Migrating server hardware replacement oes11 to oes11sp2

This summer I will be replacing server hardware at one of my schools. Currently it has sles11sp1 / oes11 -- put in in 2012. The patches are up to date for this version, but I have not upgraded/migrated it to a newer version yet. I have played in a test environment with the yast2 wagon migration from sles11sp1/oes11 to sles11sp2/oes11sp1 -- no problems. However trying to find notes on how to do a migration and identity transfer from source server hardware to new target server hardware. Found oes11sp2 migration tool administration guide. I haven't found anything telling me how to setup sles on the target server box ie server name etc. Once I have the target sles server setup, I realize I need to install OES and select the "Novell pre-migration server" option during this installation.
Current source server = sles11sp1/oes11 and has iPrint, Nss and netstorage installed. Installed in tree with oes11 and oes11sp1 servers.
The main tree server has sles11sp2/oes11sp1 on it. We will need to upgrade it to sles11sp3/oes11sp2 this summer. I'm fine with doing the yast2 wagon migration on that server. We just haven't done server hardware replacements for OES-L yet.
Looking for some good (step by step) instructions. ;-)
Thanks
Patty

Originally Posted by amdsbnovell
Thanks Thomas. Just printed the document now. If my current sles11sp1/oes11 server is called testfs for instance, then I need to install the new target server as a sles11sp3 server called tempfs. Then install oes11sp2 into the tree in a temporary location in the tree as a premigration server (for the installation). Then I should be able to follow the instructions. When I do the identity transfer, I'm assuming it renames the sles11sp3 server from tempfs to testfs as well (as that is where oes gets the file server name from)?
Um, sorta. Let's pretend your server name is: OLD and the new one is NEW (temporary NEW name and temporary NEW IP)
OLD: OES11
NEW: OES11 SP2 (assuming you want latest stuff).
Do all your data transfer/consolidations/etc
Then when you do the ID transfer, it will literally transfer the eDir databases (well copy is more correct) from OLD to NEW, you shut off OLD, I think it restarts NEW and renames/changes the servername and IP to what OLD had.
You can choose to install the NEW server with the .ISO separately (ie: Install SLES11 SP3, then after you're done, Add On the OES11 SP2 .ISO), or you may choose to use the integrated DVD and do it all at once, or use the 2 separate ISO and do them at once (but depending upon your installation method, you may not be able to do the 2 separate ISO).
I hope that helps.
I'm about halfway through editing my docs for OES11 SP1 (of course, SP2 is out now) for migrations from OES2 SP3, but the same setup steps basically apply. I think the only things that changed from NW To OES (ie: OES2 to OES11) are DHCP and iPrint migration procedures.
--Kevin

Similar Messages

  • IPrint migration oes11 to oes11sp2

    This summer I have to replace server hardware -- current one is sles11sp1/oes11. I will install sles11sp3/oes11sp2 this summer on a new temp server for the migration and id transfer. Reading up on the migration tool. Wondering if there is anything I need to be aware of in migrating the iPrint environment. The printers are not setup in dns (as we don't use Novell for our DNS server).
    Thanks
    Patty

    Originally Posted by pattymackay
    This summer I have to replace server hardware -- current one is sles11sp1/oes11. I will install sles11sp3/oes11sp2 this summer on a new temp server for the migration and id transfer. Reading up on the migration tool. Wondering if there is anything I need to be aware of in migrating the iPrint environment. The printers are not setup in dns (as we don't use Novell for our DNS server).
    Thanks
    Patty
    Well, if you're going on new hardware, you MAY be able to get away with a few things.
    Choices (off the top of my head):
    1) Use the Consolidation part of the miggui. Downsides to that are that you have to create new driver store/manager and if you're not using DNS, then you'll have some interesting issues (ie, possibly reinstalling on all your pc's). But just because you don't have Novell as your DNS server doesn't mean you can't use DNS names for iPrint. We use Sun Solaris for DNS and we just have our Unix guys adjust/add the DNS entries as necessary and it works fine.
    2) IF you're going to use the ID Transfer so that the new server is going to have the same name/IP, then you can probably do this (I only know this because we just had a server blow up):
    https://www.novell.com/support/kb/doc.php?id=3006957
    We chose option #1, BUT:
    Instead of restoring/copying just the:
    /var/opt/novell/iprint/[PSM].[OU].[O].psm/
    We did the:
    /var/opt/novell/iprint
    directory as that also gets the printer driver profiles and driverstore
    IF you choose the above option, I'd suggest that when you install your NEW OES server do NOT configure iPrint (install yes, don't configure it). Then after the ID transfer, copy/restore the configuration files and I THINK you'll be good to go.
    3) some other option I'm not aware of.

