I've defined several release strategies for contract ageement. When I create a contract, if the system cannot determine a valid release strategy, I can crate a document without release strategy.
How can I make a control when saving the document (tcode ME31K, ME32K) to verify that a strategy release is always defined?
For purchase order (tcode ME21N, ME22N) i've found a badi that works correctly, but it doesn't control in ME31K.
thanks,
Marco

I've definied several release strategy (100) with many parameters (company code, value, plant, etc).
Even if only one of parameters is not satisfied, the document has none release strategy, and I don't have any message about this.
By standard system I must define a phantom release strategy, with all combination not covered by the real strategies.
thanks,
Marco

Similar Messages

  • Release strategy of contract disappeared after using of  MEMASSCONTRACT

    Hi  All,
    May be some one can help me?
    I have next problem it tr. MEMASSCONTRACT(ECC6)
    Release strategy of contract disappeared after using of tr. MEMASSCONTRACT. I know why it happened, but I don't know how to correct it. Some time ago IN ECC5 we added a field to a table EKKO and used this field as one of characteristics in the release strategy of contracts. In order to transfer value of this field to field CEKKO-USRC1 we used User Exit EXIT_SAPLEBND_002. This User Exit is suitable only for online transactions (ME31K, ME32K). How can I feel field CEKKO-USRC1 in transaction MEMASSCONTRACT?
    Regards, Liza

    Thank you. Probably I didn't explain my problem clearly. It's section of code from User Exit EXIT_SAPLEBND_002:
    ATA: reference(20) TYPE c VALUE '(SAPMM06E)EKKO'.
    DATA: it_ekko TYPE ekko.
    FIELD-SYMBOLS: <ymm_icl> TYPE ANY.
    e_cekko = i_cekko.
    *THE "ICL Contract" FIELD IS ONLY RELEVENT IN THESE TRANSACTIONS
    IF sy-tcode EQ 'ME31K' OR sy-tcode EQ 'ME32K'
    OR sy-tcode EQ 'ME33K' .
      ASSIGN (reference) TO <ymm_icl>.
      it_ekko = <ymm_icl>.
      e_cekko-usrc1 = it_ekko-ymm_icl.
    ENDIF.
    Program SAPMM06E can only be reffered while using online transactions. Mass transactions does not use these program and it is completely class based. So,  may be someone know how can i do the same , but for tr. MASS in ECC6.

  • Purchase Order not subject to release strategy for contract rel. strategy

    Hello, I am trying to set release strategy for contracts (TCODE: ME31K). I have created characteristic, which use table CEKKO and field name BSTYP in Addnl data tab. I have checked values, and they are correct. Then I have assigned in release strategies in classification view value contract. But when I try to check release strategy in ME31K with green flag, it display error: Purchase Order not subject to release strategy. (I have tried to do the same strategy in purchase order, of course with value Purchase order, and it works nice).
    So I have checked this release strategy with this codes:
    CL24N ok,
    CT04 ok,
    CL30N ok,
    CL20N ok,
    Release simulation in release strategy works,
    Then I found out that I should check SE38, SE37 but I do not understand how to use them (according: Purchasing Document Not Subject to Release Strategy).
    Thank you for your help in advance.

    I haven't said to use EKPO table in characteristics. You have to use CEKKO - BSTYP in characteristics.
    I've just said the compare the value which you have given in Release strategy - Classification and EKPO table for the particular contract.
    Also compare your release strategy settings with many existing documents in SCN.
    Check your Classification should be like that.
    You may see the error message in ME31K. Just save the contract then go to ME32K/ME33K or ME35K you can see the release strategy will effect for the contract.

