Microsoft Project Server Online

I need to know Microsoft Project Server Online fees/user and
if we have a discount as we are a gold Microsoft partner  or for free, please advise?

Hi,
We can use the Microsoft Project Server 2013 trial version with below link:
http://office.microsoft.com/en-us/project/project-server-2013-project-portfolio-management-software-FX103802061.aspx
As far as I know, Microsoft has different business policy in different states and here is a technical forum. Thus, I recommend we connect the Customer Service Center or local provider.
http://support.microsoft.com/gp/customer-service-phone-numbers/en-us
Thanks for your understanding.
George Zhao
Forum Support
Come back and mark the replies as answers if they help and unmark them if they provide no help.
If you have any feedback on our support, please click "[email protected]"

Similar Messages

  • Moving or Copy from One Project Server Online Instance or Tenant to Another

    Hi
    Has anyone tried to move or copy an instance or tenant of Project Server Online to another instance or tenant of Project Server Online?
    We have been recommended FluentPro's FluentBooks for this.  Has anyone had any experience with doing or using this?
    Spiro.
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Hello,
    I have clients that have done this before and clients that are planning to do this (client currently in the implementation phase) using Fluent Pros tool. Fluent Pro's tools will save a lot of manual effort and the only other option currently to
    date is to reconfigured the other online instance manually.
    Fluent Pro's tool will easily copy over all of the Project Online instance config, if you have custom look at feel for PWA, custom pages, custom lists etc., these will need to be manually recreated on the target instance.
    If you have anything specific you need to copy over, give the Fluent Pro guys a call to see if their tool will do it out of the box or see if they can customise the tool to meet your requirements...
    Paul
    Paul Mather | Twitter |
    http://pwmather.wordpress.com | CPS |
    MVP | Downloads

  • Integrate cProjects with Microsoft Project server

    Dear all,
    Does anyone know how to integrate cProjects 4.0 with Microsoft Project server 2003 in details? Pls kindly help.
    Thanks and best regards
    Trung

    Hi Murali,
    Do you have any documents showing how to configure cProjects step by step to integrate with Microsoft Project server? Pls help.
    Hi Niranjan,
    Pls check your email.
    Thanks and best regards,
    Trung

  • Microsoft Project Server for SharePoint Standard

    Hi,
    We are using Microsoft SharePoint Standard version. Which product in Microsoft family should we add on to get the full capabilities of Microsoft Project into SharePoint Standard version? Is it Microsoft Project server? But Microsoft Project Server has a
    prerequisite of SharePoint Server.
    Any ideas?

    From a licensing perspective to run Project Server you require SharePoint Server 2013 Enterprise edition. A user (or device) that is using Project server would therefore require all the following CALs:
    SharePoint Server Standard
    SharePoint Server Enterprise
    Project Server
    Jason Warren
    @jaspnwarren
    jasonwarren.ca
    habaneroconsulting.com/Insights

  • Microsoft Project Server Event/Queue Services has been disable

    Hi after update Service pack 2 and December 2013 CU,Microsoft Project Server Event/Queue Services has been disable . I have manually change and start  but after some time again same thing happen.
    Kinldy let me know the process hwo to resolve this issue.
    I have fallow the below link but this is not impactable on my envirnment.
    http://blogs.technet.com/b/projectsupport/archive/2012/12/26/project-server-2010-my-queue-service-keeps-getting-disabled.aspx
    Help is appricable.
    Hasan Jamal Siddiqui(MCTS,MCPD,ITIL@V3),Sharepoint and EPM Consultant,TCS
    |
    | Twitter

