Hi All,
During planning run for a individual project planning thro MD51,
against a Order reservation for a particular material a PR is getting generated. When we convert the PR to PO and do the planning run , again a new PR is generated and therfore lead to overplanning of a material.
Suppose for the PO which is been created I do a GR for a partial quantity then after second planning run , PR is created only for the remaining qty.
This means the system doesn't considers the PO which is created and generates another PR for the same requirement which is not required.
Kindly help me on this. Its critical

K Rao,
I can see 2 projects for every material planned.
see your last screen shot ,
18-01-0027:02-01  with material I1400542007210
18-01-0027:02-01  without a material, whats the second project?
If you can correct planning for the second project which is without a header material , your issue can be resolved.
Thanks
Ritesh

Similar Messages

  • After MRP planned orders are not getting generated?

    HI,
    Our bussiness is make to stock and repetetive manufacturing.
    We have a prob in running MRP, i enter the demand in MD61 on day basis and after running MRP for some materials all planned orders getting generated wrt to demand but for some materials only some planned orders getting generated means it's not taking full demand ex i have material A and paln is 1000 for 10days i entered demand in MD61 for 10days 100 each and if B material is having same 1000 demand so i enter 100 each then i run MRP and the out put is im getting 10planned orders with 100 each qty for A material where as for material B im not getting  full 10 orders only 2 or 3 with 100 each what could be the reason ?
    Thanks
    KK
    Edited by: kiran kumar on Mar 23, 2010 10:19 AM
    Edited by: kiran kumar on Mar 23, 2010 10:20 AM

    Dear Kiran,
    As your saying it is Make to Stock, system will consider Availble stock in Net Req. Calculation
    what is startegy mainatined for A & B
    if you go with Strategy 11 then system will not consider the stock & Creates the requirements
    Regards
    Madhu

  • Planned order not getting generated for FG

    Dear Experts,
    Planned orders not getting generated for the Finished Goods - X which is having MRP Type M0 - MPS fixing type strategy group 20 which is copied fron another FG - Y , its a new product and production plan has been updated through MC88 - Rough cut planning but the planned orders are not getting generated.
    And for the material valid production version exists with selection method 3 and individullcollective as 1.
    Please let me know what might be the possibalities and what all the key fields i need to check.
    Thanks & Regards,
    Sampath
    Edited by: sampath s on Jul 13, 2011 11:31 AM

    Dear,
    In general MPS is run for High value items ( if you use like Gold , Platimum or A class items. ).
    Always only single level is used for Explosion and planning. then only you can analyse the requirements at each stage before procurement.
    Otherwise if you run MPS to multi level, Bottom most high value will be procured without any notice to authorities. Even you may cancel the process in mid way. At that time what will happen to the procured high value material.
    So for that purpose only single item single level MPS concept is evolved.
    Fo that you run MPS at single level so that only for the first level MPS will be carried out.
    Check and revert back.\
    Regards,
    Alok Tiwari

  • Planned order not getting generated at plant level

    Hi experts,
          When i run MRP for a particular plant in T- code (MD01) Planned order is not getting generated but when MRP is done against a material in T - code (MD02) in the same plant planned order gets generated... Is there any customizing  to generate planned order in plant level.....
    Regards,
    Joseph.
    Edited by: joseph5885 on Aug 12, 2010 9:23 AM

    Dear Joseph,
    No it is not recommended. only in emergance cases this will be done
    Usually in MDRE and MDAB will be scheduled before MRP run at background for inconistancies in planning file enries
    So the above said t-codes will take care of the same
    Added
    Refer this link
    [Planning file entry;
    Regards
    Madhu
    Edited by: K.Madhu Kumar on Aug 12, 2010 6:53 AM

  • Re: marketing plan and campaign element

    Hi Dipesh
    Iam facing somewhat similar issue.
    My requirement is that everytime i want to create a new number for the campaign element. We are using the BAdi CRM_MKTPL to generate the Marketing/Campaign Plan number. And using the Coding Mask to generate the campaign elements. But when we delete some campaign elements and create new ones, the system used the same Ids that are previously deleted. I want only new number to be generated, i do not want to use the deleted Ids.
    How to solve this issue? Please suggest me some solution.
    Thanks,
    Raju

    Hi Rajesh,
    This is happening b'cos the Marketing Projects (Plans, campaigns and elements) which u r trying to upload are with same name (External ID) which u have deleted, try either (Rename)change the name of u r marketing Projects while uploding in system.
    System error : The external ID is already used in the description of another marketing project. To avoid data inconsistencies in SAP BW, the external ID cannot be reused.
    Regards,
    Dipesh.

