Migrating from Developer to JDeveloper

Is there a migration path from Developer to JDeveloper?
I would like to move a Developer project to JDeveloper in order to get access to the Java code. With Developer all of the logic is hidden in the project and JAR files. The logic represented by the project will is what I desire. i.e. produce a pure java-application not a project/JAR file one.

I also have requirement like this. Can Oracle suggests any tools or means of doing this.
Regards,
Srini.

Similar Messages

  • Migration From Developer 2.1 to Forms 6i/9i

    Hello,
    My client wants to migrate from Developer 2.1 to Forms 6i or to Forms 9i with C/S architecture (Sun Solaris 2.6). They are told (from Oracle Support) that they need to add a patch set before migrating. Has anybody migrated in this environment and what patch set was added?
    Thanks,
    Arun.

    Hi,
    3 things.
    1. The forms 9i is NOT available for the client/server environment. Therefore if your customer insists on client/server environment then you need to upgrade to forms 6i (which is the final client/server version of forms/reports developer).
    2. There are OS patches that you need to apply if you want to run forms/reports developer 6i on solaris 2.6. The complete list is available in the 6i installation documentation (you might find it also on the internet). If you upgrade the OS to solaris 8, then there is no extra OS patches required for forms/reports developer 6i. We are running 6i on Solaris 8 (with no extra OS patches).
    3. The last available patch for forms/reports developer 6i is patch #10 which can be downloaded from Oracle Metalink. I did apply this patch for 6i on solaris 8 client/server environment and has not seen any negative effect so far.
    regards.

  • Planning Migration from Development Server to Testing Server

    Hi All,
    I am doing migration from development env to testing env. I am stuck in the middle of the migration. Anyone please guide me in this situation. Its very urgent for me. I am following below steps for the planning migration
    1. Create a new database on Production RDBMS Server for your planning application.
    I created the new database for my planning application.
    2. Configure a data source on Production Planning Server.
         I configured the new datasource on planning.
    3. Create fresh planning application on Production Server and Ensure the admin is the same as your planning application on Development Server.
         I created the new planning application on production server. Its working fine with admin login.
    4. Go into the database tables for the planning app on Production Server and look at table HSP_USERS; store the SID value against user 50001.
         I save the SID value against 50001 in a notepad
    5. Go into the database planning system tables on Production Server and HSPSYS_APPLICATION, clear out the version field for the application you have created.
         I removed the version for the application i created
    6. Stop Planning.
         I stopped the planning services
    7. Restore the planning application database on Development over the one created in the first step (to the Production Server Database).
         In this steps only, i am facing diffculities.
         How to take the backup of development database? (Here, i want to the take the database backup of planning application schema  or entire oracle databat in development server)
         How to restore to testing env database
    Please anyone guide me in this situtation. Please......
    8. Go into the HSP_USERS table and update the SID for user id 50001
    9. Start planning
    10. Go to planning web and you should see your application when you try and log in it should take you to a migrate screen.
    11. If you are requiring to migrate users as well, you will have to make sure you create them in Shared Services and then use the updateusers utility in the planning bin directory.
    Thanks,
    Lakshmi

    Hi Mars,
    Thanks for your reply. I did the same as you specified. I used Imp instead of import, exp instead of export.
    7. Restore the planning application database on Development over the one created in the first step (to the Production Server Database).
    I restored the Planning dmp here
    8. Go into the HSP_USERS table and update the SID for user id 50001
    Here, SID remains the same after restore the backup from the development server(SID same for Development and testing Server)
    9. Start planning
    I started the Planning Services.
    10. Go to planning web and you should see your application when you try and log in it should take you to a migrate screen
    I am facing problem here.
    While login into planning application, its not redirect to migrate screen. Its normally login to the application
    Thanks,
    Lakshmi

  • Migrating from Development to Test Server

    Hi
    I have developed an OA extension page and deployed it.
    But now once I want to move my extension page from development to test server how do I do it. My doubts are because:
    While developing the pages I specified the connection username and password which is stored in the bc4j.xcfg file.
    What is the best way to deploy the OA Extension pages in respect to migration.
    Thanks
    Abhi