  • Contract Release Strategy - field Requisitioner

    Hello,
    I will start to use the Contract release strategy and I need the field Requisitioner (EKPO-AFNAM), because this field is part of my PO release strategy.
    This field isn't available in the transactions ME31K and ME32K.
    Can you tell me, if it's possible to show it in these transactions?
    In other case, where can I fill this field? How is the BAPI, BADI, etc?
    Thank you,
    Meire

    Hi,
    Please, be so kind to refer to note 373361. This field was only                 
    available in purchase requisitions and due to requirements of                   
    SRM (formerly BBP business tons business procurement  ), it has                 
    been added into the new enjoy transaction                                       
    ME21N/22N/23N for purchase orders.                                              
    It is not available for contracts.                                                                               
    The contract is  not  the last document in the procurement.In bussiness               
    process the requirement of requisitioner in contract is less important.         
    It is enough if you don't know the requisitioner at the time of contract but              
    you know it at the time of PO creation.                                                                               
    This is the standard SAP design.   Please do not use this field in the contract release strategy: create a new release group for the contract release strategy, delete the value entry for EKPO-AFNAM in the "Change view - release strategies - classificaion". The characteristic for EKPO-AFNAM should appear as black and not as blue on the screen. Save your strategy.
    Regards,
    Edit

  • PR Release Strategy tab processor field is not getting displayed

    Hi Experts,
    While creating Purchase Requisition, In the Release Strategy tab processor field is not getting displayed which should be showing the name of the user id which has been configured in the SPRO.
    SPRO--> Rel Proc for PR > Rel Group> Rel Code--> Object type (US) and --> Agent (User id who has to approve the PR).
    release strategy - Release code  -work flow 1
    That processer name is not displaying
    Thanks
    chandoo

    This is the workflow forum.

  • Release strategy for purchase requisition does not kick in

    Hi Gurus!
    I've been struggling with this issue for some weeks now.
    I have set up the release strategy configuration for purchase requisitions with classifications.
    However, if I create a purchase requisition the release functionality is not taken into account by the system.
    See below some more information regarding my configuration:
    1. I've created a new characteristic "REL_PR_GROUP". Status: released, Multiple values, Number of Chars 3, 7 values (TR1, TR2, TR3....TR7), Table name: CEBAN, Field name: EKGRP, Procedure for value assignment set to not ready for input.
    2. I've created a new class: "REL_PR_ANPC". Class type 032, Status: released, Same classification: do not check, Char: "REL_PR_GROUP"
    3. I have one release group "T1", Rel. object 1, OverReqRel is marked, Class: "REL_PR_ANPC"
    4. I have 5 release codes. Grp: T1, Code: 01....05
    5. I have 2 release indicators:
    "R = Released", Rel. for ordering is marked, Changeabil: 4, Value chgs. 100,0
    "X = Blocked",  Changeabil: 4, Value chgs. 100,0
    6. I have 1 release strategy:
    "T1 with Grp T1"
    - one release group, 01 Manager
    - release prerequisites not applicable because of only one release group
    - release status, nothing marked = blocked, 01 marked = released
    - classification, purchasing group is TR1 or TR2 or TR3 or TR4 or TR5 or TR6 or TR7
    I intentionally kept the configuration as simple as possible so I can try to get it working first.
    Now if I create a purchase requisition for an item with release group T1, I would expect the release strategy to be activated. However, this is not the case. I don't see the "release status" tab in the PR, and if I try to relase via ME54 the system says the PR is not relevant for release.
    Could you please assist in getting this working?

    Hi,
    Have you checked in CL30/CL30N if your release strategy is derived successfully?
    See section 3 of Note 365604. A small section of it:
    You can use transaction CL30 search for an object using the data
    of the purchase requisition/purchase order. Here, it is important
    that the object search determines exactly one strategy. If this
    is not the case, this indicates that there are overlapping
    strategies in the system or that the release strategies in
    Customizing do not correspond with those from transaction CL24.
    See the previous point. If the object search returns more than
    one result, the system subsequently determines an incorrect
    release strategy or no release strategy at all.
    If it is derived successfully, next, check the user exit EXIT_SAPLEBND_001 as per Note 371667:
    The following assignment statement has to exist within activated SAP
    enhancements M06B0002 (include zxm06u13) and M06B0005 (include zxm06u31)
    for purchase requisitions:
         E_CEBAN = I_CEBAN.
    Regards,
    Purnima.