  • Migrating Server To New Machine?

    Has anyone here tried to clone a server configuration to a new machine (like completely different hardware)?
    We currently have an eMac in the office running OS X Tiger Server (I know I know) as our directory server, mail, web, file, and home directory server. It's got a lot of e-mail, work files, web sites, users, etc on it. I just bought a new powermac to replace it but I'm wondering if it's possible for me to 'clone' (like say with CarbonCopyCloner) the e-mac into the powermac.
    Will that work?
    I'm finding lots of software migration guides (eg. upgrading to a new version of OS X Server) but no server hardware migration guides like upgrading to a whole new machine...
    I'm sort of hoping that I could come in on a Saturday and transfer the server to a new machine and have everything be as it was, meaning the users wouldn't even notice. Except things might be a little faster/snappier for them of course.
    Am I in fantasy land? Any help or experiences in this area would be much appreciated!
    Technical Side Note: eMac is a G4 800Ghz, new (actually used) powermac is a dual G4 1.3Ghz

    No problem cloning machine to machine as long as the OS supports the target machine. In your case, any 10.4 server will will run on the dual.
    Clone away....
    You could also run a test... boot the eMac in firewire target disk mode, then startup the Dual G4 from the eMac's hard drive (option key on boot). It should start-up and run just fine (although a bit slower considering firewire interface).
    Once up and running, you could stop services and clone from the live eMac drive to a freshly erased Dual G4 internal drive.
    Jeff

  • ACS 5.5 Hardware Replacement option

    I have an existing 2-node, ACS 5.5 cluster (primary plus one secondary) in production running on VMs. I have two new ACS nodes (also on VMs) that I want to install to replace the existing nodes (original VMs weren't built correctly). I have several options to accomplish this but I'm interested in the option to join a secondary to a primary as a hardware replacement.
    There is very little documentation that I can find as to what is actually done to the new node during a "hardware replacement" join. Obviously, the ACS database configuration is replicated, but what about IP address, hostname, etc. - node-specific attributes? I'm going to assume that certificates would NOT be copied over as part of the "hardware replacement" option.
    Has anyone used this option before or know what attributes from the replaced node are copied to the replacement node?

    ACS doesn't replicate certificates. All you can do, export the certificates from the ACS.
    That's why a small number of configuration changes can be  performed on a secondary server while in distributed enviornment, including configuration of the server  certificate, and these changes remain local to the server.
    Regards,
    Jatin
    Do rate helpful posts-

  • Server app replacement not detected - how to force?

    I just applied the OS X Server 4.1 (I was running 4.0.3 previously) on a 10.10.3 system. But the 'server app replace,emit detected' message has not appeared (even after 10 minutes and 1 reboot for another software update). If I launch 'Server' it still says 4.0.3 in About.
    So it seems my server is in some kind of limbo state with a pending server update. How can I force it to recognise the new server app and start the normal migration process?
    Chris

    Hi Chris,
    Put the current server.app in the trash, reboot and download the new server.app 4.1 from your app store recent purchases.
    Trashing the app might already give you a replacement message.
    That should do the trick.
    Goodluck
    Jeffrey

  • Migrate Server 2008 Certificate Authority To New Server Different Host Name?

    Our internal CA is installed on one of our Exchange servers.  Exchange is being migrated from 2010 to 2013, so all current Exchange servers will decommissioned and replaced with new new Hyper-V VMs with either Server 2008 R2 or 2012 R2 OS. The old VM
    containing Exchange 2010 and the current CA will go away since we cannot afford to use the server resources and use up the required Windows license to keep that server running doing nothing but acting as a CA.
    So, we will either need to move the CA to the new replacement Exchange 2013 server or some other existing server that's being used for something else (maybe one of the domain controllers).
    What is the best way to handle this?  I don't think the migration from Exchange 2010 to 2013 allows for reusing the same host name on the replacement server and if we move the CA to another existing server, it will also be on a server with a new host
    name anyways.
    Can we migrate the CA to a new server with a different host name?
    What about reissuing all the active certificates from the current server to replace them with new certificates from the new server and then decommissioning the original CA?  Can this be automated in some way?
    Which way is best and how would it be done?

