the situation in which it will be overwritten by user selecting 2 or 3 in MD01 or MD02 or MD03. Because I have never come across such situation where I deliberately run with planning mode 2 or 3 in MD01 or MD02 or MD03.
    Thanks in advance.

    Hi Sudhar,
    Planning Mode 1 is used when:
    1.Changes in date and quantity
    2.Requirement changes
    3.Changes in the lot-sizing procedure or MRP type
    Planning Mode 2 is used when:
    1.Changes to the material BOM
    2.Changes to the sales order BOM
    3.Changes to the phantom assembly BOM
    4.Changes to references assigned within BOM
    5.Changes to material classification
    Planning Mode 3 is used when:
    1.In-house production time changes
    2.Planned delivery time changes
    3.Scheduling margin key changes
    4.MRP controller changes
    Regards
    Vinod
    Edited by: Vinod Mohan on Mar 1, 2010 6:41 PM

  • MD01 and MD02

    I've encountered a problem that I'm hoping will help me understand the MRP process a bit.
    I have a material with an independent requirement with no existing inventory.  If I run MRP using MD01, MRP doesn't plan the material.  However, if I use MD02, it plans it correctly, creating planned orders for it.
    I'm hoping someone can tell me what's going on.
    Thanks in advance.
    Ross

    Ross,
    Display is MD21.  If you are a planner, you should probably have access to MD20 Create planning file entry, MD21 Display planning file entry,  MDAB  Set up planning file entry in background, and  MDRE Check planning file entry
    You might have access to view the table that contains the planning file data.  The name of the table is usually MDVM for regular MRP(not planning area MRP; not long term planning MRP).  Use the table browser SE16N or SE16, enter the table MDVM, and execute.  You are looking for a lack of an entry against your material/plant.
    Best Regards,
    DB49

  • Md02,md01 and mdbt

    Hi, pls advise my understanding is correct or not.
    1. md01- instead of running md02 for individual header finish materials, we can combine all finish mat planning thru md01. aslo it covers all the materials of a plant for all types of requirements (pir's, s/o etc).
    2. the difference between mdbt and md01 is background planning and fore ground planning. other than that there is no difference.
    3. manual re-order point mrp type can also generate procurement proposals while running md01 or and mdbt run.
    pls advis whether above undestanding is correct.

    Hi,
    we can combine all finish mat planning thru md01. aslo it covers all the materials of a plant for all types
    of requirements (pir's, s/o etc).
    MD01 / MDBT / MD02 will plan not plan for materials with MRP type MPS (M0/M1/M2/M3)
    Regards,
    Dhaval

  • MD03 - Planning Mode 3

    Hi experts!
    I need to disable Planning Mode option = 3 at my system, because users are not authorized to delete physically.
    We have been investigating butwe didnt find any security point to limit this activity.
    Do anyone know if there is any way to restrict the use of this option of the parameter at MD03?
    Thank you in advance.
    Best regards,
    cecil

    Hi,
    One suggestion:
    For any Organization the MRP Run is very crucial..
    Only few people should be authorized to execute the MRP (MD02 & Md03)
    Only system administrators can have authorization for MD01.MDBT.
    So, remove authorizations for MD02 and MD03 for most of the users except the Department Heads..
    Schedule MRP in the background at night..
    Hope this helps..
    Revert for further discussion..
    Regards,
    Siva

  • PR and PO through MRP run

    hi,
    What are all settings to generate Purchase Requisitions through MRP run? Also, if, i wanna automate creation of Purchase order from Purchase Requisition (not manually). how to achieve this?
    thanks..

    Hi,
    1. Get PR trough MRP run
    1a, You have to have proper master data settings (e.g. material master: MRP type "PD", procurement type "F")
    1b, Proper MRP creation indicator shoudl be used in MD01 / MD02 / MD03.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2da044af11d182b40000e829fbfe/frameset.htm
    1c, Your planning situation also influences whether you get PR or not. If there's no need to procure anything (e.g. you have sufficient stock level or you have no demand for the goods > MRP won't generate procurement proposal)
    2. Convert PR to PO
    It depends on your master data settings (material master, source list, QA, outline agreeemts, etc)
    If you have proper master data settings and during MRP run it is possible to determine the source of supply, you can use ME59 to get the POs from the PReqs (otherwise you have to use ME57, ME58 too).
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4c/420d29470a11d1894a0000e8323352/frameset.htm
    But you can't get PO as the result of MRP run in standard system - you get PR (or PldOrd) and you have to convert the PR to PO (or PldOrd > PR > PO).
    Regards,
    Csaba

