ME2L Delivery Schedule Showing Fully Delivered Lines

Hey,
We are experiencing this issue on a SAP 4.7c system that we support.
Our business are trying to generate a report, every month, that is sent to vendors, of all the purchase orders that the business are expecting them to fill. To do this the business user uses ME2L report per vendor, only selecting the Schedule Agreements documents, hitting the calendar button (Delivery Schedule), exporting the resulting output to Excel, using a formula to identify the lines which have a GR value less than the Scheduled Qty value and sending these onto the vendor as a notification to the that these are the orders that the business have marked as outstanding.
The issue arose when the business cancelled lines on Scheduling Agreement 5500000073 by going into MD04 and deleting the requirement for vendor 5033760 and reassigned those requirements to a new Agreement 5500000053 for vendor 5000259.
However when you run the process above the deleted lines still show up on the report and you believe this should not be the case and never was the case.
What process to accurately identify on SAP, schedule line items, that have not being fully Goods Receipted and/or cancelled so they can be sent to the vendor?
Many thanks for any help,
Colm

Hi Jurgen,
Apologies for the delay, I was away on leave.
We use selection parameters WE101 and that correctly brings us back only open orders on the selection screen, however when we click the Delivery Schedule button it displays lines that have been fully Goods Receipted.
For example, if I have a PO with 3 lines, Lines 1 and 3 have been fully received and line 2 has only been partly received.
I run ME2L with the selection parameter WE101 and the report only displays line 2. Which is correct.
However when I click the delivery schedule button I will be shown the entire history of that line, including scheduled quantites that were fully goods receipted.
What I would like to see is only lines where the scheduled quantity is greater than the goods receipted quantity.
I hope this makes sense, thanks for your help,
Regards,
Colm

Similar Messages

  • Scheduling Agreement - Delivery schedule line number

    Hi,
       I am developing a report to show the Goods receipt postings for each delivery schedules of Schedule agreements.
    I am not able to find Delivery Schedules line(EKET-ETENR) in Material document table(MSEG).
    How do we exactly link the GR quantity to Scheduling agreement Delivery schedules.
    We have line item number but not delivery schedules.
    GR quantity may be posted to different delivery scheules and for some SAs when the MRP Runs it is positng randomly.
    Is there function to find the link,
    Searched EKBE, EKET, MSEG  and other tables also.
    Appreciate your help <offer removed by moderator>.
    Satya
    Edited by: Thomas Zloch on Jan 18, 2011 2:44 PM

    Hi Shravan,
        Thanks for answering, I checked those two tables EKEH, EKEK are release tables. We have some SAs without release documentation. I have to find the delivery schedules using the GR document to which delivery schedules the qty it is delivering.
    It is not posting the qty from top of schedules, for some SAs it posted randomly.
    Any other ideas or any function modules,
    In BW it is possible using extractor but we need in R/3
    Thanks,
    Satya

  • Delivery Schedule in Scheduling agreement

    Hi
    We have a  scheduling agreement  created  in MM in ME31L  for subcontract process .
    Delivery schedule mentioned for first two line items are  5/07/2008 .
    Deliver schedule mentioned for 3rd line item is 02/08/2008 .
    Due to this different requirement dates, always delivery split happens .
    Regarding this , I request you to clarify below points .
    1.     I understand these delivery schedule were mentioned when this scheduling agreement was created . Afterwards there is no updating happened for delivery schedules .
    Afterwards many deliveries have been generated with reference to these scheduling agreement , user is creating delivery every month with reference to this  scheduling agreement . I mean how it is possible  to create many deliveries with one schedule date .where as in SD , we need to update schedule lines always. 
    Thanks In Advance

    Excellent information !
    I understood what you have mentioned .
    Just I need your clarifications for my below queries to fix this issue .
    There are 6 line items in this scheduling agreement .
    For 3 line items , delivery schedule date is 02/08/2008 . for another 2 line items, delivery schedule is 05/07/2008 . due to this different delivery schedules for line items  in scheduling agreement . whenever  user creates delivery , delivery split is happening .
    In order to avoid this problem , can ask user to change delivery schedule for another 2 line items to 02/08/2008 from 05/07/2008 . ?
    If user change this delivery schedule  for this line items , is there any ramification in anyway ?.
    Thanks In Advance

