Measuring points-Time Confirmation

HI Gurus,
Once work order gets created thru preventive maintenance plan....we need to do a time confirmation for the completed work.When i do IW41 and clicked the measuring points button at the top.....I am not getting all the measuring points which was created for the same piece of equipment...When I cliked the measuremnt all object..I can able to see only the first measuring point...how to see all the measuring points linked to the same piece of equipment ?
Please help.
Regards,
Vijay

I agree we can able to see the measuring points...but my problem is...I`ve included the measurement routes and created the one plan .....once the wo created...I need to do time confirmation for tht order which has all the different equipments associated in maintenace routes.When I do IW41...I can see only header level equipment measuring point and not the rest of all measuring points associated in routes.As one person is goin to do all the similiar work for different equipments...we maintained one work order and one time confiramtion...but due to unavailable of measuring points...I cannot able to do the time confirmation for rest of the equipments which is in the routes.
Regards,
Vijay

Similar Messages

  • Update measuring points by good receipt

    Hi experts,
    I have a requirement where the client wants to update a measuring point based on good receipts.
    The idea is to create a equipment (PRT) with a measuing point and asign this equipment on a BOM.
    The FERT I will send to a vendor as subcontracting and when I receive this material, in the moment of good receipt the measuing point should be update. Is it possible using the standard ?
    Kind Regards,
    Bruno

    hi
    in standard you can update the measuring points by confirming the quantities in production order..but updating the measuring points using goods receipt is difficult
    you can also try a workaround ,generally the the MIC you are creating should be linked with the characteristic which is already created for equipment (as measuring point) ,then assign a material no in the serial number tab.then do the process ( i haven't checked just a try)
    so prepare an inspection plan for goods receipt with the MIC created and make the settings for follow up action for usage decision as update measuring points(assign suitable FM) ,then do the process and check
    regards
    thyagarajan

  • Measuring point update by production order confirmation

    Hi friends,
    I created a prt as equipment and assigned it to the routing. I created a production order and when i confirm the same i am getting following error as:
    Document MeasUnit has a different dimension to the characteristic unit
    Message no. IR071
    Diagnosis
    The measurement unit on creation of the measurement document must have the same dimension as the measurement unit of the characteristic of the measuring point.
    In this case, the measurement unit % does not suit the character unit EA of the measuring point 103.
    System Response
    Processing will not be continued.
    Procedure
    Use the possible entries help.
    Please suggest the solution.

    Hello Sir(s)
    i have gone through entire post for the subject related to measuring point auto update from production order confirmation.  I have tried the same but i dont know what i am missing.
    if i put some value like 1 or 2 and appropriate UOM then only my measuring document is being updated with the same value not with the actual confirmed quantity..  i have already maintained standard formulla in prt view.
    my basic requirement is to get actual value of produced quanity as counter update. means if 20 pieces have been produced and confirmed in co11n, then counter must bhe updated with the value of confirmed quantity.
    please advice what value should i put as usage in routing master to get actuall counter update.
    Will Highly appreciate your quick reply.
    Snapshots
    Regards.
    Mohammad.

  • Graph of Measurement points and a charecteristic vs time

    Hi SAP Masters,
    I am currently having a problem and I hope you can help me to solve this. I am trying to create a graph where I can compare one of  my Design data which is in my characteristic against the graph that i can generate from the measurement point vs time graph.
    How can I add the characteristic into this graph?
    And How does SAP know that which two column should be used for the graph? I know It can add a secondary y-axix but doesn't allow me to chose any data for that axis.
    My objective is to compare the measurement point data(movement) vs time with the design data(design movement). I can generate a column graph of movement vs time from the measurement points and I can display it over last couple of years. but if I can show design movement along with the measurement point movement then it is good for us to see if it is more than design movement stored in the classification tab of the Floc.
    thank you
    Edited by: sam1188 on Mar 16, 2011 2:24 AM
    Edited by: sam1188 on Mar 16, 2011 1:48 PM

    If you've been charged twice for the purchase (you didn't click on 'buy' twice and it appears twice on your purhcase history ?) then try the 'report a problem' page to contact iTunes Support : http://reportaproblem.apple.com
    If the 'report a problem' link doesn't work then you can try contacting iTunes support via this page : http://www.apple.com/support/itunes/contact/- click on Contact iTunes Store Support on the right-hand side of the page, then Purchases, Billing & Redemption

  • LabVIEW/SignalExpress: How can I automate measuring the time between two pulses?

