Message IW338 in maintenance plan.

Dears members,
When I schedule a specific plan in IP10 the system show me IW338 message. But the plan is ok. Somebody lived this situation and know a solution?
Tks, Otavio.

Hello Otavio,
usually this message is processed when a package is assigned to an invalid date, which means that you would have to change the validity of the correspondent package.
I hope that this information helps resolve the described issue.
Regards,
Isabelle

Similar Messages

  • No maintenance plan has been confirmed for Order 000004024181; Follow-up ca

    Hi
    I try to close a list of preventive order (initiated by maintenance plan) from the transaction IW38 but the system displays the following error message
    "No maintenance plan has been confirmed for Order 000004024181; Follow-up call exists
    Message no. IW597"
    thank you for your help

    Hi,
    You mean close -
    >TECO???
    If yes Go in IW38 select all orders  ,click Enviroment Tab and you can do the TECO but that order should not have Open reservation.
    Regards,
    Rakesh
    Edited by: RAKESH ASHOK MANE on Aug 26, 2010 1:02 PM

  • Certain Maintenance Plan not getting scheduled in the background job

    Hi Gurus,
    I am facing an issue here.
    A weekly background job (RISTRA20) runs every weekend and schedules the maintenance plans.
    But we have noticed that some maintenance plans are not getting scheduled. i.e no orders or schedule is getting generated.
    When I run IP30 manually for these plans then the schedule gets generated and orders get called.
    I have checked up the background job and it is running fine.
    Also, i have noticed a similarity in all these plans which are not getting scheduled. There schedule has been restarted (through IP10) at somepoint or the other.
    But i don't see any direct impact of this?
    Can any of you provide some help on this?? Points will be rewarded.
    Thanks and regards,
    Nitin Saini

    Hi Narender,
    Thanks for replying.
    The message number for 'Groups don't match' is ME303.
    I think this does not have anything to do with the restart as i have done further investigation.
    Whenever I run IP30 with sortfield input as AS02*, i get the error as mentioned above for a certain number of maintenance plans while the remaining plans get scheduled.
    If i run IP30 for any other sort fields, it runs fine and i don't encounter the error
    mentioned above.
    If you send me ur email address, i could forward you screen-shots of the issue.

  • Maintance jobs with Maintenance plans - troubleshooting

    Some of our old servers have maintenance jobs created with inbuilt mainteance plans. We find difficulty in troubleshooting these kind of jobs when it fails. Can anyone shed a detailed analysis of how to troubleshoot these jobs which are created with maintenance
    plan like where to look, any system table/view that could help etc. The job history gives very minimal details and often result in cropped off messages.
    I was told that if we alter the maintenace plans associated with the jobs and save it. It will break the job, is it so?

    For SQL server 2000
    You can check the failure logs either from jobs or Maintenance plan history
    In enterprise manager, expand the server group
    Expand the management folder and select the database maintenance plans
    Right click the maintenance plan that failed and select the Maintenance plan history
    Check for the failure occurred and double click the failed row to see more details or on failure
    Similarly from SQL server 2005 onwards maintenance plan history, you can check from maintenance plan
    In SSMS, connect to SQL instance
    Expand the Management folder and select the maintenance plans
    Select the maintenance plan and click on maintenance plan history and check for the failure
    Please click the Mark as answer button and vote as helpful if this reply solves your problem

  • Reversal of a maint. order which was released through a maintenance plan?

    Hi All,
    Is there a way to do reversal of a maintenance order that was released through a maintenance plan?
    Because I do not want to process the order; as such I would like to put a reversal indicator for that order and go ahead with the next order that was called through a maintenance plan.
    If YES, kindly let me know how to do it?
    Many thanks in advance.
    Kannan J

    Hi Thyagarajan, Thanks for the response!
    When I want to skip the maintenance call object that was generated through a plan, the system gives me the following message.
    "CALL CAN NO LONGER BE SKIPPED"
    When I press for further help, system gives me the following message:
    "Call can no longer be skipped
    Message no. IP405
    Diagnosis
    You have tried to skip a date that has already been called.
    System Response
    Since maintenance call objects, for example, maintenance orders, already exist for the dates that have been called, you can no longer skip a date within the scheduling process.
    Procedure
    If you do not want to perform the maintenance call objects due on that date, you must reverse the orders that have been called.
    You can select the maintenance call objects that have been called using the list editing functions in maintenance processing."
    Which means there should be a way to reverse the order, isn't it?
    May be with this message you may be able to throw some help on this.
    Many thanks in advance
    Kannan J

