ME01 LSMW multiple record for same material issue.

Hi Experts,
I have an issue with multiple record for the same material and plant when I upload the data from the file.  Lets I have the records.
Material        Plant              Start date      Enddate        Vendor          Porg.
1     0010     20060101     99991231     2     0010
1     0010     20060101     99991231     3     0010
When I upload the above data there are 2 IDOCs created when I am using the method LSMW-IDOC method, but only last record is getting updated and the first one is not getting updated in ME01 souce list. But I am getting the success message for both IDOC in LSMW. So I am not sure how to fix this why only last record is updated and not other records??

why do you have 2 idocs?
wouldn't be 1 idoc with 2 items be more logical?
1 record in structure E1EORDH
and 2 records in structure E1EORDM
I believe your 2 IDOCs get posted, but I think your 2nd Idoc overwrites the values entered from the first IDOC.

Similar Messages

  • Two Purchase Info Records for Same Material & Plant Combination

    Hi,
    2 Purchase Info Records are there for Same Material & Plant for 2 Different Vendors & Net Price is maintained in both Info Records
    1. Material M1 - Plant 1000 - Vendor A - Net Price Rs.4
    2. Material M1 - Plant 2000 - Vendor B - Net Price Rs.3
    Vendor A is Regular Vendor
    (Tick as Regular Vendor is his Purchase Info Record)
    It is observed that Rs.3 is picked up for Costing Purposes
    Requirement is that - Net Price within Pur. Info Record of Regular Vendor i.e Rs. 4 must be picked up always for Costing Puposes.
    Is this possible???
    What Logic system uses while picking up the Price in case where there are 2 Pur. Info Records for same Material & Plant???
    Thanks & Regards...
    Ameya...

    Hi,
    1. Material M1 - Plant 1000 - Vendor A - Net Price Rs.4
    (Validity - 28.04.2008 To 31.12.2008)
    2. Material M1 - Plant 1000 - Vendor B - Net Price Rs.3
    (Validity - 01.01.08 To 31.12.2008)
    Thanks & Regards...
    Ameya...

  • Skip lot across multiple batches for same material

    Hi,
    I am looking for a way to control skip lots across multiple batches for the same material.
    We need to do a quality check in production after a certain quantity produced (on a machine, for a material). My idea was to do skip lots (for GR)  until we reach a threshold (say 10.000 pcs) and then do an inspection for the next GR for that material.
    Any ideas how to set that up?
    Thanks for any hint
    Andreas

    Hi mergler,
    Ref to your query pls check this link Stock Posting for Skip Lots
    Thanks in advance

  • Convert multiple lines for same material into a single line in Sales Order

    Our company has a requirement, they want if there are multiple lines exist for the same material in sales order and purchase order then it should become like one single line.
    10    35712  5pcs
    20   100885  10 pcs
    30   35712   10pcs
    Now our requirement is that should  become a single line like this
    10  35712  15pcs.
    I will   Text Removed.
    Regards,
    Khawar
    Message was edited by: G Lakshmipathi
    Please dont add such text in your post

    Now our requirement is that should  become a single line like this
    Where?  Meanwhile, I hope, you would have searched in SCN / Google before posting as it is a basic question and needs to be locked.  If searched, specify clearly what efforts you took to find out solution to your requirement.
    G. Lakshmipathi

  • How to get the last (max of string) row with multiple records for same ID

    Hi all,
    I have a query that returns for each client ID the telephone nr, mobile phone nr, email etc... 
    There is also a column FLG_DEFAULT that indicates if the phone is the default one or not (N= changed).
    Basically what I would like my query to return is the phone number where FLG_DEFAULT = N, if this number is NULL or if FLG_DEFAULT =N does not exist I want to return the phone nr from DEFAULT_FLG = Y.
    Anyone know how I can do this in SQL? I cannot get a maximum because the format is string (e.g. +32/xxx xx xx or xxx/xx xxx xx.
    Thanks!

    ;With cte As
    (Select ClientID, PhoneNumber,
    Row_Number() Over(Partition By ClientID,
    Order By Case When FLG_DEFAULT = 'N' And PhoneNumber Is Not Null Then 1
    When DEFAULT_FLG - 'Y' Then 2 End) As rn
    From YourTableName)
    Select ClientID, PhoneNumber
    From cte
    Where rn = 1;
    Replace column names and table name with your column names and table name.
    Tom

  • Unit Conversion issue for same material with Diff KPI

    Hi,
    i have a report with multiple key figures which form a structure.
    Unit conversion for this report and all the key figures are defined at report level.
    Below are the settings in place
    Source currency:    Data record from target
    Target Currency:    From variable ( Input variable in BeX report)
    Conversion  factor: Dyanamic Determination of conversion factor
                                   Using Reference Infobject if available otherwise use T006
                                   Reference Infobject: 0Material
    Issue: For 1 Key figure conversion to TO is happening, however for other Key figure conversion is not happening for the same material.
    Note: Conversion to TO is defined in BEX settings for Info object 0material and stored in DSO UOM0MATE.
    Why for same material some key figures convert to target unit correctly and not the others?
    See the attached screenshot. Sales Quantity is convertin to "TO" while Volume third party shows figue in"ERR" for same material.
    Thanks
    Nayab

