MFBF run before updating product cost collector

Dear Sir,
I have done cost run through CK40N and not updated the Product cost collector. So system should stop me doing MFBF (Backflashing).
But without update to Product cost collector system is allowing to do MFBF (Backflashing).
Can u guide what could be the problem. Either it is

Hi,
  In your REM profile you might have defined to backflush using Prel. cost estimate rather than std. cost estimate, please check and revert back.
Regards
Ramana

Similar Messages

  • Standar cost and product cost collector not updating the new price

    Hi,
    Created Standard cost estimate for one FG product and runned the product cost collector. Based on that consumption delivery everthing is made. Later on the work center and activity type changed in routing. Now i am trying to run the standard cost with new activity price (due to work center change) for the current period, system is showing only the previous rate(previous period) and it is not updating the new price becuase of already we have created the product cost collector.
    Can any one give the suggestion for how to update the new price in standard cost as well as new price updation in product cost collector.
    govind.

    Hi
    1. If the original cost estimate was run in the current month - Then you cant re-release cost estimate unless you reverse it from CKR1
    If the cost estimate was of previous months - then you can definetely release it again
    2. In cost collector, you need to manually cost it again using the Preliminary costing feature... Your cost coll will then show 2 cost estimates i.e. One from Original date to current date-1, and 2nd from Current date to 31.12.9999
    br, Ajay M

  • Essence of product cost collectors

    In REM
    what is essence of product cost collector (KKF6n), {As I understand production cost collectors
    are cost carrying elements}, but needs to have more insights like how it captures
    production costs ( i.e through activities, price maintained in accounting view....)
    Does it make any difference if product cost collector is executed before MRP run, or it has
    to be executed only after MRP run

    Dear Eshwer,
    1.Product Cost collector is one of the master data in REM scenario.
    2.This product cost collector is no where related to MRP.
    3.Product Cost collector is used as a cost object in REM scenario,which means all the cost will be
    booked under this product cost collector for that material.
    4.Whatever the confirmations that are done in MFBF or MF41 or MF42N,the cost will get debited or
    credited accordingly for that material and the impact will be seen in the product cost collector.
    5.This product cost collector will be having an order number which will be used for order settlement and
    variance calculation.
    6.For creating a product cost collector you will require a production version.
    7.so whenever you do an assembly or activity or component backflush,the cost will be booked under
    this product cost collector.
    8.So as such there's no relation between MRP and a product cost collector.
    I hope this pints will help you to some extent.
    Revert back with your further queries.
    Regards
    Mangalraj.S

  • Target costs for product cost collector

    hi,
    can anyone tell me when are the target costs updated for product cost collector. it is after we post actual costs or after we calculate variance.
    Thanks

    Hi Elaine,
    Thankyou very much for the Information. In our case when we create new product cost collector and cost it and post actual costs to it, system is showing target costs on the product cost collector even before variance calculation but for product cost collectors which are existing from long time system is not showing target costs after we post actual costs. we have created new cost component structure recently and its active from april 1. does this have any impact on the target costs. Please let me know if you have any idea on this.
    Thanks,

  • Old material overwritten by new material code in Product cost collector

    Hi SAP Gurus,
    How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
    Both material code having the same plant, same orde type,same production version but just different material code.
    When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
    By right, this shd not be happened but indeed it did.
    Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
    Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
    And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
    Really appreciate your expertise on this urgently.
    many thanks!

    problem due to system bug, have to log to OSS for help.

  • Error while creating product cost collector in REM ?

    HI, all SAP expert,
                 I have to run repetitive manufacturing .
    I create work center of category production line and use in rate routing of semifinished material.
    In mm02 -- mrp 4 view of semifinished material , i select rem profile , production version.
    Now I create product cost collector ( t-code kkf6n) for semi. material by giving order type (yrem), production version after enter it shows error
    Error in number management (notify your system administrator)
    in help it shows
    Error in number management (notify your system administrator)
    Message no. KO162
    Diagnosis
    A system error occurred in the number management.
    Procedure
    Please contact your systems analyst or the SAP hotline.
    Edited by: Nitin Nerkar on Sep 30, 2009 12:16 PM

    Dear Nitin,
    Check whether is the number range maintained properly for the order type RM01,check the config setting in T Code
    KOT2_PKOSA.
    This is related to CO Module.
    Check and revert back.
    Regards
    Mangalraj.S

  • Transfer of Costs in Product Cost Collector to COPA

    Dear Experts,
    Please can you advise me on this current issue I'm having. Below is a description of problem:
    Customer is currently using report designed in COPA (KE30) to derive P&L report for using Plant as a characteristic.
    This was being done at a time when Product Costing functionality was not being used
    All costs (administrative, sales and production costs) were being collected in cost centers
    At end of month assessment of cost center values to COPA is executed (KEU5)
    Customer is then able to derive P&L report per Plant characteristic
    However with implementation of Product Costing, all Production related costs are captured in Product Cost Collectors and not Cost Center
    Hence we have no way of assessing or transferring total production costs from Product Cost Collector to CO-PA
    We have tried to configure FI/MM PA transfer structure (KEI1) and default account assignment (OKB9) for automatic transfer of costs on goods receipt/issue, however this is not working because the product cost collector is used as the default account assignment for the transactions
    So far only material cost valuation of sales/billed materials are possible (which does not address concern)
    As a result we have a gap and customer is unable to derive P&L by Plant from CO-PA.
    Can you advise if there is a way out, in order to have all Production Cost transferred to CO-PA.
    Thanks,
    Ola.