  • Update was terminated error while scheduling maintenance plan

    HI Friends,
    I created a maintenance plan.I scheduled the order and i saved.
    Now when i tried to see the schedule i am getting a message
    "Update was terminated"
    the detailed error is
    Update was terminated
    System ID....   DEV
    Client.......   XXX
    User.....   XXXXX
    Transaction..   IP10
    Update key...   49041E2C02935CCCE10000000AFA0209
    Generated....   30.10.2008, 17:22:18
    Completed....   30.10.2008, 17:22:19
    Error Info...   00 671: ABAP/4 processor: SAPSQL_ARRAY_INSERT_DUPREC
    Can anyone tell me why this error is coming and how to rectify.
    Thanks in advance
    Vivek
    Edited by: vivek mankad on Oct 30, 2008 1:38 PM

    Vivek,
    Talk to your ABAP/Basis team
    PeteA

  • Management studio error while creating/editing maintenance plan

    Hi,
    I had MS SQL 2012 enterprise edition installed and everything was working fine. Later I removed MS SQL 2012 and re-installed. Now when I am trying to create maintenance plan I am getting below error. When I click Yes system allows me to go through the maintenance
    plan wizard and create new plan but when I want to edit it give me same error and it doesn't open screen to edit the plans. Can you please provide solution to below error?
    Microsoft SQL Server Management Studio
    The 'Microsoft.DataTransformationServices.VsIntegration.DtsPackage, Microsoft.DataTransformationServices.VsIntegration, Version=11.0.0.0, Culture=neutral, PublicKeyToken=89845dcd8080cc91' package did not load correctly.
    The problem may have been caused by a configuration change or by the installation of another extension. You can get more information by running the application together with the /log parameter on the command line, and then examining the file 'C:\Users\pac\AppData\Roaming\Microsoft\AppEnv\10.0\ActivityLog.xml'.Continue
    to show this error message?
    Yes   No   
    I tried repair option from MS SQL 2012 setup but it didn't solve the problem. This is my production system and it has TFS 2013 and it's database. Please let me know how severe this problem is? Is it something to be worried about in future? How do I solve
    this error?
    Regards, Premal Acharya

    Hi Michelle,
    Thanks for your reply. I resolved this issues yesterday by installing SQL Server
    Management Tools Complete. I suspect that
    Microsoft.DataTransformationServices.VsIntegration.DtsPackage, Microsoft.DataTransformationServices.VsIntegration
    DLL files were having issues. When I searched my system I could only find Microsoft.DataTransformationServices.VsIntegration.DLL and
    Microsoft.DataTransformationServices.VsIntegration.DtsPackage.DLL file was missing. 
    When I re-ran the MS SQL setup to add new feature I selected Management Tools Complete and after installation this error was resolved. Though this has solved the issue for now I feel the error shouldn't have come with Management Tools -
    Basic installation as I had installed MS SQL Server before with Management Tools - Basic and it had worked without any issues. 
    For now this issue is resolved but it will be of good help if I can know the cause of this error and what could be the possible solution. 
    Thanks.
    Regards, Premal Acharya

  • Creating maintenance plan "MaintenancePlan" (Error)

    Hello, I get the error
    Creating maintenance plan "MaintenancePlan" (Error)
    when I try to create a maintenance plan. I checked and the Microsoft Web site and
    other forums said it may be that integration services is not installed so I tried installing it
    and it said that it is already installed.
    The accompanying messages with the report are:
    ADDITIONAL INFORMATION:
    The connection type "ADO.NETQL" specified for connection manager "{C72T6E0B-6CE7-4138-A8D9-BFE8897900700}" is not recognized as a valid connection manager type. This error is returned when an attempt is made to create a connection manager for an unknown connection type. Check the spelling in the connection type name.
    (MaintenancePlan)
    The connection type "ADO.NETQL" specified for connection manager "{C72CT60B-6CE7-4138-A8D9-BFE8897900700}" is not recognized as a valid connection manager type. This error is returned when an attempt is made to create a connection manager for an unknown connection type. Check the spelling in the connection type name.
    (MaintenancePlan)
    - Adding tasks to the maintenance plan (Stopped)
    - Adding scheduling options (Stopped)
    - Adding reporting options (Stopped)
    - Saving maintenance plan "MaintenancePlan" (Stopped)

    Sharp,
    Do you still need help with this?
    Thank you!
    Ed Price, Power BI & SQL Server Customer Program Manager (Blog,
    Small Basic,
    Wiki Ninjas,
    Wiki)
    Answer an interesting question?
    Create a wiki article about it!

