I am working on the Repeditive MFg Process. Actually our process is converting 25kg bult material into 7g sachet. so we are keeping this 25kg bulk materil as a raw material in 7g FG Bom and doing MD11, MF60 , and then MFBF using Assembly Backflush -post with correction.
ISSUE is:
                System not considering consumed quantity entered in production confirmation. It is rounding up.
For Exp: While doing production confirmation, even though consumed quantity entered as 73 kg, but system rounding up to 75 kg (nearest multiples of 25 kg).
Note : (Alternate Uom conversion is 1 Bag =25Kg in material master)
How to get the exact consumed qty (UOM Kg) conversion to BAG .Like Consumed is 73 KG and the Bag conversion should be 73/25KG =2.92 Bag instead of rounding 73/25=3 Bag what we are getting now.
Thanks,
Manikandan.P

Dear Manikandan,
If my understanding is correct, then there is no meaning in maintaining the stocks of unit of measurement like bag,barrel,drums
in decimal places.For eg a stock can be as 3 bag or 10 drum etc.
Allowing decimal places through CUNI for these UOM is not recommanded.
Check and revert back.(Also I guess there are similar issues that have been posted earlier,search and find the suggestions in
those threads).
Regards
Mangalraj.S

Similar Messages

  • Unable to clear open items through post with Clearing F-04

    Hi Experts,
    I want to clear one GL code through transaction F- 04 Post with Clearing.
    When I clear the open items throgh f-04, (Document types UA , KR , MJ ) it posts the document but again it makes a new line item as a open item with same amount.New line item shows in a list as a open item. ( I tryed F-03 as well)
    I am unable to unable to understand the exact functionality of transacion F-04.
    Can anyone explain me please ? Please advice if I am missing anthing on this.
    Thanks,
    Manasi

    Hi Manasi,
    As the name suggest, F-04 allows you to POST to one account by CLEARING another account.
    For example you have a provision account which needs to be adjusted when the actual expense is paid -  this how it will be done -
    Give the document header details, select "Transfer posting with clearing", enter the posting key (40), give the GL account (expense account as per the example) and go to the next screen.
    Give the amount and other details for the line items and then select "choose open item" from the menu. The new screen will ask you to give an account where you will give the provision account (the account from which the open item needs to be cleared).
    Press enter and you will get the list of open items for the GL account from where you can proceed like any other clearing.
    Hope this clarifies. Do revert in case of any further queries.
    Thanks and Regards,
    anit

  • Production Confirmation Through BDC.

    Dear Sap Gurus,
    I my production Scenario there is huge data entry at production level and people are doing production entries through
    CO11N. So i want to create BDC for production entries. But my problem is how i can handle Goods movement in BDC
    in goods movement screen.In my Scenario there is one GR and 5 GIs for every production entries and all the entries are batch managed. so please guide
    Regards
    ravi

    Hi
           My suggestion is you better go for BAPI rather than BDC..
    Regards,
    Velmurugan S

  • By product confirmation through PI sheet.

    Hi,
        SAP Gurus,
        My client senario is PP-PI. Order confirmation is against PI sheet. The main issue is that they want by-product auto confirmed ( comes in QI stock ) during PI sheet confirmation.
    What settings I have to do to fulfill this requirement. Please let me know.
    Thanks and Regards,
    Harriesh.

    Hi,
    I start with believing that you have maintain -ve Sign in BOM for that By Products.
    You can confirm GI of Components,GR of Header material and By Product (Movement type 531) thorough PI sheet.
        - Use Process Message PI_CONS for both Components and By Product.
        - Use Process message PI_PROD for Header material.
    Activate Post to QI stock in QM view of material master for that By Product.
    Regards,
    Dhaval

