Migrating from netbsd courier imap system to SL Server

Hello,
I am converting from a courier imap server to Snow Leopard. I have about ten virtual domains and about 25 users in total. I would like to move all their mail and folders over without them knowing. I have seen some scripts to convert the maildirs. Can I connect to the old IMAP server, get a copy of their email, one at a a time, then connect to the new SL Server IMAP and deposit the email. Am I off my rocker or has someone else done this. I can take the mail server offline for a few hours to do this. Any other ideas? Thanks in advance.
Thanks,
Gord

There is a tool called imapsync that can transfer the mail for you and handle duplicates in case the transfer stops / fails, etc. It works really well but has some dependencies (perl and some associated things so you need to install the dev tools on SL server).
I used it and had nary a problem.

Similar Messages

  • Migration from Crystal Enterprise 10 to SAP Crystal Server 2011

    Hi all,
    We are currently using Crystal Enterprise 10 to schedule and view our reports and the designer is Crystal Reports 10 .
    we are planning to migrate to SAP Crystal Server 2011 with Crystal Reports 2011 as the designer.Can we do this migration directly or do we need to do the migration to an intermediate version before going to SAP Crystal Server 2011.
    Regards,
    Sreekanth S S

    1. So in this case, I need to migrate from Crystal Enterprise 10 to Crystal Reports Server XI R2/Crystal Reports Server 2008 or more using import wizard Then I will need to migrate from Crystal Reports Server XI R2/Crystal Reports Server 2008 to SAP Crystal Server 2011 using Upgrade Manager tool. Is my inference correct?
    That is correct. For XI R2, it would be XI R2 SP2 minimum. And you need to have a live installation of XI R2 SP2 as SAP does not have it in archieve download area.
    2.What is the potential risk if we try to migrate from Crystal Enterprise 10 to SAP Crystal Server 2011 using upgrade manager tool?
    I am not sure if that will work with success, If the reports migrated from CE10 do not work in CRS2011, it would be unsupported. You can however try it anyways.
    3.Can we open the reports developed using Crystal Reports 10 designer in Crystal Reports 2011 designer? .This is for another requirement of us where we have to just migrate the reports alone .
    Yes you can do that. Try opening and running them in CR2011, they should work but some of them can also result in some errors here and their, this is more specific to report design and what kind of grouping\ filtering\formulas you use.

  • Need help migrating from pop to imap

    Hi,
    I have a domain hosted by GoDaddy and have been using their pop3 mail service. Apple Mail is set up so the messages are deleted from the server when they download to my iMac.
    I've now upgraded to their service allowing me to use IMAP but I don't want to lose the emails in my inbox and sent items on the Mac. In fact I'd like them so they will be synced with the IMAP server.
    How would one go about this, given that I want to use exactly the same email address for IMAP as I was under the pop3 settings?
    Anyone know how I can go about this?
    Any help much appreciated.
    Neil

    I'm not sure how you can sync the emails you've collected via POP to the IMAP account, or whether it's possible but to setup the new IMAP account should be straightforward. Someone else on here will hopefully be able to advise on the syncing possibilities. I would take the precaution of having a backup of your current 'On My Mac' emails before doing the following.
    To create the IMAP account in Mail:
    Mail>Preferences>Accounts
    Click on the '+' to add an account
    Select 'Add other mail account'
    Enter your credentials including the word IMAP in the 'Full Name' field (to help differentiate it from your existing POP account with the same email address - you can edit the name later if nec)
    Once the detail is filled in hold down the Alt (Option) key before you click on Create and it should change to Continue
    The next screen then allows you to specify that the account is IMAP. Input the server addresses and it should be clear from there.