    When following the instructions in the guide, I would also consider to switch to new "sanitized" URLs in certificates (CDP and AIA) in case you had used the default URLs now. That's what I did this when migrating W2K3 CAs (with default URLs) to W2K8 R2.
    Per default, the LDAP and HTTP URLs point to the CA server itself (HTTP) or to an LDAP objects that has the same name as the current server.
    Migrating to a new server, you need to make sure that CRLs will still be published to the old locations - thus the new CA server would write to the LDAP object that corresponded to the old server, and HTTP might be fixed by redirecting the DNS record. (Make
    sure this is documented so that nobody thinks it might be a good idea to delete the old object as it "references a server that does not exist anymore".)
    As you have to fiddle with URLs anyway, I would then add new URLs having neutral names - that is URLs not including the name of the CA server. The new CA instance would then 1) publish to the old locations but not add these to certificates anymore and 2)
    publish to new sanitized locations and add them to CDP and AIA URLs.
    Elke

  • Unity, hardware replacement procedure

    Hi,
    I need Unity7.0 hardware replace to new one and follows the instruction,
    1. old server, run DiRT backup and disconnect the old server from production
    2. new hardware, install OS and join to domain
    3. install Unity application
    4. run DiRT restore on the new hardware
    Q1) when the new hardware join to domain (step 2), join as same host name of old server or new one which is unique on the domain?
    -if I need same host name of old Unity server, I need delete the old server host name on the domain controller to able to join the new hardware with same host name (domain controller is not allow joining the new hardware with same host name if already exist same host name which is for old Unity server)
    -if I can join the new hardware with different host name, can I DiRT restore to the new hardware? if yes, automatically mapping all Unity database to new hardware while DiRT restore then?
    Q2) when I roll back to old Unity server in the case something problem on the new hardware, can I just reconnect the old Unity server to production with disconnecting the new hardware?
    -I think its depends on the answer of Q1 that the new hardware with same host name versus different host name
    Advise please,
    John

    Hello
    How are you?
    Answers are inline below:
    Q1: DIRT restore only requires that the system be on the same exact version of unity so the name can be different when installing a new server. Dirt will sync all the users to the new server.
    Q2: There is no documentated procedure for this but I suspect you need to do the same steps you did to setup the new hardware.
    install unity cleanly on that old server then use the dirt backup to restore to the old hardware. You will need a clean install on that system in order to run dirt. And dirt needs to run in order to sync the users back to this unity server.
    Hope this helps
    Thank you

  • Mac mini server: Hardware test error on Hard Drive

    Mac mini server: Hardware test error on Hard Drive
    'checking for slow read failures': ERROR - Target device access failure - Test failed.
    CAN I ACCESS HD (which is our data server) EVER AGAIN? IF SO, HOW?
    Meanwhile we wonder if this is really a hardware error. It all happened during writing a time machine backup.
    Probably while writing it, some data was relocated by accident, but we can not 100%-sure remember the sequence of actions :/
    This is our trauma history:
    - time machine got increasingly slower in writing a backup
    - we quit the backup
    - we switched off the mac mini (on power button)
    - we switched on the mac mini
    - we stopped time machine to the rules
    - we shut down mac mini via command
    - we booted the mac mini in save mode
    - we see a loading bar
    - no progress after 10th of loading bar
    - switched off (power button)
    - when we now switch on the loading bar below the apple-logo is all we see + the little wheel
    - we started with cmd+alt+p+r pressed
    - mac mini restarted but showed the loading bar scenario without progress again
    - we started with 'd' pressed and did the hardware test (see above)
    - we started with 'alt' pressed but it does not give us the recoverydrive to run the last backup
    ANY IDEAS?
    IS IT A SOFTWARE- OR HARDWARE ERROR?
    THX IN ADVANCE!

    BDAqua wrote:
    I thnk Intenal 2.5" Drives for servers is silly, & Ithink the Minis & iMacs re poorly cooled.
    I'd get Temprature Monitor & see what temps they're running.
    Is Temperature Monitor an app or a device?  If it's a temperature problem then that is essentially a design problem.  Two drive failures in the same Mac mini server in four months combined with the fact that they're not really user serviceable already has me 90% on the way back to more pragmatically designed Linux servers.  I think it would be foolish to waste any more money on these minis for my business hosting.