    Hi Ola
    Your Cost centers would be categorized as below
    1. MFG Cost Centers (In Plant)
    2. Service Cost Centers (In Plant)
    3. Few Cost centers (outside plant) Eg: Sales, Marketing, Sales offices etc
    At period end
    1. Allocate the Costs from SER CC to MFG CC using Distribution / Assessment cycle.
    This will make SER CC as zero
    2. Calculate actual activity price in MFG CC (KSS2 / KSII)
    3. After this, do revaluation of PCC using CON2.. This will make balance in MFG CC as zero
    4. Allow the Variances to be updated to COPA by ticking the "Variances to Costing based COPA" in your settlement profile
    5. In short, what remains for you to allocate to COPA is the 3rd category of CC.. i.e. you should allocate those CC to COPA whose cost is not included in the cost of product using COPC module
    Br. Ajay M

  • Product Cost Collectors

    Hi,
    Can anyone tell me what is exactly product cost collectors and what is the impact on the production orders and cost?
    If there is a BOM change, we will just create new production version and new product cost collector. We will not update the standard cost. Is it that the new production orders will pick up the new cost based on the product cost collector? even though the standard cost was not up to date? What will be the impact to the accounting?
    Kindly please advise. Thank you.

    Hi,
    Following link will be useful:
    http://help.sap.com/saphelp_47x200/helpdata/en/5f/1faba54aee11d189740000e8322d00/frameset.htm
    A few points for reference:
    - Product Cost by Period, Product is the main cost object.
    - Actual costs can be collected on the PCC
    - No settlement rule for a mfg order linked to a PCC
    - In PCC, the components in the BOM picks up the price from the material master
    - If Std Cost Est is not upto date, then matls in PCC will take existing / old price
    - So the FG Preliminary cost estimate will not match with its Std Cost
    - Moreover inventory valuation may vary if std cost est is not up to date
    - The Valuatin variant specified in the Costing variant actual of the PCC is used to valuate the data confirmed for the mfg order.
    - This costing variant results in a temporary prelim cost est for the mfg order. This preliminary cost estimate cannot be saved.
    Integration with Mfg Order:-
    If you have specified in the order type of your mfg orders that the costs should be collected on a PCC rather than on the mfg order, the system creates a link to the PCC when you create a mfg order for the corresponding combination of characteristics (such as material / plant / production version). The mfg order receives the status PCC (product cost collector). This status prevents costs from being allocated to the manufacturing order.
    The above might give you some lead.
    Raj

  • Product Cost Collectors not settled to GL's during Period end Close

    Hi,
    We are using the repetative manufacturing process. We have an issue with our repetative manufacturing orders, during the monthly period end close.The product cost collectors WIP is not been settled to GL's.
    The normal production orders are been settled to the GL's and both use the same settlement profile.
    Can anyone suggest where could be the problem?
    Thanks,
    Srini

    Hi,
    In the SAP standard (as per the transaction codes indicated by you) it is not possible to include multiple plants. Either you have to execute for one Plant or for all plants. Probably, in Test run you can execute for all Plants and check the results, and then decide.
    Thanks
    Murali.

  • Abolish product cost collector for production order

    Dear Experts,
    we use for some production order types the product cost collector. Now we plan to abolish them and change the settlement for production order. Which things do we have to pay attention? Do we have to finish our running production orders first or is it possible to change customizing during running production process. Thanks for your hepl!
    Best regards
    Steffen

    Hi Ajay,
    thank you for your answer.
    We have tested two variants:
    1. new order type, so we can process two separate settlements, for orders with PCC and the new orders without PCC. After archiving of all prodorders with pcc, archiving of pcc it should be possible to switch back to old order type.
    2. change customizing without finishing existing orders, settlement for existing orders, all orders which already have been processed will be settled by pcc (status pcc usage in order header) We have not be seen any strange system behavior.
    We use the pcc collector for different order types in different plants and want to abolish plant by plant. In this time the pcc will still be customized/exists.
    Best regards
    Steffen

  • Splitting without product cost collector

    Hello All,
    Can anybody tell me how a splitting of a existing production order can be done without a product cost collector. i tried splitting but it is doing with product cost collector.
    Thank you.
    Alok  Tiwari

    Hi Alok,
    This is from SAP documentation:
    Costs
    Actual costs
    The costs of the parent and child orders are collected in a common Product Cost Collector. This is because the parent order, as a rule, has already caused actual costs before the split took place. If the actual costs were collected in the parent order before the split, and separately in the parent/child orders after the split, then the materials of the parent order would have excessively high costs per piece, and the child order correspondingly lower costs. As a result, settlement for each order would result in unwanted variances in controlling.
    So, as you can see this is the way he system works, and for good reasons.
    Why is that a problem to you?

