MIGO Actual Cost

Hi, Friends,
In PO i maintained Rs 100 and given 20/- discount and my price also appearing as 80 as net value is showing in PO .
But when i do MIGO it is posting as 100/- to Inventory why it is happening ?
My doubt is there is one setting in sub total field is missing in the PRicing Procedure.
Please help me
Thanks
Prasad

Hi Prasad,
IF u have maintained the price control of the material as S-standard price, then the valuation of the material will be done using the std price.
which u can find in the material master , accounting view.
Regards
Aasif

Similar Messages

  • Actual Cost of finished goods in MIGO

    Hi,
    The value of Finished material in FI Document generated in MIGO takes the (Goods Receipt Quantity) X (Planned/Moving average Price from material master), Where as it should take the Total Actual Price calculated after Order Confirmation Based on Actual Material Purchase Price & Actual Activity Posting Value.
    For example:
    Present scenario
    Material-> MIGO QTY>Moving Avg Price -->MIGO FI Document Value
    Finished> 1000  EA> Rs. 10/ EA--
    >Rs. 10,000=00
    Required Scenario:
    MIGO FI Document value= (Purchase Value of Raw Material)+ ((Activity Posted while Confirmation)X(Activity price))
    Thanks.

    Hi,
    What u said is right Mr Kapil.. See when u do GR From Production Order System Calculate Moving Price or Planned Price from
    material Matser .
    As per ur Reuirement u told it should calculate (Raw Material Price + activity+OVHD).
    it is possible only when order quantity is less , suppose say your order qty is 150 mt per day and your Plant capacity is 500mt
    per day production will be done in a half day, sale can be done on same day after Production with the formula what u told.
    If suppose say , Your order is 2000 ton of Oil , it will take u to complete 4 days for your Total production as you told, GR should
    be done on (Raw Material Price + activity+OVHD) formula, you dont know exact activity price for 2000 ton until u finish your total
    production, at the same time until u do GR sales cannot be done. So in SAP Gr is intially done on Moving Average Or Planned
    (Standard Price) , After totla Prodcution GR is Compared with Actual Cost(Raw Material Price + activity+OVHD)= :"Variance".
    Plus are MInus is Reduced or added to Finished Goods Account or PP account during Settlement.
    If any wrong Pls Correct me Experts,
    Pavan

  • Posting date wise PM order actual cost

    Hi friends ,
    I want a report where I can see the actual cost of PM orders , posting period wise :
    Say an order's basic start date =  26.7.2011
    material is reserved on the order on 29.7.2011 with planned cost Rs100 .
    Now reservation is issued with MIGO with posting date  2.8.2010
    Now I want a report where I can see this cost by posting period.
    Say if I enter 1.7.2011 to 31.7.2011 then cost should be zero .
    only cost should come when i will enter 8th month .
    One more point should be there the report should not consider controlling area's currency .
    Because our controlling area currency is USD and cost in our orders is in INR
    Regards
    AM

    S_ALR_87012993 
    Enter
    controlling area
    fiscal year
    from month
    to month
    Enter order or order group  or leave it blank
    Execute
    Double click the actual value you want to see
    A small screen - select report will appear
    Double click 
    Orders actual line items
    click change layout    select posting date

  • Actual cost not updating in Pm order

    Hi Experts,
      We have a requirement from management for Having budget control based on department wise.
    For that we are trying out substitution rule by which Pm order is replaced with Internal order .we are having a budget profile and budget for internal order.Now we are able to control budget and system stopping if budget exceeded in migo transaction .We are replacing pm order with IO order with substitution with pm order number range. Issue is after having this setting actual cost is not updating in Pm order and pm report.
    Same is getting updated in mseg against pm order.
    With regards
    Anand.M

    Hi Anand
    Please add the budget profile at Plant maintenance order level no need to add any substitution rule
    budget should also be control at order level
    Thanks
    trinath 

  • Permit not assigned for Actual cost

    Hi Dears,
    Permit not assigned for actual cost in maint order
    Actual cost in maintenance order is 3000
    In IPMD, cost1 is assigned with class ACTUAL COST and value 3000 is defined.
    In OIPG,  Permit class ACTUALCOST is assigned.
    Goods issue done to order for value 3000.
    Again cost determination executed, but still cost1 is not assinged to the work order.
    Am i missing anything ?
    Regards,
    Alagesan M

    Hi
    In charac CT04 i maintained one value 3000 and table maintained CSEVPERMIT and IKOSTEN
    In class CL01, assigned the charac for 049 class type
    In OIPG, permit class is maintained with class
    In IPMD, new permit created and assigned class in classification and maintained 3000
    Now order created and component assigned the planned value is 3000.
    through MIGO goods issue done and found the actual value is 3000.
    But still opened the permit found nothing assigned.
    For Estimated cost and planned costs it is working good only for actual cost permit is not assigning.
    Actual cost we need to anything more other than this ?
    Alagesan

  • How to post Actual costs

    Dear all,
    I have number of activities in that i have costs(activities) planned cost is 1lac. But actual am not able get in project planning board. Plz suggest me how to go further, If i miss actual confirmation somewhere.
    Regards,
    S.Suresh.