    Yes my concern is the DB connection!
    My doubt is because of the following entry in the bc4j.xcfg file.
    <?xml version = '1.0' encoding = 'UTF-8'?>
    <BC4JConfig>
    <ConnectionDefinition name="DEV">
    <ENTRY name="JDBC_PORT" value="1544"/>
    <ENTRY name="ConnectionType" value="JDBC"/>
    <ENTRY name="HOSTNAME" value="HOST"/>
    <ENTRY name="user" value="apps"/>
    <ENTRY name="ConnectionName" value="DEV"/>
    <ENTRY name="SID" value="DEV"/>
    <ENTRY name="JdbcDriver" value="oracle.jdbc.driver.OracleDriver"/>
    <ENTRY name="password">
    <![CDATA[develop]]>
    </ENTRY>
    <ENTRY name="ORACLE_JDBC_TYPE" value="thin"/>
    <ENTRY name="DeployPassword" value="true"/>
    </ConnectionDefinition>
    </BC4JConfig>
    So while migrating to test server will i have to modify this file or this entry is required because we are using jdeveloper on the local machine.
    Can you tell me the relevance of this config file.
    Thanks
    Abhi

  • What is the right tools to migrate from developer suite 10g to 11g?

    Hi all..
    Im kinda new here and hope pro can help me in the right direction. I've been developing forms and reports in 10g which is using the developer suite. My company would like to migrate to 11g. However, i see that there are no 11g developer suite. it must have rename it something else or provided to developer in a different name or so.
    Could someone clarify this and give me a link to what i need to develop forms and reports in 11g. Im sure im going to need the weblogic as well.
    I did find a post where user states that there is no more developer suite in 11g but i find his answer a bit unclear. So i was hoping someone can give a link to what i really need in order to continue with 11g.
    Thanks

    In brief a migration from 10g to 11g is just a recompile, nothing more. There were some built-ins removed in 11g which were deprecated in 10g (like run_product for example) so if you have some dead code containing this built-ins you will get compile errors. But as those built-ins didn't do anything in 10g you should be able to remove them without a second thought.
    As for developer suite: there is no developer suite anymore like there was in 10g; There is only one complete bundle containing the development as well as the deployment components, and you can choose at installation time which components you want to install. You can install the IDEs and omit some of the components you won't need in 11gR1 or install the development version in 11gR2.
    You can find the install bundles here.
    Before you start installing it is a good idea to review the certified system configurations.
    cheers

  • Migration from Developer 4.5 to  Developer 6i

    Hello,
    I want to migrate a Oracle forms 4.5 application to developer 6i.
    The Forms 4.5 application has been built by using headstart 3.4.2. The application runs on a client-server architecture
    Is it possible to migrate to developer 6i without changing the used headstart version and the architecture.
    I already heard that we might be some problems with visual attributes in client-server environment ?
    who can give me some more information about this combination of architecture and used software and tools ?

    Hi,
    I would contact Oracle Developer support.
    This forum area of expertise is issues concerning migrations from non-oracle platforms to ORacle.
    Regards
    John

  • Migration from Developer 6i to 9i

    We are in the process of migrating a large application from developer 6i (client/server) to developer 9i (Application Server 10g). When recompiled the forms in 9i, it says built-ins such as "go_item", "Set.." etc. are not supported. We are also facing some problems in calling reports (using the run_report_object). If there are work arounds, please reply.
    Thanks in advance

    Hi,
    3 things.
    1. The forms 9i is NOT available for the client/server environment. Therefore if your customer insists on client/server environment then you need to upgrade to forms 6i (which is the final client/server version of forms/reports developer).
    2. There are OS patches that you need to apply if you want to run forms/reports developer 6i on solaris 2.6. The complete list is available in the 6i installation documentation (you might find it also on the internet). If you upgrade the OS to solaris 8, then there is no extra OS patches required for forms/reports developer 6i. We are running 6i on Solaris 8 (with no extra OS patches).
    3. The last available patch for forms/reports developer 6i is patch #10 which can be downloaded from Oracle Metalink. I did apply this patch for 6i on solaris 8 client/server environment and has not seen any negative effect so far.
    regards.