  • I'm trying to timestamp (RFC 3161) a pdf using my own timestamp server hardware but always get an error: "Certificate invalid for use" ...

    I'm trying to timestamp (RFC 3161) a pdf using my own timestamp server hardware but always get an error: "Certificate invalid for use" (Original text - pt_BR:O certificado não é válido para uso). How can I get more info on what I'm missing or whats wrong with the certificate?

    Which Acrobat version are you using? Do you use "Document Timestamp" command? If so, do you get this error during the signing process and the signature is not created or signature is created and you get this error when it is validated? If the latter you can open signature properties, click on the "Advanced Properties" and in the next dialog on timestamp's "Show Certificate". If you get this error during the signing process do you get an alert that shows some cryptic info with a number? If you do provide the content of this alert.
    Also which Acrobat version (including minor) are you using?

  • How to check server hardware and OS issue without offline DB server

    Hi Experts,
    For checking hardware issue, do we have any way to check server hardware and OS performance without offline server?
    any way we could rule out bad hardware causing the problem without offline server?
    Thanks
    Jim

    I think your answer depends on the nature of the hardware issue you think you may be having, whose hardware you have, and the OS your are running on that hardware. Such as on UNIX there are several error logs that record errors related to the system including detected hardware issues and you have numerous utilities like vmstat and iostat that can be used to measure performance. Some disk units linclude their own diagnostics modules you can run.
    If you really want help I think you have to be a lot more specific about the problem you are facing.
    HTH -- Mark D Powell --

  • Server hardware confusion with 32 bit and 64 bit

    Hi,
    I am very new to this oracle, and I have a doubt which is very stupid, please help me out here, I have been working for installing Retail, so I have to integrate the EBS with Retail, which I got the documents for, there it says we need OEL x86_64..
    My questions are
    1. Can we install OEL x86_64 in 32 bit server hardware?
    2. If we can install it, can we install 32-bit EBS staged files in that OS
    3. Also do I need 64 bit server hardware in order to achieve my goal?
    4. Also can anyone suggest good links for finding server hardware’s where can I look into building just for EBS single node..
    Thanks in advance
    Love this Forum and your helps that you all given me so far.. :-)

    Hi,
    AFAIK:
    1. Can we install OEL x86_64 in 32 bit server hardware? No, you cannot.
    2. If we can install it, can we install 32-bit EBS staged files in that OSYou can Install 32-bit of software's on 64-bit machines, but you cannot Install 64-bit software's on 32-bit machines.
    Although, its not recommended to Install 32-bit software's on 64-bit machines. Install sw same as Hw architecture.
    3. Also do I need 64 bit server hardware in order to achieve my goal?Check with oracle there should be 32-bit software available for this.
    4. Also can anyone suggest good links for finding server hardware’s where can I look into building just for EBS single node..http://www.oracle.com
    thanks,
    X A H E E R
    http://appsdbaworkshop.blogspot.com

  • Need Server Hardware Configuration Advice

    Good morning!
    We are using Microsoft Visual SourceSafe for version control.
    Two years ago, when I requested that RoboHelp be connected to a
    database application for version control and multi-author support
    (I asked for RoboSource Control on a dedicated server), they gave
    us SourceSafe on a shared server. We now have 40 help systems and
    have suffered many losses (corrupt database = rebuild the project
    using the html files) as that shared server has gone down while
    RoboHelp was connected to it.
    I'm submitting a work request to our IT department today for:
    1) Upgrade from RoboHelp Office 5 to RoboHelp 6
    2) Purchase and installation of RoboHelp Server 6
    3) Purchase of a dedicated server
    I'm stuck on what to ask for with respect to the server
    hardware configuration - and afraid that if I don't provide them
    with detailed specifications that they'll provide us with another
    inadequate setup. We currently have a need for 13 simultaneous
    authors - some over VPN - to work under version control, and we're
    growing. Can anyone provide me with a recommendation for server
    hardware configuration?
    Adobe's web site only specifies the system requirements for
    the RoboHelp Server 6 software installation - and sales support
    told me that they are not able to recommend a server configuration.
    I don't like going into this at the mercy of anyone in our IT
    department! My husband, who is a database administrator, gave me
    the following advice and I'm wondering if that's all I need to tell
    IT or are there other potential issues I need to cover?
    quote:
    For the storage or “hard drive” you want a RAID
    controller with an array of hard drives for your data. You will
    have a C: drive for the OS but your data should be separated from
    the OS on a RAID controller with an array of hard drives.
    For RAM you want a few gigs.
    In addition to the application software
    requirement of 100 MB of hard drive space, we currently have 42GB
    (2.5 years) of help system data. We have 40 help systems spread
    between 10 databases (separated by lines of business) - we used
    this configuration because early in the game we thought our
    corruption issues were stemming from databases that were too large
    for SourceSafe to handle. I'm wondering, with RoboHelp Server 6
    will we need to use multiple databases or can it handle 40+ help
    systems in one database?
    I also have a need for a few help systems to be in their own
    databases because we are running them for other companies owned by
    the bank and that data can't be co-mingled - can RoboHelp Server 6
    handle multiple databases?
    Thanks in advance for any assistance you can provide.

