MD04 not creating a PR for parts

All,
In MD04 i have aplanned order that is set to start on 5/27/11.  Not all of the parts are in stock for the BOM to be built for the planned order.  MRP runs in a batch file every night but it is not creating a PR for the some of the missing parts.  Can someone give me some guidance as to why the PR is not being created.  I have reviewed the raw material that the PR is not being created for against the other raw materials in the BOM that PRs have been created and the settings are the same for MRP.
Thanks in advance for help,
Sean

Hello,
Please check
If entry in planing file is missing for this material.
MDAB - Planning file entries
How to use T-code: MDAB and MDRE
Also check above links.
Hope it will help. Please revert back.
Alok Tiwari

Similar Messages

  • How to creat commitment for PO PR but not creat statistical cost for GR

    Hi,
    Quantities and Values in Valuated Project Stock: Example - Material - SAP Library
    Planning
    Material FIN-M is assigned to network activity V10 and is managed in the project stock for WBS element P/4711.1.
    The network type is flagged as appended and apportioned to the WBS.
    Before the first MRP planning run or before the planned orders are converted into purchase requisitions or production orders, the following amounts appear in WBS element P/4711.1:
    Planned costs of $500,00
    Remaining order plan value of $300,00
    The MRP controller begins by converting the planned orders. First, the planned order for the material RAW-M is converted into a purchase requisition and the planned order for the material SEMI-M is converted into production order A2.The order type is flagged as not appended and apportioned to the WBS.The remaining order plan value in the WBS element changes by the amount of the internal activities portion of production order A2 to $400,00 (300,00 + 100,00).After the purchase requisition is converted into a purchase order, a cost commitment of $50,00 also appears in WBS element P/4711.1.
    External Procurement
    Valuated goods are received for the purchase order, but the price is $10 different at $60. Assuming that material RAW-M is price-controlled, this gives rise to a debit posting of $60,00 in the stock account and credit posting of $60 in the GR/IR clearing account (Financial Accounting).If the inventory accounts was created as a cost element in CO, the following appear in WBS element P/4711.1:
    Statistical actual costs of $60,00 in the stock cost element
    A cost commitment of $0,00
    If material RAW-M is price-controlled the standard price is $50,00, the postings in Financial Accounting are: $50,00 debit to a stock account $10,00 debit to a price difference $60,00 credit to the GR/IR clearing account
    In this case, the only figure in the WBS element would be statistical actual costs of $50,00.
    Above excerpt from SAP help, may I know how to do configuration to creat commitment for PO PR but not creat statistical cost for GR?
    Thanks and regards,
    Ray

    Hello Jie,
    if i right assuming your query then PR->PO= Commitment should be created.
    but GRN by MIGO=Statistical cost should not create once MIGO if right then actual cost would be 0.
    you can activate commitment by OKKP transaction.
    And you want to cost should not be statistical after MIGO right?
    here solution is cost never statistical type until account assignment object not statistical type this is my assumption.
    if this is the issue then check G/L account from the PO. then check that G/L account, whether it is a B/S account or P&L account? I think you have wrongly assigned P&L account.
    Regards,
    Sanjeev

  • Jdeveloper 11.1.1.4 Could not create MAR entry for file

    Hi
    i am using jdev 11.1.1.4.i checkout code from svn to jdeveloper .
    i tried to create EAR file for the application,but while creating EAR jdeveloper throwing some error message as shown below
    find similar thread
    JDeveloper Debugger Hangs
    Could not create MAR entry for file [D:\JDeveloper\mywork\myAPortalApp\Portal\adfmsrc\oracle\webcenter\portalapp\pagetemplates\.svn\text-base\pageTemplate_swooshyPageDef.xml.svn-base], due to: MDS-01161: Reference "/oracle/webcenter/portalapp/pagetemplates/.svn/text-base/pageTemplate_swooshyPageDef.xml.svn-base" has an invalid character ".".
    from the above message ,due to svn in the output folder ,jdeveloper is not able create MAR file entry .
    i checked application properties for filter options ,jdeveloper has already has the filter "Exclude /.svn/"
    can any one help me on this?
    appreciate your help

    Hi Aaron thanx for the reply.
    i did not understand exporting from the subversion,but i did search in file for the svn there are two entires for .svn in portal.jpr file.
    if i delete subversion connection from the jdeveloper and if i compile then it will create EAR file.