  • Production migration from Development

    I would like to know how currently the migration work happens from development to production.
    Thanks
    Deb

    Export application and any supporting objects to a script, have dba load previously built script to production environment and run script. Need to make sure users are logged out of application and that the proper themes and such are loaded in production.
    Thank you,
    Tony Miller
    Webster, TX

  • Oracle froms Developer vs JDeveloper

    I have to develop a 3 tier application using O9iAS WE as application server and Oracle 9i as database to access all the details invloved in a big hospital through PCs and Pocket PCs (Wirelessly).
    I have to decide between Oracle forms developer and Oracle Jdeveloper as devlopement tool.
    Which one do you suggest ?
    sanjeev

    Thank Oracle ;)
    (well, it's the least they can do after you paid big $$$ for the database)
    Regards,
    K.

  • Migration from development to production environment for SAP Netweaver BI

    All,
    When I created a SAP Netweaver BI connection using BeX query in BW development environment, the system is defaulted to the BW development environment. Since the system textbox can't be modified to use a variable to point to production environment, can you share how you migrate your SWF file to production environment and ensure that it points to the BeX production query?
    Thanks for sharing ....

    After some more searching, I found this link: http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/f005a4ca-d4fd-2c10-adb8-8ec24383cb97

  • How to migrate from development server to prodution server

    Hi,
    I’m working in obiee 11.1.1.5.I have a development server in which I developed all the dashboards and I have a production server.Now I have to move everything to production server.Production server is pointing to a different database schema with a different port number.
    Method followed:
    1)Took a copy of catalog and rpd from the development server
    2)Copied the catalog to production server
    3)Deployed rpd in the production server enterprise manager
    Now the problem is Im getting the following error when I tried to open the dashboard
    Error Codes: OPR4ONWY:U9IM8TAC:OI2DL65P
    *State: HY000. Code: 10058. [NQODBC] [SQL_STATE: HY000] [nQSError: 10058] A general error has occurred. [nQSError: 43113] Message returned from OBIS. [nQSError: 43119] Query Failed: [nQSError: 17001] Oracle Error code: 12170, message: ORA-12170: TNS:Connect timeout occurred at OCI call OCIServerAttach. [nQSError: 17014] Could not connect to Oracle database. (HY000)*
    Is there is any further thing that I need to do?Am I missing some steps?Can anyone please tell me?

    did you changed the connection pool entries according to your Production Environment Database details,please check this first.
    check the Data source name,User,PWD are according to ur prod DB or not?

  • AIA components migration from development to testing toProduction

    Hi ,
    Here i am new for deploying AIA Components and MDS Artifacts from one environment to another is their any docs for that or please share any step by step flow on it requsting you...........
    Thanku,
    Ramesh

    Hi,
    Have a look at this one...
    http://docs.oracle.com/cd/E28280_01/doc.1111/e17364/deploycomposites.htm#CIHJHFHI
    Cheers,
    Vlad

  • Migrating from Eclipse/Ant/MyFaces Trinidad to using JDeveloper--need help

    I recently downloaded JDeveloper 11.1.1.2.0. Several years ago, I used JDev to do some very simple JSP/servlet development with no formal framework. Times have changed a lot.
    For the past few years, I have been developing server-side Java web apps using Eclipse JEE and Ant (ie, everything is set up so that the developer does not depend on the IDE). We currently implement web apps using Apache MyFaces Trinidad JSF components (but not Facelets). Any developer here can check out our code and simply run Ant to build the projects--no need to even have Eclipse installed. Anyone here can build and develop with a text editor and Ant, if they prefer.
    I am impressed and yet overwhelmed by the robust functionality of the latest JDev--so impressive, but I feel almost a bit too removed from "seeing" what is going on in the code and deployment. I like the notion of drag-and-drop along with wizards, but I want to also know how the JDev project is set up manually; ie, where everything goes, without having to guess on this. I get the impression that I need to learn, very specifically, the framework of ADF. But unfortunately, the tutorials seem to focus on only using the wizards and drag-drop functionality.
    For example, how do I set up JDev to build a project only by running Ant using my properties files and build.xml? This is trivial to do in Eclipse by specifying the Project Builder. Is there some similar setting I can use in JDev?
    Is there full compatibility with Trinidad--didn't Oracle make the original Trinidad?
    Has anyone posted advice on migrating from Eclipse JEE to JDev?
    Sorry if this is an old set of questions; if I had known where to search for this information, I would not be posting this thread.
    Many thanks!
    Mike Quentel

