Message no. AG021 when doing component availabilty check,

Hi PP Gurus,
When I'm trying to do Availability check for Planned order (order type PE) getting an error 'No control data maintained for checking group 02 and checking rule' (Message no. AG021) though Availability checking control for order type PP01 with Checking Rule PP configured, Standard production order PP01 without settlement profile but Production Scheduling profile not created. Since I'm using REM environment.
Is all the settings required that we do for Discrete for REM too as I'm using Rate Routing here.
Please come back with solution.
Thanks & Regards,
Abu Arbab

Abu Arbab,
As you are trying the availability check at planned order level check what is the checking rule maintained at Plant level (T-Code: OPPQ under Dep. reqmt availabiity) and Plant and MRP group level (T-Code OPPR under "Check rule dep.reqmt).
Then in OPJJ make sure you have maintained the scope of check for 02 and availability checking rule.Also make sure that you have the right availability rule maintained in material master MRP view for that material-plant combination.
you might have to re-create the planned order for the changes to take effect (if you change the scope of check).
Also check out the OSS NOTE: 92316 - Availability check: error message AG021
Try and revert back.
Regards,
Swapnil

Similar Messages

  • Outputting an error message in MV50AFZ1 when doing a VL01N - getting update

    Hello. I am getting an "update terminate" message due to using a MESSAGE statement in user-exit USEREXIT_SAVE_DOCUMENT_PREPARE . We need to be able to stop a delivery from getting created and alert the user under certain circumstances (if a field is not filled in on a separate screen). I have seen under Note 415716 that we cannot use the MESSAGE statement. Is there any way to stop a delivery from being created while informing the user that they have not filled out the required field? (This field is on another tab that they may not see when creating into the delivery). I have tried various uses of the MESSAGE statment, tried perform message_handling, etc., but still no luck. Thanks for any help!
    Regards,
    Vince

    Hi Vince,
    I am not too sure but could you please check below subroutine of SAPMV50A-
            PERFORM message_handling USING
                                           <item#>
                                           <number>
                                           <type>
                                           <id>
                                           <msgv1>
                                           <msgv2>
                                           <msgv3>
                                           <msgv4>.
    Thanks
    Mohit

  • ABAP Runtime error when doing component assignment in routing creation.

    Hi All,
    I have a problem in component assignment while creating routing (CA01) by using Copy from function. We are creating a Sale order specific routing for a finished material by copying it from the same material. The Transaction runs very slow and when it goes to component assignment it is taking more than 2 hrs and going to dump.
    This finished material is having  very high no. of compoents in its BOM. (14000). Pls suggest why this is happening.
    Regds
    Mahesh

    Hi,
    You can analysis the Dump error using t-code ST22 with the help of your ABAP consultant. He will be able to explain you why the dump you are getting.
    Regards,
    V. Suresh

  • Issue with sales order when doing the availability check.

    In MD04 we have a material avail date of 12.05.2011.    The order was then changed to 13.05.2011 delivery date to reflect this availability,  but then delivery time was added e.g GI time and route time which then showed the sales order in MD04 as 18.05.2011.    However,  if we run the availability and take the 18.05.2011  and key this in the delivery date,  it shows in MD04 as 13.05.2011.  It seems like the availability check is only looking backwards,  and I can't find a setting in ATP relating to this.  In MM they have foward and back consumption in days on MRP3.  Do these fields impact this.
    regards
    Kylie

    Check in OVLY what is maintained to your sale order type
    thanks
    G. Lakshmipathi

  • When does iPhone Mail check my Mail?!?!

    It doesn't say how often it will check for mail!!! Please help!?

    The setting is still there, it's just moved a little bit.
    I'm working with a German user interface so I'm not sure about the English translations, but here it goes:
    In the general settings there is a new item in the uppermost area. It should be something like "load new data".
    Once you go in there you can activate or deactivate "immediately".
    Down below you find the settings for all the applications that do not support immediate transfer – you can set it to 15 min, 30 min, hourly or manually, just like under software 1.4.
    I think the Mail goes by these settings, at least it works for me.

  • Constanr error messages re incorrect # when doing advanced search

    Every time I try to do an advanced search for a member I get the error message number is incorrect. I have tried it over and over with various ID's Anyone else see this issue. And yes, numbers are typed correctly

    I have never had the issue before. I will try listening and then typing. Is this another glitch, bug, or an attempt to not be able to search any more for Ebay ID's?