  • Rem product cost collector

    Hai gurus,
    I have one doubt in REM product cost calculation.
    1) when I am running PCC for REM I met with following error as  - Routing does not match with selection
        ID 01.
    How to correct the error.
    Regards,
    sekar chand.

    Dear Sekar,
    1.While creating product cost collector,use Production version as the controlling level.
    2.Check RM01 is the order type and ensure your production version is without any errors.
    3.Ensure you have selected rate routing in the task list type in the production version.
    4.Check what routing selection id is assigned in MRP parameters in OPPQ and also in the scheduling
    parameters in OPU5 for the order type PE.
    5,Your routing selection id should be a one which gives the first priority to the rate routing R.
    Now check and come back with your further queries.
    Regards
    Mangalraj.S

  • Target costs on Product cost collectors

    Hi,
    we have a problem with target costs on product cost collector.
    For the product cost collectors which are existing from long time, it is not updating target costs as soon as backflushing(Goods issue and goods receipt at same time) is done.
    For the product cost collectors which are created newly it is updating target costs as soon as backflushing is done.
    so we would like to know exactly at what point of time target costs will be updated on product cost collector.
    Thanks,
    Santosh Malisetti.

    Hi Rich,
    After researching little bit we found that its a standard functionality for product collector's not to update target costs until we do the variance caluculation. But there is one special case. When a new product collector is created it will update the target costs when backflushing(GI and GR ) is done, but this will happen during first month only. once this product cost collector has participated in variance calculation process, it will not update the target costs when backflushing is done,
    until it participates in  variance calculation again.
    Thanks,
    Santosh

  • Mass change of profit centers in Product Cost Collectors

    Gurus,
    My client has a requirement of mass change of Profit Centers in Product Cost Collector (Transaction Code KKF6N). Is there any way of doing this using LSMW or anything else?
    I had tried with LSMW Recording, but there is a particular production version associated to profit centers in KKF6N tranasction, because of this I couldnt go to particular production version and update the profit center.
    So, Is there any easy way doing this?
    <REMOVED BY MODERATOR>
    Thanks,
    Kalikonda.
    Edited by: Alvaro Tejada Galindo on Jun 9, 2008 6:29 PM

    Kiran,
    I have tried with Recording and problem solved.
    Thanks,
    kalikonda.

  • Product Cost Collector

    Dear All,
    I have four different prod. version of a single material and i am using product cost collector as Repetitive manufacturing is there.
    so i make 4 product cost collectors and run preliminary cost estimates for all these versions. and also i have run standard cost estimates for one version (001)to settle standard cost on material. So whenever i run kkbc_pko report for planned vs actual cost analysis then if in actual i am using version 004 for PRODUCTION, THEN TARGET COST COMES FROM VERSION 001 (FROM STANDARD COSTING RUN ) AND ACTUAL FROM VERSION 004. which arises so many variances.
    actually i want to have target cost from same version and also actual cost from same version so that i can see actual variance.
    How is it possible.

    Dear Shoaib,
    Plz Refer the below link
    [Standard cost estimate run with more than one PV;
    Hope the above helps you
    Regards
    kumar

Maybe you are looking for

  • System_Error while checking the print preview of adobe form

    Hi forum, Im new to adobe forms. I tried executing the standard forms but im getting the following issue. Exception SYSTEM_ERROR Message ID: FPRUNX Message number : 001 Please let me know the required settings for adobe forms in SAP R/3. Regards Maha

  • How to deploy the new version of webPart in SharePoint Server 2010

    Hi friend's ....I want to deploy the new version of webPart in SharePoint Server 2010. Is there any way for this....? In SharePoint sever 2013 there is version feature available for the apps..Same thing i want in SharePoint Server 2010 for webpart. P

  • My aperture keeps crashing after a recent transfer of pics from card reader

    running 10.7.2 and Aperture version 3.2.2.  Recently was transferring files from an Memorystick pro duo in a card reader (which has been done many times before).  Everything seemed to transfer fine and i ejected the card.  That's when the trouble sta

  • Technology for instant messenger, file sharing and picture sharing

    As part of project(for studies), our team is working on software which had features of instanst messenger, p2p file sharing and picture sharing and support for storing profiles, offline messages. Although we had some idea abt how to proceed.....but w

  • Configuration for elctronic bank statement

    Hi SAP Team, I have some doubts in Manual check deposition and electronic bank statement. Please explain below points. 1) when we use electronic bank statement and check deposition in SAP. 2) What is the difference between manual check deposition and