    The basic steps for bringing your existing code into JDeveloper are:
    Import->WAR File - or alternatively create a new application and in it create a new projects->project from existing source
    The next couple of steps have to do with setting the project properties:
    Then you need to set up your project content path (specifically things like Web content and resources content)
    Then you need to add the jars/libraries in your project classpath and libraries.
    A few related link:
    http://blogs.oracle.com/shay/2010/01/migrating_from_netbeans_to_jde.html - netbeans migration but similar concepts
    http://www.oracle.com/technology/products/jdev/howtos/1013/w4wljdev/workshopandjdev.html - basic migration from Eclipse to JDeveloper
    http://blogs.oracle.com/shay/2009/02/using_trinidad_in_jdeveloper_1.html - Using trinidad in JDeveloper
    Also don't forget that you can now set your JDeveloper accelerators to be based on Eclipse key mapping - might make the migration easier.

  • ERROR WHILE MIGRATING SSIS PACKAGE FROM DEVELOPMENT TO PRODUCTION IN EXECUTION

    HI,
    I have a problem while executing the package after migrating from DEVELOPMENT to PRODUCTION.
    We have two SQL database connections DEVMIDDLEWARE and PRODMIDDLEWARE for dev and prod respectively. When we have created package in development we have used DEVMIDDLEWARE and we have credentials in CONFIG file of that package and executed sucessfully. When
    we migrated this same package to PRODUCTION when have given credentials of PRODMIDDLEWARE in CONFIG FILE of this package we are getting error as below
    "Description: Failed to decrypt protected XML node "DTS:Password" with error 0x8009000B "Key not valid for use in specified state.". You may not be authorized to access this information. This error occurs when there is a cryptographic
    error. Verify that the correct key is available.  End Error  Error: 2014-10-28 07:41:44.24     Code: 0xC0016016     Source:       Description: Failed to decrypt protected XML node
    "DTS:Password" with error 0x8009000B "Key not valid for use in specified state.". You may not be authorized to access this information. This error occurs when there is a cryptographic error. Verify that the correct key is available. 
    End Error  Error: 2014-10-28 07:41:44.85     Code: 0xC0202009     Source: Package Connection manager "DEVBIZTALKDB01.RHUL_Staging.devmiddleware"     Description: SSIS Error Code DTS_E_OLEDBERROR. 
    An OLE DB error has occurred. Error code: 0x80040E4D.  An OLE DB record is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80040E4D  Description: "Login failed for user 'devmiddleware'.". 
    End Error  Error: 2014-10-28 07:41:44.85     Code: 0xC020801C     Source: Package Log provider "SSIS log provider for SQL Server"     Description: SSIS Error Code DTS_E_CANNOTACQUIRECONNECTIONFROMCONNECTIONMANAGER. 
    The AcquireConnection method call to the connection manager "DEVBIZTALKDB01.RHUL_Staging.devmiddleware" failed with error code 0xC0202009.  There may be error messages posted before this with more information on why the AcquireConnection method
    call failed.  COM error object information is available.  Source: "Package"  error code: 0xC0202009  Description: "SSIS Error Code DTS_E_OLEDBERROR.  An OLE DB error has occurred. Error code: 0x80040E4D.  An OLE
    DB record is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80040E4D  Description: "Login failed for user 'devmiddleware'.".  ".  End Error  Error: 2014-10-28 07:41:44.98    
    Code: 0xC0202009     Source: Package Connection manager "AGRDB01.abwr66"     Description: SSIS Error Code DTS_E_OLEDBERROR.  An OLE DB error has occurred. Error code: 0x80040E4D.  An OLE DB record
    is available.  Source: "Microsoft SQL Server Native Client 10.0"  Hresult: 0x80040E4D  Description: "Login failed for user 'CC\epsdbuser'.".  End Error  Error: 2014-10-28 07:41:44.98     Code:
    0xC020801C     Source: Data Flow Task OLE DB Source [1]     Description: SSIS Error Code DTS_E_CANNOTACQUIRECONNECTIONFROMCONNECTIONMANAGER.  The AcquireConnection method call to the connection manager "AGRDB01.abwr66"
    failed with error code 0xC0202009.  There may be error messages posted before this with more information on why the AcquireConnection method call failed.  End Error  Error: 2014-10-28 07:41:44.99     Code: 0xC0047017    
    Source: Data Flow Task SSIS.Pipeline     Description: component "OLE DB Source" (1) failed validation and returned error code 0xC020801C.  End Error  Error: 2014-10-28 07:41:44.99     Code: 0xC004700C    
    Source: Data Flow Task SSIS.Pipeline     Description: One or more component failed validation.  End Error  Error: 2014-10-28 07:41:45.00     Code: 0xC0024107     Source: Data Flow Task     
    Description: There were errors during task validation.  End Error  DTExec: The package execution returned DTSER_FAILURE (1).  Started:  07:41:44  Finished: 07:41:45  Elapsed:  0.859 seconds.  The package execution failed. 
    The step failed."
    Can anyone help for this error.
    Many thanx in Advance

