MFBF- REM backflush

Hi all,
While doing backflush component issue- We need to make to plant as display field to avoid changing of plant manually on MFBF.
Kindly advise how to proceed.
Thanks..Gopi

Hi Gopi,
I think there is no screen sequence kind of things for MFBF. Please try to use screen variannts or transactions variants.
You can create transaction variants  in SHD0.
Thanks and regards
Muruegsan

Similar Messages

  • Table for MFBF-REM Backflush

    Dear All,
    Can anyone please tell me me the table for MFBF-REM Backflush
    Regards
    Prashant

    Hi,
    What data you are looking for?
    However below are the tables used in REM.
    SAFK         RS Header Master Data
    S025           LIS -- Run Schedule Quantities
    S026           LIS -- Material Usage
    S028           LIS -- Reporting Point Statistics
    CEZP          Reporting Point Document Logs
    CPZP          Reporting Points - Periodic Totals
    The list is not exhaustive. Let others also add.
    Regards,
    Rohit.

  • REM Backflush

    HI GURUS,
    I have craeted production version (MOD1)and done product cost collecter ,also complete mfbf (rem -backflush).
    My new requirement is,
    i have changes bom item and in rate routing i have changes some opeartios and activity types which assigned to MOD1 prod.version.
    Now i want do product cost collecter amd mfbf transition with MOD1 version with new changes,can i do .
    is it possible....

    Dear Manoranjan,
    In my understanding even if your product is a standard cost estimated material,whenever there is some change in the
    BOM/Routing/Rate routing of this part,as explained our other forum friend use T Code MF30 to a preliminary cost estimate or else
    goto KKF6N,after entering the part code,plant,select the production version,click on change mode and the cost calculator ikon and
    then save the data.
    This is a must to do activity once after there are some changes in BOM/routing.
    Check and revert.
    Regards
    Mangalraj.S

  • Problem in REM Backflush in Repetetive Mfg

    Hi
    i got the following error when i try to run the REM BACKFLUSH in repetitive process. (MFBF)
    " Update control of movement type is incorrect (entry 131 _ _ _ F)
    Message no. M7226
    Diagnosis
    The system could not find entry 131 _ _ _ F in any of the movement type control tables."
    if any body having any idea kindly guide me
    Thanks in advance
    siva

    Hi,
    Good afternoon and greetings,
    Please go through the following OSS Notes
    Note 216633 - MB01: Error M7 226 for automatic PO
    Please reward points if found useful
    Thanking you,
    With kindest regards
    Ramesh Padmanabhan

  • Missing parts in REM backflush

    Hi Gurus....
    While doing a REM backflush using MFBF, a problem occurs such that a few of the component materials which are part of a BOM header material are missing. Ideally any material which is a bulk material will not appear in that list. In this case the material is not a bulk material also. While posting the document as well as while reversing the document, the missing materials never appear in that list.Please advice on the same.

    Dear alapati naveen,
    Please clear thse doubts,
    1. Are you using a REM profile with reprocessing allowed?
    2.If so means while doing assembly backflush,the system posts document for GR(131 movement for the
    header material) and GI (261 movement for the BOM component's) for the material which has sufficient
    stock to fulfill the requirement and the materials(component's) where there's a deficit of stock in that
    storage location or plant goes to MF47(Reprocessing List).
    3.In MB03 you can see the list of materials for which full posting has been made sucessfully,it might be
    either GR or GI.
    4.So you are saying partial GI has happened and so check in MF47 whether that one material other
    than the bulk material lies here or not.
    Check & revert back.
    Regards
    Mangalraj.S

  • Activity used for confirmation- REM backflush

    Hi friends,
    I am working on a Z report for getting cost of extra activity posted (Activity backflush) in REM backflush MFBF. Details are available in AFRU but I am not getting table for actual  'Activity type' used for confirmation.
    I need this data for each (confirmation number + counter) or Document log.
    Please help.
    Thanks & Regards,
    Sandeep

    Hi R Brahmankar ,
    Information available in S026, S227 & in MCRI & MCRJ is not wrt (Confir. number + counter) or Doc. logwise.
    I couldn't use the FM. What are the input parameters for this FM?
    Pl help.
    Sandeep

  • Incorrect routing in REM Backflush

    Hi Experts,
    While doing REM Backflush, after clicking "Actual activities", system is showing previously deleted operations and not showing the added newly added operations, hence these activities are coming in Actual cost.
    Where as in preliminary cost estimation, consider the operation correctly .
    REM profile is defined with " Post Activities  -  Using data from prelim. costing f. product Cost collector "
    Thanks.
    Kiran

    Dear Himakar,
    A rate routing is a routing for repetitive manufacturing. It enables you to easily reproduce the lean
    production process.In the rate routing, the production rate per operation is defined (production time
    according to a base quantity). *Set-up time is not usually defined, since no changes to setup are
    planned.*
    So its not required to mention any value for set up time ,so that its not considered for costing and the
    other processes.
    http://help.sap.com/erp2005ehp_04/helpdata/EN/60/c6c50f146347e1933b4c15144ec31b/frameset.htm_
    Check these links,
    Re: Very Strange: SET UP  time is not calculated Automatically Even for sta
    Re: Set up time not coming while confirming in MFBF
    Regards
    Mangalraj.S

