Migration 11.5.2 Wind 2k db 8i to 11.5.10.2 W. 2k3 different server db 10g

Hi,
I have started to migrate a Oracle Applications 11.5.2 with database version 8.1.7.4 under Windows 2000 to another server with Oracle Apps 11.5.10.2 with db version 10gR2 (10.2.0.4).
I think the best and quickest path to follow is the one explained in note: http://www.solutionbeacon.com/RapidMigrationR11R12WP.pdf
I have already working the step 1 "Perform a Fresh Install of 11.5.10.2" in the new 2003 windows server
Now I have to perform "Replace Fresh Install Database With Current Database"
My plan is:
1-) Delete Fresh Install Database
2-) Copy 8.1.7.4 datafiles from 11.5.2 env to 11.5.10.2 environment
3-) Generate a control file to trace in 8.1.7.4 env, change the paths, move it to the 11.5.10.2 env(by default 9.2.0.6 DB). Here I assume I do not need 8.1.7.4 binaries in the new server.
4-) Perform a manual upgrade following steps in http://download.oracle.com/docs/cd/B10501_01/server.920/a96530/upgrade.htm#1009200
5-) Perform the tasks in note Oracle Applications Release 11i with Oracle9i Release 2 (9.2.0) [ID 216550.1]
6-) Run autoconfig (The DB have the values of the 11.5.2 db name, hostname ... and should have now the new values)
7-) Perform the prereqs in Oracle Applications Release 11.5.10.2 Maintenance Pack Installation Instructions [ID 316365.1]
8-) Run 3480000 patch (I don't know if I have to run u driver as said in note RapidMigrationR11R12WP.pdf
or I have to run "adpatch options=nocopyportion,nogenerateportion"
9-)Here I am in the new server with Windows 2003, applications 11.5.10.2 and 9.2.0.6
10-)Upgrade DB to 10.2.0.4, jdk, ad, atg, forms, finacials modules (in summary, upgrade to the minimun supported oracle products)
Should this work? any advice? I'm missing anything?
Thanks!!!

I have found this in just 5 minutes, I do not have time to look for all of them, but here you go the same or really similar approach
upgrade 11.5.8 to R12
Re: Upgrade 11.57 on Suse SLES 7  to 11.5.10.2 on Redhat AS 4
upgrade Oracle EBS using import/export
Upgrade to 11.5.10.2
Re: 11i upgrade issues
Fresh install 11.5.10.2 and DB upgrade
Re: 11.5.10.2 best upgrade path from 11.5.7 with platform change
Anyway, it is clear that nobody here is able to help
Thanks

Similar Messages

  • Migrating SSO to a different server

    Hi,
    We are using Oracle SSO on Oracle HTTP server.
    AS requirement, we need to be moving to a different server with different IP, but out domain names will remain same.
    Do we need to re-request the SSO credentials again? Or simply performing the steps (cleartext, and apobfuscate) again on the new server with the old details will get this going?
    Please help.
    Thanks in advance.

    Yes, using dsmig is a supported method of migrating schema. However, dsmig requires local disk access to both the old instance and the new instace. Often times during migrations the new DS instance is on a new or different piece of hardware. In those cases to use dsmig you would have to either tar up the old instance, copy and un-tar it somewhere on the new system or, I suppose, you could set up a temporary NFS mount to the old system. I find either of these to be more work than is necessary. I almost always resort to a manual migration process as I know I am in control of everything being migrated. Sun does support the manual method as well and it is documented at:
    http://docs.sun.com/app/docs/doc/820-2762/dsmanual?a=view
    The section specifically on manually migrating schema is at:
    http://docs.sun.com/app/docs/doc/820-2762/schemamanual?a=view

  • Redo logs switches too frequent after migrating the db to different server

    Dear Experts,
    A couple of days back, we migrated our database (belonging to EBusiness Suite) to a different server, to get good performance benefit. The database is 10.2.0.4 and it was migrated from AIX 5.3 to Linux x86 64.
    Users are happy with the performance, but I am getting below errors in the alert logs
    a) Thread 1 cannot allocate new log, sequence 498
    b) Private strand flush not complete
    c) ORACLE Instance PROD - Can not allocate log, archival requiredOracle support is saying the issue is coming because of too frequent log switches. I am wondering how the log switches has become frequent in the new server. In the old server it was about 10 mins for every switch, now it is as frequent as 1 minute?
    Any idea, what could be the reason behind this? Do you agree this issue is coming because frequent log switches?
    Thanks
    ARS

