MIC changes in routing/inspection plan

Hi, we have created qualitative inspection characterisics (without characteristics attribute control indicator) with incomplete copy model type. This is already assigned in inspection plan and in routing. Now our users want to assign characteristics attribute.  We changed the MIC control indicators. this is not reflecting in the routing/inspection plan.
Could anyone suggest the best way to update the inspection characteristics in inspection plan as well as in routing.

Dear !!!!
Please Follow this steps
1.Check Inspection Setup What u have given
2.Create a Quality Work center with control Key QM01
3.Create Master Inspection Characteristic in QS21
4.Create Quality Plan QP01 make sure your usage type 5 0r 6
5.Assign inspection characteristics in master inspection whatever u have created in QS21 save
6.Go to QA32 check with selection by material or by plant
7.Then go to QE51n and run by selection condition by material or by plant Results recording starts
    Then click on the Inspection lot make the inspection and save it will prompt saying that results save under operation
9.Then go to Usage decision QA32
10.Move Material From Quality To Unrestricted.
Thatu2019s all the Steps
With Regards
Pushpalas

Similar Messages

  • Revision no of Routing/Inspection plan in Purchase order

    Hi MM friends,
    I have two requirements from client
    1. Is it possible to update the revision number of Routing/inspection plan or attaching any document in Purchase order to inform the vendor the relevant changes.
    2 Also the Routing changed revision number can be made as
    mandatory field in P.O?
    Regards,
    Anil

    It should pick latest revision level.Becuse PO get all data from material master.

  • Master data changes not updated in Inspection Plan- QP01

    Hi
    We created all the QM master data . After that we did some changes in inspection chars and in the sampling master data.but the values are not reflecting in the Inspection plan . How to update the changes in the inspection plan. We are trying to find indIvidual as well as Mass update
    Any input will he highly appreciated
    Thanks
    JJ

    Dear JJ
    Another easy method will be maintaining MIC as referenced mic. instead of maintaining it as complete copy model you can make it referenced. any changes in the mic can be updated automaticalyin the inspection plan using the referenced functionality.
    The issue being wherever the mic goes will be changed,
    Regards
    gajesh

  • Update inspection lot when MIC changes

    Hello Gurus,
    Is there a way to update existing inspection lot when master characterstic changes?
    Any help would be really appreciated!
    Regards,
    Owais

    Hi
    You can change the Existing Inspection plans by doing setting at Cleint level as Replace MIC
    When you cahnge MIC it will give popup of where used.You can change the task lists.
    But this changes will not automatically reflect in an inspection lot.
    for this you have to
    Go to Qa02
    Enter Inspection lot
    Click on reset
    save
    check status of lot CRTD in QA32
    now go to QA02
    enter
    click on Inspection Specification
    selct sample
    save
    check status in QA32 as REL
    Regards
    Sujit

  • Mass maintenance of inspection plan

    Hi,
    Guru,
    How to  replace  MIC's of some inspection plan through workbench CWBQM.
    Regards,
    Rakesh Patel

    Dear Rakesh,
    Even i was trying the same, could not find the reason for The "LOCK" symbol.
    I used MIC with Complete copy model, And i did not made any changes to that MIC while using it in inspection plan.
    by the way,
    If you want to replace MICs, which are locked
    Use user exit QPAA0004 with FM "EXIT_SAPMQPDA_001"
    Set E_LOCK_INDICATOR = 'X'
    in addition you have to activate EXIT_SAPLCQBM_002.
    regards,
    Amol

  • Create Inspection plan at once for many materials through QP01. Possible?

    Dear Friends,
    Is it possible to create Inspection Plant for more than one material at onece through QP01 when operation activity and Characteristics are same. I will change the Characteristics specifications afterwards.

    As suggested in earlier reply you can assign multiple materials to one inspection plan.
    But you may still need more than one plan because of
    1. UOM is maintained in Inspection plan header. So you have to create different inspection plan if you receive materials in different Unit of measures.
    2. Usage is also at header level, so depending on configuration, usage for 01 inspection type may be different from usage for 0101 inspection type.
    If you like the user exit approach.
    1. Create a dummy material and assign default inspection plan to this material.
    2. In the user exit change the inspection plan assignment.  Assign inspection plan from this dummy material.
    Form us this was a very useful approach during testing or for new material where inspection plan was not created in time.
    Once this default inspection plan is assigned, inspection lot is released even without inspection plan. If we need,  we can always change the default inspection plan in QA02 transaction before RR
    AK Marwadi.