  • Server repository could not create function template for 'ZBAPI_EXPORT_SO

    Hi all,
    When i try to post a BAPI from R3 to XI i am getting this error.
    Server repository could not create function template for 'ZBAPI_EXPORT_SO
    This message was appeared in SM58.
    Can anyone no the root cause of this ?

    Hi Christoph,
    Per the resolution of the CSS Ticket:
    Parameters that are not mentioned in the SDN guide were needed in your particular situation.
    The necessary parameters for configuring the MII side of the IDoc Listener are explained in the MII Help Documentation in the Client Properties section:
    http://help.sap.com/saphelp_xmii120/helpdata/en/45/a705b23c14532ae10000000a1553f7/content.htm
    All others are described in the Message Listeners section here:
    http://help.sap.com/saphelp_xmii120/helpdata/en/45/6a86ac88130dece10000000a11466f/content.htm
    Can you please update this post to reflect your particular situation so the SDN community can benefit from your experience?
    Kind Regards,
    Diana Hoppe
    Edited by: Diana Hoppe on Dec 9, 2008 9:06 AM

  • RFC Sender error could not create function template for...

    Hi,
    I am trying to send an async RFC to XI. Since I use IN BACKGROUND TASK and COMMIT WORK I got following error in the SM58 of the back end system
    Server repository could not create function
    template for 'XYZ'
    In the XI, I see nothing (no message, no error)
    How can I fix this problem?
    Thanks
    Thomas

    Hi Thomas,
      You may need to have logical destinatio types for sender RFC. (and in the refernce entry you need to provide the actual destination)
    may be some other errors also, Check this link and see if you have followed all the steps.
    http://help.sap.com/saphelp_nw04/helpdata/en/25/76cd3bae738826e10000000a11402f/frameset.htm
    Hope this fixes your issue.
    Regards
    Vishnu

  • Why we r not Creating Sender Agreement For HTTP & IDOc Adapter at Sender .

    Hi Buddy's,
                         Why we r not Creating Sender Agreement For HTTP & IDOc Adapter at Sender .And why we create receiver agreements at receiver side bt not sender agreement at sender side.
    Wat Is GLOBAL Container ?, where it will Occur & wat is the functionality of that.

    Kumar,
    1) XI integrattion server - IS expects the messages in XML format. If you see the HTTP request you will see that we pass all the info contained in the Sender areement in the the HTTP request itself , namely - Message interface, message type and the namespace (along with login parameters). For IDOCs the the IDOC- XML are are sent to the IS (through IDOC port configuration at the source system.
    2) When send a message to XI the sender knows that XI system parameters, but when at the reciver end there could be any any system that is reciving the IDOc/HTTTp message. you specify those message through a commumication channel and this channel is associated to a receiver agreement.
    3) A Global container is like a place holder for variables. You can set a variable here and access it throughout your mapping and hence the name.
    A good example for a gloabal container is a counter to countthe number of records in te target side.
    Regards,
    Arvind ravindran

  • Yoga 11 - can not create an account for the App store,

    I can not create an account for the App store, I live outside of the USA and the only address option is in the USA. Can you help me
    Moderator Note: Edited subject to match content.

    Hi
    Welcome To Lenovo Community
    We are really sorry to hear about the issue you are facing,
    I have verified the Microsoft windows 8 app store has different regions listed
    And you can connect app store using an existing Microsoft account like Hotmail, msn etc.
    Please refer below link
    http://windows.microsoft.com/en-US/windows-8/explore-windows-store#1TC=t1
    Also if you can share the link or screen shot of the app store to help you further
    Do give this a try and let us know  
    Hope This Helps
    Cheers!!!
    WW Social Media
    Important Note: If you need help, post your question in the forum, and include your system type, model number and OS. Do not post your serial number.
    Did someone help you today? Press the star on the left to thank them with a Kudo!
    If you find a post helpful and it answers your question, please mark it as an "Accepted Solution"!
    Follow @LenovoForums on Twitter!
    How to send a private message? --> Check out this article.
                            English Community   Deutsche Community   Comunidad en Español

  • Inspection lot not created on GR for production order

    I want to create an inspection lot upon receipt from production. Task list is set up. Inspection type 04 is assigned in material master. But when I do the goods receipt for a production order, inspection lot is not created. In the quantity tab of material document, I see that the staus GR doc is 7(Inspection lot is created at inbound delivery). I don't know where it is coming from.
    Please help.

