MD01/ MD02 : RUN MRP

Hi,
When i run MRP using MD02 for a single component, the MRP create the planned Order for my product.
But when i run MRP using MD01 for all the plant, the MRP is not working.
Please, there is something missing when i use the MD01.
/ I have the same parametrs in MD01 & MD02.
Thanks for your quick answer.

Hi,
As said by the other experts the T. Code for Activate Requirements Planning is OMDU.
As I said earlier here is the extract:
If do not activate this system will plan only Single item singe level.
===============================================================
Activating requirements planning
Inidicator that allows the execution of requirements planning in the plant as total planning and also allows the execution of single-item, multi-level planning.
If you do not set this indicator, you can only plan materials using single-item, single-level planning at this plant.
===============================================================
Hope this helps..
regards,
Siva

Similar Messages

  • What is the process flow in MRP - MD61+MD01,MD02+MD04+COR7

    Hi experts,
    I need one clarification for Material requirment planning ( MRP - Process industries )
    My company is newly implemented in SAP so i want some clarification in MRP side.  My company flow is 3 rd level converted of FG.
    1 st level - Raw paint - Samifinished
    2 nd level - Tin condition - Samifinished
    3 rd level - Case condition - FG
    I have raised PIR in MD61 at FG code, after MRP Run planded order created at three level ( 1 st, 2nd, 3rd - level)
    But what is the t.code used is correct recording MRP Run - MD01( Plant level ) OR MD02 ( Single item)
    what is the t.code used for over all requirment Bill of material list ( ROH & VERP)at plant based recording purchase the material.
    Kindly pls explain the flow for PIR > MRP RUN>STOCK RECUIRMENT LIST> PLANNED ORDER TO PROCESS ORDER>
    Thanks,
    Umapathy

    Hi,
    To proceed further you should firm confirm that below master data properly maintained in your system,
    - Create BOM - CS01
    - Create Resource - CRC1
    - Create Master Recipe - C201
    Now your business process starts with the requirements created in the system e.g. by MD61 in your case
    Now you can run the MRP by MDBT/MD01/MD02 for your case. It is suggested to go with MD02 for better understanding on MRP behavior for single FG material.
    Now You can analyze the MRP result for single FG material in MD04 transaction wherein you will get the planned order created through MRP run and also the order report for planning of below level components of BOM
    Then you can further proceed for Production Execution with the help of below transactional steps:-
    - COR1 - Create Process Order Manual
    - COR7 - Convert Plan Order to Process Order
    - COR6N/CORZ/CORR - Order Confirmation
    - CORS - Cancel Confirmation
    - CORT - Display Confirmation
    - CO53 - Control Recipe Monitor (Optional)
    - CO55/CO60 - Maintain PI Sheet (Optional)
    - CO54 - Process Massage Monitor (Optional)
    - MB31 - Goods Receipt For Order
    - COIK / MB1A / MIGO :- Goods Issue
    - KKS1/KKS2 - Calculate Varience
    - CO88 - Actual settlement
    - COOISPI - Order Information System
    You can see the all PR created through MRP in ME5A transaction by selecting the Creation Indicator as B for MRP as shown in below screen,    
    And for rest of analysis you can use COOISPI report.
    Regards,
    Narresh

  • Donot run mrp for available stock in md01 ?

    hi frenz,,,
    i ve got one requirement,,,
    while running mrp theo transaction md01 ,the mrp plan must not consider the stock availability,,
    for e.g.,
    if stock available = 10.
    if requirement = 20.
    if user run mrp ,,it must plan for 20 only excluding the available stock ,,,
    how to use the badi ,,,
    MD_CHANGE_MRP_DATA and method CHANGE_MDPSX_MARD,,
    Thanks in advance,

    Hello,
    The scope of planning is used to control whether the total planning run is executed on a multi-plant level
    several plants
    one MRP area
    several MRP areas
    a combination of plants and MRP areas.
    Here the planning will cover all the material which is relevant for planning in all the above given areas.
    You can carry out the total planning run for the scope of planning online or in background mode. The planning run, however, must always be started with parallel processing.
    Hope it helps. Please revert back.
    Alok Tiwari

  • [Help] - MD01, MD02 and Planed Orders

    Hello SAP gurus, I have a problem with transactions MD01, MD02 and the Planed Orders.
    Scenario:
    I have a IndReq of quantity 10 UN for a material. When I run MRP (MD01) with Scheduling 2, SAP creates a Planed Order of quantity 10 UN and create capacity requirement in the work center.
    If I run MRP again in MD01 but with scheduling 1, SAP does nothing!!! - This is my problem...
    But, if I run mrp again in MD02 for material with scheduling 1, SAP deletes the capacity requirement for the work center...
    Note that, I never change the IndReq.
    Can someone help me with this?
    Thanks in advance,
    Adelmo Silva