  • Reg. MFHU Production confirmation cancellation

    HI All,
    I have an requirement to cancel the production confirmation happened via MFHU.Please let me know what is the process and steps to be followed.
    My process is I have booked production confirmation in MFHU by Inputing the Handling unit.
    Now I want to cancel it the reson because during confirmation one of my SFG is issued in wrong UOM that is instead of KG it was issued in EA hence the wrong goods issue of SFG was happened. So I need to correct those stock entries.
    Please guide me how i can achieve this.
    For eg. FG has 3 Components 1 SFG and 2 RM
    here FG and SFG are batch managed.
    FG has handling unit.
    BOM Proportion for FG
    To produce 10 ea of FG i need
    SFG - 10 kg
    RM1 - 5 pc
    RM2- 5 pc
    Now i did production confirmation via MFHU, my baclflush has posted FG with 131 for 10 EA and the SFG as 10 EA instead 10 KG and rest two RM1 and RM2 as 5 PC.
    The SFG has posted wrongly here due to that my stock shows incorrect figures, hence i need to correct those SFG from10 EA to 10 kg.
    How do i do that? Kindly advice
    As i am new to Handling unit confirmation, please explain me in detail to achieve the above functionality.
    Also tell me what is process to cancel the entire Production confirmation of MFHU, I tried MF41 but it is not allowing me to cancel by saying the error- Few material could be Handling unit managed hence not possible to cancel.
    Though we cancel the MFHU posting, again if we try to book the production confirmation via MFHU we don't have option to correct the components as like we have in MFBF - post with correction.
    Kindly advice.
    Regards,
    MBN.

    Hi,
    In AFRU table, there is the STZHL field (Confirmation counter of cancelled confirmation)
    It's the confirmation counter of the original confirmation which was cancelled by the current confirmation.
    For example:
    Confirmation    Counter     STZHL
    1000                 1                blank
    1000                 2                1 --> this means that this is the cancellation entry for the line above.
    1000                 3                 blank
    I hope it helps.
    Regards,
    Marcelo

  • PP-Backflushing not posting to correct work centers

    Hello everyone,
    We are having an issue performing a backflush using an alternate production versions. We have created multiple versions for materials that point to a alternate routings and when we choose the alternate version during backflush, it shows the alternate work center(as expected), but in the background it uses the primary work center. We have set up PCC's with a preliminary cost for the alternates but during the MFBF it does not post to them. If during the MFBF I choose post with correction>actual activities>select operations to be changed>change the work center manually for each operation, then save, it will post correctly. The issue with doing this manually is that we are uaing SAP console with RF units and cannot expect our end users to know when to report on the RF unit or when to go directly into MFBF and perform these steps.
    Thoughts anyone,
    Please advise,
    Thanks
    Ray

    Dear Raymond,
    I have come across the same issue,
    Please follow the following steps and revet back,if it does not
    works.
    Since therecan be only one valid standard cost estimate at a
    time for a material,check out this.
    1.Initially create master data (material master, BOM. Rate
    Routing, Production Version, Product Cost Collector) and
    assign REM profile say TT01.(For REM Profile TT01 ,in the
    settings -indicator shud be set  for Post Acitivities-Backflush
    Using Standard Cost Estimate for material)
    2.Execute costing run using CK40N.
    3.Perform production confirmation using MFBF.
    4.Create alternate BOM/Rate Routing when required.
    5.Create new production version with new BOM-Rate Routing
    combination.
    6.Create Product Cost Collector for the new production version
    and create preliminary product costing.
    7.Change REM profile of material from TT01 To TT02 where in
    the TT02 REM profile the setting for Post Activities Using Data
    from Preleminary Costing For Product Cost Collector.
    8.Specify the production version at the time of production
    booking. The material consumption and activity booking will be
    done corresponding to the production version specified.
    I hope this will resolve your problem.
    Please reply to this thread whether it works or not.
    Regards
    Mangalraj.S

  • Collective Confirmation and Posting of Activity Types in REM

    Hi everybody:
    I'm confirming Fert items by the MF42N in REM and, i've a Repetitive Manufacturing Profile with  GI backflush at GR posting activated as well as Post Activities with Using data from prelim. costing  f. prod. cost collector but, in the product cost collector they are not updated (the activities) because the materials movements yes.
    When i confirm by the MF42N but with "Post with corrections" and i mark the Activities, it's all right.
    I need to do this posting of my activities in automatic way with de MF42N without "post with corrections".
    somebody can help me please?
    Thanks
    Omar Perea

    Mr Prabakaran:
    Thanks for your help, I reviewed my Profile for REM, your advice was good, but, i need the next:
    I need that the posting for the activities will be in automatic, just with the confirmation, that is to say, i've in my routing the times for these activities originating from my Work center, but... when i do the confirmation (MF42N) just the materials are doing the respective GI & GR, but not the activities, then i go to the MFBF and select the Confirmation for Activities for posting it and all right, so this do not is useful for me, i want not go to the MFBF nor to "post with Corrections" in the MF42N
    Would you help me whit this? If you wish i can send you in a e-mail some screens of my case.
    thank you in advance

  • Trying to create a Sales Order Confirmation through IDoc

    Hi,
    I am trying to create Sales Order Confirmation through ALE with message control.
    My recieving system is XI server.
    Can u please send me the steps to what to be done to trigger IDoc automatically.
    The condition types and access sequence created is for Output type customer but i am sending it to XI Server.
    please help me.
    Thank you in advance,
    Gangolu.