  • Start Test - HD DST passes and so does all else. But HDD when doing a straight HDD check says fail

    Laptop slid off lap on to floor while on Skype. Skype continued to work. Shut off computer and later tried to turn back on. System said their might have been a power interruption or a change in software. Recommended checking system vs start normally. I take the first option, it loads files, the Microsoft Windows logo comes up, a Microsoft load bar comes up then the screen goes to a "grey" colour that is somewhat sculptured in appearance - not a blank blue screen.
    If I try to start normally, it reverts back to the former.
    I shut off the computer and hit ESC and try some of the stated "F" functions. In the Start up screen, everything passes including the HDD Sort Disk DST.
    In the Run In Mode, everything passes and seems to stay at 99% for sometime.... perhaps it was still running and I commuted it.
    When doing a HDD check - Failure
    Anyone with ideas??? I hope I dont have to replace the HDD.

    You might first check the connection of the hard drive to be sure it didn't get jostled loose in the fall. If it is secure and you continue to fail hdd check...replace it.
    ******Clicking the Thumbs-Up button is a way to say -Thanks!.******
    **Click Accept as Solution on a Reply that solves your issue to help others**

  • Availabilty check & tor

    Hi sd gurus,
    can anyone plz send me screen shots for availabilty check and tor in sd point of view ,plz help me am having the theory part idea but am not geting complete picture plz send me