  • Creation of Maintenance Plan through IBIP t.code

    Hi,
    I want to create the Maintenance Plan in Mass using the IBIP t.code.
    I am using Record name as IBIPMPLA, and trying to create the Plan but instead of providing Plan description in t he file error is coming for Plan description.
    If any procedure is available, kindly provide the same.
    Thanks in advance

    Hello
    can you please provide the detail information of error message. is it the error for the formating error in the field RMIPM-WPTXT?
    If so, then please check if the below information can be any of help:
    When using IBIPMPLA structure it is also necessary to create at least on item with structure IBIPMPOS. If IBIPMPLA used on it own then you will get the error 'Formatting error in the field RMIPM-WPTXT'.
    Please refer to the documentation for the program RIIBIP00:
    Structure - IBIPMPLA  - Maintenance plan
                      >>  IBIPMPOS     Maintenance plan item
                               >>  IBIPTEXT   (see comment below)
                               >>  IBIPOLST   Object list
                               >>  IBIPBDCD   (see below from maintenance
                                                plan item)
    If you create an entry for the structure IBIPMPOS and maintain 1maintance plan item then IBIP should create the plan successfully and the error should not occur.
    In IBIPMPOS structure do NOT maintain a value for TCODE, otherwise an error will occur.
    Regards,
    Jane

  • Function (or BAPI, ...) to skip calls and release calls in maintenance plan

    Hi, gurus!
    We need to find a function (or BAPI, ...) in order to skip a call number in a maintenance plan.
    We need a function (or BAPI, ...) to release a call in a maintenance plan, too.
    We could use a call-transaction to IP10, but we guess there could be problems with scroll and with pop-up warning messages.
    We also thought about using IP30 but there's a problem: if there are previous calls that are not skipped, transaction IP30 releases all those previous calls and we need to skipped them.
    Thanks in advance. We really appreciate your help.
    Best regards,
    J Madariaga

    You cannot skip a call in the middle of a list of active calls - this is standard functionality.
    Can you please give more info as to why you would want to do this?
    PeteA

  • Problem regarding scheduling of maintenance plan

    Dear Sap Gurus,
    I am facing the problem during the scheduling of maintenancepan thruough IP10 follwing error is coming
    "Planned date for maintenance plan 124 was scheduled for 00.00.0000"
    Planned date for maintenance plan 124 was scheduled for 00.00.0000
    Message no. IP889
    Diagnosis
    During scheduling of the maintenance plan, the planned date was set to 00.00.0000.
    This error can occur, if, for example, the cycle for the planned schedule is too big (offset) means that the planned date is actually after the 31.12.9999.
    Procedure
    Check the master data of the maintenance plan to ensure that no date is calculated after the 31.12.9999.
    If necessary, check the counters used and the annual performance.
    I explore all the things in SPRO also also check the setting parameter for the plan but i didnt get any breakthrough for my above problem.Plz guide me whats the exactly problem with scheduling of of maintenance plan.
    points are sure
    Regards
    Rakesh

    Summary
    Symptom:
    In the scheduling of a multiple counter plan, the system
    1. generates message IP889 "Planned date for maintenance plan &1 was scheduled for 00.00.0000" or
    2. terminates with CONVT_NO_NUMBER.
    Other terms
    Scheduling, IP10, IP30, maintenance plan scheduling, maintenance plan, multiple counter, BADI IPRM_MCP_SCHE_CHANGE, CONVT_NO_NUMBER, SAPLIWP2, LIWP2F19, MCP_PREPARE_RESCH_CALLED_CALLS, LV_ABNUM
    Reason and Prerequisites
    This problem is caused by a program error.
    Solution:
    Implement the attached source code corrections.

