Migo/mb1b/lt01
hi,
may i know what is the distinct difference between migo, mb1b and lt01?
can tell each of their main function as i always confused.
thanks
rgds
HI
the basic difference between MIGO and MB1b is MIGO can be ued for normal posting meaning all type of posting starting from STO, normal external vendor to customer , GR from PO etc. but MB1B is purely used for transfer posting that means inter company transfers between the company codes withinn same client or plants within the sa,e company code,
LT01 is used for transfer of materials from the warehouse for delivery it comes after the delivery document has been created and picking has to be done from the warehouse.
Regards
Vignesh
Similar Messages
-
Avoid the delivery creation in MIGO/MB1B at the time of goods movement
Hi All
Can anyone please help me to know, How to skip the delivery creation step in MIGO/MB1B at the time of goods movement (311) indebug mode.
In which part of the code the delivery creation logic would be written...?
Thanks and regrds
KarunaHi:
It looks like to me if there is validation working in background . Please check in GGB4 there will validation active for this asset class . Low value asset check restricts you from posting an amount as specified in OAYK. Please check.
Br -
User Exit / BADI Update new line item in BSEG in MIGO/MB1B Transaction
Hi All,
I Require a BADI or user exit in MIGO transaction from which i can add or change the BSEG line item before Posting the FI document.
Regards,
Madhukar ShettyHi Asik,
Thanks for the the reply, but can tell any other badi or exit from where i can add/append a new line item in the accounting document getting posted from MIGO or MB1B.
Regards,
Madhukar Shetty -
MIGO,MB1B, print indicator should be default
Hello
MIGO and MB1B transcations, print indicator is not selecting automatically. why?
background:
In user profile (SU01D), paramater NDR was maintianed correctly.
eventhough user is having NDR parameter, but he is not able to see the print indicator automatically??
in additioon , if they give manually print indicator for individual slip /collective silp, out is saved. and output is displayed in green color in GR iteam leavel "Message" tab.It means output setting are correctly maintained.
even i tested with my user id..if i dlete the NDR to my id, it is not working.
again i added NDR parameter, now it is correctly.
Question: In production already user was maintained with NDR parameter, but he is not able to see the print automatically.
so shall i delete his NDR parameter once and add again?? this will be work or not ?? please confirm.
Regards,
Pabbati ObulesuHi,
NDR parameter value should be upper case X.
Pls check your user parameter.
Regards,
Renuga.A -
Outbound idoc for MIGO and MB1B
Hi,
MBGMCR03 is also not working. Any other idoc to trigger to o/b idoc for both MIGO & MB1B.
Thanks & Regards,
Balajihi,
This idoc WMMBID02, i'm using for inbound. The same i tried for outbound also.
In WE20, in outbound parameters, for LS partner, for Message type WMMBXY, i've maintained the receiver port & basic type as WMMBID02.
In BD64, i've created a model view for this message type & distributed the same.
Then i've tried both MIGO & MB1B, this idoc not triggered at all.
Any other settings other than this...
Thanks & Regards,
Balaji -
Batch Split in Inbound Delivery document
Hello Friends,
In decentralized WM managed scenario, inbound delivery is created automatically when the storage location is HU managed. In the current design, we need to use MIGO/MB1B transaction for replicating stocks into warehouse location, and all the materials are managed.
We have a batch split management to use for distributing the cumulative batches into warehouse. In our testing, transaction MB1B cannot support batch split management however transaction MIGO is closely supporting our need. In the MIGO, we have a distributed quantity functionality and through this we can able to split the quantity into multiple batches.
However, when during inbound delivery generation (Inbound delivery generates in background from MIGO document when location is HU managed), system is generating the individual line item instead batch split, example -
In MIGO -
Total Quantity - 10
Item: 00001
Material : ZZZYYY
Batch1: AAAA
Quantity : 4
Item: 00001
Material : ZZZYYY
Batch2: AAAB
Quantity : 6
In Inbound Delivery -
Item:10
Material : ZZZYYY
Batch1: AAAA
Quantity: 4
Item:20
Material : ZZZYYY
Batch2: AAAB
Quantity : 6
We need as below in inbound delivery -
Item:10
Material : ZZZYYY
item: 90001
Batch1: AAAA
Quantity : 4
item: 90001
Batch2: AAAB
Quantity : 6
Please suggest. Appreciate your reply.
Thanks
Best Regards,
Goutamuse BAPI: BAPI_OUTB_DELIVERY_CONFIRM_DEC
I used this long time back. it worked fine. -
File adapter become second step in the ccBPM (filename base on the input)
Hi XI Expert,
Could you help to advise me, what i should o with this scenario :
i have ccBPM scenario :
1. monitoring database table (using JDBC adapter), query filepath information and update
status accordingly after process.
2. read xml file (name and path base on the first step).
my problem is how to pass filepath and filename to file adapter, becase as i know file adapter (sender) only
can monitoring fix directory and file (patter).
Thank you
FernandHi,
It would be better if you elaborate your scenario.
Just check out the steps to create and display the file :
1 Create Material MM01 1 Create PR ME51N
2 Change Material MM02 2 Change PR ME52N
3 Display Material MM03 3 Display PR ME53N
4 List Extendable Materials MM50 4 Release individual PR ME54N
5 Stock Overview MMBE 5 Release Collective PR ME55
6 Flag for Deletion MM06 6 Create RFQ ME41
7 Enter storage locations MMSC 7 Change RFQ ME42
8 Create vendor (centrally) XK01 8 Display RFQ ME43
9 Change vendor (centrally) XK02 9 Print RFQ ME9A
10 Display vendor (centrally) XK03 10 Maintain Quotations ME47
11 Vendor Changes (Centrally) XK04 11 Comparitive statement ME49
12 Block Vendor (Centrally) XK05 12 Create contract ME31K
13 Mark vendor for deletion (centrally) XK06 13 Change Contract ME32K
14 Excise Master Maintenance J1ID 14 Display Contract ME33K
15 Create Purchasing Info Record ME11 15 Release Contract ME35K
16 Change Purchasing Info Record ME12 16 Print Contract ME9K
17 Display Purchasing Info Record ME13 17 Create PO ME21N
18 Changes to Purchasing Info Record ME14 18 Change PO ME22N
19 Flag for Deletion ME15 19 Display PO ME23N
20 Info Records Per Vendor MW1L 20 Release Individual PO ME29N
21 Info Records per Material ME1M 21 Release collective PO ME28
22 Create/ Change Service Master AC03 22 Print PO ME9F
23 Display Service Master AC04 23 Goods Receipt/Change /Display MIGO
24 List Display: Service Master AC06 24 Print of Material Document MB90
25 Invoice Verification MIRO
26 Park Invoice MIR7
27 Display Invoice MIR4
28 Cancel Invoice MR8M
29 Release Blocked invoice MRBR
30 Display of Invoice documents MIR5
Test Description: Procurement of Non-Stock Items Test Description: Procurement of Imported Gas in Bonded Warehouse
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create PR with account assignment category ME51N 1 Create contract ME31K
2 Change PR ME52N 2 Change Contract ME32K
3 Display PR ME53N 3 Display Contract ME33K
4 Release individual PR ME54N 4 Release Contract ME35K
5 Release Collective PR ME55 5 Print Contract ME9K
6 Create RFQ ME41 6 Create PO (do not select GR based IV) ME21N
7 Change RFQ ME42 7 Change PO ME22N
8 Display RFQ ME43 8 Display PO ME23N
9 Print RFQ ME9A 9 Release Individual PO ME29N
10 Maintain Quotations ME47 10 Release collective PO ME28
11 Comparitive statement ME49 11 Print PO ME9F
12 Create PO with account assignment category (A for asset and K for cost center) and enter G/L a/c ME21N 12 Invoice verification (for customs duty, warfage , CVD) MIRO
13 Change PO ME22N 13 GR bonded MIGO
14 Display PO ME23N 14 Transfer the material Plant storage to unbonded MIGO/MB1B
15 Release Individual PO ME29N 15 Capture excise invoice J1IG
16 Release collective PO ME28 16 Print of Material Document MB90
17 Print PO ME9F 17 Invoice Verification MIRO
18 Goods Receipt/Change /Display MIGO 18 Park Invoice MIR7
19 Print of Material Document MB90 19 Display Invoice MIR4
20 Invoice Verification MIRO 20 Cancel Invoice MR8M
21 Park Invoice MIR7 21 Release Blocked invoice MRBR
22 Display Invoice MIR4 22 Display of Invoice documents MIR5
23 Cancel Invoice MR8M
24 Release Blocked invoice MRBR
25 Display of Invoice documents MIR5
Test Description: Procurement of Imported Gas in Non-Bonded Warehouse Test Description: Procurement of Gas (Domestic) in Manufacturing Location
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create contract ME31K 1 Create Contract ME31K
