Meaning of CONDET key figure in standard 9ASNP94 APO SNP planning book

I am trying to clarify the use and meaning of the CONDET (capacity consumption details) key figure in the SAP standard SNP planning book 9ASNP94.
Any advice appreciated...

Hi  Frank,
This indeed is practical requirement wih no simple solution ( at least we  did not find).
We created a background job for deletion of the stocks ( which were updated through IDOCs like your situation) at specific periodicity. The jobs were made as per planners with specific variants and when planner would like to delete the stocks, the job will be run.
Another option could to be copy the standard program /SAPAPO/RLCDELETE to a module program and check validation at the input screen, before calling the deletion program.
Regards
Datta

Similar Messages

  • Key figure Explaination in SNP planning books 9ASNP94

    Dear Experts ,
    I am curious to know regarding SNP planning books key figures
    when i am exploring sap standard  Planning book
    9ASNP94
    Data view : SNP94(1)
    I can able to see many KEY FIGURES  Please refer below
    I AM NOT SURE how they are used in planning , i mean  what is clear definition of those key figures and i see some key figures are grey out and some or open for entry
    how to find those detail information
    when i go  to T code SDP84 - define planning book
    i can able to see those descrption and infocubes but not sure how to understand clearly , would be more thankful if some give me a clear explaination of it
    Forecast     TXT                                                                                                                   
    Sales Order     TXT                                                                                                                   
    Distribution Demand (Planned)     TXT                                                                                                                   
    Distribution Demand (Confirmed)     TXT                                                                                                                   
    DistrDemand (TLB-Confirmed)     TXT                                                                                                                   
    Dependent Demand     TXT                                                                                                                   
    Total Demand     TXT                                                                                                                   
    Distribution Receipt (Planned)     TXT                                                                                                                   
    Distribution Receipt (Confirmed)     TXT                                                                                                                   
    Distribution Receipt (TLB-Confirmed)     TXT                                                                                                                   
    In Transit     TXT                                                                                                                   
    Production (Planned)     TXT                                                                                                                   
    Production (Confirmed)     TXT                                                                                                                   
    Manufacture of Co-Products     TXT                                                                                                                   
    Total Receipts     TXT                                                                                                                   
    Stock on Hand     TXT                                                                                                                   
    Supply Shortage     TXT                                                                                                                   
    Safety Stock     TXT                                                                                                                   
    Reorder Point     TXT                                                                                                                   
    Target Days´ Supply     D                                                                                                                   
    Target Stock Level     TXT                                                                                                                   
    Days´ Supply     D                                                                                                                   
    ATD Receipts     TXT                                                                                                                   
    ATD Issues     TXT                                                                                                    
    Many thanks & Regards
    Raj

    Hi
    Please find below the short summary of each key figures.
    Forecast TXT  :- FCST which has been released from APO DP to APO SNP
    Sales Order TXT :- Sales order transferred from ECC to APO via CIF.
    Distribution Demand (Planned) TXT :- Dependent demand coming from other location to this location for same product. Network planning
    Distribution Demand (Confirmed) TXT :- In case deployment , we confirm the Distribution Demand (Planned) will appear her.
    DistrDemand (TLB-Confirmed) TXT :- Mainly used in case of TLB.
    Dependent Demand TXT :- Dependent demand coming from parent product in case of BOM
    Total Demand TXT :- The sum of all above demands is called as Total Demand.
    Distribution Receipt (Planned) TXT :- SNP created Purchase req will appear in this key figure.
    Distribution Receipt (Confirmed) TXT :- In case of deployment Distribution Receipt (Planned) will be get confirmed in the Distribution Receipt (Confirmed) key figure.
    Distribution Receipt (TLB-Confirmed) TXT :- Mainly used in case of TLB.
    In Transit TXT :- In will contain the in transit stock which will transfer for ECC via CIF.
    Production (Planned) TXT :- Planned order will get created via SNP in case of domestic mfg.
    Production (Confirmed) TXT :- In case of SNP deployment Production (Planned) will be get confirmed in the Production (Confirmed)) key figure.
    Total Receipts TXT  :- Total of all the receipt elements as been used.
    Stock on Hand TXT :- Stock has transferred from ECC or R3 via CIF.
    Supply Shortage TXT :- This will be calculated with macro based on total demand and total receipt.
    Safety Stock TXT :- Based on SNP master data, safety stock will get calculated during planning run.
    Reorder Point TXT :- Based on SNP master data, Reorder Point will get calculated during planning run. . There are different methods of calculating safety stock.
    Target Days´ Supply D :- The safety stock defined in number of days appears based on SNP master data in APO.
    Target Stock Level TXT :- Get calculated by macro  based on Target Days´ Supply D and total demand in future.
    ATD Receipts TXT :- Mainly used for Deployment.
    ATD Issues TXT :- Mainly used for Deployment
    If you require any specific information for any key figure please do let me know.
    I hope this will be useful for you.
    Thanks
    Amol

