Message No 06076 ordered in full

Hi,
    I have defined error message for message no 06076 Materials of requisition & item & alr. ordered in full, But it is only giving error in ME21N and ME22N transaction. For end user enjoy transaction is not allowed.
   How can i set error message for the same in ME21 and ME22.
Thanks in advance,

Dear Asish,
Please refer this Post you will get the Idea how this message works
ME21/ME22 - Are there any solution to make error when qty.PO > qty.PR
Edited by: redriver on Dec 12, 2011 8:31 AM

Similar Messages

  • Message 06076 'Materials of requisition & item & alr. ordered in full'

    Hi Gurus..
    I have the following parameters:
    Material = XXXX
    Plant = YYY
    Base Unit of Measure = BOT Bottle
    MRP Type = PD
    Lot Size = EX
    Rounding value = 12
    Procurement Type = F
    Special procurement = 40
    Strategy Group = 10
    I have my PIR on date = 18.05.2009 - 100 Units
    PurRqs = 108 units
    I transform my PurRqs to PO (UB Class Type) only for 50 BOT
    So I have..
    PO = 50 BOT
    PurRqs = 58 but fixed
    When I'm trying to convert my PurRqs to another PO (using ME21N) the following message appear
    message 06076 'Materials of requisition & item & alr. ordered in full'
    Anybody can help me...??

    Hi.. I solved the problem...
    My error was:
    I don't respect the rounding value when I was converting the units from my PurRqs to PO..In my example
    I transformed my PurRqs to PO (UB Class Type) only for 50 BOT
    So I have..
    PO = 50 BOT
    PurRqs = 58 but fixed
    When I tried to convert my PurRqs to PO the rounding value has effect as 60. So that excced the original value from my PurRqs

  • PR already ordered in full message when it is still open

    When converting a PR to PO, it is showing an error message that, the PR is already ordered in full. but it is for sure that, the PR is still open.
    Can anyone give a soultion for this.

    Dear,
    Please check below detail.
    1) Enter T-code ME53N, enter your purchase requisition number.
    Go to item level, "Status".
    Is it any purchase order prepaid with referance of purchase requisition.
    2) Check quantity of purchase requisition.
    3) Check status of purchase requisition from,
    Status Tab, Quantity/Dates Tab,
    Regards,
    Mahesh

  • Materials of requisition 14009209 item 00010 alr. ordered in full

    Dear SAP Experts,
    We have created one Services PR has one line item 10, for line item 10 we have 5 services.
    Against this services PR we created one Services PO for half quantity of services.
    For rest of quantity of services , we are creating 2nd services PO at that time system thrown an error Message i.e Materials of requisition 14009209 item 00010 alr. ordered in full.
    Kindly resolve my issue.
    Thanks&Regards,
    Amruth.
    Edited by: amruthraoch on Mar 17, 2011 6:05 AM

    hi ,which pr using
    As note 576341 states:
    When you transfer a service purchase requisition into a service order,
    the system shall reduce commitments according to value. Prerequisite is
    that the indicator "Reduction of purchase requirement commitment on
    value basis" is selected in Customizing Transaction ML91 ("Source
    Determination And Default Values").The indicator is then transferred to
    field WRTKZ in table EBAN.During the generation of the purchase
    requisition, you can use Transactions ME51 and ME51N.
    Any kind of requisitions created from PM order or PS orders
    can NOT have the flag EBAN-WRTKZ set to 'X'. The commitment of the purchase requisitions created from PM/ PS orders will be completely reduced by the first PO created to that requisition, that is why you will get also the error message 06076 when you try to create a second PO to the same requisition.
    regards
    vijay...

  • Materials of requisition & item & alr. ordered in full

    Hi Gurus,
         We have set Error Message for 06076 Materials of requisition & item & alr. ordered in full, But it is only for ME21N, So we are using user-exist for the transaction ME21 and ME22.
       Now my question is,
    Is there any standard message for the scheduling agreement for the same scenario ? Or I have to use same user-exist for scheduling agreement.
    Thanks in Advance.
    Ashish Panchal

    Hi There
    For the scheduling agreement (Materials of requisition & item & alr. ordered in full) message cant be set
    SAP dont have the std setting for the Sch Agreement in order to control order(PO) more than the PR qty,
    I think it is std functionality of SA
    Thanks
    Senthil P

  • I have a mid 2007 iMac.    2 GHz Intel Core 2 Duo, 4 GB 667MHz DDR2 SDRAM, OSX 10.9.5.   I attempted to do the latest update and got the message:  Start up disk is full.  Delete files.  How do I do that?

    I have a mid 2007 iMac.    2 GHz Intel Core 2 Duo, 4 GB 667MHz DDR2 SDRAM, OSX 10.9.5.   I attempted to do the latest update and got the message:  Start up disk is full.  Delete files.  How do I do that?

