Measuring Instrument Needs to be added in inspection plan for each part

Hi
How to assign the Measuring Instrument in the quality inspection plan for all the materials.
Whether i need to assign as material assignment or as PRT.
how to use prt to assign to the operation in the quality plan (task list)
Thanks
VRAJ

Hi,
when i try to assign the Equipment for first Inspection Characteristics.
the system thru the ERROR as,
Production resource/tool is not intended for this type of task list
Message no. CF230
Diagnosis
You want to use the production resource/tool in a task list or work order with task list type Q. However, according to usage 004 of the PRT, this task list type does not exist.
Procedure
Change the usage of the PRT in the master record or select a PRT which can be used in this task list type.
How to resolve this issue.

Similar Messages

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Do I need to purchase Office 365 A3 plan for faculty to get free Office 365 ProPlus for students in Office 365?

    Hi there
    Our school has A2 plan for both students and faculty. We recently contacted our reseller and placed an order for free  Office 365 ProPlus A for our students. We received an acknowledgement from Microsoft regarding this order saying that it was successfull
    and I can see the license added when I log into the VLSC website. Problem is, I can't see this licence listed when I log into Office 365 admin. It is not listed under subscriptions or licenses. Apologize for my ignorance, but I don't know how can I get this
    license added in Office 365 so that our students can start using editable versions of office apps on their IPADs. Do we need to purchase Office 365 A3 plan for our staff to get this student's license enabled in Office 365? Can somebody please help?

    I have similar questions concerning getting started with the Student Advantage program offering.
    I've read the blog posts and made as many as 5 calls to Office 365 and still do not understand how to get this going.
    We have a subscription to Education A2 for both faculty and students that we started in January 2014.  We receive this at no charge.  So I'm starting with a subscription at no cost.  I do not have an Education Reseller because we started our
    subscription through the website with a trial and had that converted to the no cost A2 plan.
    When I am in the portal and look under 'Purchase Services' I can see the option to add Office ProPlus for Faculty at $2.00/user/month and for Office ProPlus for Students at $1.50/user/month.  My understanding of Student Advantage is that if I license
    all my faculty/staff accounts for Office ProPlus I would then get the Student access at no charge.  So I've licensed the Office ProPlus for Faculty for all of our faculty accounts yet I cannot get a clear answer about how to get the Student accounts added
    at no cost.
    I most recently was told by Office 365 support that I needed to speak to a reseller, which I did today.  He told me that I would need to do one of two things.
    1. Upgrade my no cost A2 faculty accounts to A3.  Which for me and what I see in the portal would take them from $0 to $4.50/user/month.  With that A3 for faculty I would get the Office ProPlus for the Students accounts on A2 at no charge.  
    2. I would need an Open Value license covering all school FTEs for Office at a cost of about $29/user/year.
    Both of these options are higher than licensing all Faculty accounts for Office ProPlus via the portal at $2/user/month which I have already done.
    So I don't understand why that doesn't qualify us for Student Advantage and now have to license all FTE, most of whom don't even touch a computer, for Office.

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

  • Inspection plan for inprocess inspection

    Hi QM Gurus
    please let me know can I use an inspection plan for inprocess inspection
    Thanks
    TR

    Dear,
    Inspection Plan is similar to routing, which will indicate what are all characteristics need to be checked / inspected when you receive a material. Is a master data. Once the inspection lot is created we will check the inspection plan and perform the inspection and give the defects recording and usage decision for the inspection lots.
    So for inspection type 03 use routing with usage as 1 and status as 4 and control key as PP04 to specify the inspection characteristics.
    when u cofirm that perticular operation it will ask to record the results. Inspection lot get genarated during order release this we can see in the order header data assignment tab. PP04 assignement says this operation is relevent for inprocess inspection and we need to assign MIC's for this which are relevent created in QS21 for this also sampling procedure created in QDV1.
    Regards,
    R.Brahmankar

  • Inspection plan for Pipelines?

    Dear SAPIENTS,
    Business scenario: Various pipelines located in plan and need regular inspection depending upon requirement. It can be 3 MOnth, 6 MOnth or anything. Inspection lot and result recording required.
    Doubt: How can i link pipelines in system and how can i create inspection plan for them?
    Regards,

    Dear,
    If i create as a equipment than where should i enter about its functional location and installation details.
    i.e the reason i am asking if create an object link for the pipeline between two equipment or functional location than how can i create lot, notification for this link?
    Regards,

  • Do I need to have a different Apple ID for each apple product my family has so we are not sharing contacts

    Do I need to have a separate Apple ID for each apple product we own if I do not want to share my contacts with my children

    Yes. And separate user accounts on the computer if you only have one computer.
    How to use multiple iPhone, iPad, or iPod devices with one computer

  • How to create an inspection lot for each line item of the Purchase order?

    Hi,
    How to create an inspection lot for each line item of the Purchase order ?
    In detail if possible.

    Hi
       please check this
    [thread|Create Inspection Lot;

  • SAP QM Default Inspection Plan for all Inspection Lots created in the Plant

    Scenario: We have a Proto type plant in which Daily 15 to 20 materials are created every day. We have only one inspection plan for all the materials.
    Problem: We don't want to do material assignment in the Inspection Plant header every time a new material is created
    Requirement: Is there any way to default the inspection plan for all the inspection lots created in the Plant by Standard Configuration or User Exit.
    Your answers will be much appreciated and rewarded.
    Thanks in advance,
    Thiyagu

    Hi,
    In our case Creation of Inspection lots are controlled by QM View of Material Master. Our problem is to find alternative for assignment of New Materials in the Plan header in Tcode QP02, as we have only ONE INSPECTION PLAN. So our expection is all QM Inspection Lot created in the Plant should always get assigned to the SINGLE INSPECTION PLAN, with out doing any assignment of material in the Plan.
    Thanks,
    Thiyagu.