  • Project Server 2010 Timesheets not Updating Project Plans

    We have several project plans that are not getting updates from approved timesheets.
    Troubleshooting steps I've taken:
    1) Verified the timesheet/task submissions by the resources
    2) Verified they have been approved
    3) Verified they have been accepted by the Status Manager and processed
    4) All project plans have been published (I even used ProjTool ON the App server to do a full publish of all plans as a second step of publishing)
    5) Verified OLAP was built successfully overnight (and every night)
    6) Tasks have both remaining work and NO actual work in the Resource Usage view
    7) Had a user recall and resubmit his timesheet using "Send Timesheet" to see if the task updates would come through - they did not (I am Status Manager and the timesheet shows Approved), and even published the plan and rebuilt the OLAP again,
    just in case.
    8) Verified that no tasks are marked for closure under Close Tasks for Update in Server Settings.
    9) Verified Timesheet shows Actual Work on the Tasks via Pivot Table; compared Timesheet_User_View with MSP_Portfolio_View pivot table for project which shows 0 hours. Timesheet_User_View shows 33 hours.
    All tasks have Remaining Work, are within the date range of the timesheet and are open for submitting time. Timesheets are still out of sync with project plans for many users and there is no apparent reason. I'm out of ideas!

    Hi,
    In status manager's approval center, history, status updates, can you check the status of the approval? Do you have any errors in the ULs log for the approval or publish jobs?
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, MCP |

  • Accounting documents not getting generated for mvt. type 221 Q

    Hi friends,
    When goods are issued for consumption for project accounting documents are not getting generated.
    I have tried with mvt. type 412 Q, 211 Q,
    by mvt type 412 Q, the stock is transfered to project stock, it shows the stock of material in project stock, by movement type 211 Q the project stock gets consumed. So at the time of consumption of consumption account should hit and relevent accounting document should get generated. this is not happenning.
    When i check material document and check for accounting document, message flashses that movement is not rrelevent for accounting.
    Can any one throw more light on this?
    Thanks and regards
    SAP MM

    Hi,
    Please check in PO item details Delivery tab. In that GR Non-valuated checkbox might be checked.Generally for account assignment category asset it is ticked.
    If you tick GR non-valuated check box then at the time of GR accounting document will not be created.Accounting document will be created only at the time of IR.
    or
    Have you mantained Chart of accounts.
    have you mantained Valuation area settings
    Transaction event key
    Valuation class settings.
    Check your material master data in accounting view have mantained Valuation class.
    Check your back ground settings OMWN.

  • Project Server 2013, cannot open project plan in pwa

    I have a clean installation of Project Server 2013 and am able to save project plans, send assignments and receive task updates.
    The one error so far i'm running into is when I try to open any project plan from PWA - I get the following error:
    "we couldn't find the project detail page for this project. see the system administrator."
    Can someone assist in resolving this issue?
    Thank you,
    Damon Curtin | New Signature

    Damon,
    Navigate to Project Web App>>PWA Settings
    Select Enterprise Project types option from "Workflow and Project Details Pages" section
    Validate "available project details page section" by default schedule and project details should be selected in right hand side column, if it is not then add these two pages and click save.
    Hrishi Deshpande – Senior Consultant DeltaBahn
    Blog | < |
    LinkedIn
    Please click Mark As Answer; if a post solves your problem or Vote As Helpful if a post has been useful to you.This can be beneficial to other community members reading the thread.

  • Pur req not generated for MRP element Planned order in stock reqmnts list

    Hi SAP Gurus,
    I have a problem where in MD04, pur req is not generated for the MRP element Planned order for a future date (about two months from now). Is there a specific reason? why is it not being generated? The MRP type is PD. The procurement type is F - external procurement. Can anybody please help me on this?
    Thanks
    Anusha

    Anusha,
    ??  Not sure I understand the question.  Are you saying MRP is creating planned orders instead of  purchase reqs?  Or, are you saying that no proposals at all are being created outside of two months?  Or, are you saying that the system is creating purchase reqs inside of two months, and planned orders outside of two months?
    Regardless, these problems are probably related to your MRP settings.  Try the following settings:
    NEUPL   Regenerative planning             
    1       Purchase requisitions             
    3       Schedule lines                    
    1       MRP list                          
    3       Delete and recreate planning data 
    2       Lead time scheduling and capacity planning
    on your MDBT screen.
    Regards,
    DB49

  • Schedule lines are not getting generated during MRP Run

    Schedule lines are not getting generated during MRP Run. I have maiantained source list for the material with proper validity date and also maintained scheduling agreement . MRP relevvant Indicator , I have marked - 2 which means -Record relevant to MRP. Sched. lines generated automatically.
    Still I am not able to get schedule lines and instead of that *Purchase Requisitions* are getting generated.
    Can any one help me and suggest me what to be done in this case .
    Thanks & Regards ,
    Nirmalya