    I'm not sure what you mean by creating lot after receiving.
    When you do a GR from production the proper inspection type is the 04 inspection type.  Not 05.  This is pretty standard SAP functionality.
    Check the material movements for 101 (I assume you're using a 101 GR material movement), and make sure in config no one has deactivated QM for the material movement.
    Then, make sure you start with a freash production order. Don't copy from a previous one.
    FF

  • The system could not create any outputs for mv type 561

    Hi,
    I tried to print out a goods receipt others in MIGO and i received "The system could not create any outputs" when i tick on output control. I tried to follow the steps in How to print the material document in MB1C movement 561 I stuck at step 4 where i cannot find MvT 561. Please help
    Chk your setting as below to get GR print out.
    . Maintain the Printer Name in MM->Inv Mgmt and Phy Inv->Print Control-> Gen Settings-> Printer Setting Enter the local printer where you want to print your Goods posting document
    2. Ensure that in MM->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In MM->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In MM->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for Goods Receipt/GI/Transfer Posting Documents
    Here for Particular mvt type 101,201,121,311,313,501,521,561 etcu2026 Maintain the Print item as 1--Material document printout
    5. In MM->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the following--
    Select the particular Output type then goto Details
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Transmission medium is 1
    b. Print Parameter is 7
    6. In MM->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Printer Determination by Plant/Str Loc , Maintain the Output device for all your Plants
    7. Go to MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.
    Now the settings are ready for Printing Material doc
    8. While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    9. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately.

    issue is resolved

  • Error in Trace Level: could not create BPE proxy for message, no XML objec

    Hi
        We are doing a scenario of File to RFC using BPM and I am getting this errror in Tcode SXMB_MONI.
    <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    <!--  Call Adapter
      -->
    <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>XIAdapter</SAP:Category>
      <SAP:Code area="<b>BPE_ADAPTER</b>">UNKNOWN_MESSAGE</SAP:Code>
      <SAP:P1 />
      <SAP:P2 />
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText />
      <SAP:ApplicationFaultMessage namespace="" />
      <SAP:Stack><b>No object type found for this message; check the activation of the corresponding process</b></SAP:Stack>
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    And getting this error in Trace level
    <b>could not create <b>BPE</b> proxy for message, no XML object definition found for message EB32BB50610A11DC9648001321CB837D</b>
    Why this error occurs?
    What could be in error?
    Thanks in advance
    Regards
    Sami Qureshi

    Hi Sami,
    Check if thse threads can help u,
    Error in BPE Adapter
    BPM - BPE_ADAPTER errors
    BPE Adapter Error
    Exeception during execution error
    ***********Reward points if helpfull************

  • Server repository could not create function template for ...

    Hello,
    we are trying to send rfc and idocs from SAP to MII but we always get errors like:
    Server repository could not create function template ...
    or
    The meta data for the IDoc type "HRCC1DNPERSO01" is unavailable.
    Has anyone an idea?
    Kind Regards,
    Christoph Mertins

    Hi Christoph,
    Per the resolution of the CSS Ticket:
    Parameters that are not mentioned in the SDN guide were needed in your particular situation.
    The necessary parameters for configuring the MII side of the IDoc Listener are explained in the MII Help Documentation in the Client Properties section:
    http://help.sap.com/saphelp_xmii120/helpdata/en/45/a705b23c14532ae10000000a1553f7/content.htm
    All others are described in the Message Listeners section here:
    http://help.sap.com/saphelp_xmii120/helpdata/en/45/6a86ac88130dece10000000a11466f/content.htm
    Can you please update this post to reflect your particular situation so the SDN community can benefit from your experience?
    Kind Regards,
    Diana Hoppe
    Edited by: Diana Hoppe on Dec 9, 2008 9:06 AM

  • BDC not creating automatic delivery for consignment fill up in VA01

    Hi,
    I am doing BDC for consignment fill up in VA01. When munually run VA01, it automatically creating delivery. But when run BDC ( call transaction ) it's not creating automatic delivery. why ? I am giving below fields..
    Sales org.
    distribution channel
    division
    customer
    item (material)
    quantity
    batch
    pricing condition
    price
    serial number
    please help me...
    Venkey

    VA01 is order creation, Creating an order does not automatically create a delivery, a delivery is created with VL01N in reference to an order.
    Further you should get an error log if you process a BDC, what does it tell you?