  • Where are the key figures in standard 0PCA_C01 queries?

    Hello BW experts
    I am evaluating the standard BI content queries related to profit center accounting. I found all 0PCA_C01_q* queries don't have any key figures in their column. But when I execute the query It brings out the value.  How is that possible? Is it something related to global structure? Where can I see the information?
    Further more, I can not drag and drop any key figures from left panel to the column area. Why is that?
    Your help is very much appreciated
    Thanks
    Subbu

    Roberto
    I am looking at 0PCA_C01_Q0004, My question is about the columns. It has Plan, Actual, etc. But if I double click each of them, they are all characteristics (0version and 0vtype. Not key figures,. And I can not add any key figures (0credit, 0debit etc) from the left pannel. I made a copy from that query to another query the symptom is still the same.  I am confused. I thought on the columns we need to have key figures not characters. But this query is strange.
    Subbu

  • Help Required for Mapping Key figures from Cube to APO Planning area.

    Hello Experts,
    We have created cube in APO BW and now we want to map it to Planning area how we can map.
    Can any body explain how we can map keyfigures?
    What is the use of livechache how it will be updated?
    Regards
    Ram

    Hi,
    I am not very sure about the 9ARE aggregate (haven't used it in backups), but RTSCUBE is used to copy time Series (TS) KF data from cube to planning area (SNP or DP).
    Are you trying to restore some time series data from your backup cube to the planning area? If yes, then do a mapping of characteristic from cube to planning area in RTSCUBE, and also map the TS KF between cube and planning area.
    If your KF is not a time series KF, then you can't copy it from cube to planning area. You could get data to cube for some reporting, otherwise I am not sure what use the backup is for you. For SNP, most of the data would be received from R/3, so there's not much point in having a backup.
    Hope this helps.
    Thanks - Pawan

  • PLANNING BOOK (SDP94) KEY FIGURES EDITABLE MODE SETTINGS

    Hi,
    I am unable to get editable mode of one of the key figure(Distribution receipt confirmed) of SNP planning book using t code SDP94. Kindly help me out in getting the same.
    The following are the details which i tried:
    Opened SDP94 in change mode and clicked on design mode. Then right clicked on the Key figure, activated input/ouput mode and then saved.. Still i am unable to enter into the change mode of SDP94 of that key figure.
    Regards
    KPNMurthy

    Hi Aparna,
    Sorry for the delayed reply. After thorough investigation with our business people, we have come cross with different solution, instead of creating a new Zfigure which occupies more database. Thanks a lot for your prompt reply. Rewarding you for the same.
    Regards
    KPN Murthy

  • How to influence the text display of key figures in the interarctive DP

    Hello all,
    Does anyone know if there is a possibility (BADI, etc.) to change the text display of key figures (not characteristics!) in a planning book/data view?
    I know that you can define a free text in the data view but still, this is only one fixed text and it cannot be changed.
    Reason for the request: We would like to use the same key figure (and hence, indicate 2 different texts) for two different purposes (in different selections) without having to create a new data view.
    Kind regards,
    Klemens

    if you dont want a new data view and might even go to the extent of creating a user exit for this ... here is an idea
    - just create auxillary KF ( or use spare Temp KF depending on what you want to do with the data in the view) for each of these KF with the text
    lets say you have KF1 and KF2 - create KF1A and KF2A
    Make sure KF1A = KF1 and KF2a = KF2
    Now depending on user you can display KF 1 and KF2 or KF1a and KF2a depending on the user by using macros USER() and ROW_VISIBLE(0)