    Hi Suresh,
    I am posting this again as i typed wrong word for point no 4.
    1.If you are using Internal Activity to plan Labor Hours then while confirming the Activity system will post actual cost(Controlling document) .The cost is Secondary cost.
    2.For external services it will be after acceptance of service in ML81N.
    3.For external services it will be after MIGO.
    4.For General Cost activities you cant get costs after confirmation.For that you can post by FB50 or you can post a controlling document also by various CO tcodes(Manual cost allocation) i think tcode is KB15N .
    Muzamil

  • Report  for bom wise target and actual cost as well as qty at line item

    Dear Experts,
    Is there any standard tcode for bom wise target and actual cost as well as qty at line item level for the month.
    there is one tcode s_alr_87013127 but user has to double click in order to get line item details.
    I want to see line item wise breakup/bom wise target and cost cost as well as qty.
    Thanks in advance.
    regards
    RK

    Dear experts,
    I am still looking for a revert.
    regards
    RK

  • Posting Actual Costs at Material Level

    Hi All
    For our standard costs we will have BOM Components, Activities from Routings and additive costs. We also have activated Material Ledger and will use it for Actual Costing, the objective being that each and every actual cost will be brought to the SKU level. For BOM components and activities that is no problem since it will be done through settlement.
    However for cost components that have additive costs how do we settle them to the material ledger? Do we need to do MR22 for difference between standard and actual? Is there a way to do this through a template allocation or some other allocation method?
    Thank you

    Hi
    Lets assume, you have Std cost of 100 USD involving Material + Labor and an additive cost of 10 USD entered manually from CK74N...
    During production order processing - You would issue material components and confirm Labor hrs... Say, this amounts to 120 USD as against the std cost of 100 USD...
    However, in prod orders, there will be nothing posted against the additive std cost of 10 USD... If you wish, you need to post it either through template allocation from some cost centers or use some assessment cycle or transfer manually from KB11N or use a costing sheet
    Regards
    Ajay M

  • Break Up of Actual Costs in a report for list of orders

    Hi All,
    SAP standard reports displays only the total planned & total actual costs.
    Is there any standard report available which can display break up of planned & actual costs along with total costs, for list of orders (e.g: time, material and external resources consumption).
    Thanks in advance
    JK

    hi
    you can find the material cost,external service etc in the standard cost report itself select the change layout and select the items you want to display ,you can get the result
    regards
    thyagarajan

  • PS (plan vs actual costs) Report

    Hi,
    I have to generate the above report. How can I diffrentiate between Plan cost and actual cost. Is there any business contect report for this ? can anybody throw light on this.
    Regards,
    Bill

    Hi Bill,
               There is no std content for this as far as I know , Not sure if your report is based on cost for a given version then its really a mystery . If you are looking to pull the cost for PS then check the table RPSCO in r3 , this is the PS cost table , and you can differentiate Plan/Actual based on the Field Value type .
    hope this helps ,

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • PS - Report on Planned v/s actual cost of the project

    Hi,
    I have a client requirement on the above subject. In Report S_ALR_87013542, Under actual cost the system is taking both the Revenue and Actual cost booked on the project. Is there any other report wherein the system shows only the actual cost booked on the project so that planned V/s Actual can be compared.
    Rgds,
    Prasad

    Hi,
    You can also refer the report S_ALR_87013543 - Actual/Plan/Variance Absolute/Variance %. This will give the reports based on cost elements. Morever plan cost Vs actual cost can be obtained from Project Infosystem report (CN41/ CNS41).
    In fact the report S_ALR_87013533 is a hiecherachical report for plan & actual cost of project.
    If the system is calculating wrongly both revenue & actual cost under actual then you need to check Cost elements asignments & value category details.
    Hope this will help you.
    Regards,
    Rakesh Pradhan

  • Planned vs Actual Cost Report (with variance) for PM Orders

    Hi Experts,
    We are using the project system to collate order costs for annual shut work.  We have a requirement for a report to show 25% variance between planned and actual order costs (maintneance order).
    At this stage, we dont mind whether this is implemented in the the PM system, or the PS system.
    This is a fairly basic / common requirment.  Are there any standard transactions we could use to:
    1.  Select a list of orders using standard selection criteria.
    2.  Select a % for variance, e.g. 25%
    3.  Display a list of orders where the planned vs actual costs were greater than 25% and what the actual variance is for each order?
    Thanks,
    Maikel