    Kanchana Devasurendra wrote:
    Hi ARS,
    Please check the following item in your new database.
    1. log_archive_max_processes Most properbly value set for this parameter is low ( may be it's set to 1.) Please increase up ( 4)I am curious to know what makes you think 4 is the right magic number for log_archive_max_processes - after all, he's only got one archive destination.
    Regards
    Jonathan Lewis
    http://jonathanlewis.wordpress.com
    http://www.jlcomp.demon.co.uk
    A general reminder about "Forum Etiquette / Reward Points": http://forums.oracle.com/forums/ann.jspa?annID=718
    If you never mark your questions as answered people will eventually decide that it's not worth trying to answer you because they will never know whether or not their answer has been of any use, or whether you even bothered to read it.
    It is also important to mark answers that you thought helpful - again it lets other people know that you appreciate their help, but it also acts as a pointer for other people when they are researching the same question, moreover it means that when you mark a bad or wrong answer as helpful someone may be prompted to tell you (and the rest of the forum) what's so bad or wrong about the answer you found helpful.

  • Migration the db portion only to different server

    Gurus,
    Current configuration of EBiz application is
    AIX 5.3 - Apps (11.5.10) + db (10.2.0.4) on the same server. The plan is to delink the database from the existing AIX server and migrate to different hardware so that database can be on a different server and apps can continue on the same server.
    One of my friends suggested me to move the concurrent manager portion also to the db server (New server).
    Does anyone buy that idea?
    Regards,
    ARS

    i Just had discussion with one of colleague,i believe you can archive it, but you can't use shared applications option, if you use diffrent os, we have setup that discoverer running on HP Unix and EBS 11i in Linux, I am not sure about diffrent OS for EBS configuration, what is current OS and what is new OS.
    Check this site:
    http://h21007.www2.hp.com/portal/site/dspp/menuitem.863c3e4cbcdc3f3515b49c108973a801?ciid=c608725cc2f02110725cc2f02110275d6e10RCRD
    Check this notes,
    Note.733205.1 - Migration of Oracle Instances Across OS Platforms
    Note: 369693.1 - Using Oracle Applications with a Split Configuration Database Tier on Oracle 10g Release 2
    Note: 946413.1 - Using Oracle E-Business Suite with a Split Configuration Database Tier on Oracle 11g Release 2

  • Migrating from Essbase 7.1.6 to 9.1.3 that too to a new target server

    Hi,
    We have ASO cubes on Essbase 7.1.6. We are upgrading to Essbase 9.1.3 on a new target server. We want to migrate the ASO cubes (along with data). We know that we can get the data migrated by doing export and import. But this doesn't seem to be feasible as ASO cubes are big in number as well as size (as we want to move all the historical ASO cubes). Is there any other way to get the data from ASO cubes to new target server (and that too on upgraded Essbase 9.1.3)?

    Since in version 7 you had to rebuild ASO cubes from source data, I suggest you do the same for your migration. Version 7 did not have an export function for your ASO cubes and MDX or report scripts for that version would be extremely slow for large ASO cubes.

  • Migrating VMs between different Server Platforms

    Hello!
    I have a farm of Dell 2850s that I'm using for a pool of NFS based OVM servers. I tried adding some non Dell 2850s to the pool (Intel Developer series by SuperMicro), and they run OVM OK and the OVM manger can see them and all, but I can't migrate VMs from the 2850s to the SuperMicros. In addition, because the Dell2850s have more memory than the SuperMicros, I can't get a VM to launch from the SuperMicros.
    I'm thinking that the reason for this is the different physical server platforms. Back when I used ESX, before version 2.5, you couldn't do Vmotion (the logistic equivalent of an OVM Live Migration) on anything other than identical server platforms.
    Does anyone else have a similar problem? Do I have the root cause of the problem correct, or is it something else?
    Thanks,
    -STS

    Try to look into release notes for ovm 3.2.1
    http://docs.oracle.com/cd/E35328_01/E35329/html/vmrns-bugs.html#id414519
    Probably you are hitting bug 16005634.

  • Database migration filesystem to asm

    Hi
    Let say I have a file system database. (10g on linux)
    In other server, I installed fresh oracle 11.2.0.2 with asm on linux
    What is the best way to migrate this database to this new server?

    In the asm migration documents "rman BACKUP AS COPY" command is recommended.
    However, ASM will be on different server, it will not be on local server.
    What should be the correct steps to migrate the database to different server with ASM ?
    Also, as I mentioned in my first post, I am going higher version of oracle.