  • Business Process: Final Demand Plan Key Figure in the past for APO DP

    Hello APO process experts,
    I have a BPX question for APO DP process owners, consultants or gurus:
    1.- Have you ever seen in any SAP APO customer, that in their APO DP planning books, they chose or designed to update the Final Demand Plan key Figure in the past closed historical buckets with the Actual Sales?
    Meaning that that in the Past closed historical Buckets, Actual Sales and Final Demand Plan, look exactily the same.
    Meaning that they create a dynamic Final Demand Plan key figure so to speak, yet they did not choose to create a key figure that also keeps the Final Demand Plan as originally entered.
    2.- Would you think that doing the above, without keeping any keyfigure in the planning book that actually shows what the Final Demand Plan was in the Past, is a good practice?
         The Demand Planner could still retreive the Final Demand Plan from BI reports, yet, dynamically they could never really see it in the planning book.
    3.- Do you think the above dynamic key figure would bias the Demand Planner's behaviour to manipulate the future open Final Demand Plan buckets to enter volumes in order sum to a monthly total, independently of what were the over and underachievements in the past (since they are not really visible to him) ?
    I would really like your feedback,
    thanks in advance!
    JD Loera

    Hello Thanks for your feedback.
    I agree with your point, and I hope that i still get more feedback from other Business Process Experts.
    I am trying to build a case for my client, to challenge the decision of their initial design as this practice is going to hurt the Demand Management process, if what they intend to achieve is a true "unconstrained demand plan"
    Much appreciated
    JD Loera

  • Could not release my own Key Figure from DP to SNP

    Hi SAP Experts,
    As requirement, I have to run forecast for three Key Figures in Demand Planning (DP): Z_FK1, Z_KFK2, Z_FK3. Unit of measure of these Keyfigure are VND (currency Viet Nam Dong).
    I added these Key Figures to DP Planning Area with name Z_DPPlan01.
    I created a new Planning Area in SNP with name: Z_9ASNP02 by coppying from the standard 9ASNP02. Then I added the above Key Figures (Z_FK1, Z_KFK2, Z_FK3) into Z_9ASNP02 planning area.
    After I runing forecast in DP, I tried to release value of three Key Figures into SNP with tcode: /n/sapapo/mc90. Although system informs that u201CRelease successfully executedu201D, nothing released from Z_DPPlan01 to Z_9ASNP02 when I check in SNP Planning book.
    Question is:
    How to configure Key Figures in SNP and DP (Sematic, Key Figure Function, Category, Category Groupu2026)  so that we can release all three above Key Figures from DP to SNP?
    Thanks very much for your help!
    Duyennx