  • MRP not running with MD01

    Hi Gurus,
    My client has a problem, MRP is running OK with MD02 and MD03 tansactions but no materials are planned when MRP is run through MD01at plant level.
    Can anybody throw some light what could be the problem?
    There is no error message either.
    Thanks in advance
    Shailesh

    Dear PP and QM
    I think there is a misunderstanding
    The reason why the materials are getting planned via MD02/MD03 is because here you are forcefully running the MRP for the material,System wont look for the planning file entry where as when run through MD01 system will check for planning file entry
    Just though to explain the reason behind such behavious, there is no intention to prove you wrong
    Shailesh
    Proceed as suggested by other expert,Even i feel that planning entry might be missing
    I'm not sure how the materials were uploaded in the system,if it is via BDC then you normally one setting is there(update planning file) if it is not done then planning file entry will not get created ,we have to create it manually
    Hope this helps !!
    Thanks
    SVP

  • Give some pp module tcodes used in bdc and their purposes

    give some pp module tcodes used in bdc and their purposes
    thank you,
    Regards,
    Jagrut Bharatkumar Shukla

    Hi
    Important PP tables are..
    Master Data:
    CRHD Work center header
    MAPL Allocation of task lists to materials
    PLAS Task list - selection of operations/activities
    PLFH Task list - production resources/tools
    PLFL Task list - sequences
    PLKO Task list - header
    PLKZ Task list: main header
    PLPH Phases / suboperations
    PLPO Task list operation / activity
    PLPR Log collector for tasklists
    PLMZ Allocation of BOM - items to operations
    Production Orders:
    STKO BOM - header
    STPO BOM - item
    STAS BOMs - Item Selection
    STPN BOMs - follow-up control
    STPU BOM - sub-item
    STZU Permanent BOM data
    PLMZ Allocation of BOM - items to operations
    MAST Material to BOM link
    KDST Sales order to BOM link
    AUFK Production order headers
    AFIH Maintenance order header
    AUFM Goods movement for prod. order
    AFKO Order header data PP orders
    AFPO Order item
    RESB Order componenten
    AFRU Order completion confirmations
    Planned orders and Independent requirements:
    PLAF Planned orders
    RESB Material reservations
    PBIM Independent requirements for material
    PBED Independent requirement data
    PBHI Independent requirement history
    PBIV Independent requirement index
    RKPF header
    Capacity Planning:
    KBKO Header record for capacity requirements
    KBED Capacity requirements records
    KBEZ Add. data for table KBED (for indiv. capacities/splits)
    Important Transcation:
    CA – usually reserved for routing type transactions. This includes reference rate routings and rate routings.
    CA31, CA32, CA33: Reference Rate Routing Creationg
    CA21, CA22, CA23: Rate Routing Creationg
    CA63, CA64 – Change documents for Routings
    CA80, CA85, CA90, CA95, CA98: Where Used, Replacing Routings, etc.
    CR – Usually reserved for work center type transactions.
    CR01, CR02, CR03: Work Center Creation
    CR05, CR07, etc. – Work Centers analysis, etc.
    CS – Usually reserved for BOM type transactions.
    CS01, CS02, CS03 – Bill of Materials
    CS07, CS08, CS09: Extend Bill of materials
    CS11, CS12, CS13: Explode Bill of materials
    F – Usually reserved for financial type transactions
    A – Usually reserved for financial type transactions.
    LM – Label Management type transactions
    MB – Usually reserved for inventory type transactions
    MB51 – Material document history
    MB1A – Goods Issue for Scrap
    MB1B – Goods transfer
    MD – Usually reserved for MRP type transactions
    MD01, MD02, MD03, MDBT - MRP Run
    MD04, MD07: Stock/Requirements List
    MD05, MD06: MRP List (static)
    MD11, MD12, MD13, MD16: Planned Order creation, etc
    MD20, MD21: Planning file
    ME – Usually reserved for Purchasing Type Transactions
    ME01, ME03, ME05 – Source Lists
    ME11, ME12, ME13 – Info Records
    ME21N, ME22N, ME23N: Purchase Order creation
    ME31L, ME32L, ME33L: Scheduling Agreement Creation
    ME51, ME57 – Purchase Requisitions
    ME38, ME38: Schedule Line display
    ME37: Stock Transport Scheduling Agreements
    ME27: Stock Transport Orders
    MM – Usually reserved for material master type transactions:
    MM01, MM02, MM03: Material Master Creation
    MM04 – Change Documents
    MM06: Mark for Deletion
    MM60: Materials List
    V – Usually reserved for Sales and Distribution type transactions
    VA – Sales Orders
    VL – Deliveries
    VT – Shipments
    VD – Customer Master for Sales
    VK – Condition Records
    http://www.sap-img.com/sap-pp.htm
    http://www.erpgenie.com/sapfunc/pp.htm
    Reward if usefull