  • Release strategy for PO and Contract

    Hi,
    I maintain characteritic for PO
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    I maintain characteristic  for contract
    Company code
    Target Value
    Doc Type
    Purchasing group
    My class consist of
    Plant
    Doc Type
    Net Order Value
    Purchasing Group
    Company code
    Target value
    Q1: Do i need to maintain ALL characteristic value when i define my release strategy for PO or Contract as some characteristic only apply to PO only or contract only?
    Q2:  What option do i have if i need to maintain all characteristic value ? leave it blank ? empty
    Currently my PO release is working fine but when i try to maintain the contract release inside the class . my PO release is not triggering . I maintained diffrent release group for both PO and Contract .
    Thank for your advice

    First of all
    For purchasing like PO,pr,contract you can able to get in ekko table.No need to maintain separate release unless if it your business requirement.Take Document type as one of the characteristics it will distinguish whether it is PO or contract.
    You have to maintain all the characteristic value then only it will trigered release.
    Check the release indicator as well.
    Hope it will help.

  • PO Changeability / Release Strategy / BAPI_PO_RELEASE Issue

    Hello everyone,
    I've run into an interesting problem:
    We have defined several PO release strategies.  Most of these work in the traditional manner, requiring manual approval by a given user.  One release strategy, "99," gets picked up by a batch job and released automatically using BAPI_PO_RELEASE. Either way, the release indicator for all released PO's is set to "R." This all works as intended.
    We have maintained Changeability settings for each release indicator in customizing. "R" is set to "4 - Changeable, new release in case of new strat. or val. change," with a percent value change tolerance of 10%.
    If we make a change to a manually released PO that exceeds the threshold set in customizing, the release procedure starts over as intended.
    If we make a change exceeding the threshold to a PO that was released automatically by BAPI_PO_RELEASE, the release procedure does not start over, and the PO remains unblocked.
    What would cause this discrepancy?  The two records look virtually identical in EKKO, particularly in respect to the fields relevant to release.
    Thank you ahead of time for your help.
    -Jarrod

    Configuration issue/user error.

  • PO Release strategy

    Hi,
    I have a unique requirement in PO release strategy. The requirement is if the PO doesn't have any contract it should be subjected to 2 step release process. If there is a contract then it should be subjected to 1 step release process.
    Now i have created 2 release strategies one with 2 step release and the other one with 1 step release with the same charecteristic values. The only exception is i have used the 'USER DEFINED CHARECTERISTICS' - USRC1 with the value of X in one step release strategy and the value of BLANK in 2 step release strategy.
    After doing all these settings Release strategy is not trigerring at all. Firstly it has to trigger the release then using the exit we can change the release strategies depending upon the conditions.
    Any suggestions are highly appreciated to fix this issue.
    Regards
    Sudhakar

    Hello,
    After you have done config for the release strategy please execute " Check Release Strategies". This will also help you in giving first round of check/errors in your config.
    regards
    anand

  • Release strategy for quantity contract

    Hi Gurus,
    In quantity contract ..  target value will not filled by the value(in header details) as it is quantityt contract.
    We may have different line items with different cost..
    my doubt is how the release strategy will be triggered for the quanityt contract and how the system will consider the whole value of the contract..
    please explain/clarify
    regards
    subbu

    Hi,
    The release strategy for the contract will work in the exact mechanism as for the PO i.e. it will be determined  based upon the total net value of the entire purchasing document.
    Cheers,
    HT

  • Contract & PO Release Strategy

    Hi All,
    We are in the process of designing the release strategy for contract and PO. I  would like to know whether we can have the different release conditions for contract and different release conditions for PO. For example.
    The release conditions for Contract required are
    1)Porg
    2)Pgroup
    3) Value
    Also, for quantity contract how can we make the release strategy trigger based on value.
    The release conditions for PO required are
    1)Porg
    2)Pgroup
    3)Material Group
    4)Value
    The release strategy is not getting determined if we create po with two line items which belongs to two different material group. Is there any way out to solve this issue?
    Request your help.
    Regards,
    Kannan