  • Seasonal Inspection plan

    Hi Friends,
    1.   My clients requirement is he wants the inspection plan seasonwise. as the tolerances of the characteristics are changing seasonally.
    2 Whether identical inspection plan with periods validation possible?
    how to map this senario?
    Regards,
    Anil Mahajan

    Hello Anil,
    you could maintain this scenario using the Change management, using the engineer change management you can plan changes of an inspection plan, or characteristics in the future. Accordingly if you change the plan using the change number these changes will get active when the change number is made valid.
    The positive effect of this is that you can track all plan changes and view the valid plan to a certain date.
    Regards,
    Isabelle

  • FM/BAPI for changing the inspection plan

    Hi,
    I need to change the inspection plan.
    Can anyone suggest any FM or BAPI please.
    When I am trying to use BAPI  BAPI_INSPECTIONPLAN_CREATE for this purpose,
    I am getting the below mentioned errors:
    E  BAPI                001
    A CPCL               006 Task list Q Q0000171 1 already exists
    A CPCC_DT         210 For further processing, the routing entry is missing
    Thanks in advance.

    Hi,
    Could you please help me with the fields that need to filled for this purpose ?
    I am currently filling the TASK and INSCHARACTERISTIC structures with the following fields filled:
    TASK:
    TASK_LIST_GROUP
    GROUP_COUNTER
    VALID_FROM
    VALID_TO_DATE
    TASK_LIST_USAGE
    PLANT
    TASK_LIST_STATUS
    TASK_MEASURE_UNIT
    LOT_SIZE_FROM
    LOT_SIZE_TO
    INSPCHARACTERISTIC:
    TASK_LIST_GROUP
    GROUP_COUNTER
    ACTIVITY
    INSPCHAR
    QUANTITATIVE_IND
    MSTR_CHAR
    PMSTR_CHAR
    CHA_MASTER_IMPORT_MODUS
    CHAR_DESCR
    UP_TOL_LMT_IND
    LW_TOL_LMT_IND
    TARGET_VAL_CHECK_IND
    TARGET_VAL
    UP_TOL_LMT
    LW_TOL_LMT
    But still I am getting the error mentioned above(previous message).
    Thanks
    Shilpika

  • Digital Signature for Inspection Plan and Routing

    Hi,
    Can someone please help me on the topic of how to activate Digital Signature for inspection plan changes. I need to activate Digital signature functionality for inspection plan or routing. Please guide me to any link or shared documents on this topic.
    Thanks
    Vineeth

    Hi Vineeth,
    Standard SAP does not support this. Though I came across similar situation for maintenance plan, where we used BADI for this.
    Try to go through DIG_SIGNATURE_MAINT_PLAN. Consult with a good ABAPer if he can modify it some how for inspection plan.
    The links below may help you to understand the functionality [http://wiki.sdn.sap.com/wiki/display/SAPMDM/E-SIGNATUREforMaintenancePlants-MasterData(ECC6.0)] & [http://www.consolut.com/en/s/sap-ides-access/d/s/doc/YN-IF_EX_IPRM_DIG_SIGNATURE~~~~~~DIG_SIGNATURE_MAINT_PLAN]
    In SAP, check BADI_DIG_SIG_RES_REC_PROCESS, if anything can be done here.

  • Inspection Plan & MIC status.

    Dear SAP,
    We have a requirement that QC will creat the MIC & Inspection Plan in status created, and QA will review and change the status from Created to Release.So where or in which object level i can put control so that QC not able to select the Status 4 for inspection plan, and Release for MIC.
    Regards,
    Asif.

    Dear Craig,
    I have created a new roll will basis help.and attached the below condition in the object you can refer dow.But then to user able to create MIC & Inspection plan in release mode.Please explain what would be the issue.
    MIC Status Table & Field Name (Object Name-Q_STA_QPMK,Table-QPMK, Field-LOEKZ)
    Inspection Plan Status Table & Field Name (Object Name-Q_ROUT,Table-PLKPO, Field-VERWE)
    QSTATMERK Master Inspection Characteristic Status 1
    STATU  Status  1
    Regards,
    Asif

  • CWBQM to remove MIC from Inspection plan

    We have requirement to remove few MIC from multiple inspection plan. SO I wanted to use CWBQM trx for that purpose.
    We maintain inspection plan with unique id of group and gp counter.
    Group 111 Counter 1
    Gp 111 Countr 2
    .Group 111 Counter 110 and many more.
    Q-1: From abouve list I don't want to update all inspection plan. I want to update for only few counter of each group. So how to enter these group and group counter combination in initial screen to do mass change.
    Q-2: We wanted to remove MIC1, MIC2, MIC5 from all inspection plan. Where to enter these MICs in intial screen so system pull only those MIC list of insp plan? these are complete copy model MIC.
    Q-3: As said earlier we wanted to remove MIC from inspection plan. Now after excuting CWBQM we are getting list of MIC. So do mass change I'm selecting MIC column and applicable row and clicking on Extra --> mass change. Then system is not giving me MIC in pop-up list. It gives me all other data including qnt and qualitative field of MIC, but we wanted to remove complete MIC from plan. how to do that?
    Please help.
    Edited by: Tom_Eric on Apr 15, 2011 5:39 AM