  • Admin can not log in after migration Teaming

    Hello,
    I did migrate Teaming 1.0.3 (SLES 10 SP2) to Teaming 2.1 (SLES 10 SP 2) on a different server according to information from this web site Novell Documentation
    Everything worked with one exception admin account can not log in :(
    The rest of the account works, but users are taken from LDAP.
    I tried to use the old admin password as well as a new admin password set during installation Teaming 2.1
    In catalina.out log I got:
    WARN [http-9080-1] [org.kablink.teaming.module.authentication.impl.Aut henticationModuleImpl] - Authentication failure for zone 1: org.springframework.security.BadCredentialsExcepti on: Bad credentials; nested exception is org.kablink.teaming.security.authentication.Passwo rdDoesNotMatchException: Password does not match for user [kablink,admin]
    I think that something has gone wrong with the admin account password after the migration but I do not know how to fix it.
    I tried to change the password for the admin account directly in the database table but I do not know what hash algorithm is used by Teaming 2.1
    Does anyone encountered such a problem?
    How can I set a new password for the admin account directly in the MySQL database?
    Best regards,
    Piotr Szewczuk

    Originally Posted by pszewczuk
    Hello,
    I did migrate Teaming 1.0.3 (SLES 10 SP2) to Teaming 2.1 (SLES 10 SP 2) on a different server according to information from this web site Novell Documentation
    Everything worked with one exception admin account can not log in :(
    The rest of the account works, but users are taken from LDAP.
    I tried to use the old admin password as well as a new admin password set during installation Teaming 2.1
    In catalina.out log I got:
    WARN [http-9080-1] [org.kablink.teaming.module.authentication.impl.Aut henticationModuleImpl] - Authentication failure for zone 1: org.springframework.security.BadCredentialsExcepti on: Bad credentials; nested exception is org.kablink.teaming.security.authentication.Passwo rdDoesNotMatchException: Password does not match for user [kablink,admin]
    I think that something has gone wrong with the admin account password after the migration but I do not know how to fix it.
    I tried to change the password for the admin account directly in the database table but I do not know what hash algorithm is used by Teaming 2.1
    Does anyone encountered such a problem?
    How can I set a new password for the admin account directly in the MySQL database?
    Best regards,
    Piotr Szewczuk
    I **think** that hash is specified in the installer.xml file. Try also to post your question on the kablink forum: Installation, Configuration, Customization

  • Migrating from SBS 2011 to Windows Server 2012R2 Standard with 365

    Im looking to move SBS 2011 to Server 2012R2 standard and with a 365 migration as well.
    Im thinking
    BPA for AD (health check)
    Add the Server2012R2 as a DC
    Ensure replication
    Move DHCP
    Change DNS
    Now this is where I get lost, now Im lost to use either dirsync or add essentials service, I have gone for standard and 30 cals with the option  as I have 28 users and the essentials service would make everything quite nice for remote access and backups
    etc....  however I don't know whether to just use dirsync with password replication instead ?
    Currently Im aiming towards getting the dc up and running then enabling essentials on the dc but I dont know how it will effect SBS and having essentials on the same network and sync'ing people to the cloud ? So Should I use DirSync on a different server
    instead to sync up to azure ?
    Finally with 365 I have only ever done a migration involving an export of pst's from an exchange box and then on a new domain with new pc's and reimport the pst's on the user accounts in outlook.
    However I have read when migrating to 365 was using exchange 2010 there was a application
    to move everything across however you needed an ssl cert iirc ? so I dont know how it works now since the nice new dashboard upgrade (assuming the tool has been updated like dirsync)
    along with the above how does AD now know where exahcnge if you use the migration app with an ssl cert and is it a case of still running the 365 config tool to configure each user to look at their mail in the
    cloud ? Also is it a good idea to enable essentials from the start of the 2012r2 dc for replication top 365 or to use dirsync ?
    then finally when replications is all good start transferring the FSMO roles over to the new DC and demote and remove the SBS server
    I have seen (below) but i dont think it covers this scenario and I cant be the only person in this situation =\ ?
    http://blogs.technet.com/b/infratalks/archive/2012/09/07/transition-from-small-business-server-to-standard-windows-server.aspx
    http://social.technet.microsoft.com/Forums/en-US/f552ef12-07a9-4f7a-bf5e-24500c3e1dc3/migrate-sbs-2011-to-server-2012-standard?forum=smallbusinessserver
    http://social.technet.microsoft.com/Forums/en-US/e1d4b09f-8857-4ef6-9a80-6a906e76b688/how-to-migrate-sbs-2011-to-standard-2012-server?forum=smallbusinessserver