    Hi Muelder,
    Yes share point Project Appl service is enabled.
    Now i have resolved issue with the help of below script.
    ((Get-SPFarm).Services | ? {$_.Name -match "ProjectQueueService14"}).Instances | % {$_.Id} | Stop-SPServiceInstance -Confirm:$false -Verbose;
    ((Get-SPFarm).Services | ? {$_.Name -match "ProjectEventService14"}).Instances | % {$_.Id} | Stop-SPServiceInstance -Confirm:$false -Verbose;
    ((Get-SPFarm).Services | ? {$_.Name -match "ProjectQueueService14"}).Instances | % {$_.Id} | Start-SPServiceInstance -Confirm:$false -Verbose;
    ((Get-SPFarm).Services | ? {$_.Name -match "ProjectEventService14"}).Instances | % {$_.Id} | Start-SPServiceInstance -Confirm:$false -Verbose;
    ((Get-SPFarm).Services | ? {$_.Name -match "ProjectQueueService14"}).Instances | ft -AutoSize
    ((Get-SPFarm).Services | ? {$_.Name -match "ProjectEventService14"}).Instances | ft -AutoSize
    Hasan Jamal Siddiqui(MCTS,MCPD,ITIL@V3),Sharepoint and EPM Consultant,TCS
    |
    | Twitter

  • ¿Can i run the Microsoft Project Server in Mac OS X Lion Server?

    When i use the Mac OS X Lion Server, or even, the Mac OS X Leopard Server, can i run another program like Microsoft Project Server, because i need the features that this gives me.
    Thanks you for your solutions
    (is it possible on Xserver?)

    Unfortunately, no one will be be able to answer your question re. a not-yet-released OS; they either do not know or are prevented from sharing their knowledge because of an NDA.

  • Microsoft Project Server Support for SQL Server 2014

    Does anyone know the timeline for Microsoft Project Server to support deployment on SQL Server 2014?   Also, has anyone tried this yet as an unsupported deployment, and if so, have they found any issues?

    "SQL Server 2014 is not yet supported for Project Server 2013", as per the article Hardware
    and software requirements for Project Server 2013: https://technet.microsoft.com/en-us/library/ee683978(v=office.15).aspx updated as on Dec
    09, 2014.
    Cheers! Happy troubleshooting !!! Dinesh S. Rai - MSFT Enterprise Project Management Please click Mark As Answer; if a post solves your problem or Vote As Helpful if a post has been useful to you. This can be beneficial to other community members reading
    the thread.

  • CRM and Microsoft Project Server Integration

    Hello,
    Can anyone explain what solutions are available that can help in integrating SAP CRM with Microsoft Project Server? Is there any documentation available on this? Thanks.

    Hello Roberto,
    E-Mail rerouting is possible with an Exchange server. We use an adress [email protected] provided from the Exchangeserver. The mail is then forwarded to [email protected] to be retrieved by our CRM System for further processing. Please ask your Exchange admin again. I think he has to get wome more information about configuration possibilities.
    Regards
    Gregor

  • How To Control the Langauge of BI Reports (Using Excel 2013, oData, and Project Server Online 2013)

    Although I buried and posted the following question indirectly in a recent post, I would like to do so here to try and elevate it in the hope that I can get an answer.
    It is in regards to creating reports using Excel 2103 to querry Project Server 2013 Online using oData.  I would like to be able to control the langauge of my reports that I create for others to view.
    Just creating and then saving the Report and Data Connections in a language directory does not seem to drive or determine the language of the report.  A colleague of mine over here is using the same directories as I am, and his turn
    out to be French like his environment.  Mine, even though I save the files in same the French directories, display in English. 
    Any ideas on how I can create reports so that they display in another language, eg., French when using Excel to create reports?  I know that we can set the language in an internet browser to control the language that the result is returned, for instance,
    when querying https://.../pwa/_api/ProjectData/$metadata
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

    Correction!  Thanks to Doug Welsby of Microsoft and some our other MS friends who worked behind the scenes to correct/ assist me on this, I got the right answer after all... the difference between, example a French oData command/ statement,
    and an English one is the inclusion of the square brackets with the language abbreviation/ code e.g., "[Fr..]" in the oData connection string/ statement.  For further reference, see the connection files provided by Microsoft in the Reports and
    compare the syntax for the same report/ different language.  There is where you will see what and how Excel is able to differentiate/ control what language that the report result will return.
    \Spiro Theopoulos PMP, MCITP. Montreal, QC (Canada)

  • Microsoft.Project.Server.Library missing namespace name 'Office' -Error while building a PSI application using WCF sample code to read calendar exceptions.