  • Delivery schedule dates are coming in Past dates

    Hi Friends,
    In the Scheduling Agreements the delivery schedule dates are coming in the past dates even tough the scheduling agreements are having new schedules. There is also open quantities there for the scheduling agreements.
    please kindly explain me what is the delivery schedule date in Scheduling Agreement.
    Thanks in advance.
    Regards,
    Kannan M

    Hi Khan,
    Just check this thease might be the reasons to get correct the delivery schedule.
    To access a delivery schedule, mark a scheduling agreement item and choose Goto ® Item ® .
    The following data is displayed in the delivery schedule tabstrip:
    ·        Delivery schedule number and date
    ·        A wide range of standard cumulative quantities
    ·        Delivery information
    To display deliveries for the delivery schedule, choose Deliveries on the delivery schedule tabstrip.
    In scheduling agreements involving external agents, the system displays deliveries made to the customer by external agents as consignment issues.
    ·        Correction delivery information
    To display or create correction deliveries, choose Corr. delivery on the delivery schedule tabstrip.
    ·        An analysis function
    ·        Information at a glance
    To display a summary of delivery schedule data, choose Short disp. on the delivery schedule tabstrip.
    ·        Schedule lines
    Choose DlvSch.Hdr on the delivery schedule tabstrip to access the delivery schedule header. The following data is displayed here:
    ·        Information on quantities received by the customer
    ·        Information on the customer fiscal year and cumulative quantities reset due to a year change
    ·        A wide range of cumulative go-ahead quantities
    ·        Notes on the delivery schedule
    Correcting Cumulative Delivered Quantities
    Prerequisites
    You correct cumulative quantities in scheduling agreements:
    ·        In case of returns
    ·        When there has been a processing error
    ·        When there has been a year change
    ·        When you are transferring initial quantities from a legacy system into the SAP System
    To do this, you create a correction delivery within the delivery schedule itself. This delivery is not relevant for requirements planning, shipping, goods issue, or billing.
    Correct cumulative quantities only when the customer has not posted goods receipt.
    Procedure
    To create a correction delivery (document type LFKO):
           1.      Choose Corr. delivery on the delivery scheduletabstrip.
    The system displays a dialog box in which you enter a:
    -         Correction delivery date
    For help on deciding where you want to position the correction delivery, choose Display. The system lists delivery dates in chronological order.
    -         Correction quantity
    Enter a negative correction quantity by placing a minus sign after the quantity.
           2.      Choose Enter and save the scheduling agreement.
    Result
    When you save the correction delivery, the system updates the cumulative quantities in the delivery schedule.
    To display correction deliveries, choose Deliveries on the delivery schedule tabstrip, or  Environment ®  Display document flow.
    Example
    Your customer returns 200 pieces of material from a delivery made on 7/10 because of damage during transport. Several other deliveries have been made before you prepare the correction delivery, so you view a list and choose an appropriate date. In this case you decide on 7/14 because it occurs after the delivery on 7/10 and before the delivery on 7/15.
    Regards,
    Murthy V.N

  • Delivery Schedule Confirmation inbound

    Hi experts,
    Business scenario: For material planning purpose, The SAP PO would require delivery schedule confirmation from supplier to be used as a PO firm item when the PO is released. The PO items are critical since they will be used as material requirement planning to fulfill shop floor production.
    Can any one let me know what is the BAPI or any other method to Update PO Quantity Update Deliv. Date using custom program.
    Thank for advance
    Rambabu.A

    Hello Duke,
    Thank you very much for getting back to me.  Yes, our configuration had been maintained properly as defined. 
    IMG>MM>Purchasing>Confirmations>Set Up Confirmation Control
    1. Select the Confirmation Control Key
    2. Goto Confirmation Sequence
    We had set up AB confirmation in sequence 1 and LA in sequence 2.
    The problem happens only when the delivery schedule date or PO line delivery date is earlier than or equal to the AB confirmed delivery date. When this happens, the system does not look at  the cumulative quantity between the AB confirmation and LA confirmation.  Instead, the system treats them as two independent events resulting in an  overconfirmed situation. 
    Please see the following example:
    <b>Scenario 1</b>
    If 1000 ea was ordered with Delivery schedule date is 11/20/2007 with the following confirmation:
                                                                           Quantity reduced
    AB  Confirmation     300 ea    11/19/2007             0
    LA  Confirmation     300 ea    12/20/2007             0
    Total ATP available quantity is 600 ea (over-confirming)
    <b>Scenario 2</b>
    If 1000 ea was ordered with Delivery schedule date is 11/26/2007 with the following confirmation:
                                                                           Quantity reduced
    AB  Confirmation     300 ea    11/19/2007             300
    LA  Confirmation     300 ea    12/20/2007             0
    Total ATP available quantity is 300 ea (correct quantity)
    Please kindly advise if there is any documented SAP logic that explain this system behavior. Thank you very much.