  • Background Job in COGI(REM Backflush error handling)

    Hi Everyone.
    I have one question.
    Our company use REM Backflush .
    And Our REM profile setting is next.
    - Use GI Backflush at GR posting
    - Don't use report point backflush
    - Create cumulated and individual postprocessing record
    In this circumstance, we use T-code COGI to process backflush error.
    When I execute the COGI in online, There is no problem
    <b>But, After I make a job for background in sm37, When I execute background gob for COGI, There is a problem. In real, Background gob is will executed. But COGI errors remain as before.</b>

    Hi,
    Actually you should use
    Transaction          MF47
    Program              RMSERI11, for post process record.
    For post processing , manually entry like storage location and Batch number(if batch management is enabled) is required , if the post process record is created according to this error.
    And hence it is not possible to correct all the records by background job.
    Thanks
    Thamizh

  • Component quantity control in PP-REM backflush

    Hi all,
    We are fancing the following scenario: a FERT material X is "produced" just packing toegheter 4 units of other FERTs materials X1..X4, without restriction of quantities from each material Xn in the pack. That means a unit of X can be made from 1 unit X1, 1 unit X2, 1 unit X3 and unit X4; and another unit of X can be made of 3 units X2 and 1 unit X4. The only restriction is a unit of X must contain 4 units of Xn.
    Is there a way to control this packing scenario through REM backflush? I've created BoM, routings and production version for material X, but i can't find where to control components quantities as descrived.
    Thanks in advance for ideas o guidelines in this issue...
    mr.

    Dear Manuel,
    1.I'm not sure how this can be addressed through packing materials,but assume you have created 2 different BOM one
    containing 1x1,1x2,1x3,1x4 and the other one containing 3x2 and 1x4.
    2.Create 2 different production versions one assigned with alternative BOM 01 and the second production version containing
    second alternative BOM 02.
    3.Create REM profile allowing to backflush using preleminary cost estimate using T code OSP2 and error correction mandatory.
    4.Create 2 different product cost collectors for each production version.
    5.While backflushing the system picks the BOm components as per the production version and allow to confirm the product.
    Check and revert
    Regards
    S Mangalraj

  • Default Valuation type in REM backflush.

    Hi,
    In the configuration for split valuation (OMWC), for valuation category H (HALB), a batch HM has been defined as - Default: valuation type "in-house production" (DVT InhPr).
    This means, for inhouse manufacture, system proposes this valuation type as default.
    When, I create a production order for a material with this valuation type, system proposes valuation type HM for the given plant.
    Where as, while doing REM backflushing for a material with this valuation type, system does not propose valuataion type automatically.
    Why is it so?
    Is there any other setting?
    Is there any note for this?
    Thank You,
    -Madhavi.

    Hi,
    Apply following  BADI
    Goods Movements in Backflushing (Repetitive Manufacturing) BAdI RM_BFLUSH_GOODSMVT
    Regards,
    Sanjay

  • Question about sloc determination in MFBF and backflush in REM

    Dear SAPper,
    I just try to read about Repetitive Manufacturing and i came with some confused item.
    1. I try to backflush MFBF and i don;t fill the planned order, but the backflush is succedd. Something
    strange is my planned order is not decrease:(, so do i have to fill planned order number every time i backflush. Can i backflush anonymous to planned order number and the system derease the planned order automatically in FIFO manner
    2. I configure the auto sloc determination and i have set maximum number of split unlimitted.
    for example in MFBF i need 50 PC Raw Material
    My stock in SLoc 1000 is 40 PCS
    My stock in SLoc 2000 is 200 PCS
    I configure the sloc determination like this
    1. F 1000
    2. F 2000
    Nut in MFBF component always withdraw from 2000 with 50 (full quantity) although i set maximum number of split maximum
    I tried batch determination before and it split.
    Did i miss something so the system can split the quantity along sloc automatically
    Please throw a light:D
    Best regards,
    Freddy Ha

    Hi,
    1)
    Normally in the rem for backflush just u have to enter the product and qty then system will automatically reduces the planned order.
    But in situation if planned order is not reducing then please check ur REM profile in the "control data2" tab
    In this which one u have select for the planned order reduction.
    2)
    Regarding stock determination, create stock determination rule thr' T CODE:OXPS.
    Here u have to create stock determination rule first from which storage location material should be picked, depending upon the priority.
    Assign this stock determination rule in the material master or in the REM profile "Control data2 " tab.
    Then system will automatically pick the material depending upon the stock determination rule.
    Regards
    Vijay

  • REM Backflush (MFBF)

    Hi all
    In REM during confirmation at transaction MFBF the planned order is confirmed and one Material doc is generated but same time the corresponding planned order no vanishes. Find out where the same planned order can be traced out after confirmation, means which doc we can see the same planned order after confirmation?