    Hi,
    I have a WCF application to pull calendar exception detail from a Project Server instance 2013. As per msdn links shared below I have added two dlls Microsoft.Office.Project.Server.Library , Microsoft.Office.Project.Server.Events.Receivers as well as ProjectserverServices.dll
    from the server.
    On building the solution I am an error, The type or namespace name 'Office' does not exist in the namespace 'Microsoft' (are you missing an assembly reference?).
    The links referred for development are-
    https://msdn.microsoft.com/en-us/library/office/gg223326(v=office.15).aspx
    https://msdn.microsoft.com/en-us/library/office/ee872368(v=office.15).aspx
    Thanks in advance!!
    Mridhula
    Mridhula.S

    Hi All,
    The issue is resolved!! The Target framework by default was set to .NET Framework 4 Client Profile instead of .NET Framework 4.
    Regards,
    Mridhula
    Mridhula.S

  • Project server online workflow using visual studio

    hi sir,
    I am working on project online 2013(office 365).I have create a workflow with sharepoint designer also.but i have need to create workfow in project online using visual studio.please suggest me.and deploy as it wsp file.
    vijay

    Hello,
    you can start with SharePoint 2013 project and then add the Project server dlls. Then add the tabs to get the project server workflow history and tast list.
    follow this blog
    http://blogs.msdn.com/b/project_programmability/archive/2012/11/07/creating-project-workflows-using-visual-studio-2012.aspx
    It will help you to get started. Hope it helps.
    Please mark as answered if it helps.

  • Microsoft Project Server 2013 with SharePoint Standard 2013

    Hi,
    We are using SharePoint 2013 standard. What are our options to implement project web app into our SharePoint architecture? Please note that we are not using SharePoint Server.
    Thanks, 

    Project Server 2013 requires SharePoint Server 2013 Enterprise edition. Users that use Project Server functionality require a SharePoint Server Standard CAL, Enterprise CAL, and Project Server CAL.
    I'm not sure I understand your last comment, SharePoint Server 2013 Standard Edition is SharePoint Server.
    Jason Warren
    @jaspnwarren
    jasonwarren.ca
    habaneroconsulting.com/Insights

  • Timesheets in Microsoft Project Server 2010

    Our team is starting this year using timesheets for collecting actual work from all of our vendors.  I am having a problem seeing the actual work in project professional once the time has been entered into PWA, processed and approved.  Would
    someone with timesheet experience be able to help me with this issue?  Resource has entered actual hours in PWA, saved and submitted.  Timesheet manager approved.  No actual hours show in the project professional schedule.  Any ideas
    or suggestions would be appreciated.
    Jan Whitehead

    Hi Jan,
    Actually you have to differenciate the timesheet manager with the status manager.
    Status manager (who should be the project owner, ie the project manager) will approved submitted tasks updates. Once approved, it will be "pushed" to the project actual work.
    Timesheet manager will approved the complete resource timesheet, including administrative work.
    Note that if you activated SEM (single entry mode) in PS2010, both timesheet and task update are made from on single operation by the resource.
    Thus in your case, since you're talking about timesheet manager approval, it is normal that the actual is not send to the project. The project manager (status manager) must approve the task updates in order for the actuals to be shown in the project plan.
    Please find more information here:
    http://technet.microsoft.com/en-us/library/gg597642(v=office.14).aspx
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Project Server Online: all resources disappeared

    Hello,
    I'm testing Project On line. I worked on it during several weeks without any issue, but today the Resource Center is empty: instead of the resource names
    I have the message:
    To add resources, please click here to sync with an existing group.
    What happened?
    Thanks for your help

    I like Kiran's suggestion. Look and see if they show up in the Delete Enterprise Objects.  If they appear their and you don't see them, it may indicated that the security permissions have changed and you do not have access to the resources.
    Have you made any changes to your Security Model?  Are you using SharePoint or Project Permission mode.
    Cheers!
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

  • Microsoft Project Server 2010 - Need a query/report to show everyone who did not submit timesheet last week

    I need to create a MSPS 2010 query/report to send out to my project managers that show them everyone who did not submit their timesheet for the previous week.  I would like to be able to filter it by project/client but would settle for just a list
    of all unsubmitted timesheets at this point.  Every link I have found point to old reports for MSPS 2007 and the queries do not work because of schema changes between MSPS 2007 and 2010.  Please help!

