Measuring point in equi[ment for calibration cycle.

Hi All,
Can any body tell me how to use Measuring point and measuring document in calibration - in Equipment.
Its urgent for me
Thanks
Siddhesh

hi siddesh
iam not having any doc. please follow the link in that a model company has performed all the operation in PM
<b>http://help.sap.com/saphelp_46c/helpdata/en/fe/67f9609d6f11d189b60000e829fbbd/frameset.htm</b>
regards
thyagarajan

Similar Messages

  • Add measurement point / counter

    Hello,
    I am facing the problem that I need to add a counter value to a measure point. For this I have the equi no, the pos of the counter and the value I have to add. If the measurement point does not exist, I have to add one by creating it with the information about the pos and measurement point.
    Could someone tell me if there a some BAPIs that help finding the measurement point by equi no and pos? How to add the measurement point if it is not existing? I just saw some code that reads the information in the tables but is there something more standardized?
    Thanks a lot, Vanessa

    In a previous assignment, I used BDC/transaction call for IK01, when I found that the measure point did not exist.  If I remember correctly, it was a very short, simple process.  I believe I followed that (upon sy-subrc eq 0) with a BDC/transaction call for IK11.
    But, please take a look at Function Modules named like BAPI_MP.  The BAPI_MPIP modules may give you what you need.

  • Measuring point and characteristics

    what are the measuring points and characteristics to be created for the thermal power station , sap plant maintenance

    Hi,
    Its based on the equipments in Power Station & Parameters to be measured for the Equipments. For example, for Boiler, Temperature, Pressure, Water Level, etc., will be measured.
    So here we need to create Characteristics for all these. For Boilers, Measuring points will be created for these characteristics.
    Equipments under Thermal Power stations could be Boilers, Transformers, Electric Generators, Coal Turbines, Condensers, etc., For each equipment, there will be different critical parameters to be measured on periodical basis.
    Create Measuring points for all of them.
    Regards,
    Maheswaran.

  • CS module - Measuring Point

    Dear All,
    How to delete Measuring point of an equipment for which already measuring document is created?
    Regards,
    Samir

    Dear Samir,
    You can inactive the measuring point so that further measuring document creation is not possible. And it be available in equipment for history.
    Follow the steps:
    1) Run the transaction IK02.
    2) Enter the measuring point number.
    3) Select the following path: Measuring Point (Menu Bar) ->   Functions->    Active<-->Inactive-> Inactive
    4) Try for creating meas. doc., it will not be possible for this meas. point.
    Regards,
    Sundar Desai

  • Measuring points in maintenance planning

    Hi,
    Can we use measuring point(not a counter) for preventive maintenance planning. for example - i need to perform the operation when a color of oil is changed from yellow to black. is it possible through measuring point?. it is possible means please share that procedures.
    Regards
    sathish

    Hi Satish,
    Yes, it is possible to generate a maintenance notification if the measuring point reading is not as per standards or target value. You require a user exit IMRC0001 to IMRC0005. Also read documentation for these user exits in tcode SMOD.
    Regards,
    Vaibhav Mishra

  • Measuring points-Time Confirmation

    HI Gurus,
    Once work order gets created thru preventive maintenance plan....we need to do a time confirmation for the completed work.When i do IW41 and clicked the measuring points button at the top.....I am not getting all the measuring points which was created for the same piece of equipment...When I cliked the measuremnt all object..I can able to see only the first measuring point...how to see all the measuring points linked to the same piece of equipment ?
    Please help.
    Regards,
    Vijay

    I agree we can able to see the measuring points...but my problem is...I`ve included the measurement routes and created the one plan .....once the wo created...I need to do time confirmation for tht order which has all the different equipments associated in maintenace routes.When I do IW41...I can see only header level equipment measuring point and not the rest of all measuring points associated in routes.As one person is goin to do all the similiar work for different equipments...we maintained one work order and one time confiramtion...but due to unavailable of measuring points...I cannot able to do the time confirmation for rest of the equipments which is in the routes.
    Regards,
    Vijay