    Hi everyone, bit of a newbie here so please bear with me.  
    I'm a student at a university conducting a muon decay experiment with an oscilloscope connected to some photomultipliers.  To summarize, if a muon enters the detector it will create a very small width pulse (a few ns).  Within a period of 10µs it may decay, creating a second pulse.  The oscilloscope triggers on the main pulse 5-15 times per second, and a decay event happens roughly 1-2 times per minute.  I am trying to collect 10 hours of data (roughly 1500-2000 decay events) and measure the time it takes for each decay.
    I've been able to set recording conditions in SignalExpress that starts recording on the first pulse and stops recording on the last.  The Tektronix TDS 1012 oscilloscope however feeds 2500 points of data from this snapshot into a text file (for use in excel or other software).  Even if I perfectly collected the data, I would have 100,000+ data points and it would be too much to handle.  I don't know how (or if it's possible) to reduce the sample size.
    To conclude, using Labview or SignalExpress, I would like to be able to have the software
    1.  Differentiate between the single pulse detections and double pulse decay events
    2.  Record only when two pulses appear on the oscilloscope
    3.  Measure the time between these two pulses and ONLY that to minimize the amount of data recorded.
    Any help would be GREATLY appreciated, thanks!

    Hi wdavis8,
    I am not that familiar with Tektronix, but there should be a place in the dialog that you go through when you create the action step to acquire date to specify a sampling rate. That would allow you to reduce the number of data points you are seeing, but may reduce the quality of the data.
    If it’s just a matter of that much data being hard to dig through when you have that many points, you could do some analysis on the data after the fact, and then create a new file with only the data you want to look at. For example, you could identify the peaks in the data, and based on the distance between them or the difference in magnitude, selectively write data to a new file.  
    Here is some information about peak detection in LabVIEW:
    http://www.ni.com/white-paper/3770/en/
    You could also do some downsampling on the data to get fewer data points:
    https://decibel.ni.com/content/docs/DOC-23952
    https://decibel.ni.com/content/docs/DOC-28976
    Those are just a few quick ideas. 
    Kelsey J
    Applications Engineer

  • How to measure the time a pulse is high for?

    I am using Pulse measure.vi to measure the output of a comparator. My comparator output feeds to an LED. The duty cycle is 50% so the LED just flashes on and off. I want to measure the time the output is high ('ON time') and I have been getting this by just multiplying the pulse width measure by the no. of pulses but I want to modify it to measure the 'ON time' of random signals with different duty cycles...
    The aim is that I am taking in a signal and need the LED to turn on when the signal 'ON time' reaches a certain specified time.
    But before I continue with the LED I am wondering how to add up the time the signal is high for?

    Hi PinkLady4218,
    You should be able to use one of the shipping examples to do what you need, please open LabVIEW and go to Help >> Find Examples.
    From the Example Finder please go to Hardware Input and Output >> DAQmx >> Counter Measurements >> Period or Pulse Width >> Meas Buffered Semi-Period-Continuous.vi
    You will then need to deinterleave the output array as it will show high time then low time then high time then ...
    You will need to confirm the order these values appear and then you can use a function from the arrays palette and use the function "Decimate 1D Array"
    Regards
    JamesC
    NIUK and Ireland
    It only takes a second to rate an answer

  • Auto Update of measuring point/document

    Dear all,
    I have one issue over here.Measuring point/document is not updating automatically after productiuon order confirmation . I tried with following steps
    1) Created the equipment as test equipment -->created measuring point as a counter ---> maintain the usage value formula SAPF02 in the PRT tab . Unit of measurement for the characteristics and base unit of measure of material are same
    2) Then i have assigned this eqipment as a PRT in the routing of material .
    Which steps i am missing
    Thanks

    Hi
    I had faced the same problem  when I used SAPF02 then I did following changes.
    Created formula like SAP_09 * PRTSTD / SAP_08
    SAP_09 : Operation Qty
    PRTSTD : PRT Standard Value
    SAP_08:   Base Qty.
    Also make sure the measuring point category should me T in IK02( PRT life counter)
    Regards,
    Raj

  • How to measure the time of evolution of a signal in a graph and to compare this time measured with a known value?

    For my application, I am obliged to measure the time of evolution of a signal acquired (from T1 to t2) by an analogical entry of a module NI 9203, and to compare this value with a value known in order to judge if this time of evolution is correct or not.
    PLEASE I prefer an example for better understanding.