    Hi Gangolu,
    Have a look at url. Hope this provides some inputs.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/73527b2c-0501-0010-5398-c4ac372c9692
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/6bd6f69a-0701-0010-a88b-adbb6ee89b34
    Thanks
    Lakshman

  • Production confirmation cancel through QM

    Dear Sir/Mam
    In our scenario when production order is confirmed we get inspection lot with inspection lot origin 04,if material is accepted i post the stock in unrestricted which acceptable by the user,but if the material has to be rejected we do not want put the stock in blocked.We required that if material is rejected its production confirmation should be reversed means its last operation should be cancalled that means mvt type 102.Please guide
    regards
    kunal

    Dear Sir
    Function module done and assigned to Follow up action of Manual and even assigned to catalog 3 in inspection lot orgin 04 in that rejected(R) selected and that follow up is assigned.
    In qa32 when i m going to usage decision selecting 04, R-Rejected I can see follow up action but Function module is not triggered and where the stock to posted should it to be remained in quality.Can this function module can used for the lot whose stock is posted to unrestricted.Awaiting for your valuable answer.
    Please go through  below code
    Let me know the changes if any.
    FUNCTION ZQM_BAPI_PROD_ORDER.
    ""Local Interface:
    *"  IMPORTING
    *"     VALUE(I_QALS) LIKE  QALS STRUCTURE  QALS OPTIONAL
    *"     VALUE(I_QAVE) LIKE  QAVE STRUCTURE  QAVE OPTIONAL
    *"     VALUE(I_QAPO) TYPE  QAPO OPTIONAL
    *"  EXPORTING
    *"     VALUE(E_SUBRC) LIKE  SY-SUBRC
    *"  TABLES
    *"      E_PROTOCOL STRUCTURE  RQEVP OPTIONAL
    *"  EXCEPTIONS
    *"      NOT_FOUND
    *"      INVALID
    **"     REFERENCE(PRUEFLOS) TYPE  QPLOS
    *"     REFERENCE(I_QALS) LIKE  QALS STRUCTURE  QALS OPTIONAL
    *"     REFERENCE(I_QAVE) LIKE  QAVE STRUCTURE  QAVE OPTIONAL
    *"     REFERENCE(I_QAPO) TYPE  QAPO OPTIONAL
    *"  EXPORTING
    *"     VALUE(E_SUBRC) LIKE  SY-SUBRC
    *"  TABLES
    *"      E_PROTOCOL STRUCTURE  RQEVP OPTIONAL
    *"  EXCEPTIONS
    *"      NOT_FOUND
    *"      INVALID
      DATA : CONFIR LIKE  BAPI_PP_CONF_KEY-CONF_NO,
             CONFCOU LIKE  BAPI_PP_CONF_KEY-CONF_CNT,
             RETURN LIKE  BAPIRET1 ,
             LOCKED LIKE  BAPI_CORU_PARAM-LOCKED,
             CREATED_CONF_NO LIKE  BAPI_PP_CONF_KEY-CONF_NO,
             CREATED_CONF_COUNT LIKE  BAPI_PP_CONF_KEY-CONF_CNT.
      DATA:   P_RUECK TYPE AFRC-RUECK,
              P_RMZHL TYPE AFRC-RMZHL.
      DATA: BEGIN OF IT_QALS OCCURS 0.
              INCLUDE STRUCTURE QALS.
      DATA END OF IT_QALS.
      DATA: BEGIN OF IT_AFRC OCCURS 0,
              AUFNR TYPE AFRC-AUFNR,
              RUECK TYPE AFRC-RUECK,
              RMZHL TYPE AFRC-RMZHL,
            END OF IT_AFRC.
    break abap-core.
    *START-OF-SELECTION.
      SELECT single  *
        FROM QALS
        INTO IT_QALS
       WHERE PRUEFLOS = I_QALS-PRUEFLOS.
      IF IT_QALS[] IS NOT INITIAL.
        SELECT AUFNR
               RUECK
               RMZHL
          FROM AFRC
          INTO TABLE IT_AFRC
          FOR ALL ENTRIES IN IT_QALS
          WHERE AUFNR = IT_QALS-AUFNR.
      ENDIF.
      READ TABLE IT_AFRC INDEX 1.
      MOVE : IT_AFRC-RUECK TO P_RUECK,
             IT_AFRC-RMZHL TO P_RMZHL.
      IF SY-SUBRC NE 0.
        MESSAGE 'Value Not Found' TYPE 'I'.
      ENDIF.
      CALL FUNCTION 'BAPI_PRODORDCONF_CANCEL'
        EXPORTING
          CONFIRMATION              = P_RUECK "CONFIR
          CONFIRMATIONCOUNTER       = P_RMZHL "CONFCOU
      POSTG_DATE                =
      CONF_TEXT                 =
       IMPORTING
         RETURN                    =  RETURN
         LOCKED                    =  LOCKED
         CREATED_CONF_NO           =  CREATED_CONF_NO
         CREATED_CONF_COUNT        =  CREATED_CONF_COUNT .
      COMMIT WORK.
      IF SY-SUBRC EQ 0.
        WRITE 'PO Canceled'.
      ENDIF.
    ENDFUNCTION.
    regards,
    Kunal.