  • Wiki migration from 10.6.8 to 10.10 Server 4 no data loaded

    I'm trying to migrate wiki from an old OSX Server 10.6.8 to a brand new installation of 10.10.1 with Server App ver 4.
    I followed the article at http://krypted.com/mac-os-x/setup-os-x-yosemite-server-as-a-wiki-server/
    I used the migration method:
    1) copy the /Library/Collaboration folder to Yosemite Server ~/Desktop/Collaboration
    2) changed owner to _teamserver of the copied folder
    3) started wiki service
    4) created a new wiki
    5) configure accounts to access LDAP of the old server
    6) run sudo wikiadmin migrate -r ~/Desktop/Collaboration
    No wiki were created. The log file shows that no users and groups found.
    Extract of the log:
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSConfig.m:128 7db9d300 +0ms] CSConfig: Initializing or updating cached config file: /Library/Server/Wiki/Config/collabd.plist because file mod date 2014-12-15 11:07:02 +0000 is newer than cached file mod date (null)
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:90 7db9d300 +0ms] Wikiadmin trying to start PGCServer...
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:96 7db9d300 +135ms] PGCServer started.
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:237 7db9d300 +0ms] Repository location appears to be a relative path (/Users/micei/desktop/Collaboration), prepending --sourceRoot ()
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:240 7db9d300 +0ms] Repository location is /Users/micei/desktop/Collaboration
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:255 7db9d300 +2ms] Updating schema to current version
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:142 7db9d300 +0ms] Updating schema to latest schema version (166)
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:148 7db9d300 +0ms] Bumping schema to version (166)
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:351 7db9d300 +5ms] Schema updates completed.
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:258 7db9d300 +0ms] Running migration from source location /Users/micei/desktop/Collaboration
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:724 7db9d300 +0ms] Migrating...
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:730 7db9d300 +47ms] Migrating known users
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Warning>: [UserMigrator.m:259 7db9d300 +0ms] No Users directory found. Skipping.
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:732 7db9d300 +0ms] Generating placeholders for all known pages and wikis
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Warning>: [ProjectMigrator.m:259 7db9d300 +0ms] No Groups directory found. Skipping.
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:734 7db9d300 +0ms] Found 0 pages belonging to 0 wikis and 1 users.
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:737 7db9d300 +0ms] Re-scanning 0 pages for pasted image/attachment URLs
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:522 7db9d300 +0ms] Copying content to real tables...
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:627 7db9d300 +14ms] Destroying migration entity and scratch tables...
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:655 7db9d300 +45ms] Done
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:747 7db9d300 +0ms] Importing user preferences
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:693 7db9d300 +4ms] Rebuilding search index...
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSLocalServiceLocator.m:173 7db9d300 +1ms] Allocating service ContentService
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSConfig.m:128 cb84000 +33ms] CSConfig: Initializing or updating cached config file: /Library/Server/Wiki/Config/collabd-search.plist because file mod date 2014-12-15 11:07:02 +0000 is newer than cached file mod date (null)
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSLocalServiceLocator.m:173 cc07000 +0ms] Allocating service HTMLFilterService
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:719 7db9d300 +118ms] Done
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [MigrationController.m:753 7db9d300 +0ms] Migration complete
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:261 7db9d300 +0ms] Running post-migration updates
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:366 7db9d300 +3ms] Running post-migration updates...
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:104 7db9d300 +0ms] Executing migration SQL script /Applications/Server.app/Contents/ServerRoot/usr/share/collabd/server/sql/migra tions/36.sql
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSExecutionTimer.m:14 7db9d300 +6ms] TIMER: 6ms ---> migration #36
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:104 7db9d300 +0ms] Executing migration SQL script /Applications/Server.app/Contents/ServerRoot/usr/share/collabd/server/sql/migra tions/48.sql
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSExecutionTimer.m:14 7db9d300 +1ms] TIMER: 2ms ---> migration #48
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:116 7db9d300 +0ms] Executing migration block #58
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSExecutionTimer.m:14 7db9d300 +1ms] TIMER: 2ms ---> migration #58
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:104 7db9d300 +0ms] Executing migration SQL script /Applications/Server.app/Contents/ServerRoot/usr/share/collabd/server/sql/migra tions/68.sql
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSExecutionTimer.m:14 7db9d300 +2ms] TIMER: 3ms ---> migration #68
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:116 7db9d300 +0ms] Executing migration block #160
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [CSExecutionTimer.m:14 7db9d300 +0ms] TIMER: 1ms ---> migration #160
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:374 7db9d300 +0ms] Post-migration updates completed.
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [SchemaMigrator.m:379 7db9d300 +6ms] Performing a VACUUM FULL ANALYZE of user_activity
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:264 7db9d300 +39ms] Done
    Dec 16 12:35:20 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:516 7db9d300 +0ms] Wikiadmin trying to stop PGCServer...
    Dec 16 12:35:21 Micheles-iMac.local wikiadmin[1307] <Info>: [main.m:519 7db9d300 +130ms] PGCServer stopped.
    Please help me