    Greetings Jacob,
    I am not sure what you mean with 'time of evolution' but normally you acquire at a certain acquisition rate. How much time that has passed, you can calculate by checking how much points are between your two points of interest.
    If you are acquiring at 5Hz, the time between every point is 200ms. If there are let's say 10points between your two points of interest, 2s have passed.
    Regards,
    Wouter
    National Instruments

  • Propose Measuring point automatically in IW42

    Hi,
    I have assigned a measuring point as PRT to the operation of an Order. During confirmation in IW42, after entering the order number system proposes the operation details and I need to click button meas.points Inspn planning to display the measuring point assigned to the operation. But now my requirement is, system should propose the measuring point automatically, along with operation details, when I enter the order number in IW42 as user will forget to click button meas.points Inspn planning.
    Could anybody suggest how this requirement can be met?
    Thanks and regards,
    Basavaraj

    Hi James,
    Thanks for your reply.
    Yes, I have configured confirmation profile and same has been selected in IW42. I can see screen area for measurement document in IW42. Now my requirement is, I want the system to display the measuring point automatically, which is assigned to operation as PRT, when I enter the order number in IW42 ans press enter.
    Thanks and regards,
    Basavaraj.

  • Reg: measuring point creation and measuring point counter creation

    how to create measuring point and measuring point counter.
    what is the difference between these two.
    what is measuring point category,
    what is measuring point
    what is measuring point object
    what is measuring position.
    can anyone explain me in an easy for better understanding.

    Firstly a Measuring point is nothing but, a factor which you measure on an equipment/FL. (Temperature, Vibration etc)
    Then, a measuring point is created either on a Functional location or on an Equipment.
    IK01 is the T-code for creating it.
    If it is for F/L you have to use IFL as measuring point object, when it is an equipment you use IEQ
    Generally these two will be in use.
    In the IK01 screen if you tick the counter checkbox, the MP becomes a counter.
    Example for simple MP is temperature.
    And example for a Counter MP is 'Litres of petrol consumed'
    In the first case you don't need to add the temperature measurements, whereas in the petrol consumption you may wish to have the cumulative value of readings taken for a period of time.
    The measuring position: Example : If you are measuring the temperature of a Motor on the Drive side, you may put 'Drive End' in this field, or similar many applications.
    Category would group these MPs.
    In case of need you may define in customisation a sep[arate MP category.
    Then each time you read a MP through IK11 or other methods a Measuring Document is created.
    Regards
    Jogeswara Rao

  • Measuring Points transfer to one total measuring point

    Hi everyone,
    We would like to transfer the values of different measuring points to one global (total) measuring points. I know that it is possible to transfer one value to n measuring points but I need the opposite.
    We habe a machine with different blades (exchangebale) and would like to summarize how many time the machine cut sheets in total.
    Is there a way to do this automatically?
    Thank you for your answers.
    Regards,
    Olivier

    Hello,
    Similar request in this thread:
    Issue in Transfer Counter Reading
    You would need custom functionality to read the various source counters then transfer the total to the main counter.
    -Paul

  • Measuring Point Downloading Error

    Hi
    I'm getting error in downloading Measurment Points data.
    When I'm executing the report "RALM_ME_MEASP_FULL_DOWNLOAD_SD", it is shown  that "5 Measurement Points have been transferred", but in table "MEREP_DELTABO", no new record is displayed.
    In SM37, in Log its showing ->waiting-> "Frontend unavailable".
    What steps to follow?
    Regards.

    Hi Konchada,
    well, it seems you are missing some config steps. The server driven setup can be a little tricky if you do it the first time. Please have a look into this document, it describes the necessary steps really well:
    https://www.sdn.sap.com/irj/sdn/nw-mobile?rid=/library/uuid/818ac119-0b01-0010-ba8b-b6e3f3490a63
    Hopefully that helps to solve the issue.
    Regards,
    Oliver

  • Measuring Point Description Change-MassChange

    I have several (hundreds of ) Measuring points which i need to change .The fields to be changed include the Measuring position    and measuring descriptions. Since its a time consuming process to change individual record, can some one suggest any mass change transaction in PM with which i can achieve this changes without much time as in case of individual changes.
    Please suggest some direct method in order to avoid any BDC or LSMW.
    Thanks
    Murad Shaikh