    Hello Srinu,
    I cant provide you any screen shots for the topics you have asked. But pls go through the following notes. Its really good and you'll have a clear Picture on the topics.
         Availability check is considered as a pre-sale activity, where as TOR and MRP are post sale activities.
    Materials Requirements Planning (MRP) and Transfer of Requirements (TOR).
    1.     A schedule line in a sales order represents the customers intended delivery date and quantity to be delivered. In a standard sales order processing, the system transfers requirements (TOR) to Material Requirement Planning (MRP).
    2.     MRP - then determines if there is enough quantity of stock available for the scheduled delivery date. The TOR aims to ensure that the materials ordered are ready for the requested delivery date.
    3.     The TOR is closely integrated to Materials Management and Production Planning modules – thus it must be configured in association with the respective teams.
    4.     The TOR can be set either for individual requirements or for collective requirements in MMR (Sales: general/plant and MRP3 views).
    5.     Individual requirements are the transference of requirement to MRP for each schedule line of the sales order. An advantage of this is that the availability overview (CO09 – logistics – material management – environment – stock – availability overview) will show the order quantity, sales document number, item number and requirements class for each schedule line for which a demand has been created.
    6.     Collective requirements are a collective grouping of requirements created either daily or weekly that are transferred to MRP; but the documents processed in collective requirements cannot be individually identified from the availability overview (CO09). Collective requirements are useful to a business that deals with a large volume of sales orders per day, as it allows the business to have a clearer view of the availability overview and speeds up the response time within the system as well.
    7.     The system will automatically create individual requirements (irrespective of the collective requirements indicated in MMR) in case of special stock items such as consignment, returnable packaging, make to order stock etc.
    8.     The control elements that are used for Transfer of Requirements (TOR) and Availability Check are –
         the requirements class
         the requirements type
         the checking group
         the schedule line category
    9.     The requirements class is the controlling factor for TOR and the availability check for all sales document types. It determines if the system has to perform TOR, Availability check and product allocation to any particular sales order.
    10.     The requirements class is determined from the requirements type of the material.
    11.     The checking group in general is the criterion that groups together all the checking rules from all application areas for a material. In conjunction with the checking rule, it defines the scope of the availability check for each business event; that is, which stocks, goods receipts and goods issues are taken into account in the availability check, and whether replenishment lead time is checked. The checking group must be defined and allocated to the material master record in the sales: general/plant view in the availability check field.
    12.     for TOR to be carried out, you need to ensure the following criteria are met –
         The TOR must be switched on at the requirements class level.
         The schedule line category must be switched on for the TOR (fine tuning).
         A plant must be assigned to the sales document line item level.
         A checking group must be defined and allocated to the material master record in the sales: general/plant view in the availability check field.
    Planning materials –
         It is possible to create a common planning material and assign similar materials to it (MRP 3).Independent requirements are created for the planning material to cover the requirements that are expected for the materials assigned to the planning material. This means that you do not have to create independent requirements for each material. Instead create a material and assign the same to the planning material already created with similar properties.
         A valid material master record must exist for the planning material in the planning plant. The material master record of the planning material cannot contain a planning material as this procedure can only be carried out at single-level.
         An appropriate strategy group must also be entered in the MRP 3 screen for planning with planning materials. The strategy group groups all the planning strategies that can be used for a particular material. The planning strategy represents the procedure used for planning a material and is (technically speaking) controlled by the MRP types.
         Consumption mode defines whether and in which direction on the time axis – from the requirements date (corresponds to the date when the sales order items were created) the consumption of customer requirements with planned independent requirements should occur. Consumption period must exit between 1 and 999 days.
         Backward consumption only: starting from the requirements date, backward consumption is carried out within the relevant consumption period specified in MMR i.e. the system reduces the planned independent requirements that lie in the past. Likewise forward consumption only represents – starting from the requirements date, the system reduces the independent requirements that lie in the future within the consumption period.
         Backward/forward consumption: in this case backward consumption is performed first and forward consumption is performed later depending on the availability of the independent requirements in the past. Forward/backward consumption is vice-versa of the above.
    Stock requirements list –
    1.     Stock requirements list is the central table for planning and stock control. It is invaluable to the interpretation of the available stock and the situation of stock levels in a plant.
    2.     Menu path: MD04 – logistics – material management – inventory management – environment – stock – stock requirements list. Here you can see the order number or delivery number as well as the line item and schedule line placing the demand on the given plant. It also shows the required and available quantity of material per order.
    3.     Another view of the stock situation in plant can be obtained from MMBE (stock overview). This view will show you total stock per company code, then at the plant, storage location and at batch level.
    4.     A useful tool in MMBE is material movements, which can be viewed by selecting stock line and proceeding to environment, material movements.
    <b>Configuring Transfer of Requirements –</b>
    1.     IMG – sales & distribution – basic functions – availability check & TOR – transfer of requirements – define requirements classes.
    2.     Requirements class – (OVZG) is the controlling factor for the availability check and TOR for all sales documents. It determines whether the system should perform the transfer of requirements, availability check and product allocation when a sales order is created.
    3.     The system uses the entries used at this level as default and brings the data into the sales order. The same entries made at the schedule line category level (VOV6) are only used to fine tune the entries previously made at the requirements class level. The standard requirement class is 041 (order/delivery requirement).
    4.     Requirements type – (OVZH) – (displayed in the sales order beside schedule line category) requirements types identify the different requirements, such as sales order requirements, delivery requirements or individual customer requirements. The requirements types can be changed, for example, in order to represent customer-specific terms.
    5.     The first step in the process of configuring TOR is to define a requirements class (041 – standard) by copying the standard one. It contains the preconditions for performing availability check, TOR and product allocation.
    6.     Next step is to create a requirements type, which is based on item category and MRP type of the material and allocate the previously defined requirements class to it. A requirements class can be allocated to more than one requirements type. It is possible to change the requirements type manually at the time of creating the sales order.
    7.     MRP type in the MMR determines how a material is planned for requirements i.e. automatic reorder point planning, manual reorder point planning or forecast based planning.
    8.     Determination of requirements types using transaction: when a sales order is created, the system looks for a relevant requirement type by using its own search strategy. Either it uses the following search strategy or you can make the system skip this entire process and straight away search for item category and MRP type by selecting 1 in the Q field while configuring determination of requirements types using transaction.
    9.     First attempt is to find the requirements type using strategy group in MMR.
    10.     If strategy group is not found, it will look for MRP group (MRP group groups’ together material with similar planning requirements and allocates special control parameters for planning such as strategy group, planning horizon and the creation indicator for planning run.
    11.     If MRP group is not found, it will try to access MRP type.
    12.     If no requirements type is found using MRP type, the system will use material type when accessing the corresponding tables.
    13.     Failing to find the requirements type even at this stage, it will try to get the requirements type using the item category and MRP type.
    14.     If this doesn’t work either, then it will try to determine requirements type using only item category.
    15.     If the last attempt fails, the system determines the transaction is not relevant for availability check or transfer of requirements.
    16.     As discussed earlier TOR and availability check are fine tuned at the item category level. This is done at this stage i.e. define procedure for each schedule line category as a next step.
    17.     Block quantity confirmation in delivery blocks (linked to VD05 customer block): in the standard sales order processing, the system transfers the requirements to MRP, but in some cases you may need to block a transaction due to a bad result of the credit check.
    18.     When requirements are transferred to MRP, the confirmed quantity is also reserved for confirmed sales documents . If a transaction is blocked for delivery, the required stock will be blocked so it cannot be used elsewhere. To prevent this, you can block the transfer of requirements for a delivery block in this step.
    19.     You can set a limit on the number of days you would want the system to postpone this block on confirmation of requirements. This can be done by setting the number of days to the block in the Def. period column.
    20.     Maintain requirements for TOR: can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met. For example in a standard sales order processing, a purchase order may need to be created in order to meet the demands of the customer. This purchase order is used to purchase new stock in order to meet the demand on MRP for particular customer’s sales order. Here you define requirements that must be met in order for the purchase order or assembly order to be created.
    <b>Availability check</b>
    1.     Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2.     Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3.     Rescheduling: is a proposal of how – confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4.     Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) – planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics – sales & distribution – sales – environment – availability overview.
    5.     Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6.     RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7.     there are three types of availability checks –
         Check on basis of ATP quantities.
         Check against product allocation.
         Check against planning.
    Configuring Availability check through Checking Groups –
    1.     The checking group + checking rule determine how the availability check is to be performed.
    2.     The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3.     The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4.     The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5.     Briefly explaining the above – checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6.     advantages of individual processing over summarized processing –
         Backorder processing is possible.
         You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
         The system automatically uses individual requirements in case of special stock items.
    7.     Required data for the Availability check to be carried out –
         The Availability check must be switched on at the requirement class level.
         The Availability check must be set at the schedule line level.
         A requirements type must exist by which the requirements class can be found.
         A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
         A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8.     configuring Availability check and defining Checking Groups –
         Checking groups are introduced into the sales order based on the setting in the material master record.
         SAP standard checking groups are 01 – summarized requirements and 02 – individual requirements or you can create your own by copying the standard ones.
         Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
         Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
         The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9.     Defining material block for other users – the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10.     Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
         However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
         This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
         If an entry exists, this default value is over written by MMR.
    11.     Controlling Availability Check – in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12.     These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13.     These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14.     It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15.     It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16.     Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17.     defining the elements in the availability check entirely depends on the business needs, but a few tips are given under –
         When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
         A shipping notification on the other hand - a confirmed purchase order – is a good indicator of receiving stock on a specified date.
         It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    <b>Reward points if helpful</b>
    Regards
    Sai