    I have a bad 10.8 server, and what I did to rescue my WIKI
    1- Listed users on old wiki server " dscacheutil -q user | grep -A 3 -B 2 -e uid:\ 5'[0-9][0-9]'    ", I dont use open directory
    2- Create an new 1.8.5 server
    3- Create users on new server (keep an eye on order of creation ID is more important than username)
    4- Turned on Wiki *Important starts up service for 1st time
    5- Then followed these instuctions on:  http://support.apple.com/en-us/HT5585
    *Wiki worked
    6 -Then Upgraded form 10-8-5 to Yosemithe server
    ALL WORKS
    *Note1: Apple's KB note has 10.6 to 8 migration which I did not use, try that before
    *Note2: Clone new server each important step with CC or DiskUtil, step 5 trashed compleatly the server at one time, never knew what happened

  • Migrating from Seagate Info 7.5 to CR Server XI release 2 - HTML problem

    We are currently trying to migrate from using Seagate Info 7.5 to using Crystal Reports Server XI Release 2, for our reports generation / scheduling.
    We currently have a number of reports which are generated as HTML and saved to a network shared folder. These reports are viewed by internal users and are updated every 15 minutes. This works well at the moment as the users have a browser shortcut to the report page and hit refresh every now and then to see updated content.
    However, in CR Server XI R2, there is no option to export HTML. So what would be the recommended workaround in this situation?
    Thanks in advance.

    I wasn't aware that CR Server doesn't include OpenDocument, are you certain?
    I think CR Server should have Crystal Reports URL Reporting though, called viewrpt.cwr. You can achieve pretty much the same with this, documentation is in our developer library:
    http://devlibrary.businessobjects.com/BusinessObjectsXIR2/en/devsuite.htm
    Developer Library home > BusinessObjects Enterprise SDK > .NET developer guide and API reference > Viewing Reports and Documents using URLs > URL Reporting for Crystal Reports.

  • Help!  Migrated from POP to IMAP - Lost Sent Mail!

    Hello all,
    OK, I messed up. It happens to us all, once in a blue moon (even if I knew better to back up BEFORE I tried something new, and it had been 3 months).
    I've been using the Mail App with my Gmail accessed through POP Mail since 2005.
    Today, I wanted to make a switch from the Mail app checking my Gmail account with POP to checking it with IMAP. It's the same Gmail account that I previously retrieved with POP, but now wanted to access through IMAP (better syncing ability through multiple machines).
    I created a new IMAP account in the Mail Preferences.
    I had meant to disable the POP account, but instead...I DELETED THE POP GMAIL ACCOUNT! This stupid accidental mistake has me kicking myself!
    As a result, all of my sent mails are gone. My Inbox is synced up like it was before, but NOT my Sent Mail.
    The last time I backed up was 3 months ago - so I could retrieve 5 years (minus last 3 months) worth of sent emails.
    I've checked my Library / Mail Settings, and the Pop Gmail account is no longer there. That file, that has all my sent mail data, is not in the Trash - it's nowhere to be found.
    I can find the file that has all my sent mail on a backup drive. (A .mbox file found in Library / Mail.) Since I have not backed up recently, I'm losing 3 months worth of sent emails.
    Any help in retrieving it would be appreciated.
    thanks,
    Mike

    Mike,
    Gmail, which is not true POP, captures a copy for the Sent on the server if you use their SMTP -- smtp.gmail.com. To see those messages captured that way requires web mail access and will not be seen by any other email client accessing as POP. I know this to be true, for I tested it when I once used POP with Gmail.
    In general your comment is true for POP, as I well know.
    Ernie