  • When MRP run through background process in MDBT open PR and PO not comming?

    Hi,
    When MRP run through backgroung process in MDBT open PR and PO not coming in MDBT result.
    Pls advise accordingaly.
    Regards
    rk

    Ram,
    Either I am totally misunderstanding your statements, or your business people are misinformed.  
    The output of MD01 (MRP total run in foreground) and the output of MDBT (MRP total Run in Background) ARE IDENTICAL, provided you have selected the same parameters.  
    Neither output contains a discrete listing of open Purchase orders and Purchase requisitions.
    Standard output of both MD01 and MDBT are:
    1.  List of materials processed, with exception messages
    2.  Statistics
    In addition, both of these programs also write MRP records to the MRP databases, provided that the "Display Material List" parameter is set.  In this case, both of these programs will produce data that can be further reviewed and managed in MD05 and MD06. MD06 is the tool that most planners use to process the MRP database info.
    If you wish to see a listing of the entire MRP results (either MD01 or MDBT), then execute transaction MDLD.  This will produce either a spoolfile or a printed document.
    For the PO or PR listings, review my earlier suggestions.
    Rgds,
    DB49

  • Automatic production order creation and confirmation

    Dear all,
    I am in a situation where i have to configure the SAP system in the following ways:
    1. From the planned orders automatically production order should be created today for the next day production and the end user will re-declare the quantity if there are any changes in the production order.
    2. If there are no re declarations to be done SAP should automatically release production order and save it.
    3. After the goods are produced the confirmation of the order should happen automatically from the measuring points.
    4. In the order confirmation, the storage location for goods issue should be automatically captured from the goods issue slip.
    5.After the confirmation of the order the goods receipt should happen automatically.
    Please suggest me whether these are possible in SAP or not.  If yes please tell me the procedure.

    HI,
    I hope this will give you the clear picture
    actually my scenario is:
    Finished good= x
    work centers involved = WC1, WC2.
    HERE BOTH THE WORK CENTERS ARE IDENTICAL, INPUTS ARE SAME AND OUTPUT IS THE FINISHED GOOD "X"  FOR BOTH THE WORK CENTERS.
    I HAVE A ROUTING FOR THE FINISHED GOOD "X" WITH TWO GROUP COUNTERS AS (1)WC1 AND (2) WC2
    When i create plan in md61 for 1 month and when i do mrp run in md02 it will create the planned orders and we can see the stock requirements in md04 and when we double click on the planned order we can convert them into production orders.
    But my users requirement is, he want to run the mrp in md01 and after that automatically each day the production order should be created.
    example with the above work centers and materials:-
    i have done the mrp run for "x" for November and December months
    i want to produce "x" of 200 kg on 30.11.2011.
    so SAP should generate production order for WC1 AS 100KG AND WC2 AS 100KG on 29.11.2011 at 5 pm automatically  and the user will release the order.
    similar example:-
    i have done the mrp run for "x" for November and December months
    i want to produce "x" of 400 kg on 03.12.2011.
    so SAP should generate production order FOR WC1 AS 200KG AND WC2 AS 200KG on 02.12.2011 at 5 pm automatically and the user will release the order.
    Please suggest me how to do the configure settings for my users requirement.
    Thanks,
    Aravind.C