  • I am trying to use logic pro 9 on my lion system and it continues to say I have a bad midi...when i go to check my midi drivers folders in my library its empty...does anyone know whats going on?

    i am trying to use logic pro 9 on my lion system and it continues to say I have a bad midi...when i go to check my midi drivers folders in my library its empty...does anyone know whats going on?

    I
    got your message about making sure to use the machine specific disk that came with my machine. Unfortunately, Apple no longer sells Tiger replacement disks. I've got a couple of bids out on ebay, and will update when I have news to add to this post.
    Thank you for your help, Frank!
    To be clear you called the 800 number and explained what the situation was, old machine and lost the original DVD's?
    Just checking because if you just called and tried to buy the DVD's they might tell you they no longer sell them but you aren't really trying to buy them your trying to replace the ones that are missing.
    Ebay may work but there is a certain specificity to the DVD's required which, even if they seem right, might not work.
    Good luck either way. If you get a chance when you get the DVD's I'd be interested in hearing how it all works out.
    regards

  • When uploading my formatted resume to my Apple Jobs profile, I am always presented with a c:\fakepath message and the resume does not upload. How can I rectify this?

    When uploading my formatted resume to my Apple Jobs profile, I am always presented with a c:\fakepath message and the resume does not upload. How can I rectify this?