2 Change Contract ME32K 2 Change Contract ME32K
3 Display Contract ME33K 3 Display Contract ME33K
4 Release Contract ME35K 4 Release Contract ME35K
5 Print Contract ME9K 5 Print Contract ME9K
6 Create PO (do not select GR based IV) ME21N 6 Create PO ME21N
7 Change PO ME22N 7 Change PO ME22N
8 Display PO ME23N 8 Display PO ME23N
9 Release Individual PO ME29N 9 Release individual PO ME29N
10 Release collective PO ME28 10 Release collective PO ME28
11 Print PO ME9F 11 Print PO ME9F
12 Invoice verification (for customs duty, warfage , CVD) MIRO 12 Create Inbound delivery VL31N
13 GR plant stocks MIGO 13 Change Inbound delivery VL32N
14 Capture excise invoice J1IG 14 Display Inbound delivery VL33N
15 Print of Material Document MB90 15 Create Shipment(Transport Planning) VT01N
16 Invoice Verification MIRO 16 Change Shipment VT02N
17 Park Invoice MIR7 17 Display Shipment VT03N
18 Display Invoice MIR4 18 Create Shipment costs VI01
19 Cancel Invoice MR8M 19 Change Shipment costs VI02
20 Release Blocked invoice MRBR 20 Display Shipment costs VI03
21 Display of Invoice documents MIR5 21 Goods Receipts MIGO
22 Capture and Post Excise MIGO / J1IEX
23 GR for free goods receipt MIGO
24 Post Excise for free goods MIGO / J1IEX
25 Print of Material Document MB90
26 Invoice Verification MIRO
27 Park Invoice MIR7
28 Display Invoice MIR4
29 Cancel Invoice MR8M
30 Release Blocked invoice MRBR
31 Display of Invoice documents MIR5
Test Description: Procurement of Gas (Domestic) in Trading Location Test Description: High Sea Sales
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Contract ME31K 1 Create Contract ME31K
2 Change Contract ME32K 2 Change Contract ME32K
3 Display Contract ME33K 3 Display Contract ME33K
4 Release Contract ME35K 4 Release Contract ME35K
5 Print Contract ME9K 5 Print Contract ME9K
6 Create PO ME21N 6 Receipt of Order from Customer Manual Process
7 Change PO ME22N 7 Create sales order SD process
8 Display PO ME23N 8 Automatic PR Automatic
9 Release individual PO ME29N 9 Display PR ME53N
10 Release collective PO ME28 10 Create PO ME21N
11 Print PO ME9F 11 Change PO ME22N
12 Create Inbound delivery VL31N 12 Display PO ME23N
13 Change Inbound delivery VL32N 13 Release individual PO ME29N
14 Display Inbound delivery VL33N 14 Release collective PO ME28
15 Create Shipment(Transport Planning) VT01N 15 Print PO ME9F
16 Change Shipment VT02N 16 Goods Receipt/Change /Display MIGO
17 Display Shipment VT03N 17 Print of Material Document MB90
18 Create Shipment costs VI01 18 Invoice Verification MIRO
19 Change Shipment costs VI02 19 Park Invoice MIR7
20 Display Shipment costs VI03 20 Display Invoice MIR4
21 Goods Receipts MIGO 21 Cancel Invoice MR8M
22 Capture and Post Excise J1IG 22 Release Blocked invoice MRBR
23 GR for free goods receipt MIGO 23 Display of Invoice documents MIR5
24 Post Excise for free goods J1IG
25 Print of Material Document MB90
26 Invoice Verification MIRO
27 Park Invoice MIR7
28 Display Invoice MIR4
29 Cancel Invoice MR8M
30 Release Blocked invoice MRBR
31 Display of Invoice documents MIR5
Test Description: Procurement Scenario in Haldia / Aegis Test Description: Procurement of Services
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Contract ME31K 1 Create PR( with Item category D) ME51N
2 Change Contract ME32K 2 Create PR ME51N
3 Display Contract ME33K 3 Change PR ME52N
4 Release Contract ME35K 4 Display PR ME53N
5 Print Contract ME9K 5 Release individual PR ME54N
6 Create PO ME21N 6 Release Collective PR ME55
7 Change PO ME22N 7 Create RFQ ME41
8 Display PO ME23N 8 Change RFQ ME42
9 Release individual PO ME29N 9 Display RFQ ME43
10 Release collective PO ME28 10 Print RFQ ME9A
11 Print PO ME9F 11 Maintain Quotations ME47
12 Receipt of Order from Customer 12 Comparitive statement ME49
13 Goods Receipt/Change /Display MIGO 13 Create contract ME31K
14 Print of Material Document MB90 14 Change Contract ME32K
15 Invoice Verification MIRO 15 Display Contract ME33K
16 Park Invoice MIR7 16 Release Contract ME35K
17 Display Invoice MIR4 17 Print Contract ME9K
18 Cancel Invoice MR8M 18 Create service PO ME21N
19 Release Blocked invoice MRBR 19 Change PO ME22N
20 Display of Invoice documents MIR5 20 Display PO ME23N
21 Release service PO ME29N
22 Release collective PO ME28
23 Print PO ME9F
24 Service Entry/ Acceptance ML81N
25 Invoice Verification MIRO
26 Park Invoice MIR7
27 Display Invoice MIR4
28 Cancel Invoice MR8M
29 Release Blocked invoice MRBR
30 Display of Invoice documents MIR5
Test Description: Procurement of Assets via Internal Order Test Description: Painting / Rework of Cylinders
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Capital Investment order KO01 1 PO Creation (Item Category L, Account Assignment K) ME21N
2 Create an AUC for the Internal Order KO02 2 Change PO ME22N
3 Release the Internal order KO02 3 Display PO ME23N
4 Create a Purchase order with account assignment 'F' and asssinging the suitable order number ME21N 4 Release service PO ME29N
5 Post Goods Receipt with reference to PO MIGO 5 Release collective PO ME28
6 Post Invoice Verification MIRO 6 Print PO ME9F
7 Do an initial settlement of internal order to AUC (automatic). Need not maintain settlement rule in the order for AUC KO88 7 Material transfer to vendor MB1B
8 Create an asset against which the order needs to be finally settled (Full settlement) AS01 8 Receive the material from vendor MIGO
9 Settlement rule need to be maintained in the order for asset number for full settlement KO02 9 Logistics Invoice Verification MIRO
10 Do a final(Full) settlement of the internal order to asset. 'Select the option full settlement' KO88 10 Park Invoice MIR7
11 Check the posted entries for the asset AS03 11 Display Invoice MIR4
12 Cancel Invoice MR8M
13 Release Blocked invoice MRBR
14 Display of Invoice documents MIR5
Test Description: Posting of Gas Gain / Loss at the end of the Month Test Description: Physical Inventory
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Physical Inventory Document and Post MI10 1 Create Physical inventory document MI01
2 Update Excise Records J1IG / J1I5 2 Change Physical Inventory Document MI02
3 Display Physical Inventory Document MI03
4 Enter Inventory count MI04
5 Recount MI11
6 Post difference count MI07
7 Count/ difference MI08
Test Description: Filling of Cylinders 8 Update Excise Records J1IG / J1I5
No. Business Process Steps Transaction Code
1 Run the Filling Transaction ZFILL
2 Check for the Material Document MB03
Test Description: Day End Excise Transactions
No. Business Process Steps Transaction Code
1 Update of Registers RG1 and RG23 (Part 1) J1I5
2 Escise Register Extraction J2I5
3 Print Excise Registers J2I6
4 Download Register Data J1IR
Test Description: STO Process Manufacturing to Trading Test Description: STO Process Trading to Trading
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create PO ME21N 1 Create PO ME21N
2 Change PO ME22N 2 Change PO ME22N
3 Display PO ME23N 3 Display PO ME23N
4 Print PO ME9F 4 Print PO ME9F
5 Create Outbound delivery VL10B 5 Create Outbound delivery VL10B
6 Change Outbound delivery VL02N 6 Change Outbound delivery VL02N
7 Display Outbound delivery VL03N 7 Display Outbound delivery VL03N
8 Print of Material Document MB90 8 Print of Material Document MB90
9 Create Excise Invoice J1IS 9 Create Excise Invoice J1IJ
10 Goods Receipts MIGO 10 Goods Receipts MIGO
11 Capture and Post Excise J1IG 11 Capture and Post Excise J1IG
12 GR for free goods receipt MIGO 12 GR for free goods receipt MIGO
13 Post Excise for free goods J1IG 13 Post Excise for free goods J1IG
14 Print of Material Document MB90 14 Print of Material Document MB90
Test Description: STO Process Trading to Manufacturing
No. Business Process Steps Transaction Code
1 Create PO ME21N
2 Change PO ME22N
3 Display PO ME23N
4 Print PO ME9F
5 Create Outbound delivery VL10B
6 Change Outbound delivery VL02N
7 Display Outbound delivery VL03N
8 Print of Material Document MB90
9 Create Excise Invoice J1IJ
10 Goods Receipts MIGO
11 Capture and Post Excise J1IG
12 GR for free goods receipt MIGO
13 Post Excise for free goods J1IG
14 Print of Material Document MB90
Sr.no Transaction Menu Path
1 Create PR for Materials
(ME51) LogMMPurchasingRequisitioncreateEnt
er appropriate document type,item category(blank for materials),appropriate A/C ***.Cat,Del date,plant,pur grp,mat grp and Req tracking no and Requisitioner(not mandatory)press enterEnter MESC no. of the material or Description in short text/long text,Qty,unitpress enterEnter estimated unit pricepress enterEnter G/L A/C and Cost centre or ORDERdepending upon A/c ***. Categorypress enterSave. Note the PR no.