  • Do we need to buy the license from SAP for EACH 'Z'form

    Hello
    I heard that, we (company) have to take license for the development of EACH adobe interactive form (even though its totally custom brand-new interactive form created from scratch), on individual form basis, is it true? (i know, its free of cost to play around with interactive forms in DEV and QA, but, if we want to move them to PROD, in that case do we need to buy the license from SAP for EACH form individually?)
    Thank you

    Thats true...license based on end user usage is required for SAP interactive forms. For more information read SAP note number 750784. The license comes in package like per 1000 users one time payment.
    Regards,
    Vaibhav

  • Is it possible to create  inspection plan for "Inprocess Inspection"

    Hi,
    Is it possible to create  inspection plans for "Inprocess Inspection".
    If yes , what would be the "task List Usage".Is it "1"?
    If no ,then how to map this requirment?
    Regards
    Vemula

    Hi
    Vemula
    Generally as Per SAP std Routing is used for inspection of 03 type of inspection.
    but you can also customize the Inspection task list Usage for Inprocess Inspection.
    This is possible through
    QCC0>Quality Inspection>Insp lot creation>Assign Insp type to origine>
    here informt of 03 inspection type you can assign
    Task list type:Q
    Usage:either 1(Production) or 3(Universal)
    save
    Regards
    Poonam

  • I need to check comparative three conditions and for each output I need to perform some action. can anybody please suggest

    I need to check three comparative conditions and for each status I need to perform some action. can anybody please suggest
    Requirment:
    Need to check if a numeric value is within a number range by using comparative function. Depending on status i need to ggive a constant input to numeric function.

    Easiest is suing an array of range boundaries, e.g. as follows:
    (Found here)
    Now it is fully scalable and  independent of the number of ranges. The solution in the earlier post would get complicated quickly whenever the number of ranges or boundary locations changes.
    LabVIEW Champion . Do more with less code and in less time .

  • Assignments of materials and vendors to inspection plans for the plant 1500

    Hi to all,
    Please give me solution for make assignments of materials and vendors to inspection plans for the plant 1500.
    Thanks,
    NAgesh

    hi gang,
    try to make usage decision ,kindly check in material document which you have created while making the GR, check in which storgare location you have specified and try to transfer the stock from quality to unrestricted.and also make a note on batch number also if you have activated the batch management
    regards
    thyagarajan

  • Inspection plan for all materials GOODS Receipt

    Hi qm experts,
    I have a scenario. How could I make an inspection plan which covers all materials with variable base unit of measure. Its because my client is using winlims for their results recording. I want to create only one inspection plan to incorporate all materials for assignment, how could I make this one. I hope anybody could answer my question.
    Regards,
    Edsel matildo
    QM Consultant

    Hi,
      Say u have different materials with different base unit of measure ( kg / ltr / ea / pc /  --- -
    etc ) And u have assigned all these material in qulity plan having only one unit of measure (say mm )for characterisrics then there is absolutely no need to maintain conversion rule for all these
    Beacuse base unit of measure is different and unit of measure is different .
    Note Conversion rule is only required if ur using alterenate base unit of measure
    Amol

  • How to set up the inspection plan for the material in super BOM

    Hello,
    how to get the accurate inspection plan of the IQC for the material which was class item in a super BOM?
    I've gotten the characteristic value from the sales order, and get the PO after MPR. The problem is how to specify the target value and the range of inspection characteristic in inspection plan, because the value is temporary?
    Thanks!
    Lin

    Hello,
    I think you need to create MIC which linked with the configuration characteristic, and specify "inspection by configuration" for the inspection type.
    then the configuration value in the sales order can be transfered to the inspection lot when production released or goods receipts if you use inspection type 03 or 04. that means the value range for the MIC will be determined dynamically for each sales order.
    Regards, Winnie

Maybe you are looking for

  • How to find out the Batch job selection screen values

    Dear Users, One of our users has set up a Batch job by manually entering values into the Selection screen of a report instead of picking up a Variant. We would like to know the values entered on selection screen since the job has failed and the user

  • SaxParseException message problem

    I try to validate my xml file with its schema ... The xml file is not valid and a SaxParseException is throwed (all is ok) but this exception message is : cvc-complex-type.2.4.b : Le contenu de l�l�ment '{0}' est incomplet. Il doit correspondre � '{1

  • Creating sitemap for webpage in new iWeb...

    I am having a lot of trouble getting a sitemap to generate for my website that I built using iWeb. It will only generate a map for the very first page and none of the rest of them. Has anyone else had this issue? www.mtbtrailreview.com

  • Problems with sound when using adobe flash player

    It seems that we have some issues with the sounds of the uploaded videos. I have uploaded some videos directly on our website http://yoananin.com/ but many people complained that  they can not hear the sound  Can anyone help?

  • 10.8.2 sandboxd errors

    I went from 10.7 striaght to 10.8.2 so I have no idea if this Mountain Lion as a whole or just .2 My logs are full of page after page of these entries 21/09/12 8:18:45.644 AM sandboxd[63712]: ([36979]) Mail(36979) deny file-read-data /Library/Prefere