    Add this one to the list of thinks that don't work on the Apple Job Board. It looks like Apple is using ADP's VE (Virtual Edge) technology to run this system, and I've been stupified by the number of features that are just broken, or so poorly thought out by ADP as to be unusable, (certainly for webkit and mozilla browsers at least: I didn't bother checking IE.)
    Here are a few highlights:
    "My Job List", list of jobs applied for, seems to max out at three. You can apply for more than that, but you can only see the first three.
    "Search Using Your Resume" feature yields few or no results, even when the pasted text contains only common, exactly matched words like 'Design' or 'Engineer'.
    The missing resume upload, described in this thread.
    "My Job Agent" seems to never flag anything, at least it hasn't ever for me despite pretty loose criteria.
    Agent's created using "My Job Agent" eventually just disappear, which is fine because they don't seem to work.
    When updating a profile, acknowledging the 'Terms' happens twice in a row. 
    Job seekers can only supply one cover letter despite being able apply for several jobs.
    Pagination for search results only appears at the top of the page, so it's necessary to scroll down through each page, then up to the top again to proceed to the next page.
    Well, I'm sure there are others, but you get the idea. I hope the Apple folks can fix this, (or twist ADP's arm to fix it,) so it better represents the quality of experience that Apple is so respected for consistently delivering.

  • Iphone 4s-when wifi is off and I am away from my home connection can I receive and send texts and text messages?  I want to keep my wifi off to limit data (email etc) to when I want to check it.  Cellular is roaming"voice only" it says.Can I get texts?

    When my wifi is off and I'm away from my home connection - it shows wifi off (unless I turn it on to check my email etc.) - and in the settings cellular it shows "voice only". Will I be able to receive and send texts in those settings?  Or check voicemail.  I had wanted to keep my email from coming in all the time and only want to check it periodically - so I turn ON my wifi when I want to check my email.  But when my wifi was off away from home- I hadn't seemed to be getting my texts.  So- do I need to keep wifi roaming connected when away from home to receive and send my texts in real time.  (which is what I want) or am I still able to send and receive texts with my wifi off when I'm away from home.  (When I'm home I am connected to my home data plan automatically through wifi and I get texts when I'm home - but I'm thinking I'm not getting texts in real time - is it because my wifi is off when I'm away from home?  My cellular shows voice only when my wifi is off away from home.  Am I doing it right to receive and send texts away from home?  Or do I need to open up the wifi in order to receive and send text messages.  I know that I would need to turn on wifi roaming - which will use data - for email checking or sending - as well as to use browsing apps and now I'm guessing to receive voice messages I may have missed?  So do I need wifi on to receive texts too?  Thank you - GregorySC

    Hello GregorySC,
    In order to send and receive SMS or MMS messages, you will need to have an active cellular data or Wi-Fi connection.
    You will need these to send and receive iMessages:
    An iPhone, iPad, or iPod touch
    iOS 5.0 or later
    A cellular data connection or a Wi-Fi connection
    A phone number or Apple ID registered with iMessage in Settings > Messages
    iOS: Troubleshooting Messages
    http://support.apple.com/kb/TS2755
    Cheers,
    Allen

  • When I start iTunes I get the following message. "A required iTunes component is not installed. Please repair or reinstall iTunes (-42404)" I have installed the latest version of iTunes but still get this message. Can anyone help.

    When I start iTunes I get the following message. "A required iTunes component is not installed. Please repair or reinstall iTunes (-42404)". I have installed the latest version of iTunes but still get this message. Can anyone help?

    Hello mustangcim243,
    iTunes has various components bundled with it that it requires for general usage. I advise that we completely remove iTunes and all of these related components, verify that they have been removed, then reinstall. To do so, please follow the steps in this article:
    Removing and reinstalling iTunes, QuickTime, and other software components for Windows Vista or Windows 7
    http://support.apple.com/kb/HT1923
    Note: it is important to remove the 7 components in order. Uninstalling these components in a different order, or only uninstalling some of these components may have unintended affects.
    If the above does not resolve your issue, I recommend we reset the SC Info folder:
    iTunes repeatedly prompts to authorize computer to play iTunes Store purchases
    http://support.apple.com/kb/TS1389
    (See Step 4: Remove the SC Info folder)
    Thanks,
    Matt M.

  • When I try to check for updates, an error message appears with no details. How do I get and check the updates on my new intex cloud fx phone?