2 Create PR for Services (ME51) LogMMPurchasingRequisitioncreateEnter appropriate document type,item categoryD, appropriate A/C ***.Cat,Del date,plant,pur grp,mat grp and Req tracking no and Requisitioner(not mandatory)press enter Do you want to create outline?NoEnter job heading in Short text,service no or service descriptionin item 10,20,- - - - ,Qty,unit,estimated priceclick on OutlineEnter G/L A/C noand Cost centre or ORDERdepending upon A/c ***. CategoryClick on job headingclick on new sub groupCreate new subgroups such as Scope of work, Special conditions, etcSave. Note the PR no.
3 Check Release Strategy for PR (ME54) LogMMPurchasingRequisitiondisplayEnter PR no.Press Enter Select the line item and click on the Release Strategy (Green) iconNote the release strategy.
4 Create Service RFQ
(ME41) LogMMPurchasingRFQ/QuotationRFQCreateEnter Quot. Deadline,pur org,pur grp,plant, Click on Ref to Preq,Enter PR no.press enterSelect services Click on Copy+Dtails Click on Vendor adressSelect VendorPress EnterCheck vendor detailsSaveNote collective RFQ no.Press EnterNote the individual vendor RFQ no.Select second vendor and follow the same procedure for as many no of vendors as deesired.
If Quotations are to be compared with the BPCL estimate, then create RFQ for BPCL Estimateas a vendor (vendor no.300648)
5 Printing of RFQs(ME9A) LogMMPurchasingRFQ/QuotationRFQMessagesprint/transmitEnter individual vendors RFQ noExecutetick in the check boxclick on output
6 Reprinting of RFQ LogMMPurchasingRFQ/QuotationRFQchangeEnter RFQ no.enterclick on HeaderMessagesDelete the message NEU and create new message by writing NEUpress enterSaveenter printer nametick on print immediately & release after outputEnter.
7 Maintain RFQ
(ME47) LogMMPurchasingRFQ/QuotationQuotationMaintainEnter each partys Individual RFQ no.Enterselect the item and click on services Enetr the tax code Enter quotations of each party against each line item and saveEnter jurisdiction code. .
8
Quotation comparison
(ME49)
LogMMPurchasingRFQ/QuotationQuotationPrice ComparisonEnter collective RFQ no.Execute
9 Create PO wrt RFQ(ME21) LogMMPurchasingPur. Ordcreatevendor knownRef to RFQEnter Vendors RFQ noEnterSelect the items Copy+ Detailspress enterEnter jurisdiction codeSave. Note the PO no.
10 Create Service PO
Vendor known
(ME21) LogMMPurchasingPur. Ordcreate-vendor knownEnter vendor no, Pur org1000, Pur Grp, Item Cat.D, A/C ***.cat.K, Delivery Date, Plant, Material group (alpha numeric for services), Req tracking no. (Optional)Press enterAcknowledge the warningDo you want to create Outline? Press NOEnter the short text of the services in the headerEnter service no. or the short text of the services with quantity,Unit and Price.To write more details about services,select the line item & click on Long text for line(Paper and pencil symbol) OR double click on the service line item click on long text symbol against line item short textEnter G/L A/C and Cost CentreSaveenter Tax code 00press enterEnter jurisdiction code IN 00Note the PO number.
11 Check Release Strategy for PO(ME23) LogMMPurchasingPOdisplayEnter PO no.Press EnterGo backSelect the line item and click on the Release Strategy (Green) iconNote the release strategy.
12 Release PO(ME28) LogMMPurchasingPOReleaseEnter PO no in document no. and Release code Executeselect the POClick on Release + Save.
13 To paste a file in any long text Create a word document and save the same as RTF file.
To upload this file in the long text, click on TextUploadselect radio button on RTFClick on TransferGive menu path for the saved RTF fileClick on TransferGo backSave.
14 Create SES(ML81) Logistics Materials Management  Purchasing  Purchase order DisplayPurchase Order Select Purchase Order Follow on Functions  Service Entry Sheet  Maintain  Press Enter  Select the item Click on Create Entry sheet icon  Click Service sel icon  Press enter  Select items  Click on Adopt services icon  Enter the actual quantities  Save.
15 Release SES(ML81) Logistics  Materials Management  Purchasing  Purchase Order  Follow On Functions  Service Entry Sheet Maintain  Select the Purchase order No.  Press Enter  Double Click on Service Entry Sheet No.  Go Back  Click on Accept icon (green colour)  Enter appropriate release code as per authority  Save.
16 Logistic Invoice verification
(MR1M) Logistics  Materials Management  Purchasing Purchase Order  Display  Purchase Order Follow On Functions Log .Inv Ver.Enter Doc date, Gross inv amount,Press enetr . Check the tax code for TDS/WCT W.tax base (if applicable.If w.tax base amount is not mentioned the system will take Gross inv amount by default for calculating works contract tax) ),terms of payment & W tax code will get defaulted from vendor master, Click on header  Enter PO number in Allocation ,House bank and Payment method as C ( Cheque) Go Back Click on item list Check the green signal and then save.
17 Goods Issue(MB1A) Logistics  Materials Management Inventory managementGoods movement Goods IssueClick on To Reservation and enter Resservation no,if GI to be done wrt to reservation.Otherwise enter movement type,plant,slocpress enterEnter MESC no,Qty,Cost centre or ORDER as the case may be and SAVE.
L8 Goods Receipt
(MB01) Logistics  Materials Management  Purchasing Purchase Order DisplayPurchase Order  Follow On Functions Goods receiptBill of lading or delivery challan noclick on copy+details,Enter quantity to be receivedSave.
19 Electricity and other Statutory payments
(ME21) Create PO with Vendor known, order type FO, Item Category B and A/C ***.Cat K.Press enterEnter validity start and end dateEnterEnter short text, overall limit & expected valueEnterEnter G/L A/C, Cost CentreEnterSaveEnter tax codeEnterNote the FO order no.
For this order neither Service Entry nor Goods receipt is required. An Invoice can be directly processed in the system for making payment.
Carryout Logistics Invoice verification in reference to the purchase order. Though the cost center defaults from the purchase order, the same can be changed during the invoice verification.
20 LIV for FO order
(MR1M) Logistics  Materials Management  Purchasing Purchase Order  Display Purchase Order Follow On Functions Log .Inv Ver.
Enter Document Date, Reference, & Amount to
be paid. Press enter .Check the tax code for TDS/WCT.Click on header . Enter the PO number in Allocation/House bank and payment method. Go back.
Click on Item list  Select the invoice item by ticking in the check
box on the left  Click on Account Assignment  In the account assignment page  enter the amount you have entered earlier in the amount field (The amount can be distributed amongst various cost centres)  Go back  Indicator turns green  Save
21 Travel & Ticketting Create standard PO type NB with item category D and A/C ***. Cat K.Enter each bill as line item.While entering the G/L A/C and Cost centre , enter INDAIRLINES or JETAIRWAYS in the ORDER so that corporation can avail of bulk discount.