    Hi,
    Would you please let us know current situation of this issue? If any update, please feel free to let us know.
    à
    Currently Im aiming towards getting the dc up and running then enabling essentials on the dc but I dont know how it will effect SBS and having essentials on the same network
    and sync'ing people to the cloud?
    I’m a little confused with the description. Did you mean that set up DC (Windows Server 2012 Standard) and
    then install the Windows Server Essentials Experience role? If so, when you migrate, please refer to the article:
    Migrate from Previous Versions to Windows Server 2012 R2 Essentials or Windows Server Essentials Experience
    Regarding to migrate Exchange to Office 365, please refer to following articles.
    Migrate
    All Mailboxes to the Cloud with a Cutover Exchange Migration
    Step-By-Step:
    Migrating from Exchange 2007 to Office 365
    Please Note: Since the web site is not hosted by Microsoft, the link may change without notice. Microsoft
    does not guarantee the accuracy of this information.
    Meanwhile, there is an additional article that you can refer to:
    Manage Office 365 in Windows Server Essentials. It may help us to understand Office 365 in Server Essentials clearly.
    If anything I misunderstand, please don’t hesitate to let me know.
    Hope this helps.
    Best regards,
    Justin Gu

  • How to migrate from BE6000 to Communications Manager

    Dear forum members,
    first of all, I'am tired. I have been on a long journey from the day we bought our Cisco Unified Communication system until now.
    Technically everything worked just fine, right from the beginning until now. But starting from the first day, I had several huge
    issues with our Cisco reseller (Deutsche Telekom/T-Systems).
    It all started with the fact, that all hardware related contracts and services were SmartNet Services and added directly to our company account.
    All software related services were booked as "Shared Services". So we were the rightfull owner of the licenses but our reseller had to migrate/issue all tickets, licensing requests and so on.
    It took us (me and our reseller) over a year to set these things "right".
    Right now, everything (hardware and software related services, licenses, ...) are bound to our Cisco account. We can open TAC cases, download software/firmware and so on.
    Last week, we migrated successfully from Call Manager 8.6.5 to 10.0. So I was really happy to see, that everything worked fine (I could migrate my licenses, download the software, ...).
    I thought, "Hey, finally eveything works as expected..."
    I was wrong, so wrong...
    What happend? I tell you what happend...
    During the migration, we had to move all our servers (CUCM, CUC & CUPS) from our Cisco C200 M2 Server to our Dell VMware cluster, because the C200 M2 is (as far as I know) not supported anymore for BE6000 10.x and we didn't wand to buy a new C220 M3 server.
    Due to the fact, that the BE6000 is only supported on that hardware, we decided to migrate our BE6000 to a Cisco Unified Communications Manager.
    Our reseller told me, that Cisco Unified Communications Manager is supported on third party hardware (if the hardware meets certain requirements, like processors and so on) and due to the fact that we only use CUCM, CUC & CUPS there would be no difference for us when it comes to features.
    So I said: Great, let's do that. And when you are doing that, can you please order us a license for a collab edge gateway (the thing that enables Jabber to proxy through the firewall without the need of a vpn tunnel).
    And that was the point when our communication stucked...
    Since that mail, I don't get any response from our reseller regarding this two tasks. They told me, that I can do that myself. I tried that and searched all cisco portals and then opended a TAC case.
    The TAC team told me, that our reseller had to file a sales order (is that right?) and send me back to them.
    Right now, I'am trapped between Cisco and my reseller and I'am really tired. Can someone please tell me what I can do/have to do to patch things up?
    Kind regards,
    René

    DRS from your current server which is using the 6K OVAs, into your dell server which should NOT be using the 6K OVAS, but any of the other non-6K options you have.
    I assume you've already verified your server is supported under 3rd party spec guidelines???
    But, that's all it takes to move from a 6K into an enterprise CUCM, or the other way around as well.