    HI  Murad
    As such there is no standard T code for carrying out mass changes for measuring points except list editing (IK08) through which you can do it by selecting one by one. Since the fields you wants to change are free text type & will vary from one measuring points to other its not logical also. Better to do it through LSMW using recording IK02 its very easy & will take 10min to create one LSMW.
    Shakti

  • Measuring Point for Tools and Die Maintenance

    Dear All,
    I am trying to map the following process:-
    My client has 10 press machines and around 250 Dies for punching. Dies are assembled to press machines and they produce jobs by punching.
    Client has an Preventive Maintenance plan for each Die in terms of number of strokes punched by an Die. for e.g PM is done after every 300000, 600000, 900000, 1200000 strokes. Estimated life is 1200000.
    What they want is when production person confirms the production order say for 10000 jobs the counter of the die should increase by 10000.......and so on. When the counter reaches 300000 preventive maintenance call should be scheduled.
    What i have done is created an Die as an Equipment with PRT as equipment category. Created an measuring point for that Die, assined Usage formula etc.
    I have created an Maintenance plan for that die in which i have assigned the strategy (IP11) which contains the stroke cycles 300000, 600000.........etc.
    Assigned the Die as a PRT to the material which is to be produced in the Routing.
    When i confirm the production order the counter of the PRT increases which i can check IK13.
    What i am expecting is that in IP10 system should update the counter automatically so that when the counter reaches to 300000 maintenance call wil be scheduled and order will be generated.
    I would request you to please give me some input on this.
    Thanks and Regards,
    Rashmi

    Hello Rashmi;
    I have seen the screen shots & there are problems with the following:
    1) Counter overflow reading
    You have entered 130;  keep it as- 999999 (it is the reading after which system starts counting from 0 value)
    2) Formula that you have used;
    You have used the formula- SAPF02; do not use this. Create you own formula with following details: SAPF99 (new formula)  = SAP_20 * SAP_09
    3) You have manually entered the reading for the measuring point; do not use it. System will calculate the measurement reading from PRT usage value.
    CREATE a single measuring document with reading as '0'.
    4) Also in CA01; you need to assign this PRT in routing with "EQUIPMENT" & not material. Also make sure that in the same screen (assignment of PRT- basic data) maintain usage value as 1 (if this is not maintained, measuring doc. will NOT be updated).
    5) Now when you confirm the production order, based on number of units created; system will automatically create the measuring doc.
    If there is any problem with CA01, CO01 or CO11n; ask your PP consultant to assist.
    Do let me know if there is any problem in this.
    Regards
    Hemant

  • Measuring point as counter mass maintenance

    Hi,
    I have created some 500 equipments through BDC. But I forgot to put a tick (X mark in template) against field u2018Indicator to Show that Measuring Point Is a Counter.
    How to put a tick on that field in mass?? Other wise I will have to go to T code IE02 500 times and put a tick manually.
    Pls guide.
    Regards.

    Hi Dear,
                 You can use the LSMW for the T-Code IE02, Recording Methord.
    That can serve your Purpose.
    Regards,
    Yawar Khan

Maybe you are looking for

  • N95 8Gb USB Data Transfer Mode not working

    I have a bizarre problem with USB Data transfer. a) I upgraded to the new 15.x firmware with the correct HKCSL package - 0557980 b) I connected PC #1 in data transfer mode with no issue and copied a bunch of installers onto the mass memory and went o

  • Using Acrobat 9 Pro Extended and Adobe InDesign

    I was wondering if my MB would be capable of running Acrobat 9 Pro Extended and Adobe InDesign. My MB has 4GB of RAM, when in Parallels it I have the RAM allocated to 1GB for XP and 3GB for OS X. Currently, I have 84GB or hard drive remaining. Would

  • ICR - Process 001 and Process 002 Obligatory Group Chart

    Hi, another problem with ICR. I use ICR process in ECC 6.0 version but my client don't use the Group Chart. how can I use ICR processes to riconciliation my company? Can you help me? Thank you very much. Best regards. Giampaolo

  • Plugin not appearing for CS2

    Hello, I'm working on an issue with a Photoshop plugin. This is an automation plugin that works fine under CS3 on mac, CS CS2 and CS3 for pc. However on the mac under CS2 or lower it does not load, and will not appear as an option. Has anyone else ha

  • Aperture 3 & iPhoto - How to add photos w/o putting them into the library

    Hey Guys, I want to know if there is a way of using iPhoto or Aperture without having to store my photos into their library. I've been traditionally keeping my photos in my "Pictures" album by adding folders and numbering them accordingly to keep tra