22 Outline Agreement Creation w.r.t. RFQ
(ME31K) Logistics Materials Management PurchasingOutline AgreementContractCreate
Click on Reference to RFQ Give the individual RFQ number against which the contract is to be created Press enter Give the validity start ,end dates and the target value of the contract. Press EnterSelect the material line item and click on Copy +Details .In case the account assignment is not given befor give the relevant account assingnment category K/F/P and then click on Copy Details Press Enter If the ssignment is not given give the required account assignment now . If it is to be maintained same for all the services click on Auto repeat AAGive the Jurisdiction code as IN00 . Check whether all the services have been copied from the RFQ along with the rates by selecting the material line item and then going to services screen (HammerSpanner) Save the contract . note the number
23 Create PO w.r.t. Contract
(ME21) Logistics  Materials Management  Purchasing Purchase Order Create  Vendor known Click on Reference to Contract  Give the Contract number in Outline agreentment field Press Enter Select The material line item and click on Copy +Details Press enter Say No when asked Do you want to create an outlineChange the short text as per the requirement and then click on Service Sel icon Press enter to select the services from the contract .Select the required services and then click on Services(Adopt Services icon). The quantities of the various line item are defaulted as 1 . Change the quantities as per the requirement. Press enter . Save the PO and note the number .
24 PO for one time vendor Create standard PO with vendor code 900000. Give correct vendor details. Save and release the PO. For one time vendor IV to be done and not LIV.
25 IV for one time vendor Logistics Materials Management  Purchasing  Purchase order DisplayPurchase Order Select Purchase Order Follow on Functions Invoice verificationEnter all details of billsEnter CancelEnter Amount ,Payment method,Payment method supplementEnterSimulate Save.
26 Cancel PO(ME22) LogMMPurchasingPurchase orderchangeEnter PO no.enterSelect the items to be cancelledClick on delete.
27 Close PO
(ME22) LogMMPurchasingPurchase orderchangeEnter PO no.enterclick on HeaderDetailsTick on complete DeliverySave
28 Print PO
(ME9F) Logistics  Materials management  Purchasing  Purchase Order Messagesprint/transmitEnter PO no.ExecuteTick in the check boxClick on outputOutput device LOCLtick on print immediately
29 Reprinting of PO LogMMPurchasingPurchase orderchangeEnter PO no.enterclick on HeaderMessages create new message by writing NEUpress enterSaveenter printer nametick on print immediately & release after outputEnter.
30 PO History
(ME23) LogMMPurchasingPurchase orderDisplayEnter PO no.Press Enter(Incase of metrials select the material line item . For services Go back to material screen Select line item & click on PO history(Graph symbol)
31 LD Deductions LogMMInvoice verification Invoice verificationClick on Enter credit memoEnter document date,vendor code,company code 1000,currencyClick on Memo iconEnter reason for LDClick on enterEnter the amount,payment method supplementpress enterClick on EditNew itemG/L AccountEnter G/L A/C 480070,click on Credit PostingPress EnterFill in the same amount & Business areaEnterSave.
32 Release of Retention Money After the final Invoice verification, Find out all the Invoicing documents from the PO history.
LogMMPurchasingPurchase orderDisplayEnter PO no.Press Enter(Incase of metrials select the material line item . For services Go back to material screen Select line item & click on PO history(Graph symbol)
Double click on the LIV documentsclick on Follow on DocumentsDouble click on the retention money documentDocumentDisplay->ChangeChange the base line date (6 months from the final bill) and remove payment block HSave.
By this procedure the payment shall fall due 6 months after the final bill or on the Base line date
33 Down payment Request AccountingFinancial AccountingAccounts payablePostingDown paymentRequestEnter Document date, document type KA, company code 1000,posting date, currency. vendor code, Trg .SP G/L Ind. A Press EnterEnter the amount of advance, Business area, Due on date, PO no against which the advance is being paid, item no 10 in the next field, Enter PO no preceded by * in the allocation field, Enter relevant text in the text field, Enter the relevant W.tax code(from D series)Press EnterAccept warning, if anyClick on more data from menuEnter house bank Save
34 Check Vendor Line items for above Accounting Financial AccountingAccounts payableAccountDisplay Line itemsEnter Vendor codeTick open items with special G/L indicators button, Go to selection criteria, Enter business areaEnterNote the displayed Vendor line items for Down payment request in open items
35 Clearing Down Payment AccountingFinancial AccountingAccounts payablePostingDown paymentClearingEnter Document date, posting date, company code, currency, Vendor code, Relevant Invoice document no against which the document is to be recovered, fiscal year, Enter PO no preceded by * in the Allocation field, Enter relevant text in the text fieldEnterMessage Correct the line marked line items appears, Double click the line item, Enter the relevant text, payment method supplementSave. For checking the Vendor line item for Down payment clearing, follow the same menu path as in Sr no. 31
36 Enter Credit Memo LogisticsMaterial Mgmt Invoice verification Enter Credit memoFill in the details: Date - Todays Date, Document Type - KA, Company code - 1000, Currency - INR, Vendor code - fill in vendor code Do not enter P.O No. Press Enter Fill in the amount to be deducted with withholding Tax code as Z0, Payment method as C, payment method supplement as applicable Invoice ref No Eight digit No as noted from invoice document and Necessary text in allocation. Press Enter In this screen, use path Edit New item GL Account(480070 for LD and 480000 for misc income), In the pop-up box press Radio button as Credit posting Fill in necessary GL Account as mentioned below Press enter  In this screen Give the same amount and fill in the Business Area where credit is to be given {In case of Credit, to be given for multiple business area/ GL account repeat} Press EnterClick on simulate (check the entries are Proper i.e. diff is zero.) Save Note and record Credit document No
You can revert back with a bit more elaboration of your scenario.
Regards,
Sushama -
Copy the Movement types in OMJJ
Hi,
I have copied one movement type from 303 to 403. I assigned the tcode o MB1B and MIGO.
Now I try to check in MB1B, Its no showing 403 mov type..but if I give manually, its allowing and working perfectlly..
Anywhere any setting is missing while copy the mov type in OMJJ..
Please Guide me.
Regards,
PriyaHi
I am not sure of functioning of mvt types 401-403 which donot have any updates (value wise) but only quantity wise updation is there. 403 is standard mvt type defined by SAP, I hope it is not relevant for transfer posting where quantity and value will be updated. When I tried with Tcode MB11, it is appearing where as for MIGO, MB1B/A it is not. Hope its functionality doesnt support these Tcodes.
When you copy any existing mvt type to other, use Z or X as prefix so that it will not fall under standard types.
Thanks -
QM inspection for movement 321 and 322
Dear guru,
Presently there is one new requirement from our business wanting us to create an inspection type that will allow for users to use movement type 321 & 322 through MIGO.
Because the standard SAP setup (i.e. SPRO QM Quality Inspection Inspection Lot Creation Inspection for Goods Movement) for movement type 321 and 322 are not tied to any inspection lot origin, further, if I will to use u201Dcopy..asu201D method or hit create New method, the inspection lot origin field box is grey out and not allow input of inspection lot origin.
May I know how to resolve this issue? Or 321 and 322 should not involve QM? or other?
Thanks.
TuffTuffy,
What I have understood is, I try to re quote the same.
1. Your declare production and stock goes to quality inspection with 04 inspection type
2. You clear this inspection lot and post the stock to unrestricted use through QA32 / QA12
3. Now you want to reverse the production movement.
4. System doesnu2019t allow you to reverse this and throws error as u201CDeficit of stock in qualityu201D
5. If you try to cancel 321 material document system throws error as u201CMaterial document cannot be processedu201D
If above is the scenario then perhaps you have following 2 options
1. Document specific reversal
a. You need to implement SAP Note 175842
b. As a result of which you get a program in system, give inspection lot as reference.
c. System reverses the stock and posts back to quality inspection
d. Now if you try to cancel 101 material document (production reversal) through MBST, system will allow you.
2. Without document specific
a. Go to MB31
b. Input production order and opt for 102 movement.
c. Enter
d. Select the stock type as unrestricted. (default it would be X i.e. quality inspection)
Under ideal circumstances the need to use any of above options shouldnu2019t arise. If requirement is the production reversal, I think to stop inspection lot creation or use of MIGO / MB1B would not work as this eliminates the utilization of QM module.
Regards,
Anand Rao -
Hi Techies,
I have some issue regarding the printing of GI /GR Slip using the MIGO transaction.
All the required output types for GI & GR are configured, driver program & forms have been developed.
Now when I test the developement by performing a GI or GR against a material document no spool is getting generated.
Can someone help me out in this regard ?