    Dear Pawan,
    2 . The business requirements are:
    Our customer is a bank that has many branches. They want to forecast for each branches:
    - The Total money (all denominations) will be issued in next quater (Z_KF1). This base on historical data (Z_HIS1)
    - The total money (all denominations)will be received in next quater (Z_KF2). This base on historical data (Z_HIS2)
    Base on these forecast KFs, we need to calculate the Average of Total money will be received and Issued in next quarter (Z_KF3 = (Z_KF1+ZKF2)/90.
    90 is the number of days in a Quarter.
    We need to release the three KFs from DP to SNP for further calculation and reporting. As said previously, I added three time series KFs Z_KF1, Z_KF2, Z_KF3 to SNP Planning Area (Z_9ASNP02)
    If could not release, we can coppy. But the problem is that: in DP, beside standard characteristics 9AMATNR and 9ALOCNO, we also added more custom characteristics like Z_TYPE (to generate CVCs and to drill down money by type (cotton, polymer, coin)). So when I run the Tcode /n/sapapo/tscopy, despite of the fact that in u201CCharacteristic Assignmentu201D I only assigned 9AMATNR and 9ALOCNO from source to target, system show message like:
       3 combinations not contained in target master planning object structure
    Message no. /SAPAPO/MSDP_REL108
    Diagnosis
    Characteristic combinations exist in the source planning area's master planning object structure that are not contained within the master planning object structure of the target planning area.
    System Response
    The source data of these characteristic combinations is not written to to the target planning area.
    So, How to copy with my case?
    4.Please Explain more about:
    u201CCreate a third custom category group containing your custom category, and add this under 9AMALO. Give only your category group name & Semantic should be 000u201D
    4.1.I can creat a custom category group under menu path:
    SAP Reference IMG u2192 Advanced Planning and Optimization u2192 Supply Chain Planning u2192 Supply Network Planning
    u2192 Basic Settings u2192 Maintain Category Groups.
    But where can I create my custome category? Is this menu path:
    SAP Reference IMG u2192 Advanced Planning and Optimization u2192 Global Available-to-promise (Global ATP) u2192 General Settings u2192 Maintain Category
    In this path, I can see to folder:
    -u201CSAP categoriesu201D: We could not create new category in this folder
    - and  u201Cnon-SAP Categoriesu201D: I can press button u201CNew Entriesu201D and key in Data like:
    oCategory: TT
    oCategory text: TT
    oCategory Description: TT
    oSort String: 99
    oCategory type: Requirements (I also tried with Forecast, Stock, Receipt)
    And then, press u201CSaveu201D button. But system always create message:
    u201CEnter values in work area for non-key fields
    Message no. SV174
    Diagnosis
    An entry has been made for a non-key field in the view or table, which does not satisfy a selection condition stored in the Dictionary or made in the maintenance transaction initial screen.
    System Response
    The values entered cannot be accepted.
    Procedure
    Ensure that your entry is correct. This data record will not be displayed if you use the same selection conditions again.u201D
    I donu2019t know what wrong here. How to create my custom Category? Here is u201Cnon-SAP Categoriesu201D, Is there any problem if we create category with this type?
    4.2 How to add custom Category Group under 9AMALO? Which T-code we use?
    5. By the way, Please clearly explain for me:
    5.1. What are differences between u201CTime series live cacheu201D and u201COrder live cacheu201D?
    5.2. What are differences between releasing KFs from DP to SNP and copying KFs from DP to SNP?
    Thanks very much for your help!
    Edited by: xuanduyen on Dec 31, 2011 4:38 AM

  • Calculated Key Figures based on Attributes

    Hi
    In one of our queries we need to create a calculated key figure based on an attribute. Any suggestions on the best way to do this?
    I have looked at a Virtual Key Figure, but because our Cube name contains underscores (_) it shortdumps. Is there a way around this?
    Thanks in advance.
    Chami Herath

    Hi,
    what do you mean with calculated key figure based on an attribute? Is your attribute a characteristic in the cube or is it just a attribute of a characteristic? Let me know more details.
    regards
    Siggi

  • SIS some key figures are displaying zero value

    Dear all
    Following Key Figures in Standard SIS tcode like MCTE, MCTA, etc. are displaying as zero
    Incoming Return
    Credit Memo
    Credit memos qty
    Returns items
    Returns Quantity
    MC+6 is displaying all the key Figures as zero.
    What may be the reasons
    Regards
    Vipin

    Dear Babubala
    In MC26 I am getting below warning for Incom. Returns, Gross returns, Net Returns 1, Net Returns 2, Returns items, Returns Qty
    Incom. returns: Updating with date field VDATU can be set up restrictively only
    Message no. M!208
    Diagnosis
    While updating the key figure Incom. returns the data field MCVBAP-VDATU for the period determination is used.
    Updating via MCVBAP-VDATU causes a different result online as for statistic data set up. Online, MCVBAP-VDATU is filled with the current date (SY-DATLO); during set up, however, it is filled with the creation date MCVBAP-ERDAT of the item.
    By using VDATU document changes you can see in the statistics that this type of 'delta updating' cannot be reproduced by a statistic data set-up. During the set-up the data is updated in different periods as in online updating, thereby causing the change history to be lost.
    Procedure
    Be certain that this is the type of updating you want.
    In MC26 the Credit Memo Update Setting is VD Billing document and Type of Updating is A     Cumulative updating
    while as in Credit memo pricing procedure there is no subtotal. How to maintain it in Pricing procedure and in MC26 because in MC26 after pressing the change button the system is displaying the following message "Maintenance of SAP standard updates not allowed"
    Regards
    Vipin

  • Unable to Change Key Figure in DP

    Hello Experts,
    I am facing an error in Demand Planning.  There is an existing Key figure in which I need to change the Type/Data type from Number to Quantity wherein it is showing Grey(uneditable) even in Change mode.  The other tabs like Aggregation, Additional Properties are showing as editable.
    Could you please provide how to modify this Type/Data type field in the key figure.  I would appreciate your quick turnover based on which I need to decide on my solutioning approach to my client.
    Thanks in advance.
    Regards
    R. Senthil Mareeswaran.