    Hi Kannan
    Yes your requirement is possible...
    While creating Charectristics in CT04 for External Purchase Documents...Create one more Value  for your Document Category...ie) Table as :CEKKO   and Field  as BSTYP   and choose the Purchase Doc. Category  values K  and F.
    Then create Charecteris for  CEKKO - EKORG,  CEKKO - EKGRP   and   CEKKO - GNETW, CEKKO- MATKL...  and assign these all 4 Chareteristices in your release class.
    And Configure your release statergy according to your requirement...
    Reward if useful
    Regards
    S.Baskaran

  • Release Strategy for SA/Contract/PO

    Hi friends,
    Should we have different release groups and release codes in contracting/ SA/ PO.
    Because...
    I have maintained 4 characteristics in release strategy for PO _[ Comp Co, plant, porg, total net order value].
    But i want to maintan only 2 characteristics in release strategy for contract  [plant, total net order value]
    because the same is reflecting in contract config also.
    Is it possible..please help me frnds.
    Prabhu

    Hi Prabhu,
    Unfortunately you need to maintain characteristics of all possible values for company code and plant for contractsu2019 to subject the release.
    Wish that SAP would be more flexible with release of PO, Contract and RFQ but it does not.
    Regards

  • Release Strategy for Contract is not getting picked whereas it is ok for PO

    Dear Experts,
    I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    Kindly resolve the issue.
    Satish

    S0004830404 wrote:
    Dear Experts,
    >
    > I have created release strategy for PO with doc type, p.org, net value as chars and frg_ekko as class and release group as 02.
    > I kept NB,FO,MK and WK as char values. it is working fine for PO's whereas it is not getting picked for Contracts. we need same release strategy for PO as well as for Contract.
    >
    > Kindly resolve the issue.
    >
    > Satish
    hi,
    use create other characteristic for value CEKKO-GNETW in this use the mk , wk values in value field and assign this characteristic to your class and save.
    Thanking you

  • Issue with retriggering Release Strategy

    Hi all,
    We have a one off situation here. We had already 10 release staragies in our system. We added 2 more release strategies with a new characteristic. We updated the characteristic value only for the new 2 release strategues and did not update the rest 10. Although now we had updated the characteristic value for remaiining strategies, the purchase documents created in the mean tme is not subjected to release strategy. To ensure business control we need to retrigger back the release strategy for almost 1000's of documents.
    As any change to purcahsing document will retrigger it when done manually, but given the number of documents and as per Note 493900 we cannot trigger it by any backgoriund job to modify as below:
    16. Question :
    Why is there no release strategy determination when a program changes in
    background a purchasing document which corresponds to the classification of
    a release strategy ?
    Answer :
    This is the system design that a release strategy determination can only be
    triggered through a user action and not by changes made in background
    process.
    If you create a document (e.g. PO, Contract, etc), the determination of the
    release strategy takes place only in case of a user event like checking or
    saving the document.
    Kindly suggest any best practise to retrigger release strategy  for the missing documents to ensure business control. Any easy and time savig measure to get it resolved will be appreciated.
    Regards,
    Anand Sampath