    Hi THessler
    I've used Microsoft Visual Source Safe (VSS) quite
    successfully for many years with RoboHelp with no issues such as
    you are citing. You further state something I and probably many
    others here find very disturbing.
    You said:
    We now have 40 help systems and have suffered many losses
    (corrupt database = rebuild the project using the html files) as
    that shared server has gone down while RoboHelp was connected to
    it.
    This would seem to imply that you aren't using RoboHelp
    correctly with the source control system. And if this proves to be
    true, you will likely see the SAME behavior with RoboSource Control
    or any other source control system you decide to use.
    Please allow me to explain. RoboHelp does not like working in
    any form of a networked situation, period. If you use it this way,
    it will frequently crash and corrupt files and all sorts of ill
    mannered things. Bottom line is that RoboHelp absolutely needs to
    be working on files only when they are stored on your local PC.
    I know I know, how does one accomplish this with a Source
    Control system? After all, the fact the Source Control system has
    to sit on a server means working from a server, no?
    Here's the deal. With any Source Control system you use, you
    should find that you have the main Source Control database, which
    resides on a server.
    But (and here's the kicker) when you configure users that
    participate in Source Control, each user is configured with
    something called a
    Working folder. This is a special folder where the files
    from the database are copied to. RoboHelp should be working on
    files inside this folder. As they are updated, copies are placed on
    the server copy.
    Sooo, before abandoning VSS or before totally configuring the
    new source control system, I'd first ensure you are using it
    properly. You may just find that you don't need to spend the money
    for a new source control system after all.
    Cheers... Rick

  • Forms and Reports 11g server hardware..

    We're looking to move from 6i to 11g F&R..
    But cannot find any docs anywhere that will help us to size the F&R 11g server hardware.
    Could anyone please point us in the right direction?
    many thanks

    We are in the midst of moving our application from forms 6i c/s to forms 11g web. I have the entire stack installed on a Pentium4 3.2Ghz 4GB DDR RAM server (its a 1U rackmount) and it actually works, although rather slowly (its for development) and only has at max 5 users on it.
    Here is the products I have installed:
    Windows Server 2003R2 32bit
    Database 11g (for metadata repository)
    Weblogic 10.3.1
    OID 11g
    SSO 10.4.3
    PFRD 11g (services and developer)
    It uses all available RAM and the Pagefile to disk is 6.03GB
    We have implemented the stack on a customer's server which is a modern quad-core Xeon with 4 GB RAM with SATA drives, and it is much snappier. Still 32bit Windows 2003R2, thought.
    We are about to try out a new server running on Windows 2003R2 64 bit with 8GB RAM to see how it performs. The database/weblogic/OID/PFRD combined is such a memory hog.......

  • Can I install Snow Leopard on Mac Mini Server hardware?

    What I would like to do is buy the Mac Mini Server but I don't need the server OS. I want the desktop OS on the Mac Mini Server. Will installing Snow Leopard on the server hardware be just like installing it on a regular Mac Mini?
    Or should I just wait and see how Lion shakes out?