    Hi,
    Following reasons cause to your issue,
    1. Unit Conversion is not maintained for that particular material  in source system Material itself, so that  conversion data data may not updated in DSO (UOM0MATE).
    2. For particular transnational data record key figure value don't have any base unit or units measures, that case also  you may get that error.
    Request check the transnational data in your InfoProvider and 0Material Master data and DSO data (UOM0MATE) . Correct the data based on that.
    Check the Master data test in RSRV for 0Material, if any SID generations was missed or not.
    I hope this can be help to find the cause of error , based on that you can resolve problem.
    Thanks & Regards,
    Leela Krishna.

  • Create inbound delivery for same material with multiple batches

    Hi Experts,
    An ASN( advanced shipping notification) contains multiple batch numbers for same material or line item.An IDOC has different segments with batch numbers but in SAP while creating Inbound delivery(VL31N) only batch number ( segment) get posted automatically in SAP other batches are need to post manuaaly.
    I am using IDoc type : Delivery03 ,Message type: DESADV
    How to resolve this problem?
    Thanks,
    Anil

    Hi Anil,
    Welcome to SCN for your first post. Did you check with your functional people about this.
    Regards,
    Madhu.

  • Why are there multiple keychain records for same email account?

    I have noticed that it takes sometimes up to 45 seconds for Apple Mail to send (whoosh...) an email. Then I started getting an alert asking for my password intermittently.
    I checked my KeyChain Access and note 5 records for this email account dating back to 2007 and while the password hasn't changed in all these years, I note the "Where" field is different in some of these records. So my uneducated hunch is Apple Mail is getting a little confused and having to go thru all 5 records insteads of just one.
    As note multiple records for other email accounts and website logins I have.
    1. Why is this happening?
    2. Is it normal
    3. Can I, should I, delete all but one for each item be it an email account or web login, etc.
    or
    Should I delete all 5 and let a brand new one be created for Keychain next time I send or get email for this particular email account?
    I also see there is some info on keychain syncing. Does this have anything to do with my situation?
    Thx,
    Steven

    I'm a little distracted with Steve's passing. He will be missed to say the least
    But if it isn't too disrepectful to reply at this time, I'm unclear with your advise because there are 5 items all for the same email account. A couple are duplications, and the others have slightly different "Where" info.
    I can't imagine I need all 5 and wonder if I should delete 4 and keep the newest one?
    All my email accounts have multiple entries.
    Anyone know why this is happening and if it's OK to delete the oldest ones and keep just the newest?

  • Multiple physical inventory document active for same material-storage locat

    hi experts,
    I am using transaction code MI31 for creating physical inventory document for all materials at a particular warehouse(storage location). User is selecting direct generation of of PI documents in the transaction. If by mistake he presses execute button more than once system is creating as many copies of physical inventory documents. As per ERP system logic it sound very wrong to have multiple physical inventory document active for same material-storage location ( no batches or special stocks exist ).
    Is there a message number or some standard setting to prevent such occurrence.
    regards
    Avinash

    Hi,
    Syetem won't create again physical inventory document, if allready PI is active for the same part number,  plant, storage location & batch/valuation type.
    Check your PI documnets
    Regrads
    KRK

  • How do we maintain diff price for same material diff customer

    Hi Experts,
    Wish you all a very happy new year 2010.
    Here is the question which I have for you..very elementary.
    I need to maintain different price for different customer for same material in the same sales area, for the same plant
    Can anyone let me know how to do it !!
    There are more than 10k customers for whom different price needs to be maintained.
    P.S: I tried to search in the forum a lot about this, but was not able to find one correct answer.
    Thanks and Regards
    Rohit Dujari

    Hello,
    You can take help of ABAPer to create a batch input session or you may use LSMW .  You can split these 10000 customers into some practicle numbers (group) depending on your policy.
    You may also explore rules for creating condition records which frankly i am not awareyou get a select rule tab on bottom side of screen when you go to  vk11/vk12
    Regards
    Vivek

  • Error during creation of info record for pipline material.(Urgent)

    Hi All,
    We are getting the following error during creation of Info record for pipeline material
    " Material XXXXX is not a pipline material"
    we have checked the material master  and found it is a pipeline material.
    Kindly advice on the same.
    Help in any form will be rewarded.
    Best Regards
    Arihanth

    Hi Arahanth,
       The steps u need to check are;
    1) The Material Type ( If standard then it is PIPE or if defined own Material Type check the settings once preferably in special material type a tick at pipeline mandatory)
    2) when u create the info record (ME11) ensure the info category is selected as pipeline.
    Hope its clear to u
    if solved do reward me points
    Regards
    Anil Thai