    Hi Arnand,
    After investigation by searching customer messages database ,I found              
    other customer has  similar problem as the release strategy has changed           
    after creation of the SES please review the  explanation from developer           
    :(whose release code is 03 )                                                                               
    When you try to revoke the acceptance of the service entry sheets                 
    in ML81N or ML81, the 'Enter release code' pop  up window appears, but            
    entering the code that is determined via the menu path Goto -> Entry              
    Sheet -> Release Strategy (which is the 03), the SES remains the same.            
    Nothing changes. The status does not vary and no error or warning                 
    message is issued.                                                                               
    Checking the customizing for the release strategy, the release code               
    03 should have never been assigned to the SES 800024272 as the values             
    for the relevant characteristics were not included under that code.               
    I do not know how it was managed to accept the SES.                                                                               
    Now, when you try to revoke it, it seems that no release                          
    strategy can be determined, not even including the values RCARESANO               
    and 012 between the valid values for the characteristics of the release           
    code 03 (RCARESANO as valid value for SUPERVISOR_SERVICIOS                        
    (CESSR-ERNAM)and 012 as valid value for GRUPO_COMPRAS (CESSR-EKGRP)).                                                                               
    The only Possibility is to change now the SES so that the release                 
    strategy can be re-determined by the system.This is the Only possible             
    way that the system can  redetermine the Release Strategy , but it will           
    not be possible to do so as the SES is already accepted with the Old              
    strategy and it does not admit any further changes.                               
    To be able to change it you would need to revoke the SES first,                   
    but this Will also not be possible as the Release Strategy was changed            
    and the system still applies the old rules for determining the Release.           
    Solution to our Problem                                                                               
    The Only way to revoke the SES is to Restore back the Old Strategy that           
    was prior to 03 in the customizing.So now what will happen is that by             
    applying the Old Rules the System will be able to revoke the SES that#s           
    using the Old one. Once the necessary SES are revoked then go back to             
    customizing and apply the new strategy as it was did now, and                     
    Change the SES and save , the new value of the Release Strategy will get          
    updated in the table ESSR and the field frgsx will now have 03.                                                                               
    Problems associated if the Release strategy is changed                                                                               
    Actually the release strategy is not supposed to be changed when there     
    are some documents in the System that uses it and even if you change the   
    Strategy the Old records will not get AUTOMATICALLY UPDATED by the        
    system.The Release Strategy routine has to run again to update the         
    values. This is Possible by changing the document SES ,                    
    This change will happen only if the SES is not accepted and if its         
    accepted then you need to revoke and to revoke you need to restore the     
    old strategy , revoke and then change the SES , and have to go back to     
    customizing and Start using the New strategy from now on by doing so the   
    Routine will update the old record with the new strategy.                 
    b) You may want to use CEKKO-BADAT(Requisition Date) or any other
    structure in CEBAN or CEKKO and create a new release strategy    
    to differentiate the old release strategy.
    Hope this helps,
    Kind Regards,
    Matthew

  • Purchase order release strategy report

    Dear Gurus,
    We are using purchase order release strategy with classification.
    We have 3-4 level of release. We want to develop a report where we will come to know at which level purchase order is pending for release .
    How to get it ?
    Please provide ur help for the same
    Rgds,
    Saurabh

    Hi,
    Basically in EKKO table there is a field name FRGZU  -
        Release status based on that we can write a logic take the report.
    for example A1,B2,C3 ARE THREE release codes in that if A1 released means with check thable whether A1 released once it is release it will go to next release code it iwll check the status again inthe loop....
    Just tell him the logic to ABAP person they will develop
    Rehgards
    Murugan J

Maybe you are looking for

  • How to create a view in table DB for a few servers

    Hi We need to create a table Country that will hold the countries data. I would like to create it in a way that it will be common for all the servers - but as a view. not the real table, only a view to see the data and not to change it. How do I do i

  • Service for my Ipod with colour display

    My ipod had a problem of which i notify the nearest country near me(South Africa) since my country(Ghana) had no service center for 2 times of which i had no reply from them? The problem is it does not connect with fire wire cable any longer and even

  • Oracle 9i WEB-forms, with or without Headstart?

    We have some applications that are created with Designer 2.1.2 and Headstart 2.1.2 and we are about to migrate these to Oracle9i Web Forms and here are my questions: 1) What are the advantages/disadvantages if we continue to use Headstart? 2) What do

  • How to set s:text name=""/ in Struts2?

    Hi I want to do the equivalent of Struts 1's <fmt:message key="${someVariable}"/>using Struts2: <s:text name="somethingDynamicHere"/>I have searched high and low for the answer... anyone know how to do this please?? Nick

  • Fireworks CS6 Drag and Drop?

    I recently got the Fireworks CS6 trial to just well...try it out. I was unable to drag and drop images on to the program, instead when I try to the cursor changes to an icon with a circle and a line going diagonally across it..Any solutions?