  • Confirming an order with a by-product

    Am having a problem, If l confirm an order without a by-product an inspection lot is generated automatically and its post to inspection stock for Quality inspection, but the moment l try to confirm an order of the same product with a by-product it is posted to unrestricted-use stock but the material have 04 as its inspection lot origins in the material master. What can l do to post to inspection stock for this material with and without by-product.

    Thanks a lot
    I really agree with our solution because I also suspect that the problem can be valuation type 531 because for the other products am using 261, above all they all activate for Quality management in the material master data, but now the problem is am now not sure o the menu path so if the menu path is correct maybe l donu2019t know what am suppose to check for. So can you help me out if the manu path that am using is not correct. Spro>QM>Q inspection>inspection lot creation>inspection for goods mvt.
    Thanks once again

  • Reversal of Production Order Confirmation through IDOCS

    Hello all,
                  The time for each operation in a  production order is logged in KabaBEnzing tool called Autotime. This is sent to SAP through IDOCS and the order confirmation is created. There is a scenario where the supervisor could have entered the wrong time against an operation. Is it possible to reverse the confirmation through IDOCs. If yes, please let me know what should be the approach? Also, I heard that SAP does not accept negative time to do the reversal. How true is this?
    All helpful answers will be rewarded.
    Thanks,
    Kalyan

    Hello,
    I saw your message and we are doing the same thing.  Did you find any answers to your questions.   We are using Kaba for our shop system and now we would like to sent negative numbers back to sap because of supervisor adjustments.  I have not found any way to set Sap to allow it.  What conclusions have you came up with the situation.
    Thanks again,
    Jeff

  • Problem posting through FBV0 with BTE enhancement

    Dear Gurus,
    I created BTE enhancement event 1030 in P/S modules.
    The BTE program used to post another document after original (standard) document is posted.
    If we post directly without park, the document all posted successfully.
    So when the document is parked through FV50 or FV60 and then post with FBV0.
    But when we use FBV1 and F-65, then post FBV0 it raised error: No batch input data for screen SAP***
    This error apparently because we commit document while updating document park (from parked document to posted document in BKPF).
    this symptoms found when we use BAPI_ACC_DOCUMENT_POST or BAPI_ACC_DOCUMENT_CHECK.
    the only way making both document (standard and BTE doc) posted is to call BAPI_ACC_DOCUMENT_POST in background task.
    But we can't get the message in return parameter.
    I try to use function AC_DOCUMENT_DIRECT_INPUT then the error change into "UPDATE ERROR FBVB".
    I change the BTE event to Process Module 1140, results the same.
    The question is, can we post another document using FM and commit during standard updating routine in SAP?
    Is there another FM/method i could use to post another document while posting park document FBV0?
    Really need your help.
    Thanks,
    Tiara
    Edited by: tiara astari on Nov 24, 2009 8:14 AM