  • Assign particular measring point to Particular Maintenance Plan

    Hi,
    I would like to know whether it is possible to assign measring point to maintenance plans.
    Here it goes the scenario
    Equipment= PUMP
    I have maintenance plan weekly & monthly
    In weekly maintenance plan ( Every Monday)I have to check
    1.Vibration,
    2. Speed,
    etc upto 10 measuring point
    In Monthly maintenance plan (30 days) I have to check
    1.Bearing Condition,
    2.Oil Level,
    3. Pressure
    4.Temperature
    5. Current,
    6. Voltage 
    The above mentioned measuring point is created w.r.t equpt PUMP by T-Code IK01.
    Now problem is whenever I get call object i.e maintenance order according to weekly & monthly maintenance plan.
    Weekly order- 100001 is generated while confirming (IW41) this Order & its operation activity
    I will update measuring point but it is displaying all the measuring point of an equipment.
    I want only measuring point pertaining to weekly maintenance plan should only display.
    How can I link measuring point to particular maintenance plan?
    Is there any solution available or does anyone come across this scenario?
    Pls revert back for any more information.
    Regards
    Pradeep

    Hi,
    I have been able to see measuring point in a task list since upgraded to EhP4.
    I was just trying to assign measuring point to operation But it is throwing error message saying measuring point doesnot exist.
    When I  press F4 none of the measuring point is existing though I have created Measuring point to equipment?
    Can someone help me or guide where am  I going wrong?
    I have gone through the below link for details on inspection rounds but there is no elaborative & detailed procesure existing
    http://help.sap.com/erp2005_ehp_04_sp/helpdata/en/48/689d3dd2613c87e10000000a42189c/frameset.htm
    Could you pls tell me the detailled procedure or provide the material?
    Regards
    Pradeep

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

  • PM archive maintenance plan data

    Hi all,
    I try to archive maintenance plan by use t-code sara
    - select archive object PM_MPLAN
    - select maintenance plan for archive
    and run will shown message "no maintenance plan was selected"
    please help me to solve this problem,
    Thanks

    hi
    have you set the deletion flag for the maintenance plan ,kindly refer the following link for the prerequisite for Archiving the maintenance plan
    http://help.sap.com/saphelp_47x200/helpdata/en/a4/96ba49e41c11d1951d00a0c93029cf/content.htm
    regards
    thyagarajan

  • Mandatory field "Priority" for maintenance plan

    Hi,
    Setting mandatory fields on preventive maintenance plan is not possible in customizing.
    So the alternative are:
         - User-exit as described above (TCode SMOD)
         - Transaction variants (TCode SHD0)
    I've tried SMOD: this approach is not a user friendly option. The user get an error but the field are greyed out and need to click on cancel before the are able to enter data.
    So I triend the screen variant (SHD0). But I'm having an issue on the field "Priority" (RMIPM-PRIOK). The dropdownlist is not working...
    Does anyone has a workaround? I want to avoid development...
    Thanks,
    Laura

    Hi Laura,
    I understand that you are trying to make the Priority field (PRIOK) in maintenance item mandatory. It is a very simple task with User-Exit. Just put the following code in the include ZXPRMU06 of user-exit IPRM0004.
    IF IMPOS_IMP-PRIOK IS INITIAL.
       MESSAGE: 'Please Fill the Priority field.' TYPE 'I'.
       RAISE NO_UPDATE.
    ENDIF.
    You will get this message and the Plan is refused to be saved until Priority Field is filled.
    Your ABAPer will be able to do it in few seconds.
    Jogeswara Rao K
    PS: Also for me SHD0 option has always been last resort.

Maybe you are looking for

  • Replication sales order from CRM to R/3?

    Hi Gurus I need some advice. We are implementing CRM for a over client Over sale Cycle is LeadOpportunity- sales order- delivery  billing Once sales order created in CRM we have to send that sales order to SAP R/3 Then delivery and Billing will d

  • Combining JQuery and Normal Javascript

    I have 2 html regions on my page which just contain text that is used in JQuery dialog boxes. At the moment one dialog is displayed onload and the other is displyed on an onblur event on a page item. I am trying to alter the onblur, so it only fires

  • Graph showing an extra plot in cursor palette

    Hi, I have an XY graph with many plots. The graph is showing an extra plot in the cursor palette. I have 9 plots.In plot legend palette its showing the correct plots only. But in the cursor palette it showing an extra plot with name plot9. I have giv

  • Where does Plan Version field store in SAP project system table?

    Hi, I would like to know where where does Plan Version field store in SAP project system table. The plan version that I m refering is the Plan Version 1 in the menupath u201COn the Project Info System: Progress Analysis: Initial Screen, Choose Settin

  • Import User Fields

    I am moving my Multisim 10 project to another workstation and am having trouble getting the User Fields to transfer to the new workstation.  I found the corporate database that the user fields information is supposed to be stored in and tried to impo