  • Change number that are not created earlier accepted for change of BOM

    Hi,
    When i am going to change BOM it gives warning message "Enter change number, BOM has history requirement"
    But my problem is when i put any number in field of change number it is allowing me to change the BOM.
    It should not be accept any number that are not created earlier in the system. It must have to accept change number that is created for the history requirement for perticular material. kindly give your input on this issue.
    Atul

    Hi Atul,
    Please refer the thread ECM-Problem with Change number in CS01 and CS02 Transactions
    Thanks,
    Rakesh J

  • My software can not create with thinapp for use in workspace

    i have problem appear  this error when i am create a software with thinapp for workspace for all of them i get this error when click on save
    Could not copy file C:\Users\Administrator\NTUSER.DAT -> C:\Program Files (x86)\VMware\VMware ThinApp\Captures\GOM\%drive_C%\Users\Administrator\NTUSER.DAT
    Could not copy file C:\Users\Administrator\ntuser.dat.LOG1 -> C:\Program Files (x86)\VMware\VMware ThinApp\Captures\GOM\%drive_C%\Users\Administrator\ntuser.dat.LOG1
    i have login with admin domain user (Administrator) now what is the problem ?  i have attached error appear this error for most of spftware that i want to create with thinapp and can not sync any of these software in workspace
    Best regards
    babak

    thanks
    i readed that post but it was not usefull i do all of these steps on the other host and it work fine just on the other host my os is windows server 2008 r2 but on that machine which get eror my os is server 2008 r2 sp1
    i think it is not very important
    in addition when we create a software for workspcae with thinapp it have to create 4 files .dat , .alt , .msi , .exe  but here when get error just create 3 file  .alt can not create

  • Can not Create Address Book for new Supplier

    Hi,
    I am trying to create a supplier in R12. Under create Address Book for the supplier, I have created the address and when I select the operating unit and click apply, I am getting the following error:
    Address and Site Creation - Unable to create address and sites because of the following error when trying to create the site in operating unit [Anirudh Operations]: [ORA-01403: no data found in Package AP_VENDOR_PUB_PKG Procedure Validate_Vendor_Site]. Either resolve this issue and try again or deselect the operating unit with the error and continue. Note: any new address requires at least one site in order to be created.
    Oracle Version: 12.0.4 - Vision Database.
    Am I doing something wrong here?
    Any help is much appreciated.
    Thanks & Regards,
    Sasibindu.

    Looks like the responsibility you are using is pointing to a new operating unit created by some one. But for that operating unit all the fundamental options are not complete (financial, purchasing, payables and so on). Hence you are getting this error.
    If they are setup, you can try adding this operating unit into your security group associated to the MO: Security group profile and try.
    If not use the Vision Operations responsibility and give it a try.
    Thanks
    Nagamohan

Maybe you are looking for

  • Bapi for sales order

    hi all , could any one give me the step by step procedure how to creat a sales order using bapi.  i found BAPI_SALESORDER_CREATEFROMDAT2 this the bapi ... but iam not sure about the passing the parameters. please it would be help ful. the fields whic

  • Acrobat X Pro - Page Scaling Document Property

    I have an archive of 1000's of PDF files and I want to change the Page Scaling property in each of them from "Default" to "None."  I would like to automate this process, but there doesn't seem to be any way to do this with the tools provided. Without

  • Issue with Grub after install

    When selecting Arch in Grub I'm getting the error "You need to load the kernal first". I'm not sure where I've gone wrong. I followed the Beginner's Guide very carefully, I read through the installing Grub section a dozen times and even the section a

  • Cannot install Lojack for Laptops

    The install is failing when it is in the final stages and checking that it can connect with Lojack server. Has anyone ever used this software? thanks paul

  • Making animation using java, need help, image doesn't get painted

    I was trying to make some sort of animation and it is done by painting a head and a body at a time. The problem is the body never gets painted but the head is perfect. Unless I replace the int variable within imgBodypics[int variable] with a variable