    Thanks Elli!  Is there any way to also pull in the active resources that have not created a timesheet in the timeframe I am filtering on as well?
    Here is the query I had came up with.  Looks like I was on the right track...  I did two actually.  First one to give me a roll up list of employees with outstanding time sheets for last week and the hours, then the same data with an explosion
    by employee by project and also pull in their associated time sheet manager:
    --Everyone with an timesheet for last week where status  is not 'Approved' or 'Submitted'
    SELECT DISTINCT
            CONVERT(varchar(10),b.StartDate,1) + ' - ' + CONVERT(varchar(10),b.EndDate,1) as [Timesheet Date]
          , [ResourceName]
          , [TimesheetStatus]     
          , SUM([ActualWorkBillable]) as [Hours Entered]
      FROM 
        [dbo].[MSP_TimesheetLine_UserView] a
      , [dbo].[MSP_TimesheetPeriod] b
      WHERE
          a.PeriodUID = b.PeriodUID 
      and [TimesheetStatus] NOT IN ('Approved', 'Submitted')
      and DATEADD(dd,-7,GETDATE()) BETWEEN b.[StartDate] AND b.[EndDate]
      GROUP BY 
        b.[StartDate]
      , b.[EndDate]
      , [ResourceName]
      , [TimesheetStatus]
    GO
    --Everyone with an timesheet for last week where status  is not 'Approved' or 'Submitted' w/ Project/Customer explosion
    SELECT
     CONVERT(varchar(10),b.StartDate,1) + ' - ' + CONVERT(varchar(10),b.EndDate,1) as [Timesheet Date]
    , r.ResourceName AS [Resource Name]
    , [TimesheetStatus]     
    , [ProjectName]     
            , ([ActualWorkBillable]) as [Hours Entered]
    , isnull(rm.ResourceName,'<No Timesheet ManagerInformation Available>') AS [Timesheet Manager]
    FROM
          dbo.MSP_EpmResource_UserView r 
     LEFT OUTER JOIN
          dbo.MSP_EpmResource_UserView as rm 
       ON r.ResourceTimesheetManagerUID = rm.ResourceUID
    ,[MSP_TimesheetLine_UserView] as a
    ,[MSP_TimesheetPeriod] as b
    WHERE
          a.PeriodUID = b.PeriodUID 
      AND a.ResourceUID = r.ResourceUID
      AND  [TimesheetStatus] NOT IN ('Approved', 'Submitted')
      AND  DATEADD(dd,-7,GETDATE()) BETWEEN b.[StartDate] AND b.[EndDate]
      AND (r.ResourceIsActive = 1)
      AND (r.ResourceType = 2)
      AND (r.ResourceIsGeneric = 0)
    ORDER BY 
       r.ResourceName
     , ProjectName
    GO

Maybe you are looking for

  • Text Caption will not pop up and go away.  It is there the whole slide

    I have a Text Caption box that I am wanting to pop up and give a Hint on how to answer a question slide and then go away after a few seconds. I have this in the Options tab for it: Display for: specific time: 2.2 seconds Appear after: .3 seconds Effe

  • Cannot Delete file iCloud

    I am having an issue with the New Late 2012 iMac and syncing numbers documents in the cloud. 1) I cannot sync a native document from the new iMac to the cloud via the Numbers Program. I can drag the document into the browser and update it that way 2)

  • I GOT A PROBLEM WITH SPEAKERS DEVICE

    I bought the Creative X-Fi Fatalty sound board... So i have a 2.0 sound system connected to my soundboard with Speaker 2/2. device. ( output) I got a 3" ampd subwoofer and i want to use it with the THX Setup Console. so will be 2. system. ( output to

  • Xorg.conf for T510 + NVIDIA NVS 3100M

    Can you send me, or point me to a website with a working and well tuned xorg.conf for T510 + NVIDIA NVS 3100M. I've had a few problems creating one myself and I am sure that many people have good working X configurations. I am using Kubuntu 11.04.

  • PHP to SES with doOracleSearch

    Does anyone have a sample or know how for calling SES Web Services from PHP with doOracleSearch? Using doOracleSimpleSearch message seems to be working but I do not know how/if doOracleSearch works. I need to get the result by specifying source group