    Freeing Up Space on The Hard Drive
      1. See Lion/Mountain Lion/Mavericks' Storage Display.
      2. You can remove data from your Home folder except for the /Home/Library/ folder.
      3. Visit The XLab FAQs and read the FAQ on freeing up space on your hard drive.
      4. Get an external hard drive on which to store some of your files after which you can
          erase the data from your internal drive to free up space.
      5. Also see Freeing space on your Mac OS X startup disk.
      6. See Where did my Disk Space go?.
      7. See The Storage Display.
    You must Empty the Trash in order to recover the space they occupied on the hard drive.
    You should consider replacing the drive with a larger one. Check out OWC for drives, tutorials, and toolkits.
    Try using OmniDiskSweeper 1.8 or GrandPerspective to search your drive for large files and where they are located.

  • Error message06076 -Materials of requisition 15863 item 10 ordered in full

    Hi ,
    I am trying to create a PO with reference to a particular PR.
    I get an error message "Materials of requisition 15863 item 10 ordered in full".
    Can anyone please suggest me the reason for this error and how to overcome it.
    Thanks
    Regards,
    Vinayak

    Hi Venkatesh,
      As you might have ordered full quantity of PR in PO already, you might be facing this error. Check the status which has been mentioned in above thread and change the error message as warning message and carry on. While you rise PO w.r.to that PR again, you need to enter the quantity manually.
    Regards,
    Prasath

  • "Materials of requisition 300004365 item 00010 alr. ordered in full".

    Dear All,
    We have creted a service PR for 1000 qty.
    we created service PO for 600 qty ref to that PR.
    Later when we create PO with ref to that PR, system is throwing error "Materials of requisition 300004365 item 00010 alr. ordered in full".
    i checked in ME5A, it shown as closed requistion. but for remaining items ,P.O has not been created.
    Please share ur views

    Hi,
    You have createded service  PR with 1000 quantity.Then,you have created service PO with reference to PR for only 600 quantity,
    Then, you did change in closed PR check box flagged
    you have done changes in PR : (ME52N)
    In ME52N Change PR, you have flagged the closed check box in item details( Tab quantities/dates) of your material.
    Purchase Requisition Closed remain quantity Flags a purchase requisition as closed, that means that no further purchase orders are to be created for this purchase requisition.
    Use of this check box flag: --
    Set this indicator manually
    In change mode for a purchase requisition on the item detail screen
    When you create a purchase order with reference to a purchase requisition
    Have the system set the indicator when automatically creating purchase orders from purchase requisitions
    You can use the indicator Set reqs to "closed" to specify that the purchase requisition is considered closed once the associated purchase order has been created, even if the complete requisition quantity has not been ordered.
    If you have checked the closed in PR it won't allow to do PO for the remaining quantity.
    Please, Remove the check box in ME52N transaction. Now,proceed to do PO then only system will allow without show any messages.
    Regards,
    Thiru
    Edited by: thiru on Dec 23, 2009 6:55 AM
    Edited by: thiru on Dec 23, 2009 6:57 AM

  • When i try to open Photoshop 7.0 I get a message "the search discs are full" and it will not open. Help?

    When I open Photoshop 7.0 I get the message "the search discs are full"  and it will not open.  Help?

    Is your scratch drive over 1 Terabyte? Photoshop 7 was never programmed for those sizes  and will return that type of error if you recently changed drives,
    Solution is to partition that drive to less than one 1 TB or find a smaller drive.
    And update to 7.0.1 Adobe - Photoshop : For Windows : Adobe Photoshop 7.0.1 update
    Gene

  • Create another purchase order for a material ordered in full

    Hello friends,
    I have a little MM question for you.
    I've created a purchase requisition with a material A and quantity 100 UN
    I've then created a purchase order in reference to this PR.
    This PO has been released.
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?
    How does SAP control that ? (customizing path ??)
    Regards,
    Bahia.

    Dear,
    Is it possible, in standard SAP, to create another purchase order in reference to the same purchase requisition for the same material and the same quantitiy ?  Yes it is possible in SAP
    How does SAP control that ? (customizing path ??): SAP controls in that way, when ever you create purchase requisition with a material A and quantity 100 UN...Now PO created and released...
    Now again if you try to create PO wrt PR, you can observe this time you will get all deatils in PO without quantity...reason behind that is, you have already released an order for full qty w.r.t. that PR...So this time qty field will be empty..You have to manually enter this field.
    Now the same you can see in the the PR status in ME53N Tcode.
    Regards
    Utsav

  • I ordered the full creative cloud on sunday and received an order number but still can't open any of the programs. When i check the status of my order online, it says it can't find it. Is this normal after 3 days?

    I ordered the full creative cloud on sunday and received an order number but still can't open any of the programs. When i check the status of my order online, it says it can't find it. Is this normal after 3 days? I tried asking in a chat window instead of the forum but no one answered and after about ten minutes my screen restarted and closed the chat window down. It seems a little frustrating not knowing what happened to my order and not being able to contact anyone. Is all this usual with Adobe or are they just having technical problems this week?