Suhas.Hi there
Check the below settings whether you have done it clear,,
NACE-Select ME Click on Condition records- Select WA02( As you want)-Trans/Event Type-"WA" Print Version " 2" and Execute it
In the next scren P-1, medium-1, Date/Time-Select 3 as you want), Language EN and enter,, Now select the line and click on the communication and there enter the output device if anything specified for you,, and save it,,
Now check in MB02, enter the material document, and double click on the any line item, Click on the messages do the same process for this document as above and save it and try MB90,, surely it wil work and for the future docs,,
Finally-- At the time of MIGO/MB1B check that Indiviual/Collective slip is Enabled or not,,,
Thanks
Senthil -
Batch Derivation on subcontract POs
Hi all
Has anyone used batch derivation on subcontract PO? Also does it require enhancement pack 4?
I have a requirement where the expiry date on the finished goods on a subcontract PO should be be populated with the shortest expiry date of all its components. This should happen durng the GR
Suggestions welcome
JayshreeBy issuing stock to vendor using movement 541 (MIGO/MB1B)
I should also mention that this is an internal vendor (Intead of using PP subcontract PO's are used)
Edited by: Jayshree Ravi on Sep 23, 2010 12:01 PM -
We have the following scenario.
Some equipment or component of equipment, which are defined as equipment master in PM module are to be sent out for repair.
What should be the procedure adopted?
What we are planning is to create a material master for this item to be sent out and upload the stock with 561 movement.
Is it the correct way of doing or can we get stock from PM module directly.
We need to have a print of material document for sending the material outfrom the company
However there is no excise involved in our company
CAn anybody explain the correct procedure to be followed?Follow below procedure;
1. MM01 - Create Equipment as a Material for e.g. "M1"(Valuated OR Non-valuated, depends on requirement)
2. MIGO - Goods Receipt > Others (Using Movement Type "202" i.e. Receipt from Material "M1" against Cost Center, do not use 561)
3. ME21N - Create Subcontracting PO for Material "M1", use Item categroy "L" in PO, use component as "M1" only
4. MIGO/MB1B - Transfer Posting of Material "M1" to Vendor using Movement Type "541" (Activate Print settings for this Material Doc and take print from MB90)
5. MB90 - Print Transfer Posting Material Doc
6. MIGO - Goods Receipt against Subcontracting PO through Movement Type "101' (Here Stock of M1 will get consumed through "543" from vendor stock and get received through "101" in unrestricted stock)
7. MIRO - Invoice Verification for Servcie charges -
Hi Gurus,
As a SD guy i would like to learn MM also. One thing is that i think i don't need to know the whole stuff in MM. Could anyone guide me in this way?
Thanks in advanceMM-T-Code
Test Description: Maintenance of Masters Test Description: Procurement of Stock Materials
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Material MM01 1 Create PR ME51N
2 Change Material MM02 2 Change PR ME52N
3 Display Material MM03 3 Display PR ME53N
4 List Extendable Materials MM50 4 Release individual PR ME54N
5 Stock Overview MMBE 5 Release Collective PR ME55
6 Flag for Deletion MM06 6 Create RFQ ME41
7 Enter storage locations MMSC 7 Change RFQ ME42
8 Create vendor (centrally) XK01 8 Display RFQ ME43
9 Change vendor (centrally) XK02 9 Print RFQ ME9A
10 Display vendor (centrally) XK03 10 Maintain Quotations ME47
11 Vendor Changes (Centrally) XK04 11 Comparitive statement ME49
12 Block Vendor (Centrally) XK05 12 Create contract ME31K
13 Mark vendor for deletion (centrally) XK06 13 Change Contract ME32K
14 Excise Master Maintenance J1ID 14 Display Contract ME33K
15 Create Purchasing Info Record ME11 15 Release Contract ME35K
16 Change Purchasing Info Record ME12 16 Print Contract ME9K
17 Display Purchasing Info Record ME13 17 Create PO ME21N
18 Changes to Purchasing Info Record ME14 18 Change PO ME22N MKVZ
19 Flag for Deletion ME15 19 Display PO ME23N
20 Info Records Per Vendor MW1L 20 Release Individual PO ME29N
21 Info Records per Material ME1M 21 Release collective PO ME28
22 Create/ Change Service Master AC03 22 Print PO ME9F
23 Display Service Master AC04 23 Goods Receipt/Change /Display MIGO
24 List Display: Service Master AC06 24 Print of Material Document MB90
25 Invoice Verification MIRO
26 Park Invoice MIR7
27 Display Invoice MIR4
28 Cancel Invoice MR8M
29 Release Blocked invoice MRBR
30 Display of Invoice documents MIR5
Test Description: Procurement of Non-Stock Items Test Description: Procurement of Imported Gas in Bonded Warehouse
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create PR with account assignment category ME51N 1 Create contract ME31K
2 Change PR ME52N 2 Change Contract ME32K
3 Display PR ME53N 3 Display Contract ME33K
4 Release individual PR ME54N 4 Release Contract ME35K
5 Release Collective PR ME55 5 Print Contract ME9K
6 Create RFQ ME41 6 Create PO (do not select GR based IV) ME21N
7 Change RFQ ME42 7 Change PO ME22N
8 Display RFQ ME43 8 Display PO ME23N
9 Print RFQ ME9A 9 Release Individual PO ME29N
10 Maintain Quotations ME47 10 Release collective PO ME28
11 Comparitive statement ME49 11 Print PO ME9F
12 Create PO with account assignment category (A for asset and K for cost center) and enter G/L a/c ME21N 12 Invoice verification (for customs duty, warfage , CVD) MIRO
13 Change PO ME22N 13 GR bonded MIGO
14 Display PO ME23N 14 Transfer the material Plant storage to unbonded MIGO/MB1B
15 Release Individual PO ME29N 15 Capture excise invoice J1IG
16 Release collective PO ME28 16 Print of Material Document MB90
17 Print PO ME9F 17 Invoice Verification MIRO
18 Goods Receipt/Change /Display MIGO 18 Park Invoice MIR7
19 Print of Material Document MB90 19 Display Invoice MIR4
20 Invoice Verification MIRO 20 Cancel Invoice MR8M
21 Park Invoice MIR7 21 Release Blocked invoice MRBR
22 Display Invoice MIR4 22 Display of Invoice documents MIR5
23 Cancel Invoice MR8M
24 Release Blocked invoice MRBR
25 Display of Invoice documents MIR5
Test Description: Procurement of Imported Gas in Non-Bonded Warehouse Test Description: Procurement of Gas (Domestic) in Manufacturing Location
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create contract ME31K 1 Create Contract ME31K
2 Change Contract ME32K 2 Change Contract ME32K
3 Display Contract ME33K 3 Display Contract ME33K
4 Release Contract ME35K 4 Release Contract ME35K
5 Print Contract ME9K 5 Print Contract ME9K
6 Create PO (do not select GR based IV) ME21N 6 Create PO ME21N
7 Change PO ME22N 7 Change PO ME22N
8 Display PO ME23N 8 Display PO ME23N
9 Release Individual PO ME29N 9 Release individual PO ME29N
10 Release collective PO ME28 10 Release collective PO ME28
11 Print PO ME9F 11 Print PO ME9F
12 Invoice verification (for customs duty, warfage , CVD) MIRO 12 Create Inbound delivery VL31N
13 GR plant stocks MIGO 13 Change Inbound delivery VL32N
14 Capture excise invoice J1IG 14 Display Inbound delivery VL33N
15 Print of Material Document MB90 15 Create Shipment(Transport Planning) VT01N
16 Invoice Verification MIRO 16 Change Shipment VT02N
17 Park Invoice MIR7 17 Display Shipment VT03N
18 Display Invoice MIR4 18 Create Shipment costs VI01
19 Cancel Invoice MR8M 19 Change Shipment costs VI02
20 Release Blocked invoice MRBR 20 Display Shipment costs VI03
21 Display of Invoice documents MIR5 21 Goods Receipts MIGO
22 Capture and Post Excise MIGO / J1IEX
23 GR for free goods receipt MIGO
24 Post Excise for free goods MIGO / J1IEX
25 Print of Material Document MB90
26 Invoice Verification MIRO
27 Park Invoice MIR7
28 Display Invoice MIR4
29 Cancel Invoice MR8M
30 Release Blocked invoice MRBR
31 Display of Invoice documents MIR5
Test Description: Procurement of Gas (Domestic) in Trading Location Test Description: High Sea Sales
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Contract ME31K 1 Create Contract ME31K
2 Change Contract ME32K 2 Change Contract ME32K
3 Display Contract ME33K 3 Display Contract ME33K
4 Release Contract ME35K 4 Release Contract ME35K