    Dear,
    Welcome to SDN,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.
    Regards,
    R.Brahmankar

  • Hi, After I try to load either an existing or new project in Adobe Premier Elements 9 I just get a blank grey screen with none of the timeline, etc. boxes on view. This has suddenly happened, one day OK next not! At the top of the screen I get the normal

    Hi, After I try to load either an existing or new project in Adobe Premier Elements 9 I just get a blank grey screen with none of the timeline, etc. boxes on view. This has suddenly happened, one day OK next not! At the top of the screen I get the normal Pre icon, File, Edit, Clip, etc.
    I am planning on purchasing Premier Elements 13, would it be better if I bought a new program rather than download an upgrade, just in case the upgrade doesn't load properly due to the error with my existing program?
    If I the deleted Premier Elements 9 on my PC would I lose all my existing videos that were produced using Premier Elements 9 or would they be saved so that they can still be worked on in Premier Elements 13?
    Does Premier Elements 13 work with Windows 7?
    Thanks
    Terry

    Premiere Elements 13 absolutely works with Windows 7!
    In fact, I'd highly recommend you download the free trial and give it a test run.
    Meantime, go to Windows Update and make sure you have all of the latest Windows updates, including those that don't install automatically. Then go to the nVidia or ATI site and ensure you have the latest driver for your graphics card, and go to Apple.com and ensure you have the latest version of Quicktime, per the program's requirements.

  • Schedule Lines are not getting generated after MRP run.

    Hi,
    I have an issue where a SA exists for the parent material with item category L (subcontracting). The parent material has a valid BOM and some sub components as well. I see in CS03 that BOM is fine with validity dates for the parent material. A valid source list also exists for the parent material where SA is present as the source of supply with MRP indicator as 2. Now when i run MRP for the parent material using MD02 (NETCH), with indicators as below:
    Create pur.req.  2
    Schedule lines   3
    Create MRP list  1
    Planning mode   1
    i don't see any schedule lines in MD04. Instead it creates a PR that too without any source of supply.
    In master data for the parent material MRP type is PD with Procurement type F and special procurement key 30. I have checked and every thing seems to be fine still MRP run doesn't create schedule lines.
    Any help is appreciated. I can give more info if required.
    Thanks.

    Dear Rakesh,
    Scheduling agreement:An outline agreement against which materials are procured at a series of
    predefined points in time over a certain period.
    1.For this you have to first use ME31L for creating scheduling agreement and then ME38 for maintaining scheduling agreemnet
    schedule.
    2.Ensure in the source list after maintaining the material,vendor combination the setting for MRP relevancy is set to 2 - Record
    relevant to MRP,Schedule line generated automatically.
    Moreover you have to use value 3 for delivery schedule line which is one of the MRP control parameter while taking MRP run.
    So for the materials for which scheduling agreement exists,schedule lines will be generated.
    Check and revert back.
    Regards
    Mangalraj.S

  • Planned orders not getting generated

    Hi friends,
    we are running material level MRP  MD02 (make to `order scenario).
    when we run MRP instead of generating planned orders, it is generating Purchase requisition . i can see purchase requisition generated instead of planned orders in MD04 screen.(we are facing problem with only one material).BOM of FERT Contains 3 HALB.all the mrp parameters have been maintained.
    thanks in advance.

    Hi
    1. Since you are telling it is MTO scenario you need to use the MD50
    2. Also in the MRP screen check the Create Purchase Reqn try the setting   "" 3     Planned orders"""
    3. As you have mentioned only for that particular material - kindly check if any scheduling margin key has been maintained. ??
    check and revert back
    Reg
    dsk

  • Excess schedule is getting generated in Mrp.

    Hi Gurus,
        Excess schedule is getting generated although enough stock is available to cover the requirement why the requirement are getting generated
    Mrp 2 lot size is weekly lot size
    Minimum lot size 10    
    Covrage profile of 20
    what is the effect of coverage profile 20 can any body  tell me.
    Quick response will be helpful
    Thanks & Regards
    Sandeep Praharaj

    Dear Sandeep,
    Coverage profile is used for dynamic safety stock. As safety stock can be define manualy in master data. But by assigning coverage profile system automatically generate requirement of safety stock on the basis of no. of days, no of period and target days. System calculate safety stock by given below formula.
    Dynamic Safety Stock= Average Daily Requirement * Range Of Coverage
    Average Daily Requirement =
    (Requirements in the specified periods) / (Number of periods * No. of days per period)
    Regards
    Muhammad Umar

  • Table or Function module to get Internal order planning and Cost element pl

    Dear All,
    Table or Function module to get Internal order planning and Cost element planning.
    Internal order planning from T-code KO13.
    Thanks in advance.
    Regards,
    Ravi
    Edited by: Ravi Chandra on Sep 13, 2011 8:08 AM