Measuring Point for Tools and Die Maintenance

Dear All,
I am trying to map the following process:-
My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
Assigned the Die as a PRT to the material which is to be produced in the Routing.
When i confirm the production order the counter of the PRT increases which i can check IK13.
What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
I would request you to please give me some input on this.
Thanks and Regards,
Rashmi

Hello Rashmi;
I have seen the screen shots & there are problems with the following:
1) Counter overflow reading
You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
2) Formula that you have used;
You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
CREATE a single measuring document with reading as '0'.
4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
Do let me know if there is any problem in this.
Regards
Hemant

Similar Messages

  • What are "polling tools" and "centralized maintenance" for a Windows 7 machine?

    Hello all.
    Can somebody explain to me what "polling tools" are and what they do? What is their purpose? Also may somebody explain what "centralized maintenance" may mean?
    Thank you!

    Hi,
    Could you pleaes tell us more information so we can better know what you mean? When and where do you find the "polling tools" and "centralized maintenance" in Windows 7? A snapshot would be more helpful.
    Regarding to the "centralized maintenance", Windows 7 has a built-in maintenance service,  performs common maintenance tasks in Windows, just lauch Action Center, you will find it.
    More information would be helpful
    Yolanda Zhu
    TechNet Community Support

  • Measuring Points for Equipment

    Hi-
    I have a req., where in I need to capture the Measuring Points for a given Equipment, but there might be more than one measurement points(Milage, Hours, Days etc.,) So, How should I capture them? What is the best bet?
    I I do it on Equip. Master(Time Dependent) I'm thinking it will have multiple columns with same Euip.,
    Is ODS the best bet?
    Any idea appreciated.
    Thanks,
    Chandra.

    Hi,
    You just want to capture measuring points or you wnat to capture, measurment documents against these measuring points also?
    In case of measuring point, it is a master data and hence an info object/ODS both can suit. If you want to have ODS, then you should keep Measuring point also in to the key fields..
    In case of measurment documents ODS will be the best fit.
    Trust this helps.
    Regards
    Meyyappan S

  • Measure Formulae for Uploadable and Data collection report

    Hi,
    I have query related to application of measure Formula for Uploadable and Data collection report.
    Consider a scenario where i use a MDX query to create a data collection report and I map these columns from these reports to an rowsource using a loader file. Can I use measure formula feature like onchange to work with Uploadable and Data colection reports such that changes to any one column should take effect in another column.
    Regrads,
    Wesley

    Wesley,
    IOP uploadable reports are used for sending data to the server in batch. They are coupled to the IOP model via a rowsource. You have a lot of flexibility with the spreadsheet you build for staging the upload. It's really just a function of how crafty you are with vb. Cascading changes from one column to another can be easily accomplished this way.
    Onchange formulas are for something else. They are part of the model definition and are used for describing how to cascade changes between IOP data blocks.

  • How can a company sell a Times Capsule appliance as a solution for backup and die for this manufacturing fault? And with that Apple? nothing, or technical assistance. Of a sledgehammer, open the device and attempt to recover your files by force!???

    How can a company sell a Times Capsule appliance as a solution for backup and die for this manufacturing fault? And with that Apple? nothing, or technical assistance in Brasil. Of a sledgehammer, open the device and attempt to recover your files by force!???

    Heat up the bottom rubber mat with a hairdryer for 5-10 minutes to loosen the adhesive, then pull the rubber mat away from the bottom metal plate carefully.
    Then use a screwdriver to remove the 10-12 screws to open up the case.

  • User set cliping points for Highlight and Shadow

    OK I know Lightroom 3 is currently available as a Beta version and is not complete and there may be more features to come.
    But
    Wouldn't it be nice in the develop module to set the point at which you get clipping warnings for highlight and shadow.
    I ask this as a lot of my work goes straight out for repro, and it would be usefull to be able to set the highlight  to say 90-95% and the shadow to about 15-20%.
    OK I know I can run  a tool over the image and see what the percentage is, but it would be a lot esier if I could set my own limits and just watch for the red and blue "blobs"
    Just a sugestion
    John c

    I too find the FTP server implementation to be sorely lacking in OS X Server. There is no option to share out only the designated FTP root folder without showing the other share points. It seems impossible to lock down subdirectories to specific users with letting them see the contents of the root directory. Maddening!
    I'm looking at other FTP server options. Rumpus comes highly recommended, but I also just found CrushFTP which also looks intriguing, especially its option to integrate with LDAP - something that Rumpus does not do. CrushFTP is also significantly less expensive.
    -Doug

  • Uer exist / enhancement point for J1IEX and MIRO

    Hi,
          I want to know is there any user exit /enhancement pointt are available for J1IX and MIRO transaction,           how to find the user exist of a transation.
      regards,
       zafar