5 Print Contract ME9K 5 Print Contract ME9K
6 Create PO ME21N 6 Receipt of Order from Customer Manual Process
7 Change PO ME22N 7 Create sales order SD process
8 Display PO ME23N 8 Automatic PR Automatic
9 Release individual PO ME29N 9 Display PR ME53N
10 Release collective PO ME28 10 Create PO ME21N
11 Print PO ME9F 11 Change PO ME22N
12 Create Inbound delivery VL31N 12 Display PO ME23N
13 Change Inbound delivery VL32N 13 Release individual PO ME29N
14 Display Inbound delivery VL33N 14 Release collective PO ME28
15 Create Shipment(Transport Planning) VT01N 15 Print PO ME9F
16 Change Shipment VT02N 16 Goods Receipt/Change /Display MIGO
17 Display Shipment VT03N 17 Print of Material Document MB90
18 Create Shipment costs VI01 18 Invoice Verification MIRO
19 Change Shipment costs VI02 19 Park Invoice MIR7
20 Display Shipment costs VI03 20 Display Invoice MIR4
21 Goods Receipts MIGO 21 Cancel Invoice MR8M
22 Capture and Post Excise J1IG 22 Release Blocked invoice MRBR
23 GR for free goods receipt MIGO 23 Display of Invoice documents MIR5
24 Post Excise for free goods J1IG
25 Print of Material Document MB90
26 Invoice Verification MIRO
27 Park Invoice MIR7
28 Display Invoice MIR4
29 Cancel Invoice MR8M
30 Release Blocked invoice MRBR
31 Display of Invoice documents MIR5
Test Description: Procurement Scenario in Haldia / Aegis Test Description: Procurement of Services
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Contract ME31K 1 Create PR( with Item category D) ME51N
2 Change Contract ME32K 2 Create PR ME51N
3 Display Contract ME33K 3 Change PR ME52N
4 Release Contract ME35K 4 Display PR ME53N
5 Print Contract ME9K 5 Release individual PR ME54N
6 Create PO ME21N 6 Release Collective PR ME55
7 Change PO ME22N 7 Create RFQ ME41
8 Display PO ME23N 8 Change RFQ ME42
9 Release individual PO ME29N 9 Display RFQ ME43
10 Release collective PO ME28 10 Print RFQ ME9A
11 Print PO ME9F 11 Maintain Quotations ME47
12 Receipt of Order from Customer 12 Comparitive statement ME49
13 Goods Receipt/Change /Display MIGO 13 Create contract ME31K
14 Print of Material Document MB90 14 Change Contract ME32K
15 Invoice Verification MIRO 15 Display Contract ME33K
16 Park Invoice MIR7 16 Release Contract ME35K
17 Display Invoice MIR4 17 Print Contract ME9K
18 Cancel Invoice MR8M 18 Create service PO ME21N
19 Release Blocked invoice MRBR 19 Change PO ME22N
20 Display of Invoice documents MIR5 20 Display PO ME23N
21 Release service PO ME29N
22 Release collective PO ME28
23 Print PO ME9F
24 Service Entry/ Acceptance ML81N
25 Invoice Verification MIRO
26 Park Invoice MIR7
27 Display Invoice MIR4
28 Cancel Invoice MR8M
29 Release Blocked invoice MRBR
30 Display of Invoice documents MIR5
Test Description: Procurement of Assets via Internal Order Test Description: Painting / Rework of Cylinders
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Capital Investment order KO01 1 PO Creation (Item Category L, Account Assignment K) ME21N
2 Create an AUC for the Internal Order KO02 2 Change PO ME22N
3 Release the Internal order KO02 3 Display PO ME23N
4 Create a Purchase order with account assignment 'F' and asssinging the suitable order number ME21N 4 Release service PO ME29N
5 Post Goods Receipt with reference to PO MIGO 5 Release collective PO ME28
6 Post Invoice Verification MIRO 6 Print PO ME9F
7 Do an initial settlement of internal order to AUC (automatic). Need not maintain settlement rule in the order for AUC KO88 7 Material transfer to vendor MB1B
8 Create an asset against which the order needs to be finally settled (Full settlement) AS01 8 Receive the material from vendor MIGO
9 Settlement rule need to be maintained in the order for asset number for full settlement KO02 9 Logistics Invoice Verification MIRO
10 Do a final(Full) settlement of the internal order to asset. 'Select the option full settlement' KO88 10 Park Invoice MIR7
11 Check the posted entries for the asset AS03 11 Display Invoice MIR4
12 Cancel Invoice MR8M
13 Release Blocked invoice MRBR
14 Display of Invoice documents MIR5
Test Description: Posting of Gas Gain / Loss at the end of the Month Test Description: Physical Inventory
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Physical Inventory Document and Post MI10 1 Create Physical inventory document MI01
2 Update Excise Records J1IG / J1I5 2 Change Physical Inventory Document MI02
3 Display Physical Inventory Document MI03
4 Enter Inventory count MI04
5 Recount MI11
6 Post difference count MI07
7 Count/ difference MI08
Test Description: Filling of Cylinders 8 Update Excise Records J1IG / J1I5
No. Business Process Steps Transaction Code
1 Run the Filling Transaction ZFILL
2 Check for the Material Document MB03
Test Description: Day End Excise Transactions
No. Business Process Steps Transaction Code
1 Update of Registers RG1 and RG23 (Part 1) J1I5
2 Escise Register Extraction J2I5
3 Print Excise Registers J2I6
4 Download Register Data J1IR
Test Description: STO Process Manufacturing to Trading Test Description: STO Process Trading to Trading
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create PO ME21N 1 Create PO ME21N
2 Change PO ME22N 2 Change PO ME22N
3 Display PO ME23N 3 Display PO ME23N
4 Print PO ME9F 4 Print PO ME9F
5 Create Outbound delivery VL10B 5 Create Outbound delivery VL10B
6 Change Outbound delivery VL02N 6 Change Outbound delivery VL02N
7 Display Outbound delivery VL03N 7 Display Outbound delivery VL03N
8 Print of Material Document MB90 8 Print of Material Document MB90
9 Create Excise Invoice J1IS 9 Create Excise Invoice J1IJ
10 Goods Receipts MIGO 10 Goods Receipts MIGO
11 Capture and Post Excise J1IG 11 Capture and Post Excise J1IG
12 GR for free goods receipt MIGO 12 GR for free goods receipt MIGO
13 Post Excise for free goods J1IG 13 Post Excise for free goods J1IG
14 Print of Material Document MB90 14 Print of Material Document MB90
Test Description: STO Process Trading to Manufacturing
No. Business Process Steps Transaction Code
1 Create PO ME21N
2 Change PO ME22N
3 Display PO ME23N
4 Print PO ME9F
5 Create Outbound delivery VL10B
6 Change Outbound delivery VL02N
7 Display Outbound delivery VL03N
8 Print of Material Document MB90
9 Create Excise Invoice J1IJ
10 Goods Receipts MIGO
11 Capture and Post Excise J1IG
12 GR for free goods receipt MIGO
13 Post Excise for free goods J1IG
14 Print of Material Document MB90
SD-T-Code
Test Description: Bulk Sales - Manufacturing Test Description: Bulk Sales - Trading
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Sales Order VA01 ZBLS 1 Create Sales Order VA01 ZBLS
2 Releasing Credit Block for Sales order VKM3 2 Releasing Credit Block for Sales order VKM3
3 Create Delivery & Picking VL01N 3 Create Delivery & Picking VL01N
4 Post Goods Issue VL02N 4 Post Goods Issue VL02N
5 Check Material Document and Accounting document VL02N 5 Check Material Document and Accounting document VL02N
6 Shipment VT01N 6 Shipment VT01N
7 Invoice Create VF01 7 Excise Updation J1IJ
8 Excise Invoice Creation J1IIN 8 Invoice Create VF01
9 Shipment Costing VI01 9 Shipment Costing VI01
10 Shipment Control sheet ZSC 10 Shipment Control sheet ZSC
Test Description: Refill Sales (Delivery) - Manufacturing Test Description: Refill Sales (Delivery) - Trading
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Sales Order VA01 ZROD 1 Create Sales Order VA01 ZROD
2 Releasing Credit Block for Sales order VKM3 2 Releasing Credit Block for Sales order VKM3
3 Create Delivery & Picking VL01N 3 Create Delivery & Picking VL01N
4 Post Goods Issue VL02N 4 Post Goods Issue VL02N
5 Check Material Document and Accounting document VL02N 5 Check Material Document and Accounting document VL02N
6 Shipment VT01N 6 Shipment VT01N
7 Invoice Create VF01 7 Excise Updation J1IJ
8 Excise Invoice Creation J1IIN 8 Invoice Create VF01
9 Check Accounting document for Commercial & Excise Invoice VF02 9 Check Accounting document for Commercial & Excise Invoice VF02
10 Return Sales Order VA01 ZLAD 10 Return Sales Order VA01 ZLAD
11 Return Delivery VL01N 11 Return Delivery VL01N
12 Post Goods Receipt VL02N 12 Post Goods Receipt VL02N
13 Shipment Costing VI01 13 Shipment Costing VI01
14 Check Stock (at Each Stage) MMBE 14 Check Stock (at Each Stage) MMBE