  • Measurement Point Synchronisation

    I am not getting Measurement Points on the Mobile Device.
    I have read several of the threads related to the replication of Measurement Points but have been unable to find the answer to my problem:
    I have run the Function MAM30_041 in the backend R/3 where it selects 157 Measurement Points.
    I have created a Variant in SPRO ALM_ME_GENERAL for the Measurement Points and executed RALM_ME_MEASP_FULL_DOWNLOAD_SD.
    On checking table MEREP_207 in the MI there are 35 records. However, after synchronising the mobile device, I am not getting any measurement points for the technical objects to which they are assigned.
    The technical object are available on the mobile device but no measurement points.
    The configuration for the Scenario assigned to the user has the following settings:
    Defects Recording: Defects Recording Active
    Notification Type:  Z1 (our own)
    Meas. Recording:  Measurement Recording Activated
    Help please!
    John Woodland

    Hi John,
    from your description you have two problems:
    1. Not all measurement points that are configured for replication are being replicated
    2. Equipment which is expected to have measurement points downloaded to the device does not have them.
    Problem  1 - meas. point is configured for replication but does not come to MEREP_207 table..
    The best way to understand how many meas.points are configure for replication are:
    1. Put a breakpoint in RALM_ME_MEASP_FULL_DOWNLOAD_SD before the RFC call to the middleware system and check how many meas.point keys are going to be transferred.
    2. Right after executing RALM_ME_MEASP_FULL_DOWNLOAD_SD  check how many keys are transferred in MEREP_DELTABO.
    If you see that more keys are transferred in MEREP_DELTABO that eventually make it way to MEREP_207 - that is real problem that have to be investigated and fixed. That is what I would do to investigate the reason:
    1. transaction se22 to see if there any errors
    2. figure out which meas. points were not replicated in MEREP_207 and execute BAPI MAMXX_041_getdetail on the backend for these meas.points.  Fails/error of this BAPI is the reason why meas.point was not replicated.
    Problem 2 - equipment is downloaded to the device without meas.points it references.
    There can be 2 reasons why it is being downloaded without meas.points:
    1. meas. point that this equipment references is not replicated in MEREP_207 because of the problem that was discussed before. Once you fixed the issue and all 137 meas.points are replicated, the problem with equipment will be solved as well.
    2. equipment is referencing meas.point that is not configured for replication (variant for meas.points that you configured in MAM excluded this meas. point). To figure this out: execute MAMXX_031_getdetail for the equipment in question, check that all meas. points in table "Equipment meas. points" are within meas.point variant. If not - fix the variant and fix problem 1 to ensure that all meas.points are replicated.
    Regards,
    Larissa Limarova

  • Measuring Point for Tools and Die Maintenance

    Dear All,
    I am trying to map the following process:-
    My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
    Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
    What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
    What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
    I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
    Assigned the Die as a PRT to the material which is to be produced in the Routing.
    When i confirm the production order the counter of the PRT increases which i can check IK13.
    What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
    I would request you to please give me some input on this.
    Thanks and Regards,
    Rashmi

    Hello Rashmi;
    I have seen the screen shots & there are problems with the following:
    1) Counter overflow reading
    You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
    2) Formula that you have used;
    You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
    3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
    CREATE a single measuring document with reading as '0'.
    4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
    5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
    If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
    Do let me know if there is any problem in this.
    Regards
    Hemant

  • Making system settings for measurement documents and measuring point

    What is the significance of making system settings for measurement documents and measuring point in spro?
    Edited by: Pallavi Kakoti on Jul 14, 2011 1:23 PM

    Hi,
    << Moderator message - Cut and paste response from http://www.consolut.com/en/s/sap-ides-access/d/s/doc/YY-OLI0IMRCCUST removed. Plagiarism is not allowed in SCN >>
    Regrds
    Jitender
    Edited by: Rob Burbank on Jun 6, 2011 10:53 AM

  • Datatable for upper and lower limit maintained in Measuring Point.

    Hi,
    I am making use of user exit : IMCR0001. User exit generates maintenance order for measuring reading which are beyong the range maintained in measruing point.
    I have create measuring point with characteristics as TEMPERATURE. I have maintained upper limit : 1500 C & lower limit : 1200 C.
    When I check datatable IMPTT and look for upper and lower limit, it is showing me : Upper range :1.7731500000000001E03 Lower range : 1.4731500000000001E03
    Why is that I can not find the actual value as 1500 and 1200 n the datatable?
    In which datatable I can find these values?
    Kindly help.
    Thanks in advance.
    Regards,
    TOM.