    Hi Senthil,
    Try to delete the existing data in your key figure. and then try to change the key figure type. However in SNP i checked that keyfigure type can be changed. Are using RSA1 for this?
    Thanks,
    Satyajit

  • How to create a key figure in SNP plannignbook which generate FA type order

    Hello
    trying to create a Key Figure in SNP planning book which generates FA type orders
    could kindly suggest how to do it?
    thanks
    elena

    Hi,
    You would be having different key figures in SNP. The type of orders that you see in Key figure is driven by type of categories or category group that you assign in planning area to each key figure. You can modifiy these cateogry groups in IMG settings.
    When you manually create a forecast through a report then automatically you will see those orders in key figures where you have assigned the category FA.
    Hope this helps.
    Regards
    Alhad

  • The macro attempted to modify a key figure that is not locked

    Hi
    In my planning area I choosen detailed lock, keyfigure specific lock and do not lock read only keyfig after that In interactive DP, I have 2 Planning Books A and B .when I load the selection for book A itu2019s loaded well because all are editable key fig but when I load book B I get error u201CThe macro attempted to modify a key figure that is not lockedu201D in this book 3are editable keyfig 3 are display. I am in SAP SCM 7.0,I had seen the SAP NOTE 851731but its too old i think now iam in advanced that that but that note is not there in my system .
    Any ideas on why this is happening?
    Regards
    siva
    Edited by: sivaram2411 on Feb 3, 2012 1:52 PM

    Hello,
    According to your setting in the palnning area ("do not lock read-only key figures"), if you have set a key figure as "Output Only" in /sapapo/mc8b or by a default macro, then this key figure could not get locked.
    It is not allowed to make changes to unlocked key figures. So if there's  a macro that tries to update this key figure, you'll get the error message.
    If you have "do not lock read-only key figures" set, you must make sure that your macros do not make changes to those key figures that are output only (read only).
    Best Regards,
    Ada

  • Displaying Restricted Key Figure Based on Fiscal Year

    I'll try and explain my problem.
    We have created a query using the CCA cube. We created 3 restricted key figures each with a different budget plan version. They are called 'AB' ,'PB' and 'RB'. When the user runs the query it will show planned values out for 5 years. So for example right now we are in Fiscal year 2006.
    The problem is that 'AB' is only valid for year 2006, 'RB' may only me valid for 2007 and 'RB' may only be valid for 2008 - 2010. They use a different plan version for different years, If I place all three columns on the report I get zeros when the plans are not valid. Here is what I would like: When the fiscal year changes somehow select the correct restricted key figure to show and also adjust the text to reflect the fiscal year.
    Its like my variables are dependent on the fiscal year displayed.
    Any help would be great.
    Rick

    Hi Richard,
    Have you tried out the Suppressing Zeros options in query properties...if the whole column is blank for a particular year, you should be able to suppress it. Click here for more info:
    http://help.sap.com/saphelp_nw04/helpdata/en/1e/99ea3bd7896f58e10000000a11402f/content.htm
    You can use text variables in the RKF description to reflect the year for which the data is being displayed.
    Hope this helps...

  • Mass Data Loads into SNP Key figures

    Hi All,
    Does anyone have any knowledge of doing mass data uploads agains key figures (e.g. Safety Stock Planned). There is a transaction /SAPAPO/TSKEYFMAIN - Mass maintenace of Time Series Key figures, but this does not give me the option of loading thousands of materials at one time. Any thoughts would be appreciated.
    Rumi

    Rumi
    As Kaushik has mentioned you can upload data from info cube to planning book for time series key figures and you can read data maintained in excel and upload it to your info cube.
    But i have a question. Why cant you maintain safety stock in APO product master for the material branch and using macro read data from product master and populate safety stock key figure ?  Acutally you can maintain the safety stock in R/3 and as soon as you CIF material to APO the safety stock field in product master will get populated and you can read that using a macro .
    Thanks
    Aparna
    Edited by: Aparna.Ranganathan on Dec 9, 2010 6:17 PM