    Hi Babloo,
    According to the error message, the package may have failed are as follows:
    The user account that is used to run the package under SQL Server Agent in PRODUCTION server differs from the original package author.
    The user account does not have the required permissions to make connections or to access resources outside the SSIS package.
    The package may not run in the following scenarios:
    The current user cannot decrypt secrets from the package. This scenario can occur if the current account or the execution account differs from the original package author, and the package's ProtectionLevel property setting does not let the current user
    decrypt secrets in the package. In this scenario, we can change the SSIS Package ProtectionLevel property to EncryptSensitiveWithPassword, then modify the SQL Server Agent job step command line to include this password.
    File access fails because the current user does not have the required permissions to write to the file share that the connection manager accesses. In this scenario, we can create a SQL Server Agent proxy account. This proxy account must use a credential
    that lets SQL Server Agent run the job as the account that created the package or as an account that has the required permissions.
    References:
    SSIS package does not run when called from a SQL Server Agent job step
    Run an SSIS Package Under a Different Account
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • Migration on Production from Development

    Hi,
    I have no idea about migration from development to production. First time I'll be doing this on my own.
    Could you please guide me on this.
    Development Environment is as:
    HFM - 11.1.2.1
    EAL - 11.1.1.4
    Essbase - 11.1.2.1
    OBIEE - 11.1.1.7
    HFM is already there at client side. We installed OBIEE, Weblogic, Essbase, EAL.
    OBIEE will be taken care of by OBIEE team. I have to look into Essbase/EAL part. We already have 2 HFM applications. Then we created 2 Essbase cubes via EAL from HFM. Then we created one more cube in Essbase and merged it with those 2 EAL generated cubes.
    We have transparent partitioning with merged cube as target and 2 cubes as sources. We have formulas on some members in Essbase cubes. We have MAXL scripts to automate creation of some new members and loading of formulas in Essbase cubes.
    OBIEE reporting is done on final merged Essbase cube.
    So if I am asked to migrate Essbase/EAL on production server, looking at this scenario, please guide me step by step.
    I think development and production server architecture are different in terms of no. of servers etc. I am not into installation/technical stuff. So while migrating Essbase/EAL components, such technical parameters will also come into picture ?
    Thanks,
    RS

    Hi,
    refer to this link for catalog migration
    http://www.rittmanmead.com/2008/04/migration-obiee-projects-between-dev-and-prod-environments/
    http://www.rittmanmead.com/2007/12/migrating-obiee-reports-between-web-catalogs/

Maybe you are looking for