  • Data migration from one DEV(DE1) system to other DEV(DE2) BW system using client copy or client export import

    HI SAP Gurus,
    Please find the below details:
    SAP NetWeaver 7.3
    We have to copy all customized or developed BW objects like master data, DSO's , Infocubes , Reports etc.
    We need only the design changes but not the data within the DSO or cubes that exist .
    We have tried below procedure:
    1) Taken export of DE1 source client 400 with profile SAP_CUST
    2) Imported transports generated for above export into DE2 target client 350.
    3) Executed transaction SCC3 and performed post processing, post processing was successful  . Still we are not able to see DSO's, infocubes ,reports.
    Please lets us know what we need to do to fulfill our requirement.
    Thanks,
    Avadhesh
    + 91 8095226536

    Hi Basis,
    Please refer to below documentation on how to perform system copy in BI systems
    How to System Copy in SAP Business Intelligence System Landscapes (NW2004)
    Post processing steps for SAP BW system copy or db copy
    BI systems has mostly cross client objects. So client copy with SAP_CUST profile will not serve your purpose.
    Hope this helps.
    Regards,
    Deepak Kori

  • Problem migrating from 10.5 to 10.6 mail server: cvt_cyrusdb does not exist!

    The problem
    I am migrating a mail server from 10.5 to 10.6 (as the first step to moving to 10.8).
    I'm trying to migrate mail from Cyrus to Dovecot, using the command migrate_mail_data.pl but I keep getting the error:
    Error: cvt_cyrusdb does not exist in: .
    Background
    An example of how to use the command is at:
    http://www.opensource.apple.com/source/dovecot/dovecot-239/dovecot.Config/migrat e_mail_data.pl
    Example: migrate_mail_data.pl --cyrusBin "/Volumes/Tiger/usr/bin/cyrus/bin" --database "/Volumes/Tiger/var/imap" --sourceSpool "/Volumes/Tiger/var/spool/imap" --targetSpool "/Library/Server/Mail/Data/mail "
    So, the syntax is:
    sudo [location of migrate_mail_data.pl command] --moveMail 0 --cyrusbin "[location of cvt_cyrusdb binary]" -- database "[location of original mail database] "--sourceSpool "[location of original spool files]" --targetSpool "[location of destination files]"
    Locating my files
    Locate all of my files:
    sudo find / -name migrate_mail_data.pl
    /usr/libexec/dovecot/migrate_mail_data.pl
    sudo find / -name cvt_cyrusdb
    /usr/bin/cyrus/bin/cvt_cyrusdb
    --database files are at the default location:
    /private/var/imap
    --sourceSpool files are at the default location:
    /private/var/spool/imap
    --targetSpool is set for:
    "Volumes/Iomega1TB/121014/121005Dovecot/mail"
    What I've tried
    So, I've tried the following commands (and many other variations!):
    sudo /usr/libexec/dovecot/migrate_mail_data.pl --moveMail 0 --cyrusbin "/usr/bin/cyrus/bin" -- database "/var/imap" --sourceSpool "/var/spool/imap" --targetSpool "Volumes/Iomega1TB/121014/121005Dovecot/mail"
    sudo /usr/libexec/dovecot/migrate_mail_data.pl --moveMail 0 --cyrusbin "/usr/bin/cyrus/bin/" -- database "/var/imap/" --sourceSpool "/var/spool/imap/" --targetSpool "Volumes/Iomega1TB/121014/121005Dovecot/mail/"
    sudo /usr/libexec/dovecot/migrate_mail_data.pl --moveMail 0 --cyrusbin /usr/bin/cyrus/bin/ -- database /var/imap/ --sourceSpool /var/spool/imap/ --targetSpool "Volumes/Iomega1TB/121014/121005Dovecot/mail/"
    sudo /usr/libexec/dovecot/migrate_mail_data.pl --moveMail 0 --cyrusbin /usr/bin/cyrus/bin -- database /var/imap --sourceSpool /var/spool/imap --targetSpool "Volumes/Iomega1TB/121014/121005Dovecot/mail/"
    All give me the same error:
    Error: cvt_cyrusdb does not exist in: .
    Interpretation
    The error message tells me (perhaps I'm misunderstanding!) that there is a problem with this part of the command:
    --cyrusbin "/usr/bin/cyrus/bin"
    because that's what defines the path to  cvt_cyrusdb
    But 'Find' has told me the location of that cvt_cyrusdb command and I can see it in the GUI, too!
    Help!
    What am I doing wrong?
    With thanks in anticipation,
    Kevin