    Hi,
    To find the user exit,
    1. Goto the tarnsaction say MIRO.
    2. Click on System and In that status.
    3. Double click on the Program screen Which is under SAP data.
    4. In that Program, Click on GOTO and find the package name. (It is MRM for MIRO Transaction).
    5. Go to SMOD.
    6. In the enhancement field click f4.
    7. give the package name and execute and you will find list of User exits.
    LMR1M001  User exits in Logistics Invoice Verification
    LMR1M002  Account grouping for GR/IR account maintenance
    LMR1M003  Number assignment in Logistics Invoice Verification
    LMR1M004  Logistics Invoice Verification: item text for follow-on
    LMR1M005  Logistics Inv. Verification: Release Parked Doc. for Po
    LMR1M006  Logistics Invoice Verification: Process XML Invoice
    MRMH0001  Logistics Invoice Verification: ERS procedure
    MRMH0002  Logistics Invoice Verification: EDI inbound
    MRMH0003  Logistics Invoice Verification: Revaluation/RAP
    MRMN0001  Message output and creation: Logistics Invoice Verification.
    8. Ask your ababper to check these exits functionality and use it as per your requirement.
    Raj

  • Measuring point for Power Factor Meter

    Dear All Experts,
    I need to create PF meter as Measuring Point.
    I have created characteristic PF without any unit of measure assigned to it since PF is a ratio.
    Now if I create Measuring point using characteristic PF system does not allow me to create the same popping up message" only characterisitcs with a unit of measure can be used."
    Then I created a unit as Ratio and assigned to the Characteristic PF.
    Even then system does not allow me to create measuring point popping up the same message.
    Please help.
    Regards,
    Sanjay

    Hi,
    You could create the Measuring Point only with the characteristics with Numeric UoM. So create the ratio with Numeric UoM & try the same.
    Regards,
    Maheswaran.

  • Steps for preventive and breakdown maintenance

    hey gurus,
    i'm a novice in plant maintenance and ve been assigned to take care of PM in the project. can u pls tell me the step by step procedure for carrying out preventive maintenance and breakdown maintenance in sap.
    thanks in advance...

    Hi Abhi
    If you are a end user and u want to know abt the process... then it is simple to explain here...
    for Breakdown Maintenance
    Creation of notification ( with B/D tick) TCODE : IW21
             Which includes functional location, equipment, catalog etc
    Creation of order TCODE : IW31
              Which Include Operation, work, materials, manpower etc
    check whether internal / external labour or material required...
    If material internal - do material reservation - Goods issue
    If labour internal - Internal work entry
    If material External - create PR & PO
    If labor external - create PR & PO & service entry sheet
    execute the order
    confirm the order
    for Preventive Maintenance
    Create Maintenance Stratergy
    Create Maintenance Task List
    Create maintenance plan
    scheldule the plan
    Confirm the order
    teco
    These are some of the basic requirements for the process...
    Rest every thing you should explore yourself...
    - pithan

  • Xournal - missing icons for tools and colors

    Hey guys,
    i have a little problem with xournal. There are no icons for the tools and the colors.
    http://i40.tinypic.com/1zfhd77.jpg
    I installed ArchBang with openbox gui. Xournal is from extra.
    Anybody an idea how i can fix this?

    Maybe, you better post your question in the Archbang forum

  • Measurement mark for start and stop interval

    I have added measurement mark as Start interval and Stop Interval and saving that in the Time interval measure as indicator for BAM in my BPM Process.
    This is to calculate the time it takes to finish some task. e.g.
    A. process is started
    B. Start Interval measurement mark is added and saved in measure BAM indicator
    C. some task takes places.
    D. Stop Interval measurement mark is added and saved in measure BAM indicator
    But, when I create the report, the measure indicator doesn't have any value.
    I think I am doing something wrong, but don't know what.
    Has any one done this or come across this situation.
    Thanks

    Dear sir,
    My application development steps are as follows:
    1. My application consists of three control buttons are Start, Stop & Exit
    2. Initially input parameters validation (Limits are assigned)
    3. If any value entered out of limit, it will show the error message and the start button will gray and disabled. The user should not start the application until entered values are valied.
    4. Internally some conversions and logics are implimented.
    5. Coming to Front panel (GUI) start button is green color and stop button is red color.
    6. The user entered the correct parameters and he started the appilication. After sometime he should know already application was started and he should not start again until he stops the appilcation.
    For this i need logic for start and stop buttons to implement in my application. Thats why i choosen the traffic light concept changing the colors vice versa (which button shows green he should press that perticular button).
    Please suggest me or provide any better option for start and stop buttons.
    Regards,
    S Nagaraju

  • Different measurements between ruler tool and marquee tool?