  • Cost Estimation Through Two PIR valid for same material

    Hello Everyone
    I am trying to costing strategy with PIR (Purchase Info Record). Just to check whether its working right or not i have only choosen sub strategy 'Effective Price from Quotation'. My problem is we have got more than one PIR for the same material from different vendors (both have valid dates). My first question is how system will calculate if both PIRs for same material is valid with different prices.
    My expectation was that system should pick up the price from PIR which has regular vendor flag ticked in PIR master record but this is not the case. System is picking up the price from the other PIR although i don't know the logic. I am observing system is picking the lower price (as i tested two materials) in both cases. Can anybody guide me how can i make sure that system picks up the price from PIR which has regular ticked or can anybody suggest something elsethat which is right sub strategy to use for PIR?
    Thanks in advence

    Hi Young Sun
    The link really helped me a lot to understand the process how system is picking up price. We don't use source list and quota requirement. I have noticed that system will not consider regualr flag tick in PIR for costing unless you you configure at backend in
    Material Logistics->Purchasing->Source Determination->Define Regular Vendor
    Once i have activated that tick system is working fine and picking up the price from regular vendor flag. If regular vendor is not ticked system will go vendor with lower price.
    @Imdad: Thanks for your kind help as well and input.
    Many thanks again.
    Regards

  • How to Maintain two different prices for same material in different qty?

    Dear all,
    How to maintain two different prices for same material in different batch quantities in purchase order(ie.,info record)?
    (Vendor is supplying quantities in 2 different batches & also in different prices)
    Expecting valuable reply.
    Jeyakanthan

    In a PO you can create 2 items, and each item can be maintained with a different price in the conditions.
    In info record it is not possible to have different prices for the same period, except for scales.
    so if you have a price of e.g. 2 USD for 1000 kg and 1,90 USD for 2000 kg then you can maintain this in scales, but you still have to have 2 items in the PO so that each one can individually find its price.
    Alternative you can create contracts (as well with more than one item) to reflect the different prices and batches.

  • Multiple pricing for 1 material

    Dear All,
    We are implementing SAP at a leading pesticide industry.  They have a very complex pricing structure.  They have over 40 different pricing policies for 1 product. Their pricing policies consist of all the basic info e.g., MRP price, invoice price, tax, customer discount and net & final price.  We can maintain all these using condition types in the pricing schema. 
    However the problem is if a customer orders 100 ton of product A, He can pay for 20 tons in cash, 20 tons in advance and the rest he can buy on credit or vice verse. And on all these he can have different pricing policies for the same material in single order.
    And in 1 order he can have any number of products and he can pay by cash , advance & credit and he can have different pricing policies on each one of them.
    Please provide assistance on how can we configure a pricing schema that can cater all these requirements. 
    Thanks

    Hello,
    I believe your requirement is based on Payment Terms, you want to have different Price for Each Line item in Sales Order.
    Firstly create all the different Payment Options as Payment Terms in T-Code OBB8.
    Now Insert Payment Terms as one of the combination creteria in the Condition table of Access Sequnce of Basic Price.
    You can maintain different Payment Terms for each LIne item in Sales Order (Sales Order LIne Item Details - Billing Tab). For this you need to put a Tick Mark in Business Item under Business Data in your Item Category (T-Code VOV7).
    Following the above you can have multiple Prices for one Material based on Payment Terms.
    Thus now as soon as you enter Payment Terms in the LIne Item details of Sales Order, system will search for Basic Price based on the Combination including Payment Terms.
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

Maybe you are looking for

  • [SOLVED] system no longer knows about xfs filesystems?!?

    last Monday (11/14/2011) my system was able to mount an external drive with an xfs filesystem on it. as of today (11/21/2011) it no longer recognizes xfs: % mount <my_dir> mount: unknown filesystem type 'xfs' does anyone else have this problem?  i se

  • Errors while installin of Oracle 8i (8.1.7 32 Bit) on AIX 4.3.3

    I got following errors while installing Oracle. Though the make files were there but the install process was reporting error to invoke it. I selected ignore and proceeded further. Is this normal. Is this something to worry about? Exception String: Er

  • Archiving in BW 7.0 links and litterature

    Hi Guys 'n' Girls I was wondering if you have any nice links, documents, presentations, book recommendations etc. about archiving in BW 7.0? Thanks a lot in advance. Kind regards, Torben (torben.r.p {a-t} gmail com)

  • Why cant i connect to wifi on my IPad Mini

    When i put my password in my Wifi Network.. All it does is show me the loading sign, But it never gave me the blue check mark indicating that's it's connected But when i try connecting to my mom's hot spot it works.. My Ipad Mini is IOS 8.2 i have tr

  • Dashboard in telesales-ebusiness centre

    In oracle telesales-e business centre- dash board(Next to overview tab), by default 1.Leads 2.Opportunity 3.Quotes 4.order 5.service 6.task are getting populated. I wanted to keep Leads & task in the dashboard. How to set this dashboard in the e-busi