    Hi,
    Maybe it could help.
    When you do a POST document in asyncrounous update, try to use IN BACKGROUND TASK.
    In your case, when you call function BAPI_ACC_DOCUMENT_POST add statement IN BACKGROUND TASK.
    like this
    CALL FUNCTION 'BAPI_ACC_DOCUMENT_POST' IN BACKGROUND TASK
    IMPORTING
    EXPORTING

  • Post with clearing through transaction code f-04

    Hi
    While clearing the Gl account Manually with transaction code F-04 we
    are getting the Error Consolidated companies SASA and ' ' are different
    Diagnosis
    The number of the affiliated company must be clear for the selected
    document type for all line items. In this case at least two different
    companies or a company in connection with a business partner who does
    not belong to a company are stated.
    Procedure
    If you selected the correct accounts, you must enter the document with
    a document type that allows cross-company posting. Otherwise, please
    correct the entered account.
    Please help in this matter. This is bit urgent
    Regards
    Vinay Bhaskar

    Hi Manasi,
    As the name suggest, F-04 allows you to POST to one account by CLEARING another account.
    For example you have a provision account which needs to be adjusted when the actual expense is paid -  this how it will be done -
    Give the document header details, select "Transfer posting with clearing", enter the posting key (40), give the GL account (expense account as per the example) and go to the next screen.
    Give the amount and other details for the line items and then select "choose open item" from the menu. The new screen will ask you to give an account where you will give the provision account (the account from which the open item needs to be cleared).
    Press enter and you will get the list of open items for the GL account from where you can proceed like any other clearing.
    Hope this clarifies. Do revert in case of any further queries.
    Thanks and Regards,
    anit

  • CS6 not showing in product dropdown box with correct serial number

    Hi.  I'm trying to reinstall CS Production Premium on a machine that had to be restored.  It acknowledges the serial number as correct, but says no qualifying product exists on the machine despite me having installed it and currently using the trial version to get work completed.  In the product drop down box, it only lists Production Premium 5.5.
    Thank you for any and all help.

    I still can not register and use my new Elements 13.  I went to the redemption code help link that you sent me but it still asks me for a code that is 24 characters long.  On my disc sleeve is a sticker with an 8 digit number then under that number is a string of letters and numbers.  I tried to enter this string of letters and numbers but it keeps coming up "invalid".  One of the characters is a "/" (slash) and if I don't use that as one of the characters then I don't have 24 characters to put in the boxes.  Also, part of that string of characters on that sticker are the characters 13.0 which is the version that I bought.  I even tried to put in or leave out the period between the 13 and the zero but I still can not get that code to work so it will show me a serial number. On the back of my box is a hologram Adobe sticker with a barcode symbol that has an 18 digit number so I figured that is not the right code number.  Also on the sticker is a string of letters and numbers that are separated by dots/periods but that string also has 13.0 in it and even if I leave out the dot between the 3 and the 0 I still have 25 characters which is one too many for those code boxes.  I also looked in our email to see if Costco sent me a code but I have nothing from them either.  I think you're right- I obviously have a redemption code instead of a serial number on my product because nothing starts with 1057.  But I can not figure out what they want for the redemption code......Please help.......Thanks

  • HT2731 Do u get a bill sent through the post with your purchases on?

    Do u get a bill sent through the post with your purchases on?

    No.
    You can look up your purchase history in itunes.
    You should also get an e-mail.

Maybe you are looking for

  • Image size vs zip for reducing

    I am not looking forward to open up files/mouse up to image size/type up the required 800x600 a million times, and I just discovered control/compress . My camera has, in the 2 sizes of the smallest set of  JPEG, the larger @ 2784x1856 is a 728 KB whi

  • Managing Data Backupss?????? Please help me out in this :)

    Hey all, I have created a software for a school, and yes I am managing it quite well. I am not very well versed with the latest technologies and the latest design patterns. My software is functioning well but I am facing two problems in it, one of wh

  • Object with External Text

    I am new to Flash/ActionScript and hope I can explain this problem, because I am completely lost as to what went wrong. I am working on a hurricane tracker. First I have comboBoxes with a list of storm names, when selected an XML file is loaded and t

  • No direct postings can be made in G/L account.140000 in cocode GBTS

    HI GURUS             iam creating PO with account assignment category 'K' . I have been cncountered with a probklem "No direct posting can be made to G/L account 140000 in cocode GBTS Diagnosis G/L account entered is a control account .transaction ca

  • Experience with eIB?

    Someone with experience in Enterprise Install Base? Regards Marcos Pineda [email protected]