    Hi Prasad,
    MD01 or MD02, we are running the same Programe,
    MD01 is for a total Plant or a group of plants, so the number of materials are going to be huge.so the planning file entry makes more sense here rather than at MD02 , where only one material with its Componenets are being planned.
    Irrespective of the Transaction, when we run the MRP , checking the planning file entry makes sense as it optmises the system load.
    Regards
    Ratan

  • One pr for multiple materials with line items while running mrp

    Hi SAP gurus,
                  I am config the system for MRP as per my client requerement.
                     We use CBP for different RAW materialsfor example they having a 10 materials for planning,were,
             MRP type is VB,
              LOT size is FX,with Different Reorder points and fix order quantity for all materials,
             My client whant run MRP for all these materials in single time that means they whant multiple item at single levels,
            i soles these requirement with the help of Product Group(sop) and its working but when we running md02 for product group all materials have planed and they give different purchase requistion numbers for all these materials but my client Wants single purchase requistion with line items for all these materials.
         Pls give me the solution for that requirement.
    thanks and Regards,
    abhi

    this is not the way SAPs MRP run works.
    Where is the benefit for this?
    the requisitions are not even split into header and item table, it is just one table EBAN, and either way you would get exact the same number of records in EBAN.

  • The problem about running MRP by MDBT

    Hello everydody,
    I encountered a strange problem in SAP system when I runned MRP by using MDBT.
    Usually running MRP has two ways.First running MRP by using T-code MD02 ; second running MRP by using T-code MDBT in the background.In my SAP system,I used T-code MDBT to run MRP, and the MPR parameter is below:
    Scope of planning
    Plant                             2000
    Processing key             NETCH 
    Create purchase req.      1      
    Schedule lines                 3      
    Create MRP list                1      
    Planning mode                 3      
    Scheduling                      1      
    Planning date             2010.06.30
    Normally if I choosed the Planning mode 3 Delete and recreate planning data,then after running MRP ,the Plan orders' number and purchase requestions number should be changed and produced new numbers.
    But I used T-code MDBT to run MRP, the Plan orders' number wasn't changed,the purchase requestions' number was changed. If I used T-code MD02 to run MRP, the  parameter is the same as above.After running MRP,the plan orders' number and the purchase reequestions' number were changed.
    I don't know how caused this happening.
    Is  there anybody who can help reslove this problem?
    Thanks & Best regards!

    Hi,Nikolai
    I was spending vacation, i can't get that now, and i will send it to you as soon as possible,i think maybe that error occured beacause I updated the metadata from V 9.0.2 and imported it into the new version of Builder?

  • How to run MRP for BOM as well as ROL items

    We have only one plant. I  want to run MRP for BOM items as well as ROL items.  MRP can be  run plant wise thru tcode MD01.  I want to run mrp for only ROL items.
    Please suggest
    Regards,
    ( Rajneesh Gulati )
    Edited by: Rajneesh  Gulati on Jun 20, 2008 11:33 AM

    As I understand for Quartz, I think you should create a security subject for it in your code. I guess the background tasks in Quartz work in separate threads. It is not recommended in EJB application. you can use EJB timer service instead.
    -Albert

  • Run MRP by vendor

    Hi,
    Do you know if there is any way to run MRP by vendor ?
    We would like to define for a planning run only material of a particular vendor.
    Thanks,
    PYR
    Edited by: Pierre-Yves Ryckwaert on Apr 7, 2008 2:49 PM

    I suggest you use 'MD01' specifying using a user-exit (created in customizing) and a user-exit parameter. First, you create a user-exit in the customizing, then with the help of an abaper you program the exit 'EXIT_SAPMM61X_001' where you  code something like this:
    clear: no_planning, stop_planning.
       case user_key.
        when 'ZVE'. " Your user-exit
           data wa_lfa1 type lfa1.
           data lv_lifnr type lifnr.
           if user_par is initial. " Stop planning if user parameter is not specified
             stop_planning = 'X'.
           else.
             move user_par to lv_lifnr. " This is the user-exit parameter
             call function 'CONVERSION_EXIT_ALPHA_INPUT' " Convert the vendor code
               exporting
                 input         = lv_lifnr
               importing
                 output        = lv_lifnr.
             select single * from lfa1 into wa_lfa1 where lifnr eq lv_lifnr. " Verify that vendor exists
             if sy-subrc ne 0. " ¿Doesn't exist? then no planning
               stop_planning = 'X'.
             endif.
    When you execute 'MD01' you specify user-exit = 'ZVE' and user-exit parameter = 'the vendor code'.
    Hope it helps.

  • Run MRP by MRP area - Tcode?

