Dear Expert,
Is there any way to find the list of measuring points or documents searching by maintenance plant?
Thanks & regards,
TusharA

Hi Tushar,
Run the transaction IE07 : Multi-level Equipment List
Select the dynamic selection displayed at application bar. Select the plant from PM Order node displayed in dynamic list. Copy the same for selction. Enter the plant number in selection screen.
Also tick mark only 'Measuring Point' from filter screen.
This way you can get the all mesuring points from selected plant.
Same way you can get the list of measuring documents by selecting from filter screen.
Sundar

Similar Messages

  • Assign particular measring point to Particular Maintenance Plan

    Hi,
    I would like to know whether it is possible to assign measring point to maintenance plans.
    Here it goes the scenario
    Equipment= PUMP
    I have maintenance plan weekly & monthly
    In weekly maintenance plan ( Every Monday)I have to check
    1.Vibration,
    2. Speed,
    etc upto 10 measuring point
    In Monthly maintenance plan (30 days) I have to check
    1.Bearing Condition,
    2.Oil Level,
    3. Pressure
    4.Temperature
    5. Current,
    6. Voltage 
    The above mentioned measuring point is created w.r.t equpt PUMP by T-Code IK01.
    Now problem is whenever I get call object i.e maintenance order according to weekly & monthly maintenance plan.
    Weekly order- 100001 is generated while confirming (IW41) this Order & its operation activity
    I will update measuring point but it is displaying all the measuring point of an equipment.
    I want only measuring point pertaining to weekly maintenance plan should only display.
    How can I link measuring point to particular maintenance plan?
    Is there any solution available or does anyone come across this scenario?
    Pls revert back for any more information.
    Regards
    Pradeep

    Hi,
    I have been able to see measuring point in a task list since upgraded to EhP4.
    I was just trying to assign measuring point to operation But it is throwing error message saying measuring point doesnot exist.
    When I  press F4 none of the measuring point is existing though I have created Measuring point to equipment?
    Can someone help me or guide where am  I going wrong?
    I have gone through the below link for details on inspection rounds but there is no elaborative & detailed procesure existing
    http://help.sap.com/erp2005_ehp_04_sp/helpdata/en/48/689d3dd2613c87e10000000a42189c/frameset.htm
    Could you pls tell me the detailled procedure or provide the material?
    Regards
    Pradeep

  • Plant Maintenance - Measuring Point Counter Replacement

    Dear Expert,
    I had created Measuring Point which is cumulative in nature and the Counter Overflow reading is 999999. Suppose the last reading was 999900. Now my today reading is 500 then system is showing total counter reading 10000400.
    My question is "how system will replace the counter reading as 401 automatically instead of 10000400". I don't want to replace the counter manually. Please guide me where i have to do configuration for this or what is best way to do it.
    Thanks & Regards
    Rajiv Ranjan

    Hi Thyagu,
    Thanks for your reply and valuable suggestion.
    My question is how the Total Counter Reading will become zero and start from zero when it overflow.
    For example :
    Lets Counter Over Flow Reading is 100
    total counter reading on 8th august is 90.
    on 9th august the difference is 40, then Counter reading become 30 and TotalCtrReading               is 130. I want TotalCtrReading should show 30 instead of 130. how to do it?
    Regards,
    Rajiv Ranjan

  • Triggering of Preventive Maintenance based on Measuring Point

    Hi,
    I have set measuring point & defined upper range limit and lower range limit. Now I want to trigger preventive maintenance, based on reading enter against measuring point specifically if measuring point reading is above or below defined upper range limit or lower range limit.
    Letu2019s say example, If 10 and 5 is upper range limit and lower range limit, now in this case creation of notification / main order if user has enter measuring point value more than 10 or less than 5.
    Regards,
    Dipen Shroff

    Hi,
        You can do it via Condition Based Maintenance ..
    IMRC0001- U can use this User exit
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/a7/fa4c988f6611d29e8a0000e8323350/frameset.htm
    regards
    pushpa

  • Maintenance Order through Measuring Point

    Dear all,
    I want to know whether it is possible to create the maintenance order on the basis measuring point .
    I know how to create the order on the basis of measuring counter.
    Is there any procedure to create the maintenance Order through measuring point as done in case of counter?
    kindly provide the solution for Creation of Maintenance Order using Measuring Point..

    Really very thanks for the solution.
    I have one more query, we can create the measuring point using the t.code IK01.As you told we have to create the measuring point with upper and lower range.
    Is that we have to create 2 measuring point for upper as well as lower range or in one measuring point it is possible to accumulate both the upper and lower range.
    If it is possible to accumulate both the upper and lower range in one measuring point then kindly provide the procedure.
    Thanks in advance.