    Thanks Indy, I already had proceeded the installation according your tip. Just an objection related to the updates: I was able to install the OS updates only while in target mode, as when I made 2 attempts to update the version 10.6.6 to the current one (10.6.7 - the combo one and the MBP version too) it was not permitted. I had to plug the FW cable into the MBP again and update the Mini's OS (using the special MBP version of 10.6.7) in target disc mode. I want to use the Mini as a media server and intend to install Windows 7 on the other HD which now hosts the server OS. However, according to one poster (Sven G) there are some problems (I don't know exactly what they are) related to Boot Camp software. Have you any information about these problems?
    I have maintained both OS (standard and server) living side by side on the Mini, is there any problem with that?
    Again many thanks, you were succinct, right to the point, and your tip just proved itself correct. 
    Cheers
    Marola

  • Move Adobe Connect 7.5 to new server hardware

    What is the process for moving Adobe Connect to new server hardware. We are currently running Adobe Connect Pro 7.5 (7.5.1.0.100) on a Win2K3 SP2 server. We would like to move Connect over to new server hardware running Win2K8 R2 (64-bit). The Connect database will remain on a separate Win2K3 SP2 / SQL 2005 sp4 server.
    Unless it will pose a problem, the NETBIOS computer name will be different. However, the IP address and FQDN will remain the same.
    What is the recommended procedure for doing this?
    PS - Shortly after moving to new hardware, we plan to upgrade to Connect 8. Is it better to upgrade first, then move to new hardware? Or vice-versa?

    Hi,
    moving to new hardware is basically a new install on the new server, then moving over backed up content, then reconnecting to the database.
    It makes no difference if you upgrade first and then move hardware or move first and then upgrade. I'd move first and make sure Connect works fine on the new hardware, then upgrade.
    Here are some steps that should work.
    1. make sure your new hardware, OS and SQL Server are supported
         http://help.adobe.com/en_US/connect/8.0/installconfigure/connect_8_install.pdf
        (for 7.5 check the requirements here: http://www.adobe.com/products/acrobatconnectpro/systemreqs/#proserver )
    2. Take a backup of your current content directory and all customised config files.
        (the config files will be a reference to restore SSL or other modifications, do not just move them back in once upgraded).
    3. Take a backup of your database and make sure you know the login and password to your SQL server.
    4. Stop the services on the old server
    5. If also moving DB, attach your DB backup to the new SQL host.
    6. Install Connect on the new hardware.
    7. Do not start the services yet, first restore the backed up content.
    8. start the services, bring up the console and connect to the DB.
    9. check your settings in the console, a restart might be required first.
    10. Does the login page load?
    11. Follow the install guide from step 1 to re-apply SSL config if required (in Connect 8 this is done slightly different than in C7)
    Changing the windows machine name, can cause trouble, not always, but it's easiest to just re-use the name on the new hardware.
    If that's not an option, an entry in the conenct DB needs to be updated:
    http://kb2.adobe.com/cps/407/kb407446.html
    I am fairly certain these steps will work, but cannot test this and I do not know your exact environment, so I can give no guarantee this will work. It is always good to just test the move to new hardware and if things go wrong, bring the old system back into production and contact support.
    Good luck!
    Kay

Maybe you are looking for

  • Very simple question from a rookie

    Hi, I don't know how sequences work in OWB. I have a very simple mapping: 1 (not empty) source table, 1 (empty) target table, 1 sequence. Source and destination are connected. The sequence.nextval is connected to the primary key. sequence.currval is

  • Playing music across accounts?

    I asked this question last March when I first got my Mac, but no one had an answer. I'm posting again, since it's starting to become a point of contention between my wife and me. We've set up accounts for each of us on the Mac. Is there any way to co

  • Can not re-size photos for wall paper, any ideas?

    As a photographer my main reason for purchasing the ipad 4th gen. Was to be able to customize my wallpaper display.  thanks IOS7, that has all gone south.  Anyone know of a way to re-size images so they fit?

  • Level of Maintenance

    Hi. I´ve tried to upgrade from JDeveloper 11.1.2.3 to 11.1.2.4.0, but the installer gives a message that I must have one with the correct level of maintenance (the 11.1.2.4.0 is incompatible with the installed one). What can be the usual suspects of

  • Entire MBP screen becomes pixelated!

    This has happened to me three times already. I usually close my MBP when I'm not using it, but recently, when I open it again, my screen is all pixelated. I try to press buttons and move the mouse but nothing happens and I have to do a hard restart.