    Experts -
    How I can run MRP for MRP area? We have few MRP areas and assigned to many materials. MD01 is for plant level, I am looking for simmliar transaction (not background job) that can run MRP for MRP area.
    Thanks for your time-

    Hi Air, 
    Normally Planning of materials takes place on a plant level
    By usung MRP Areas - Specific storage locations can also be grouped together and planning takes place on that grouping area (MRP Area)
    Ex : Plant 3200/Sloc 50 & Plant 3200 /Sloc 51 is one MRP Area this is done in Configuration
    When activated materials can now be planned per MRP area and MRP runs can also be done on MRP area
    Consumption history will be kept on MRP area level
    i'm also forwarding a link which would be very helpful to you
    www.sap123.com/showthread.php?t=57
    In case if this information is found helpful do please do reward
    accordingly
    Thanks & Regards
    Pavan

  • Can we run MRP for perticular ITEMS or Can we run MRP on MRP Group wise

    Dear Friends,
    Out of all Material masters MRP should be run on some meterial.
    Is there any way to run MRP on perticular 1 MRP Group ?
    Is there any way to run MRP on selected MATERILS ?
    Waiting for ur help.
    Thanks...
    Yogesh.

    Hi Yogesh,
    It is possible with the enhancement -> M61X0001, take the help of your abaper & he / she would implement your logic.
    In customizing, SPRO - Production - MRP - Planning - User Exit: Mtl selection for planning run define a key & assign it in MD01 initial screen.
    If helpful award points
    Regards,
    Vivek

  • Run MRP

    Dear all,
    I have one problem and i need your support.
    I create a production order, material's strategy is 40 (make to final assembly). After that, I've used MD02 to run MRP but no proposal be created although component's stock is empty.
    I thinks that is depend on strategy, so which strategy will be use for this case to run MRP?
    thanks

    Hi,
    Processing Production Order is the very last stage of your planning process.
    If the Reservation/Purch.Req. key in OPL8 is 3 (Immediately) then system will create PR for the respective components immediately when you create a production order.
    Creating a production order for a material and then running MRP for it will not create anything in the system.
    Try creating requirements for the header material (Planned independent requirement or sale order etc). and then run mrp, system will create planned orders.
    Check and revert.
    Pavan

  • Run MRP as a JOB

    Hi all,
    How can i run MRP (md01) as a scheduled JOB?
    Best regards.
    Munur EBCIOGLU

    Munur,
         I can give you step by step instructions:
    1) Go to MDBT
    2) Click on create variant button
    3) Enter your variant name and click create
    4) Next screen select "For all Selection screens"
    5) on teh next screen enter MRP Parameters and select attributes and enter description in the "Meaning" box and click save
    6) Go back until you reach Variants page. Select teh variant you created and click schedule.
    7) In the next screen enter start date and time and click schedule periodically and enter how you want to schedule.
    Hope this helps...
    Atul

  • Running MRP for finised product material

    i have a material BOM (finished product material and it consist of some raw material) those materials have MRP
    when i run MRP for this BOM i want to generate PR for the raw materials and a production order for the finised product material
    Please i want all the steps for these senario

    Nehad,
    You need to create PIR(Demand) for the finshed product for the MRP to trigger Planned order for the Finished product and Dependent requirments/PR for the Raw materials.
    1. Use transaction MD61 to enter demand for the finished product with respect to the plant and requirement type "LSF" if it was strategy "10" or "BSF" for strategy "11". You can check the planning strategy used for the finished product using transaction "MM03" in the MRP3 view... if no strategy is assigned you can still use "LSF" requirement type.
    2. Now run MRP using "MD02", you should get planned order for the finished materail and PR for raw material. Please note the MRP type for both the materails should be "PD" you can check this in "MM03" - MRP1 view of the materails.
    Regards,
    Prasobh

  • Running mrp for a particular group of amterials

    How do we run mrp for a particular group of materials.not for the whole plant.like running mrp to mrp group.

    Hi,
    You also have three other choices:
    1. MPS vs MRP for splitting into two sets of materials, e.g. daily MPS for manufactured material and weekly MRP for purchased material.
    2. Running Single Item, Multi-level MPS (MD41) or MRP (MD02) for a product group
    3. Develop an ABAP using your selection criteria (based on view MA61V?) that makes calls to FUNCTION BAPI_MATERIAL_PLANNING.
    Regards
    Alex Dixon

  • Viewing requirements generated after running MRP (MD50)

    Hi All,
    I would like to know if there is any way to check for all the requirements that have been raised subsequent to running MRP using MD50. We have an MTO scenario and want to cross-check if the requirements for raw materials are being accurately generated.
    This cross-checking requirement has risen due to the fact that there are many alternative BOMs for each material and there have been instances where due to errors in the material master, some raw materials are suspected to be missing out from the list of requirements generated.
    Thanks!
    Praveer

    Praveer,
    Check MDKP table for list of materials for which last MRP run date.
    Run MRP in MD01 for if in case MTO Raw materials has MTS relevancy this way you can include all materials for MRP.
    BR
    KK

Maybe you are looking for