15 Check Material Document List (at Each Stage) MB51 15 Check Material Document List (at Each Stage) MB51
Test Description: Refill Sales (Collection) - Manufacturing Test Description: Refill Sales (Collection) - Trading
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Return Sales Order VA01 ZLA 1 Return Sales Order VA01 ZLA
2 Return Delivery VL01N 2 Return Delivery VL01N
3 Post Goods Receipt VL02N 3 Post Goods Receipt VL02N
4 Create Sales Order VA01 ZROC 4 Create Sales Order VA01 ZROC
5 Releasing Credit Block for Sales order VKM3 5 Releasing Credit Block for Sales order VKM3
6 Create Delivery & Picking VL01N 6 Create Delivery & Picking VL01N
7 Post Goods Issue VL02N 7 Post Goods Issue VL02N
8 Check Material Document and Accounting document VL02N 8 Check Material Document and Accounting document VL02N
9 Invoice Create VF01 9 Excise Updation J1IJ
10 Excise Invoice Creation J1IIN 10 Invoice Create VF01
11 Check Accounting document for Commercial & Excise Invoice VF02 11 Check Accounting document for Commercial & Excise Invoice VF02
12 Check Stock (at Each Stage) MMBE 12 Check Stock (at Each Stage) MMBE
13 Check Material Document List (at Each Stage) MB51 13 Check Material Document List (at Each Stage) MB51
Test Description: Floor Stock Issue & Return (Deposit) - Trading Test Description: Floor Stock Issue & Return (Deposit) - Manufacturing
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Sales Order VA01 ZFID 1 Create Sales Order VA01 ZFID
2 Releasing Credit Block for Sales order VKM3 2 Releasing Credit Block for Sales order VKM3
3 Create Delivery & Picking VL01N 3 Create Delivery & Picking VL01N
4 Post Goods Issue VL02N 4 Post Goods Issue VL02N
5 Check Material Document and Accounting document VL02N 5 Check Material Document and Accounting document VL02N
6 Excise Updation J1IJ 6 Invoice Create VF01
7 Invoice Create VF01 7 Excise Invoice Create J1IIN
8 Check Accounting document for Commercial & Excise Invoice VF02 8 Check Accounting document for Commercial & Excise Invoice VF02
9 Receive Deposit Amount Finance 9 Receive Deposit Amount Finance
10 Return Sales Order VA01 ZFRD 10 Return Sales Order VA01 ZFRD
11 Return Delivery VL01N 11 Return Delivery VL01N
12 Post Goods Receipt VL02N 12 Post Goods Receipt VL02N
13 Payback Deposit Amount Finance 13 Payback Deposit Amount Finance
14 Check Stock (at Each Stage) MMBE 14 Check Stock (at Each Stage) MMBE
15 Check Material Document List (at Each Stage) MB51 15 Check Material Document List (at Each Stage) MB51
Test Description: SV Stock Issue & Return - Trading Test Description: SV Stock Issue & Return - Manufacturing
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Sales Order VA01 ZSVS 1 Create Sales Order VA01 ZSVS
2 Releasing Credit Block for Sales order VKM3 2 Releasing Credit Block for Sales order VKM3
3 Create Delivery & Picking VL01N 3 Create Delivery & Picking VL01N
4 Post Goods Issue VL02N 4 Post Goods Issue VL02N
5 Check Material Document and Accounting document VL02N 5 Check Material Document and Accounting document VL02N
6 Excise Updation J1IJ 6 Invoice Create VF01
7 Invoice Create VF01 7 Excise Invoice Create J1IIN
8 Check Accounting document for Commercial & Excise Invoice VF02 8 Check Accounting document for Commercial & Excise Invoice VF02
9 Receive Deposit Amount Finance 9 Receive Deposit Amount Finance
10 Return Sales Order VA01 ZSVR 10 Return Sales Order VA01 ZSVR
11 Return Delivery VL01N 11 Return Delivery VL01N
12 Post Goods Receipt VL02N 12 Post Goods Receipt VL02N
13 Payback Deposit Amount Finance 13 Payback Deposit Amount Finance
14 Check Stock (at Each Stage) MMBE 14 Check Stock (at Each Stage) MMBE
15 Check Material Document List (at Each Stage) MB51 15 Check Material Document List (at Each Stage) MB51
Test Description: Floor Stock Issue & Return (Rent) - Trading Test Description: Floor Stock Issue & Return (Rent) - Manufacturing
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Sales Order VA01 ZFIR 1 Create Sales Order VA01 ZFIR
2 Releasing Credit Block for Sales order VKM3 2 Releasing Credit Block for Sales order VKM3
3 Create Delivery & Picking VL01N 3 Create Delivery & Picking VL01N
4 Post Goods Issue VL02N 4 Post Goods Issue VL02N
5 Check Material Document and Accounting document VL02N 5 Check Material Document and Accounting document VL02N
6 Excise Updation J1IJ 6 Invoice Create VF01
7 Invoice Create VF01 7 Excise Invoice Creation J!IIN
8 Check Accounting document for Commercial & Excise Invoice VF02 8 Check Accounting document for Commercial & Excise Invoice VF02
9 Create Rental Contract VA41 9 Create Rental Contract VA41
10 Monthly Billing on Rental Contract VF04 10 Monthly Billing on Rental Contract VF04
11 Return Sales Order VA01 ZFRR 11 Return Sales Order VA01 ZFRR
12 Return Delivery VL01N 12 Return Delivery VL01N
13 Post Goods Receipt VL02N 13 Post Goods Receipt VL02N
14 Settle Rental Contract VF04 14 Settle Rental Contract VF04
15 Check Stock (at Each Stage) MMBE 15 Check Stock (at Each Stage) MMBE
16 Check Material Document List (at Each Stage) MB51 16 Check Material Document List (at Each Stage) MB51
Test Description: Floor Stock Issue & Return (Free) - Trading Test Description: Floor Stock Issue & Return (Free) - Manufacturing
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Sales Order VA01 ZFIF 1 Create Sales Order VA01 ZFIF
2 Releasing Credit Block for Sales order VKM3 2 Releasing Credit Block for Sales order VKM3
3 Create Delivery & Picking VL01N 3 Create Delivery & Picking VL01N
4 Post Goods Issue VL02N 4 Post Goods Issue VL02N
5 Check Material Document and Accounting document VL02N 5 Check Material Document and Accounting document VL02N
6 Excise Updation J1IJ 6 Invoice Create VF01
7 Invoice Create VF01 7 Excise Invoice Creation J!IIN
8 Check Accounting document for Commercial & Excise Invoice VF02 8 Check Accounting document for Commercial & Excise Invoice VF02
9 Return Sales Order VA01 ZFRF 9 Return Sales Order VA01 ZFRF
10 Return Delivery VL01N 10 Return Delivery VL01N
11 Post Goods Receipt VL02N 11 Post Goods Receipt VL02N
12 Check Stock (at Each Stage) MMBE 12 Check Stock (at Each Stage) MMBE
13 Check Material Document List (at Each Stage) MB51 13 Check Material Document List (at Each Stage) MB51
Test Description: Gas Returns - Bulk Sales - Manufacturing Test Description: Gas Returns - Bulk Sales - Trading
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Return Sales Order VA01 ZGRS 1 Create Return Sales Order VA01 ZGRS
2 Create Return Delivery VL01N 2 Create Return Delivery VL01N
3 Post Goods Receipt VL02N 3 Post Goods Receipt VL02N
4 Check Material Document and Accounting document VL02N 4 Check Material Document and Accounting document VL02N
5 Excise Invoice / Entry J1IS 5 Excise Invoice / Entry J1IG
6 Create Credit memo VF01 6 Create Credit memo VF01
7 Check Accounting Entries for Credit Memo VF02 7 Check Accounting Entries for Credit Memo VF02
Test Description: Gas Returns - Cylinders - Manufacturing Test Description: Gas Returns - Cylinders - Trading
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Return Sales Order VA01 ZGRS 1 Create Return Sales Order VA01 ZGRS
2 Create Return Delivery VL01N 2 Create Return Delivery VL01N
3 Post Goods Receipt VL02N 3 Post Goods Receipt VL02N
4 Check Material Document and Accounting document VL02N 4 Check Material Document and Accounting document VL02N
5 Excise Invoice / Entry J1IS 5 Excise Invoice / Entry J1IG
6 Create Credit memo VF01 6 Create Credit memo VF01
7 Excise Invoice / Entry J1IS 7 Excise Invoice / Entry J1IG
8 Check Accounting Entries for Credit Memo VF02 8 Check Accounting Entries for Credit Memo VF02
9 Check Stocks of Gas and Cylinder MMBE 9 Check Stocks of Gas and Cylinder MMBE
Test Description: Sale of Non Gas Products (Manufacturing & Trading) Test Description: Free of Cost Sale of Non Gas Products (Mfg & Trading)
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
4 Create Sales Order VA01 ZNGP 4 Create Sales Order VA01 ZFNG
5 Releasing Credit Block for Sales order VKM3 5 Releasing Credit Block for Sales order VKM3
6 Create Delivery & Picking VL01N 6 Create Delivery & Picking VL01N
7 Post Goods Issue VL02N 7 Post Goods Issue VL02N