    I have a new Intex Cloud Fx phone. In this, I go to 'Device in formation' and try to update the device by pressing update now, I get an error message that says 'an error occurred while checking for updates'. Also, it does not respond to the' last updated' command. When I press 'more device information' I can see’ OS version Intex_Cloud_FX_V07’. I have tried all kinds of procedures suggested on the net and elsewhere but have not succeeded in updating my phone, so far. This includes resetting the phone. I am using a Wi-fi connection. It seems that quite a few persons are facing this problem. There have been suggestions ranging from 'there is a bug' to 'there are no updates'. So, the problem persists, with no end in sight. I feel Mozilla should look at it.

    Hi!
    Thanks for contacting us today! I understand you are having issues with updating, and using the device.
    I believe that we are aware of the update issue however, it is ultimately the carrier/ manufacturer to provide updates. Please contact the respective company for assistance.
    As for device using, and things not working. Please provide us with more details. (Note: the bug may have already been fixed, but is available in a later update).
    Thanks!

  • Defer log shipping and RMAN-08137 message when doing archivelog backup

    Hello,
    in a Primary & Dataguard scenario in which we set to DEFER the log shipping to the Dataguard during a high impact process done in the Primary, we receive the message "RMAN-08137: WARNING: archive log not deleted as it is still needed" when doing archive log backup with rman.
    Is it the expected behaviour due to the DEFER status with the Dataguard? or even in this scenario  we might we able to delete the logs and therefore we have to look more in deep to find our problem?
    Thanks in advance for your help.

    Hello,
    Had a look on v$archived_log and found the archivelogs that are not deleted and the state for them is
    DEST_ID=1 
    STANDBY_DEST=NO
    ARCHIVED=YES
    APPLIED=NO
    as http://docs.oracle.com/cd/B12037_01/server.101/b10755/dynviews_1015.htm says , they are all Local, were archived and there is no apply needed for them as they are not defined to go to the StandBy Database.
    Therefore, why can not still archive them?  How can we check if they had been processed by a Streams process?
    Regards

  • When I select "plugin check" for updates, I have received a "try again later" error message for the last three days.

    for the last few days, I've been experiencing long pauses or crashes while viewing a movie or clip using adobe flash. i've had no update requests for flash from auto updates. so my next thought was the flash plugin. however i'm not able to get the plugin updater to work. i get the error message listed above.