    Thanks for your advice, MrHoffman.
    I was trying to avoid taking the mail server down for more than a few minutes so wanted to:
    a. clone and migrate the server configuration to the new machine
    b. take server offline
    c. copy data to new machine and convert it from Cyrus to Dovecot
    d. take server online
    Due to the problem with converting the data, it looks like my only option will be to take the mail server down for some hours while I perform all of those operations.
    I was really hoping that there might be a simple answer to invoking the cvt_cyrusdb command!
    Can anyone tell me how I might fix that?
    Kevin

  • I will be working on a project to migrate from Sybase ASE (15.7) to SQL Server 2014 using Oracle golden gate........I am trying to find documentation which can guide me to use a separate box installation of OGG and how to configure it for Sybase and SQL s

    Hi,
    I need guide to install OGG on a separate box which will help me to migrate Sybase to SQL server.
    Viral Dave

    hi - just an fyi
    we have SQL Server 2012 and from my reads and understanding OGG supports SQL Server up to 2008. not to say it wouldn't work on higher versions if installed. in the link above check out the SQL Server installation chapter. before purchasing the license I would contact Oracle.
    maybe someone here has installed it on a higher version and got it to work. we are currently working on setting up OGG to work on Oracle to Oracle servers.

  • Migrating from Crystal Enterprise 8 to Crystal Reports Server 2008

    Hi,
    In our current CE8 setup, we have a web server with the web connector, which connects to the Web Component Server (WCS) running in the CE8 application server. Our reports (rpt) are 'unmanaged' and they simply reside in a directory on the application server, together with csp pages (for handling parameter passing, configuring ActiveX viewer settings, etc). The link-to-folder path mapping is specified in the web connector settings. Users view the reports by pointing the browser to the csp pages.
    Given the scenario, we would like to migrate to the new CRS2008 platform, while maintaining similar setup as above.  However, it is noted the web connector/WCS are no longer there in the new version. My questions are:
    Can Viewer/RAS SDK be the replacement for achieving the setup?
    What is the mechanism for web and application server communication?
    Any enlightenment on the above will be much appreciated.
    Thanks,
    John

    Post Author: TAZ
    CA Forum: Deployment
    CRS is limited to single server installs, it has less functionality such as no auditing. Enterprise can be clustered across many servers, has auditing and webi/deski from E6. So which one is best would depend on the size of your planned implementation and the features that you want.
    Regards,
    Tim

  • Migrating from weblogic 8.1 to sun one server

    I need some documentation that could guide, in steps involved, in migrating an J2ee application from weblogic 8.1 to sun one application server.
    Please help.

    Do you have any migration guide from weblogic 8.1 to sunserver 8.1?
    We want to know how to handle null in jsp? Because in weblogic 8.1, we can set printNulls to false in weblogic.xml file. Is there any way we can do this in sun server?

  • DB migration from 9i to 10g (in a new server) using a cold backup

    We have a cold backup of a 9.2.0.5 database,
    we would like to migrate this 9i DB to a new server with only 10g software already installed.
    1- can we use DBUA to do the migration?
    2- should we start the database before running DBUA?
    3- if yes then we need to prepare the pfile, and the password file?
    we would like to avoid installing 9i in the new server
    Thanks for help

    I have to Install 10g on Solaris 10 on a new server and then move my old >database which is 9i on Solaris 9 to the new box. I'm not sure how to go about >doing all this right since I'm new in the dba field and this is production.How much down time you have to perform this activity?
    How big is your database?
    Since you're moving the database from one server to another, You have to proceed with Export/import or datapump export/import(only if you can upgrade your 9i database to 10g).