    I'm using Photoshop Extended CS 5
    Why are there two different measurements?
    I positioned  guides on an image for measuring purposes.  I have Snap to Guides on. I used the Ruler Tool snapping to one guide and  I extended a straight line to the other guide (Shift key pressed). The Ruler Tool read 712 pixels.
    I then used the Marquee tool to snap to the guides and it read 720 pixels.
    Which one do I believe?

    raylaur wrote:
    I then used the Marquee tool to snap to the guides and it read 720 pixels.
    Where?  In the Info panel?  If so, did you read the W (width), and not the X (horizontal pixel position)?
    I just did what you said and got consistent measurements.
    -Noel

  • Internal Order Budgeting for HR and Plant maintenance

    Dear All,
    I am using internal order for budgeting control. I want to use internal order budgeting for Payroll also. How do i assign internal order for the same.
    I want to check budget through internal order for plant maintenance order also. At the time of issue of material to PM order or at the time of settlement.
    regards
    ranga

    Budget Profile:
    IMG => Internal Orders => Budgeting and Availability Control => Maintain Budget Profile
    Make sure activation type made to 1.
    Availability control settings:
    IMG => Internal Orders => Budgeting and Availability Control => Define Tolerance Limits for Availability Control
    Regards,
    Ravi

  • Unit of Measure(UOM) for PO and Packing

    Dear all,
    we have got issue about UOM for Purchase order and Packing.
    When we create PO with vendor then we use UOM is  set for example: sofa.
    but when we GR from Vendor  the storekeeper check artice follow UOM is Set. (packing).
    pls help us

    Dear,
    Basing on your post - your stock keeping unit is SET.
    Purchase order is SOFA.
    Go to material master and maintain basic UOM as SET and Order unit as SOFA.
    Whenever you are raising PO using this material, the PO UOM will be SOFA. Maintain the conversion factors if applicable.
    One more way in PR - Source of supply tab you can mention purchase organization and order unit as SOFA (this wihthout making changes in material master). But everytime create PR indentor has to pay attention towards this entry.
    Regards,
    Syed Hussain.

  • Solution for dead and dying Bretford carts

    I teach 7th grade social studies at a middle school in SC with 360 iTouches and more than 100 iPads.  We use what I believe is the first generation Bretford cart to charge and sync groups of 40 (20 per drawer).  At the beginning of the year one of our carts simply had no power to either drawer.  I have followed the trouble shooting tips of plugging and unplugging power supply cables.  I even replaced the main power supply cable with a cart that was functioning.  The only "electrical" components appear to be where the USB cables gather inside the drawer and a junction box that splits the power for the two drawers.
    I am looking for suggestions for repair or replacement.
    The warranty is out on the cart and Bretford's suggestion is to ship it back to them.  That does not make a lot of sense.  Currently, I am using four brand new 12-port usb hubs to charge and sync our dead cart.  But these have already started having issues.  I am getting error messages that sycning and charging are not supported on the device.
    Does anyone have any suggestions for either repairing the Bretford cart or a proven, reliable replacement?

    I cannot find the solution to this Bretford cart in the forum; can someone direct me to the answer?  I have a similar problem but it specifically is related not to the power to the cart but to the USB cable going to the lower drawer which apparently was torn by a user (it has only one end with the USB connection; the other is torn wire).  I need to replace it but don't know if this is possible. Does anyone know? There is no obvious way to take the cart apart to even get to the metal "box" in the drawer where the other end of the USB cable would go. Any suggestions?

Maybe you are looking for

  • Is there a process/program  to update tables/data after System Refresh?

    We are planning a refresh of SAP R/3 47 and SRM EBP 4.0. Copies of all data from our production system will be refreshed onto our test environment.  Is there a program that can be run to reset the "Destination" targets as there is with "source" using

  • ADF navigation menu

    Hi, I downloaded this 11g rel 2 application for creating ADF navigation menu. On jdeverloper 11.1.1.5., I get some deployment problems. Any feedback are appreciated. http://download.oracle.com/docs/cd/E18941_01/tutorials/jdtut_11r2_43/jdtut_11r2_43.h

  • Saved project opens blank - Captivate 7

    I've been working on a few projects and some of them open up blank, the filmstrip shows there is content on the slide but there is none on the main window, I have to click each individual object in the timeline for it to show on the screen again. Sav

  • Podcasts in itunes mobile

    Can I dowload podcasts in the itunes stores on itouch? If not, does anybody know whether Apple plans to add such a feature?

  • Camcorders/Video Cameras recommendationsfpr FCP or FCE

    I wish to buy my daughter a Camcorder/Video Camera suitable for use with Final Cut Pro/Final Cut Express. She is doing Film Studies A level at the present, and her school uses FC Express. The Uni she wants to do Film Studies at, uses FC Pro. She is a