  • Measuring Point for Tools and Die Maintenance

    Dear All,
    I am trying to map the following process:-
    My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
    Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
    What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
    What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
    I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
    Assigned the Die as a PRT to the material which is to be produced in the Routing.
    When i confirm the production order the counter of the PRT increases which i can check IK13.
    What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
    I would request you to please give me some input on this.
    Thanks and Regards,
    Rashmi

    Hello Rashmi;
    I have seen the screen shots & there are problems with the following:
    1) Counter overflow reading
    You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
    2) Formula that you have used;
    You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
    3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
    CREATE a single measuring document with reading as '0'.
    4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
    5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
    If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
    Do let me know if there is any problem in this.
    Regards
    Hemant

  • Measuring Point in Maintenance Plan

    How can I link a measuring point (not a counter) to the Maintenance Plan?
    Currently, I can only link a counter to a Maintenance Plan but not a measuring point.
    The reason why I am asking for this is that I would like to trigger automatic creation of a work order whenever a measurement reading for an equipment goes outside the specified upper and lower limit of a measuring point.  I would like to define a condition in the maintenance plan for this based on the measuring point say for example temperature.
    I believe activating userexit IMRC0001 is just part of the solution.  Is there something else that needs to be done?
    Thanks.
    Giscard

    I have already activated userexit.
    Is it correct that the userexit is triggered upon saving a measurement reading (tcode IK11)?
    Do you have sample code for the userexit so that a Notification or Work Order will automatically be created when the reading entered is outside the upper and lower limit?
    But my questions actually is this - Is possible to link a measurement point (not a counter) to a Maintenance Plan?

  • Measuring points in maintenance planning

    Hi,
    Can we use measuring point(not a counter) for preventive maintenance planning. for example - i need to perform the operation when a color of oil is changed from yellow to black. is it possible through measuring point?. it is possible means please share that procedures.
    Regards
    sathish

    Hi Satish,
    Yes, it is possible to generate a maintenance notification if the measuring point reading is not as per standards or target value. You require a user exit IMRC0001 to IMRC0005. Also read documentation for these user exits in tcode SMOD.
    Regards,
    Vaibhav Mishra

  • Measuring point as counter mass maintenance

    Hi,
    I have created some 500 equipments through BDC. But I forgot to put a tick (X mark in template) against field u2018Indicator to Show that Measuring Point Is a Counter.
    How to put a tick on that field in mass?? Other wise I will have to go to T code IE02 500 times and put a tick manually.
    Pls guide.
    Regards.

    Hi Dear,
                 You can use the LSMW for the T-Code IE02, Recording Methord.
    That can serve your Purpose.
    Regards,
    Yawar Khan

  • Datatable for upper and lower limit maintained in Measuring Point.

    Hi,
    I am making use of user exit : IMCR0001. User exit generates maintenance order for measuring reading which are beyong the range maintained in measruing point.
    I have create measuring point with characteristics as TEMPERATURE. I have maintained upper limit : 1500 C & lower limit : 1200 C.
    When I check datatable IMPTT and look for upper and lower limit, it is showing me : Upper range :1.7731500000000001E03 Lower range : 1.4731500000000001E03
    Why is that I can not find the actual value as 1500 and 1200 n the datatable?
    In which datatable I can find these values?
    Kindly help.
    Thanks in advance.
    Regards,
    TOM.

    Hi Tom,
                 These are system Generated Values, but they will be concatenated by a few Zeros, but you can always find the exact value,
    I am able to see the Values correctly in my system follower by some 10-12 zero's "E"+ 02 or 03.
    but can check the values
    can cross check the Characteristics for the same measuring point?
    Regards,
    Yawar Khan

  • Usage of Measuring Point : Counter for Generating Bills

    Case : Client has a Power Generation Unit, from which it supplies power to customers. Meters installed at the customers premises are recorded by Client personnel. Bill is generated on the basis of meter reading.
    Requirement : Can Plant Maintenance : Counters be used for bill generation? How should the process be mapped?