    Hi Tom,
                 These are system Generated Values, but they will be concatenated by a few Zeros, but you can always find the exact value,
    I am able to see the Values correctly in my system follower by some 10-12 zero's "E"+ 02 or 03.
    but can check the values
    can cross check the Characteristics for the same measuring point?
    Regards,
    Yawar Khan

  • Maintenence for measuring point

    hi,
    i am having clear idea about what is measuring point and counter and how to asign to a equipment.my question is how to give regular maintenece for measuring point or counter. how to calibrate that the measuring point is working properly...................(like preventive maintenence plan)..is it possible ?
    regards
    muthuraman.d

    Either
    Go to K11>edit>change gr counter
    or
    IK12 >enter>measuring document->function>reversal indicator-->set
    check what happens
    Regards
    Sujit

  • Usage of Measuring Point : Counter for Generating Bills

    Case : Client has a Power Generation Unit, from which it supplies power to customers. Meters installed at the customers premises are recorded by Client personnel. Bill is generated on the basis of meter reading.
    Requirement : Can Plant Maintenance : Counters be used for bill generation? How should the process be mapped?

    Hi Raju,
    You can do this through,
    IMG - Maintenance Plan,work center, task list & PRTS - Maintenance Plan - Set maintenance plan catagories.
    Here in call object column you can define which type of call object you want for your maintenance order based on this you will get the order or notification as a call object.
    And rest of the things measuring point & counter that already defined in this thread.
    Regards,
    Rip

  • Measuring Points for Equipment

    Hi-
    I have a req., where in I need to capture the Measuring Points for a given Equipment, but there might be more than one measurement points(Milage, Hours, Days etc.,) So, How should I capture them? What is the best bet?
    I I do it on Equip. Master(Time Dependent) I'm thinking it will have multiple columns with same Euip.,
    Is ODS the best bet?
    Any idea appreciated.
    Thanks,
    Chandra.

    Hi,
    You just want to capture measuring points or you wnat to capture, measurment documents against these measuring points also?
    In case of measuring point, it is a master data and hence an info object/ODS both can suit. If you want to have ODS, then you should keep Measuring point also in to the key fields..
    In case of measurment documents ODS will be the best fit.
    Trust this helps.
    Regards
    Meyyappan S

  • Measuring points tab repeating the point no for different selection.

    I have selected one entry list and enter into points tab to see the corresponding measuring point .
    Then select one equipment which already in the entry lists tab for an ad hoc entry.  In this case ‘B-781-A-001’
    Now the points tab repeating the points no (below screen shot) which should not be the case it should be sync with the existing points . Even I select one point to take reading it’s only completing the selected one not the similar point in the points tab.
    Please suggest how to solve this data repetition problem.
    Tags edited by: Michael Appleby

    Hi Ranjoy,
    I have updated your tags with the correct information (you will get more responses now).  Please use the tags in the future.  In some communities with narrowly focused topics, they are not as important as they are in SAP for Mobile.  This community receives questions on SUP, SMP, Afaria, Agentry, HWC, MBO, Kapsel, Cordova, SAPUI5, and other technologies.  While I suspected that yours was an Agentry based application, it was not too unlikely that it could have been something else.
    Thanks, Mike (Moderator)
    SAP Customer Experience Group - CEG

  • Table for Measuring point Reading.

    Dear Experts,
    Please guide where can I find the database table for measuring point reading values namely READC which is a part of RIMR0 structure, for using in developemts.
    Regards
    Jogeswara Rao

    hi
    check in IMRG table, you can find the values in SI unit . convert the same using Functional module. consult with your technical team
    regards
    thyagarajan

Maybe you are looking for

  • Tune this "contains" query in Oracle 11g EE 11.2.0.3.0

    I have a query like below. It runs for ever. The size of this table is not very big, it has around 30 millions rows. The owner column is very selective, and I've added "owner' column in the "filter by" clause of the domain index against description.

  • How do I download my MAC contacts to my new gmail acct.?

    How do I download my contacts on my MAC osx to my new gmail acct.? I need to send an email to all my contacts using gmail. Thank you for your help.

  • Get results of interactive report

    After using the interactive report to narrow down my results, I now want to get the id's of the results. Can I add a check box to this report in order to do bulk operations on the result or is there another way to get the id's. Thanks Rob

  • Download error under apps in creative cloud

    After ages with someone controlling my computer, i gave up because i didn't think she new what to do next. I have the error message under the Apps section  Download Error  get help. Any solutions or  what  the problem is? Richard

  • Implementing listener in JcomboBox

    I am trying to create JcomboBox in which its item are a)1 b)2 so that when a user click on 1. In a JTextField called "add"the content of textfield should be increased by 1 and when 2 is clicked content of textfield should be increased by 2 thanx