  • Can i migrate my files and programs from one mac book to another

    I have 2 macbook pros 13.3  april 2010 release
    one has a 250gb drive and the other 500gb
    both are running lion - after upgrading from snow leopard
    I have al my adobe creative suite and mac office on the machine with 250gb hard drive - i want to transfer all my files and applications including adobe and mac office to the 500gb machine - can this be done via migration assistant? are there things i need to check etc before doing this
    i am assuming the 250gb will be empty afterwards- i am not expecting to have 2 copies of the files and applications
    Thanks for taking a look at my question

    You can do that through Migration Assistant without any problem. See > http://support.apple.com/kb/HT4889
    There are different ways to connect both Macs in order to transfer the files. As both computers have got FireWire, I recommend you to buy a FireWire cable, connect it to both computers and run Migration Assistant. Doing this, the transfer will be faster and much reliable than with Ethernet or Wi-Fi. Also, check > http://pondini.org/OSX/MigrateLion.html

  • How do I view Migrate Data errors - Access 2003 - Oracle 10g

    I'm trying to use the SQL Developer to migrate data from an Access 2003 database to an Oracle 10g database. I followed the instructions found here:
    http://www.oracle.com/technology/tech/migration/workbench/files/omwb_getstarted.html
    I was able to complete every step except the actual data move. I exported the xml for the Access database, I captured the export and then ran the generation scripts on my target Oracle database (I'm using the same schema for the migration repository and the actual data). It created the tables with only one or two errors which I resolved.
    Now, when I select Migration->Migrate Data, I get the dialog that appears to start 4 or 5 threads and attempts to migrate each table. They all error and do not transfer any rows. I can see that there's one error per table, but I can't see the error text. I just know that an error occurred. Is there a log somewhere or is the error displayed somewhere else? How do I know what's gone wrong?
    Thanks.

    I too receive unexplained error counts using the Migrate Data menu selection and unexplained failures using the Generate Data Move Scripts menu selection. Permissions granted by role or direct grants should not be a problem, but a Migrate Data error appears in the Migration Log panel at the bottom of the SQL Developer window, "Failed to disable constraints: ORA-00942 ... ". No further details available on what constraints or why the error. No other errors were detected while following the instructions found in the Oracle SQL Developer Migration Workbench Getting Started guide. SQL Developer never migrates the data from the existing Access 2000 mdb file to the newly created schema objects in Oracle 10g using either method. The following roles and privileges have been granted to both the repository owner and the target schema owner:
    GRANT RESOURCE TO MIGRATE_USER WITH ADMIN OPTION;
    GRANT CONNECT TO MIGRATE_USER WITH ADMIN OPTION;
    ALTER USER MIGRATE_USER DEFAULT ROLE ALL;
    -- 25 System Privileges for MIGRATE_USER
    GRANT CREATE ROLE TO MIGRATE_USER;
    GRANT ALTER TABLESPACE TO MIGRATE_USER;
    GRANT ALTER ANY SEQUENCE TO MIGRATE_USER;
    GRANT INSERT ANY TABLE TO MIGRATE_USER;
    GRANT SELECT ANY TABLE TO MIGRATE_USER;
    GRANT CREATE ANY TABLE TO MIGRATE_USER;
    GRANT UNLIMITED TABLESPACE TO MIGRATE_USER WITH ADMIN OPTION;
    GRANT DROP TABLESPACE TO MIGRATE_USER;
    GRANT CREATE ANY TRIGGER TO MIGRATE_USER;
    GRANT ALTER ANY ROLE TO MIGRATE_USER;
    GRANT CREATE VIEW TO MIGRATE_USER WITH ADMIN OPTION;
    GRANT DROP USER TO MIGRATE_USER;
    GRANT CREATE TABLESPACE TO MIGRATE_USER;
    GRANT GRANT ANY ROLE TO MIGRATE_USER;
    GRANT CREATE ANY SEQUENCE TO MIGRATE_USER;
    GRANT ALTER ANY TABLE TO MIGRATE_USER;
    GRANT DROP ANY TRIGGER TO MIGRATE_USER;
    GRANT DROP ANY ROLE TO MIGRATE_USER;
    GRANT DROP ANY SEQUENCE TO MIGRATE_USER;
    GRANT UPDATE ANY TABLE TO MIGRATE_USER;
    GRANT ALTER ANY TRIGGER TO MIGRATE_USER;
    GRANT COMMENT ANY TABLE TO MIGRATE_USER;
    GRANT DROP ANY TABLE TO MIGRATE_USER;
    GRANT CREATE PUBLIC SYNONYM TO MIGRATE_USER WITH ADMIN OPTION;
    GRANT CREATE USER TO MIGRATE_USER WITH ADMIN OPTION;
    -- 1 Tablespace Quota for MIGRATE_USER
    ALTER USER MIGRATE_USER QUOTA UNLIMITED ON USERS;
    Operating system for both Access 2000 and Oracle 10g is Windows XP PRO SP2.
    Oracle SQL Developer is version 1.1.2.25 build MAIN-25.79 on Windows XP PRO SP2. All three are on the same PC.
    Since only the last step failed, I created a User DSN with the ODBC administrator. Then, linked the newly created Oracle table to Access via ODBC using the DSN created. Next, I created an append query with the source being the Access table and the target being the Oracle table. I moved the data by pressing the red exclamation mark.