    Hi Maikel,
                   I have never seen any such scenario, but the best thing that can come to me is for the shut down activities you muct have created a Revision, then based on that Revision you can take a dump of all the orders with Planned and Actual Cost, in the excel, and there by putting the formulae you can definitely have the Varience report.
    Hope it helps you.
    Regards,
    Yawar Khan

  • Breakdown of  COGS into ACTUAL cost components

    Hello,
    I am looking to design a product cost report which gives breakdown of COGS into actual cost components. We use moving average cost for all materials (purchased as well as manufactured) in a make to order environment.
    For example:
    Sales order - Shipped material A at COGS $100.
    Process order # 1 produced material A using input material B and a series of operations defined in a recipe.
    Process order # 1 costs: Input material B - $70
    Operations cost - $30
    Process order # 2 produced material B using raw material C and a series of operations.
    Process order # 2 costs: Input material C - $40
    Operations cost - $30
    So, the results should look like COGS 100 comprise of $ 40 material cost and $ 60 operations cost.
    I understand standard cost estimates can be linked to CO-PA fields to get cost component structure. But, we don't use standard costing. We use CO-PA which gives COGS.
    Is there something similar to cost estimate to calculate as above? Or, this is a custom development.
    Thanks in advance for any pointers / advice?
    Sanjiv Agrawal

    What is COGS?

  • Getting diffrent Actual cost from 0PM_OM_OPA_2 to 0pm_c01 and 0pm_c07

    Hi All,
    I am using BI report for plan and actual cost deviation of Work order(maintenance order) of PM(tcode iw33>cost tab>plan actual cost to check),
    question there is 2 query for this plan actual cost deviation, one on 0pm_c01(Maintenance Orders - Costs and Allocations) and second on 0PM_C07 Maintenance Orders: Scheduling, datasource is common 0PM_OM_OPA_2 for actual cost population in this cubes, BUT update rule are diffrent for both target,
    in 0pm_c07 its getting update by 0pm_ds04(dso) where we are getting only Actual cost with Debit(S) Entery(as debit(S) entery hardcoded at start routine in update rule from this datsource to 0pm_ds04), for report on 0pm_c07actual cost is matching with standard ecc report MCI8 - PMIS: Cost Analysis.
    in 0pm_c03 we are getting all Actual cost entry both Debit(S) and Credit(H), getting actual cost total as debit minus credit entry at cube 0pm_c03 and hence getting same on report on that, this report is same as like report on 0pm_c07.
    both report are calculating Actual vs Plan cost relation ship, but one report(on 0pm_c07) have only debit(S) entry while other report(on 0pm_c03) have both Debit and Credit entery, So getting diffrent  Actual cost at both report hence diffrent Actual VS plan Cost relationship from both report,
    Both are standard report given by SAP, Now which report we have to take it as correct one? which report is right?
    Regards,
    Dushyant.

    Hi,
    Sorry, In my pain post whereever i written 0pm_c03 is wong its 0pm_c01,
    as u said ur query on 0pm_c01 works fine? are u getting Debit(S) and credit(H) both entery for actual cost in this cube?
    as in 0pm_c07 we are gettin only debit(S) entery and this report matching with standard ecc reprot( as i mentioned in main post ) BUT for 0pm_c01 its have both S and H entery. if ur actual/plan cost report on 0pm_c01 have S and H entery for actual cost than with ECC report you are reconciling?
    Dushyant.

Maybe you are looking for

  • Encrypt/decrypt using update

    Hi, can someone give me an encrypt/decrypt pair of code samples that use the cipher.update() call. i am trying it like that but apparently it doesn't work byte[] temp = new byte[message.length/2]; byte[] temp2 = new byte[message.length/2]; System.arr

  • Extreamly slow container managed persistence

    Hi. We perform the following procedure: 1. We invoke a finder method on a container managed bean 2. Then we traverse the enumeration of beans returned and invoke a getter method to get their properties. The finder finishes really fast, but then trave

  • My subscription

    Hi sir as refer my account you are deduct the money from my bank account unfortunately but I can't see the subscription so I want to cancel all my subscription please help me to do this Thank &rRegards by K.Anandhan

  • Have 12.0.1 and notification to update crashes

    I keep getting notifications for my windows 7 that I have an Apple update available.  When I try it crashes. I checked iTunes andI have 12.0.1 and no updates are available.  How do I remove reminder?

  • WGBH HD schedule off by half hour

    I noticed that on the HD channel of WGBH (channel 502), on every Thursday, the listings are one half-hour early. And this is only on the HD channel, the SD channel is normal. Is anyone else from Boston noticing this?