  • Sales order item gets "Fully delivered" status even if partial qty

    Hello,
    We have a depot sales configuration in SAP. I found that some sales order lines are getting completed (delivery status "Fully delivered") even if partial quantity is pending for the order line. I checked the status in VBUP table where LFSTA gets the value "C" instead of "B". This is happening for some of the order lines (specially orders with small qty, just an observation).
    Can anybody help to know why the delivery status change to "C" inspite of partial delivery.
    Thanks,
    Rajeev

    Thanks for your help but your solution doesn't give any clue/solution to my problem
    I checked the customer master for shipping-> Partial delivery tab for fully delivered & partailly delivered cases. All the customer masters have same setting. This is confired by checking in the table KNVV.
    As explained earlier we have depot configuration & all Sales orders are created with item category "TAB" & there is no completion rule mentioned in VOV7.
    Regards
    Rajeev

  • Read PO delivery schedule data

    Hi SAPPERS,
    Is there any FM or table, were I can find delivery schedule data from purchase order-?
    thanks for your help
    Saso

    Hi,
    You can get delivery schedule data for each line item of PO in EKET table.
    Regards
    Radhika

  • PO Delivery schedule

    when creating PO item via PR, i find one PO item have several ve delivery schedule item, and each delivery item generate from same PR.
    Example,
    Item 10
    Material A 37 Qty's
    I am getting Delivery schedule with multiple schdule lines with splitting the total Qty's for same Purchase Req
    Can you explain how this happening for One PO item.
    I am getting this for Intra Company STO.
    There is no delivery created for this STO
    With Regards
    Ram.

    Check whether is there any maximum order qty maintained in the material master or in the info-record

  • Help with Delivery Schedules In PR

    Is it possible to enter a delivery schedule in a purchase requisition (like it is in a Purchase Order)?
    The desired output is multiple delivery schedules in one PO line item, but it doesn't seem to be possible to enter this information in the purchase requisition.

    Hi DG,
    I am sorry to say that there is no possiblility of Delivery schedules in Purchase Requisition like Purchase order.
    Reg,
    Ashok
    Please close this issue, if answered.

  • Delivery deleted but schedule line status shows as fully delivered - Urgent

    Hi,
    I deleted the delivery related to the order but teh schedule line status says its fully delivered....
    Is thr a way to refresh the schedule line so it shows the correct status? Urgent PLs.,
    Thanks
    Keshi

    Thanks fro the reply.. But i tried this but the inconsistency is still there? any other report i cn try
    Thanks
    Keshi

  • Scheduling Agreement Delivery Schedule Line Remains When Fully Delivered

    Hi Experts!
    I had an issue regarding our scheduling agreements. Issue is below:
    Our delivery schedule lines remain on the delivery schedule list item detail screen (VA32 or VA33), even though the delivery has been delivered and completed. The only way this seems to disappear is when a new schedule line is loaded. Why do the old delivery schedule lines remain on the JIT delivery schedule list even though they have been fully delivered and completed?
    This is an urgent matter. Any responses will be greatly appreciated and points. Thank you for your time!!
    Best Regards,
    WC

    Hi Shravan,
        Thanks for answering, I checked those two tables EKEH, EKEK are release tables. We have some SAs without release documentation. I have to find the delivery schedules using the GR document to which delivery schedules the qty it is delivering.
    It is not posting the qty from top of schedules, for some SAs it posted randomly.
    Any other ideas or any function modules,
    In BW it is possible using extractor but we need in R/3
    Thanks,
    Satya