8 Check Material Document and Accounting document VL02N 8 Check Material Document and Accounting document VL02N
9 Invoice Create VF01 9 Invoice Create (with Zero Value) VF01
10 Check Accounting Document VF02 10 Check Accounting Document VF02
Test Description: Return of Non Gas Products with Credit Memo (Manufacturing & Trading) Test Description: Return of Non Gas Products without Credit Memo (Manufacturing & Trading)
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Return Sales Order VA01 ZNGR 1 Create Return Sales Order VA01 ZRNG
2 Create Return Delivery VL01N 2 Create Return Delivery VL01N
3 Post Goods Receipt VL02N 3 Post Goods Receipt VL02N
4 Check Material Document and Accounting document VL02N 4 Check Material Document and Accounting document VL02N
5 Create Credit memo VF01
6 Check Accounting Document VF02
Test Description: Sale of Service (Manufacturing & Trading) Test Description: High Sea Sales
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Sales Order VA01 ZSER 7 Create Sales Order VA01 ZHSS
2 Release Billing Block VA02 8 Releasing Credit Block for Sales order VKM3
3 Crete Billing Document VF01 12 Create Billing Document VF01
4 Check Material Document and Accounting document VF02 14 Check Accounting document for Commercial & Excise Invoice VF02
9 Create Purchase Order ME21N
10 Release Purchase Order ME29N
11 Invoice Verification MIRO
15 Check Accounting Documents - Invoice Verification & GR VA01
Test Description: Credit Memo with Billing Reference (Manufacturing & Trading) Test Description: Credit Memo without Billing Reference (Manufacturing & Trading)
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Credit memo Request VA01 ZCRB 1 Create Credit memo Request VA01 ZCR
2 Release Billing Block VA02 2 Release Billing Block VA02
3 Create Credit Memo VF01 3 Create Credit Memo VF01
4 Check Material Document and Accounting document VF02 4 Check Material Document and Accounting document VF02
Test Description: Debit Memo without Billing Reference (Manufacturing & Trading) Test Description: Debit Memo with Billing Reference (Manufacturing & Trading)
No. Business Process Steps Transaction Code Order Type No. Business Process Steps Transaction Code Order Type
1 Create Debit memo Request VA01 ZDR 1 Create Debit memo Request VA01 ZDRB
2 Release Billing Block VA02 2 Release Billing Block VA02
3 Create Debit Memo VF01 3 Create Debit Memo VF01
4 Check Material Document and Accounting document VF02 4 Check Material Document and Accounting document VF02
Test Description: Rebate Process (Manufacturing & Trading) Test Description: Sales Agent Commission Process (Manufacturing & Trading)
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Create Rebate Agreement VBO1 1 Create Customer & Assign Sales Agent as Partner Function XD01
2 Create Billing Document VF01 2 Create Master data for Sales Agent Commission VK11
3 Settle Rebate Agreement VBO2 3 Report Generation Periodically Z Report
4 Create Credit memo for Rebates VF01 4 Create Credit Memo Request VA01
5 Check Accounting Document VF02 5 Release Billing Block VA02
6 Create Credit Memo VF01
Test Description: Excise Process (Trading) Test Description: Excise Process (Manufacturing)
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
1 Maintain Excise Master Data for Customer J1ID 1 Maintain Excise Master Data for Customer J1ID Classification IIM
3 Extraction of RG23D J2I5 2 Updation of RG1 J1I5 RMA- Receipt IPD
4 Printing of RG23D J2I6 3 Extraction of RG1 J2I5 ROP -GAS Return IWD
5 Forms Tracking J1IUN 4 Printing of RG1 J2I6 IDH - ISSUSE IDH
5 Forms Tracking J1IUN IWE-Removal without payment of duty for export under bond IDE
6 List of Excise Invoices - Manufacturing J1I7 Removal without payment of duty for export under bond IWE
7 Excise Invoice Printing J1IP IWT
8 Excise Data Download J1IR IWO
RMA
Test Description: Inter Company Sales - Bulk Test Description: Inter Company Sales Returns (When Material Returned to Selling Company Plant) ROP
No. Business Process Steps Transaction Code No. Business Process Steps Transaction Code
7 Create Sales Order VA01 1 Create Return Sales Order VA01
8 Releasing Credit Block for Sales order VKM3 2 Create Return Delivery VL01N
9 Create Delivery & Picking VL01N 3 Post Goods Receipt VL02N
10 Post Goods Issue VL02N 4 Check Material Document and Accounting document VL02N
11 Check Material Document and Accounting document VL02N 5 Create Physical Inventroy Document MI01
12 Shipment VT01N 6 Physical Inventory Document Posting MI07
13 Shipment Costing VI01 7 Excise Updation J1IG
14 Shipment Control sheet ZSC 8 Create Credit Memo Request VA01 -
Concession based approval of Quantity
Dear Friends,
We are using ECC 6.00 with QM module activated. In our business process, when the revision level of materials change, our product development will approve certain QTY to continue with the old revision level (considering stock with vendor manufactured for old revision level).
In Quality department, the same control has to be established. i.e., when the new revision level is released and the qty is approved by the Product development department, Quality users will maintain this qty in a record and based on the GR, system should reduce the qty of GR from the qty maintained and automatically prevent further GR if the qty is exceeded.
For example.
Total approved qty :- 1000 (Cleared by Product Development)
Total qty maintained :- 1000 (By quality users)
Total qty for which GR is made :- 100400500 = 1000
Qty for which GR is tried to made = 100 (System should throw error message and prevent from inwarding unless the total approved qyt is increased based on deviation request)
At present this is available in the quality info record but this qty is for the Purchase order qty and does not check the GR qty.
Experts help!
Regards,
M.MCheck the user Eixit in the MIGO
MB1B User exit or Badi before saving transaction
May helpful to you -
Print GR/GI slip issue.
Dear Experts,
I am not able to print GR/GI slip during GR or GI (in MB1B and MIGO)
I have maintained condition records in MN21. Still the problem exist.
Print indicatiors are maintained for Movement types and T-codes in SPRO
What could be missing ?
Please suggest
regards
ShashidharHi there
Check the below settings whether you have done it clear,,
NACE-Select ME Click on Condition records- Select WA02( As you want)-Trans/Event Type-"WA" Print Version " 2" and Execute it
In the next scren P-1, medium-1, Date/Time-Select 3 as you want), Language EN and enter,, Now select the line and click on the communication and there enter the output device if anything specified for you,, and save it,,
Now check in MB02, enter the material document, and double click on the any line item, Click on the messages do the same process for this document as above and save it and try MB90,, surely it wil work and for the future docs,,
Finally-- At the time of MIGO/MB1B check that Indiviual/Collective slip is Enabled or not,,,
Thanks
Senthil
Maybe you are looking for
-
No performance counters and other issues
The title is my main issue, but beating my head against a wall here. Anyone with enough patience to read through my issues below is a saint. Following every guide out there, myself and our Linux admin have gone over in detail everything that needs to
-
How do I disable hyperlink in Reminders?
-
Input controls problem in web i
hi.. system : bo 4.0 last sp,fp update in a webi reports everything is ok.. i have a full control in the report.. just click input controls i see that "Your security profile does not include permission to edit this document. (Error: ERR_WIS_30252)" a
-
External java function that should return String array
Hi everyone, I have a split function in plsql that takes 10 times longer a java tokenizer function that i was written. So, i want to use java external function to split my plsql strings into pieces. I can write a java external procedure that returns
-
Budgeting for CO production order
From KOT2 we can see budget profile exists for CO production order type CP01 and CP02. But it is not allowed to use KO22 to enter budget amount. Can anybody tell me how to set budget for CO production order? Thanks~