    I'm following these steps:
    CWBQM work area - Q_OPR_000000000010
    Entering inspection plan data in selection screen - Ctrl + F7
    Got MIC list
    Select Master Inspection chara. column
    Select row to delete particular MIC
    Menu > Extra > Mass change --> Here I got two pop-up screen
    One with name Mass change inspection char -- but this screen is empty - no field on this screen
    There is one more screen which says "select fields" - List of fields like, lower limit, upper limit, catalog type, selected set, info feild, inspection method, plan, insp qualification, long term indicator, item......but there is no field which says MIC
    If I select any field from second pop-up then it pull that field to mass change screen, but that I don't want to do. My purpose to remove MIC, not its field.
    Please let me know where I am wrong?

  • Change Inspection Plan

    Hello everyone,
    I have a problem, I change a control indicators of characteristic in the inspection plan, but it doesn't take effect.
    whether I need to set other setting? Thanks in advance.
    zhigang
    Edited by: zhigang lu on Oct 16, 2009 5:29 AM

    Hi,
    Please also check under QM client settings in SPRO to ensure that the "replace master inspection characteristics" box is ticked as this will allow changes in the MIC to update the references in the inspection plan. Also check the QM settings at plant level if you have ticked master inspection characteristics with history then if you do a change in the MIC it will create a new version and not update the inspection plans. If this is ticked you will have to manually go into the inspection plan and assign the new MIC version.
    Regards,
    Roderick

  • Inspection Plan - Change order date Combination issue

    We are facing 1 issue in our system.
    The Inspection plan assignments with new change orders is not assigning the correct inspection plan.
    Example:
    Plan                       Change Number               Valid from Date
    1                              CO-1                                1/01/2007
    2                              CO-2                                1/01/2008
    3                              CO-3                                1/01/2010
    The plan selected when Change order CO-2 is cut in, is plan 1 but should be Plan 2. We believe the date on the CO does not drive the selection of the most current plan. When plan 3 is implemented after plan 2, Plan 2 is selected.
    Any one has faced this kind of issue in your exp?
    Edited by: Tom_Eric on Apr 28, 2010 10:49 PM

    No reply

  • How to display changes of inspection plan via t-code :CBWQM ?

    Dear all,
    We are using ECM for inspection plan updating, Is it possible to see changes in detail like QP60,QP61 via T-code : CBWQM ?
    Regards,

    QP61    Display change documents insp.plan?

  • BAPI or FM to change an inspection Plan

    Hi everyone,
    I have a requirment,when a specification (Recipe managment) is changed ,the data accordingly should be updated in the inspection plan that is linked with that.
    Can you pelase let me if i have any function module or BAPI which can be used to update the existance inspection plan.
    I have a BAPI to create INSPECTION PLAN but i didn't find any bapi to change INSPECTION PALN.
    Thank you in Advance.

    Hello Parankusham,
    Unfortunately, there is no BAPI for changing the please.You can look into the engineering workbench CWBQM and which possibilities it offers you in your case.
    Thanks
    Amber

Maybe you are looking for

  • How can an OS software bug be submitted to Apple, including screen shots?

    A systematic software problem with OS X Lion, occuring on MacBook, Mac Pro, Mac Book Pro after OS upgrade and Fire Vault switch to "ON":  the login screen after screen saver is black, and the screen is restored in partial blocks while typing in the u

  • Loosing internet when using 11n

    Hello I own a MacBook Pro (Late 2008), and just bought a Airport Extreme. I found in Network utility that I always connected to the b/g network and never to the n. I then manually changed the AP Extreme to divide it into two separate channels (airpor

  • Billing Question

    Trying to make a purchase last night, I kept recieving an error message stating credit card processing was down, please try again later. I kept trying and kept getting the same message until it finally went through. I find out today, I was billed fou

  • How to video on macbook air

    Can I shoot a video on macbookair?

  • Restored Address Book information is replaced by iCloud

    Long story short, another user messed up my address book contacts, and they synced with iCloud.  Fortunately, I have an Address Book Archive that's current.  So, I restored the Archive, which replaces everything in the Address Book.  Then, it starts