    Dear Kaisar,
    IF you carryingout Planned orderwise confirmation in MFBF,after posting,check the details in T code MD04 & MD05.
    Wherein MD04 you will not be able to see this confirmed Planned order anymore,but the same can be seen in MD05,assuming those
    planned orders are created automatically after MRP Run,and no MRP run was taken in between these time.
    Document's list can be obtained for 131 movement in MB51 T code and also in T code MF12.
    But you cannot confirm that this much GR is for this Planned order,as even in MF12,the system does not shows you the Planned
    order number,but while doing backflushing,in the document header text,enter this planned order,so that this can be used for further
    reference.
    Please check and confirm and revert back in case of any queries.
    Regards
    Mangalraj.S

  • HR data in REM backflush posting

    Hello,
    I am working in REM scenario and have this REM back flush situation -
    During Activity back flush the actual timings needs to be posted against the individual activity.
    Is it possible to post these activities against personnel ID which are maintained through HR mini master in REM through MFBF ?
    (In discrete we can post the actual hrs against individual personnel ID in CO11n)
    I will really appreciate any inputs and suggestions.
    Thank you in advance.

    HI
    Check the REM profile assigned to your material and also when you Backflushed the QTY then do post with correction system will explode the BOM and then fetch the qty required then you can edit them there and then save it. you wont be able to see the header material on the next screen but you can see the document generated in MB51or MIGO
    Check and revert
    Regards
    Anupam Sharma

  • REM Backflush Scrap

    Hello!!
    I have a question on how the scrap is posted in MFBF transaction.
    If we make 1000 units of a finished goods and 100 of them are scrap. In the MFBF transaction we can do the backflush for 1000 units first, this will leave 1000 units of finished good inventory and also system goods issues the finished goods BOM components. Then when i go in to record scrap for 100 units, system is only goods issuing on the BOM components and it is not reducing the finished good inventory by 100. How to handle this? We want to see 900 units in the finished good inventory.
    Bottom line is, business wants to know both the gross units and the scrap for the finished goods.
    Also, there is only one scrap movement 551 defined in the MFBF transaction, is there a way to have multiple scrap movements. We wanted to track multiple scraps with different movements depending on when it occurs during the production cycle.
    Thank you in advance...

    Hello,
    You can maintain operation scrap, component scrap or assembly scrap and capture the extra goods movement. But this will increase consumption of materials where scrap is maintained. And you get report in terms of the total value (amount) but not in quantity.
    What you can do is maintain scrap as one more material in BOM of FG with negative quantity. as by product.
    When you backflush, system will list all materials being consumed along with scrap quantity calcuated with reff. to BOM quantity and total FG production qunatity. If you feel that scrap generated is different then you can change the quantity also here. You can define different store location to recieve the scrap quantity.
    For Scrap movement type is 551 which is used in REM Profile.
    Hope the information is useful
    regards

  • MFBF - Read BackFlush Error message

    Hello friends,
    Can any one advice me how to read the Backflush error message text in MFBF transaction from se38 program while doing BDC.
    Thanks for immediate reply guys.
    Regards,
    Siva

    You may be stuck with copying the files locally and editing and then copying back to the network drive. I am not good with networks, but have noticed posts about network problems over the years -- often focused on specific networks. The solution is typically to deal with the PDFs locally and then copy to the network. In creating PDFs, it seems that some of the results had to do with the TMP folder usage, but I have no clue why.
    As far as AA 10.6.3, you must have a cloud version or something. The latest AA is 10.1.7.

Maybe you are looking for

  • Remote Sensor not working HP h8-1260t

    My computer works fine to watch TV on Windows Media Center using an over the air antenna.  But the Remote sensor does not seem to be working.  I have the remote sensor plugged into the IR IN spot.  When I press any of the remote control buttons, noth

  • Reboot won't work on netbook

    Halt, suspend to disk and suspend to ram all work fine, but I can't get this machine to reboot - it goes through the usual halt procedure, but afterwards does not power off the hardware. Instead it powers off the screen, but I hear the fans going and

  • Displaying fixed message when deploying package

    Hi! I'm using SCCM 2012 and it works fine and all but I wonder if there is a possibility to play with some messages for the user? For example, when I'm deploying a Java package I would like to display a fixed message to the user like: "The system is

  • Hi neede help in WeB IC adding Survey View

    Hi, we are doing the following development. This Enhancement is for Service Cace of IC Web Client. We need to Integrate the Survey View based on the Type of Transaction Select as a Follow Up Activity. If Some body can walk through the basic steps ple

  • Display issue after Nvidia update

    After installing the newest driver (ver 340.52) for my graphics card (Nvidia GeForce GT 625) through the HP Support Assistant, my display has been altered. Everything has a blue/gray tint - it's as if the color red and green no longer exist!  Cables