    Hi Raju,
    You can do this through,
    IMG - Maintenance Plan,work center, task list & PRTS - Maintenance Plan - Set maintenance plan catagories.
    Here in call object column you can define which type of call object you want for your maintenance order based on this you will get the order or notification as a call object.
    And rest of the things measuring point & counter that already defined in this thread.
    Regards,
    Rip

  • Measurement point and counter SAP PM

    Hi SAP Guru
    I've one scenario in which we've to input counter reading smaller than the previous reading
    and some times bigger reading than previous reading for a single counter.
    It is because single counter is for Energy Meter which sometimes shows bigger value and sometimes shows lesser value in case of shutdown at plant.
    Please let me know asap - is it possible for a single counter to accept bigger value one time and next time smaller value ?
    We can't make two counters for a single equipment.
    Regards
    Pooja

    Try using the counter as a measurement point.   Unclick the box measurement point is a counter and set the upper and lower tolerance settings on the details page.  The meter is not a counter but a gage.  as long as the gage reads between the upper and lower tolerances you are good.     If the gage reads out of tolerance designate a warning or an error.  You can also set it up through a user exit to produce a notification or a work order for out of tolerance readings.  See Condition Based Maintenance. -Rich

  • Measuring points and counters

    Hi all,
    Can anyone please tell me the process of how to use measuring points and counters and in which scenario it will be used in plant.It would be great if anyone can tell the process with an example and also how to create measuring points and counters iin SAP  as  well.
    Thanks in advance.
    Regards,
    Vijay

    Measuring points are physical and/or logical locations at which a particular condition
    is described - for example, the temperature of coolant in a nuclear power station
    after an outflow from the pressure vessels, or the number of rotations per minute of
    the rotary blades of a wind-driven power station. Measuring points are located at
    technical objects.
    Counters are resources that enable you to represent the wear and tear of an object or
    the consumption or reduction in its useful life - for example, the mileage indicator of a
    motor vehicle or the electricity consumption meter of an electrically-powered system.
    Counters are located at technical objects.
    You can enter measurement or counter readings for each object to be maintained. This
    makes sense if you want to document the condition of an object based on measurement
    readings or if the regular maintenance of an object depends on its meter readings.
    You can also check these links:
    http://www.sap-img.com/plant/recording-measuring-docs-against-work-orders.htm
    http://www.sap-img.com/plant/measuring-points-questions-in-sap-pm.htm

  • Measuring point and characteristics

    what are the measuring points and characteristics to be created for the thermal power station , sap plant maintenance

    Hi,
    Its based on the equipments in Power Station & Parameters to be measured for the Equipments. For example, for Boiler, Temperature, Pressure, Water Level, etc., will be measured.
    So here we need to create Characteristics for all these. For Boilers, Measuring points will be created for these characteristics.
    Equipments under Thermal Power stations could be Boilers, Transformers, Electric Generators, Coal Turbines, Condensers, etc., For each equipment, there will be different critical parameters to be measured on periodical basis.
    Create Measuring points for all of them.
    Regards,
    Maheswaran.

  • Measuring point External Number range

    Dear Masters,
    I am trying to create the external number range for one of my measuring point type. Is it not possible to do so? If no why? If yes how?
    Thanks to all in advance.

    Hello Vaibhav,
    I have already followed the steps given by you only I cannot find the assignment of measuring point category to the number range. I have also done the number range assignment for equipment and functional location but there it exists here it does not.
    It is also showing me the error of external number while creating the new measuring point. Please do guide about the assignment to the number range.
    Thanks again.

Maybe you are looking for

  • Questions on Shared and Group To Do lists

    A few questions: 1) I am in a Group (domain group), that was assigned a task. So I had a To Do list for that group on the left, in my To Do list screen. Well, we aren't going to assign tasks to that group anymore. The To Do list is empty. How do I re

  • Hitting some limitations on exporting a CR XI R2 report to a PDF.

    Hello. Using Crystal Reports XI Professional Release 2 SP6 V11.5.12.1838. I have a stored procedure on an MS SQL 2005 server which requires 3 parameters. A supplier, POD (Proof Of Delivery) Range Start and POD Range End. The procedure generates a lis

  • HT4994 HAI CAN YOU TELL ME WHICH SIM IS USED IN THIS IMEI **** AND WHICH COUNTRY

    HAI CAN YOU TELL ME WHICH SIM IS USED IN THIS IMEI **** AND WHICH COUNTRY <Edited By Host>

  • Open hub services

    hello Friends, Can you please tell me what is the use of open hub service ? As i believe that it is sending a data to flat file ? BUT even though we can also directly send a data through export datasource. i just want to know is there any additional

  • Mic suddenly stopped working

    Okay so. I have a Turtle Beach Ear Force X12 headset which has been working great since I got it a couple months ago, well today it suddenly stopped working skype says my mic is muted and it's not, I can hear myself through the headset which means it