  • Data Migration from R3 to new ECC System

    Hello,
    We are doing a fresh implementation for SAP MDM. Currently we have 3 SAP R/3 systems and 1 non-R3 system (BPCS system). One of the project goals is to do data migration from all these 4 systems into a new SAP ECC system and to MDM for Vendor Master, Customer Master and Material Master. My manager says that we need Business Objects tool to Migrate these data. But, my question is that is it not possible to achive this through XI/PI itself ? Can anyone let me know the entire process in XI/PI as to how do I receive the Idocs from R/3, convert into XML and then send it to the new ECC system in Idoc format ?
    Thks & Rgds,
    Hema

    Hi Gandhi,
    You have SAP MDM, BPC and R/3 systems in your landscape, when you are migrating data to new ECC system, what is the role of mdm, did you moving the same data to MDM to avoid duplicate/redundant data??is there any data migration from R/3 to MDM(any integration required)or MDM to R/3,
    You have to develop different interfaces to transfer data from MDM to ECC, BPC to ECC.definelty you required one middleware, the option definitely SAP PI. it offers very easy of integration between MDM and R/3 system, you can use MDM-PI adapter to connect to directly MDM syndicator file port from there you can pull the XML file and convert it in to IDoc format use Receiver IDoc adapter in PI, the same way we can integrate BPC system with R/3.
    Search in sdn, there are some scenarios integration of R/3 and MDM using PI, refer those links, if still you have any doubts let me know,
    Regards,
    Raj

  • Migrating From IMAP to Exchange 2013

    Hi
    I'm looking to migrate from a hosted imap email provider to racked exchange server 2013
    we have about users, but also some of the services we provide generate and send mail
    We are looking to just migrate the users for now, but at the risk of sounding stupid, I don't think this is possible due to the domain and the mx records, as in we don't want to change the email address' and we would be able to have both hosted and in house,
    using the same domain
    Any help and advice is very much appreciated 

    Do you have access to hosted environment to move the mailboxes?
    What is the number of users you are talking about?
    To move the mailbox you would require some third party tool.
    Cheers,
    Gulab Prasad
    Technology Consultant
    Blog:
    http://www.exchangeranger.com    Twitter:
      LinkedIn:
       Check out CodeTwo’s tools for Exchange admins
    Note: Posts are provided “AS IS” without warranty of any kind, either expressed or implied, including but not limited to the implied warranties of merchantability and/or fitness for a particular purpose.

  • Migrating from 10.4.11 Server to Mavericks (App) Server

    Hello All!
    We have recently purchased a new Mac Mini 2.3GHz quad-core i7 with OS Server, in the hope of replacing our current G5 X-Serve running 10.4.11.
    I would like it to be known that I am not a server administrative wizard, but am aware that the migration from 10.4.11 to an Intel-based system is not as pleasant as I had imagined.
    Our G5 hosts our Mail database (Cyrus IMAP) - and this is my primary concern. I have read that the new Mail service differs hugely from Cryus (Dovecot - if Im not mistaken?). We rely hugely on archive mail for legal reasons and losing it is not an option. I will of course have Carbon Copy Cloned the X Serve before carrying out any migration, and certainly intend to leave the old hog alone if I need to revert to it at a later stage.
    The only documentation I can find is the Apple Technical document which outlines how to migrate from 10.4.11 to Snow Leopard Server 10.6 - this is an issue for me, since I have Mavericks now installed on the Mac Mini and "reverting" back to an older OS is rather difficult (especially with no superdrive).
    Could anybody please point me in the right direction? Is it likely that I will need to downgrade the Mini's OS first? Or have Apple already produced literature which can guide me through this process?
    Help!

    Migration Assistant will not overwrite the OS or replace newer versions of applications with older ones. It is designed to do what you presumably want to do: make the transition from the older to newer Mac(s) as smooth as possible.
    One thing: if it is convenient to do so, I suggest you connect each old & new Mac by Firewire, with the older one in Firewire Target Disk Mode, to do the Migration. This will be the fastest way to do the migration.

Maybe you are looking for