    Does your Cloud subscription show on your account page?
    https://www.adobe.com/account.html for subscriptions on your Adobe page
    This is an open forum, not Adobe support... you need Adobe staff to help
    Adobe contact information - http://helpx.adobe.com/contact.html
    -Select your product and what you need help with
    -Click on the blue box "Still need help? Contact us"
    -or by telephone http://helpx.adobe.com/x-productkb/global/phone-support-orders.html

  • How to permanently disable this message: "Press Esc to exit full screen." (by Adobe Flash Player) in Mac's Safari Browser?

    Hello everyone,
    I have been searching for sometime (without any success) for a solution to permanently remove this annoying message: "Press Esc to exit full screen."
    Whenever I go to full screen mode, watching any video on YouTube, BBC, CNN (or many other websites which use Adobe Flash Player for streaming video) I have to bare seeing this message for several seconds until it fades away. Seeing this message once or twice would have been okay, but as we all watch many videos on a daily basis on internet, after weeks, months and now years seeing this message over and over again many times every day, it becomes very annoying, and I find myself rewinding many videos to their beginning after this message fades away to be able to watch it from the beginning without anything obstructing it!
    Does anyone know how to "permanently" disable this message from appearing?
    I am using the latest version of Safari 6.0 on the latest version of OS X (Mountain Lion 10.8.1), and have the latest version of Adobe Flash Player (Plug-in version 11.4.402.265) installed on my new MacBook Pro 15" with Retina Display.
    Thanks,
    Ally
    Thursday, September 13th, 2012

    Thanks Carolyn,
    I am attaching a screenshot here for you to see that this setting was already set to what you suggested. I didn't need to change it as it was like this even before I post this message.
    So the problem still presists and unfortunately your suggestion is not a solution to this probelm.
    Last night I did more reseach and found a discussion in Adobe website, it seems a lot of other people have the same issue, and even started a discussion in Adobe website about it. But unfortunately Adobe refuses to address it and enable the end user at least to have an option to turn this message off from displaying permanently on his/her computer.
    I am writing down the url links for the two posts regarding this issue on Adobe's website:
    Link #1: http://forums.adobe.com/thread/921270
    Link #2: https://bugbase.adobe.com/index.cfm?event=bug&id=3058752
    Hopefully more people will get involved and ultimately we will either get Adobe's attention, or someone will find a "hack" and post it here for all of us. I have found some suggested "hacks" for Windows environment (you can simply google it, I am sure you will find them too). But so far I haven't seen anything for Mac's Safari browser.
    Cheers,
    Ally
    Thursday, September 13th, 2012

  • "Error while reading Exceptions" - Message No. /SCMB/ORDER 351

    Hello,
    An error message that we are getting as "Error while reading Exceptions" - Message No. /SCMB/ORDER 351 while entering a Work Order Number in the 'Work Order details' screen in the SNC Web UI. So, please let us know how to tackle this error in SNC.
    Regards,
    PCN

    Hello Pavan,
    This message can occure at multiple places. Most of these are status reading and checking in the /SCA/CL_SVORDER class. The following methods can throw this message:
    CHECK_ITEM_EXCEPTION_STATUS
    You can set a BP at line 20 and debug the STATUS_CHECK function.
    GET_ITEM_EXCEPTION_STATUS
    You can set a BP at line 29 and debug the STATUS_READ function.
    READ_ITEM_EXCEPTION_STATUS 
    You can set a BP at line 31 and debug the /scmb/cl_odm=>get3_by_id method.
    I hope this will help you.
    Regards,
    Richard

  • Error Message while doing Order CLSD

    Hi,
    I am getting error message while doing Order CLSD...
    Error Msg: Invalid cost element(XXXX) for reservation item 010.
    please suggest me...how to solve this issue.
    regards,
    Venkatesan Anandan

    Hi Venkatesan,
    I had replied and asked for one clarrification and to check same at your end.
    Is your Cost Element mapping done with cost cost center used in order settlement rule.
    Also check for Material Master Change document for Valuation Class change and revert back in this thread.

  • How to Configure a Pop Up Message in Sales Orders

    Hi,
    How can I display a message when creating or changing sales orders? I need the configuration steps for 4.6.
    Thanks,
    Sai.

    Hi,
    First you need to make an entry of your pop up message in the sales text view of the material master and when the user enters that material, he will be able to see that message. The Config part is in spro/sd/basic func/text control. You need to define the text types, access sequences and the text determ procedures.
    You have to maintain the desired text in the material master sales text editor and turn on the indicator 'Display texts during transfer' under Text control in configuration for the sales order-item for the material sales text. This will display a Pop-up message when booking orders
    Reward points if found helpfull...
    Cheers,
    Siva.

Maybe you are looking for