    2 links for Plugin Check. Both are working for me on my XP system with Firefox 3.6.13.
    *https://www-trunk.stage.mozilla.com/en-US/plugincheck/
    *https://www.mozilla.com/en-US/plugincheck/
    You must have JavaScript on (Tools > Contents, check "Enable JavaScript")
    If you use NoScript, you must allow (or temporarily allow):
    *on the first link, '''''mozilla.com'''''
    *on the second link, '''''mozilla.com''''' <u>and</u> '''''mozilla.org'''''
    <br />
    '''Other issues that need your attention'''
    The information submitted with your question indicates that you have out of date plugins with known security and stability issues that should be updated. To see the plugins submitted with your question, click "More system details..." to the right of your original question post. You can also see your plugins from the Firefox menu, Tools > Add-ons > Plugins.
    *Adobe Shockwave for Director Netscape plug-in, version 11.5
    *Adobe PDF Plug-In For Firefox and Netscape "9.4.0"
    **New Adobe Reader X (version 10) with Protected Mode was released 2010-11-19
    **See: http://www.securityweek.com/adobe-releases-acrobat-reader-x-protected-mode
    **'''''Security update for versions 9 and 10 of Adobe Reader released 2011-02-08'''''
    *Java Plug-in 1.6.0_07 for Netscape Navigator (DLL Helper)
    **Firefox 3.6+ requires at least version 1.6.0_10
    **16 updates behind
    **You may want to remove the old version before installing the new version; link to removal instructions below
    #'''Check your plugin versions''': http://www.mozilla.com/en-US/plugincheck/
    #*'''Note: plugin check page does not have information on all plugin versions'''
    #'''Update Shockwave for Director'''
    #*NOTE: this is not the same as Shockwave Flash; this installs the Shockwave Player.
    #*Use Firefox to download and SAVE the installer to your hard drive from the link in the article below (Desktop is a good place so you can find it).
    #*When the download is complete, exit Firefox (File > Exit)
    #*locate and double-click in the installer you just downloaded, let the install complete.
    #*Restart Firefox and check your plugins again.
    #*'''<u>Download link and more information</u>''': http://support.mozilla.com/en-US/kb/Using+the+Shockwave+plugin+with+Firefox
    #'''Update Adobe Reader (PDF plugin):'''
    #*From within your existing Adobe Reader ('''<u>if you have it already installed</u>'''):
    #**Open the Adobe Reader program from your Programs list
    #**Click Help > Check for Updates
    #**Follow the prompts for updating
    #**If this method works for you, skip the "Download complete installer" section below and proceed to "After the installation" below
    #*Download complete installer ('''if you do <u>NOT</u> have Adobe Reader installed'''):
    #**Use the links below to avoid getting the troublesome "getplus" Adobe Download Manager and other "extras" you may not want
    #**Use Firefox to download and SAVE the installer to your hard drive from the appropriate link below
    #**Click "Save to File"; save to your Desktop (so you can find it)
    #**After download completes, close Firefox
    #**Click the installer you just downloaded and allow the install to continue
    #***Note: Vista and Win7 users may need to right-click the installer and choose "Run as Administrator"
    #**'''<u>Download link</u>''': ftp://ftp.adobe.com/pub/adobe/reader/
    #***Choose your OS
    #***Choose the latest #.x version (example 9.x, for version 9)
    #***Choose the highest number version listed
    #****NOTE: 10.x is the new Adobe Reader X (Windows and Mac only as of this posting)
    #***Choose your language
    #***Download the file, SAVE it to your hard drive, when complete, close Firefox, click on the installer you just downloaded and let it install.
    #***Windows: choose the .exe file; Mac: choose the .dmg file
    #*Using either of the links below will force you to install the "getPlus" Adobe Download Manager. Also be sure to uncheck the McAfee Scanner if you do not want the link forcibly installed on your desktop
    #**''<u>Also see Download link</u>''': http://get.adobe.com/reader/otherversions/
    #**Also see: https://support.mozilla.com/en-US/kb/Using+the+Adobe+Reader+plugin+with+Firefox (do not use the link on this page for downloading; you may get the troublesome "getplus" Adobe Download Manager (Adobe DLM) and other "extras")
    #*After the installation, start Firefox and check your version again.
    #'''Update the [[Java]] plugin''' to the latest version.
    #*Download site: http://www.oracle.com/technetwork/java/javase/downloads/index.html (Java Platform: Download JRE)
    #*Also see "Manual Update" in this article to update from the Java Control Panel in Windows Control Panel: http://support.mozilla.com/en-US/kb/Using+the+Java+plugin+with+Firefox#Updates
    #* Removing old versions (if needed): http://www.java.com/en/download/faq/remove_olderversions.xml
    #* Remove multiple Java Console extensions (if needed): http://kb.mozillazine.org
    #*Java Test: http://www.java.com/en/download/help/testvm.xml

Maybe you are looking for

  • How do I resolve LOCKED DISKS problem ? NO ACCESS ANYMORE !

    Hello everybody, I've looked carefully where to post this topic, and I hope it's the right place here (I have already been warned not to post the same questions in different places). I have actually 2 internal volumes locked, 2 external Firewire volu

  • HOWTO: Process IDocs To non-SAP receiver

    Hi Experts! Today our SAP R/3 sent the IDoc LOIPRO to non-SAP external system, called O2P. Now, we would like to send this IDoc (LOIPRO) to XI, and the XI sends the IDoc to the non-SAP external system. Then, our scenario will be: Step 1. The IDoc LOI

  • MY HP OFFICEJET 8500a910a , SCAN,PRINT PROBLEMS

    I can print from my laptop but when i try to scan it isn't picking up any information paper comes out blank when i scan manually or from laptop.  when i try to manually copy only a blank page will come out as well. ANY HELP.  I JUST SET UP MY PRINTER

  • Standard Documentation for Add-on and Add-on's Data Base?

    Hi! I'd like to know if there is a stantard to create documentation for Add-On and Add-On's Data Base to get the Add-On's Certification. Thanks! William

  • Code completion for fl.*  group?

    hey, i'm not getting code completion for tweens or anything like that. when i type 'import fl.' i also don't get any completion. what am i missing? how do i fix it? thnx for the help. lou