  • Forecast delivery schedule lines consumption

    Hi,
    I cannot fully understand what is the logic behind the consumption of the forecast delivery schedule lines. This is how the problem can be exactly defined:
    - scheduling agreement with delivery orders (LZM)
    - JIT delivery schedules are not used and no delivery schedule is maintained... just a forecast delivery schedule
    - the whole process is manual, there is no EDI implied
    - the cumulative received quantity is updated by an ABAP development that is triggered at delivery goods issue
    The rest, happens normal - forecast schedule lines are updated weekly, the customer send pick-up sheets, a TAM delivery order is created, then delivery, GI...
    The problem: not always the MRP requirements generated by the forecast delivery schedule lines are consumed by the delivery order/GI. If the delivery orders / deliveries are made on the exact quantity of the schedule lines everything works fine. It is also ok when there are two successive delivery orders with a cumulative quantity that matches exactly the forecast line. As soon as a over-delivery is made, everything turns upside-down: older delivered schedule lines appear again in planning as if nothing was delivered until now...
    I suspect that the problem is related to the fact that the whole process is manual and updating the cumulative received quantity is not the only parameter that is counting... is it so? Or the forecast delivery schedule has to be respected 100% in terms of quantities and timing?
    I would really appreciate your help.
    Regards,
    H.

    Also please clarify whether delivery schedule lines in ME38 (even it is created automatically), in Planning time fence, will get affected by MRP run.

  • Converting Multipule Reqs to a Purchase Order with Delivery Schedule Lines

    Is it possible to convert a multiple Purchase Reqs for the same items to a PO that has one line but multipule deliver dates in the Schedule lines - Where the Purchase Reqs have been generated by MRP
    Example
    I have an SAP Contract 46***** that runs via MRP and creates 3 Reqs for item number 12345. All from the same vendor
                 Req 1 delivery date 2/4/10  QTY 50
                 Req 2 delivery date 6/4/10  QTY 20
                 Req 3 delivery date 10/4/10 QTY 30
    Aim is to have 1 PO with line 1 having a QTY 100 but the Delivery Schedule Tab to show the three seperate delivery needs
                date 2/4/10  QTY 50
                date 6/4/10  QTY 20
                date 10/4/10 QTY 30
    Any Help?

    When i try that the QTY in line one does not alwasy update to the total qty of the reqs and infact the qty on the req doesnt always appear in the schedule line....
    This works for me perfect, I never encountred that the item quantity was not updated if I added a new requisition to the schedule.
    ME59N should work, do not select per requistion and per delviery date in the New PO section in the selection screen. But set a flag into box create schedules.

  • *MRP unable to create Delivery Schedule Lines in MM Scheduling Agreement*

    Hi Experts,
    I need your help...
    The issue is, in-spit of maintaining Source List with an u201CScheduling Agreement with item No.u201D & u201CSource List Usage in MRPu201D as 2 (Record relevant to MRP. Sched. lines generated automatically), MRP run does not generate Schedule Lines, instead PRs are created.
    Please help me to understand such behavior and fix the issue as the requirement is to generate Schedule Lines only.
    Thanks,
    Pratap

    Hello
    Please check
    1) Source List maintained properly in terms of Material # ; plant # ; proper POrg ; Schd Agr # and line item# ; proper validity date & MRP relevant indicator
    2) Please also check Quata arrangement if you are using. whether % is maintained correctly against the vendor
    3) MD03 , Delivery schedules- should be 3
    4) check your planning horizon whether it is NETCH or not
    5) check material master -MRP2 view, Procurement type is F- external procurement, schedule margin key if you are using
    if everything above is set, then I feel it should work
    Also please verify-
    lot size, safety stock and the corresponding prod volume for MRP input v/s the stock available in MMBE
    example.
    MD04, we can see the open del lines.
    if SS = 50 , prod volume is 150
    1) if MMBE shows 200 then it wont generate any schedule.
    2) if MMBE is 180 and your lotsize is 40, then after MD03, you will have a schedule line of 40 (provided if everything is set properly)
    Please ensure there are NO open delivery lines . if you find such in MD04, then please close open delivery lines
    in calculation of MRP, system considers such open delivery lines are going to receive and no additional schedule line generated even after MRP run
    thanks

  • Delivery schedule ME2L

    Material which is already partially delivered are appearing in the base list of ME2L Report but the same is not reflecting in Delivery schedule report.Pls help

    Hi Pradeep,
        Check whether any filters have been applied because we had same kind of issue with me5a.
    Regards
    Pavan