  • Poor performance on reports that were migrated from 6i to 10g

    We are migrating from 6i client server to 10g reports server and getting poor performance on various reports. Reports that work in seconds in 6i are taking much longer to run or even timing out.
    Reports Server:
    Version 10.1.2.0.2
    initEngine = 1
    maxEngine = 20
    minEngine = 1
    engLife = 1
    engLife = 1
    maxIdle = 30
    The reports are being called from 10g forms with the following:
    T_repstr := '../reports/rwservlet?server=rep_aporaapp_frhome1'
    || '&report='|| T_prog_name
    || '&userid='|| T_nds_uid;
    || '&destype=cache'
    || '&paramform=yes'
    || '&mode=Default'
    || '&desformat=pdf'
    ||' orientation=Landscape';
    web.show_document(T_repstr,'_blank');

    Using these and not hearing much bad
    Init Engine 1
    Max Engine 6
    Min Engine 0
    Eng Life 10
    MaxIdle 30
    Trace Error
    Trace Replace
    I set my Report Server Parameters
    CACHE SIZE - 700
    CACHE DIRECTORY = (you have to decide)
    IDLE timeout 120
    Max Connections 120
    Max Queue Size 4000
    trace options = trace_err
    trace mode trace_replace

  • Migration of Windows Small Business Server 2011 Standard Edition to new hardware

    Hi
    I have a Windows SBS 2011 Standard Edition installation, of which, the windows component is very buggy.  Everything on the server is working i.e. AD, Email.  I am unable to shutdown the server gracefully, i am unable to open the system manager.
     Backups also are not running, so i don't have a proper backup that i can use.
    I want to migrate my Windows SBS installation to some standby equipment which i have, then reinstall the old server with Windows SBS 2011 and migrate back from the standby equipment to the original hardware.
    I know this is possible, and i know that Windows SBS 2011 gives a 21 days grace period to complete the migration.
    Is the path i have mentioned above seems to be viable for me to try and get back to my original hardware, with a fresh installation of Windows SBS, keeping AD and Microsoft Exchange intact.
    Regards

    Will not work as you have outlined it.  The installation of a new server installs a new SID and you cannot add SBS to SBS domains.  The only chance you have at this is to install a new non-SBS DC in the domain, export the mail assuming you are
    using Exchange, move the shares to the new DC or some other system, pull out the SBS from the domain, move all the FSMO roles and have a stand alone Server Domain without SBS.  Then, add SBS back to the domain in the documented manner.
    I suggest you contact www.sbsmigration.com for a documented and supported method to accomplish this migration.
    Larry Struckmeyer[MVP] If your question is answered please mark the response as the answer so that others can benefit.

  • Migration from 32-bit to 64-bit on Oracle 9.2.0.5

    Hi guys.
    I have two question for migration 32 bit to 64 (x86_64) bits on Oracle 9.2.0.5 for SAP 4.7 Enterprise?
    1.- When i migrated 32 bits to 64 (x86_64) bits is necesary migrated to Oracle 10 ?
    In the note SAP Note 960769 - Windows: Migration from 32-bit to 64-bit (x86_64), say that, pag 4:
    " Oracle:
    =====================================
    On Windows Server 2003 X86_64 (64-bit), you may only use Oracle 10g Release 2 (10.2) software for X86_64 (64-bit) as a database. Note 949116 describes the installation (homogenous system copy) of old products that were not originally released on Oracle 10g Release 2 (10.2). If you want to make the copy using the backup/restore procedure, for which the source database was not yet upgraded to Oracle 10.2, see Note 932722"
    But, in the pam matrix say that support for 9.2.
    I confused for the information.
    2.- In the case that is not necessary to migrate to oracle 10, i can execute the migration to 64 bits the SAP 4.7 with the procedure Backup/Restore?
    I don´t have the new server, the server for the migration is the same. The procedure you want to follow is:
    1.- Backup Offline all server.
    2.- Delete the server, i install the server on Windows 2003 64 bits.
    3.- Install SAP 4.7 on kernel 64 bits.
    4.- Restore de backup offline (only data): datafiles, archive log, redo log.
    Aprecciated for the help.
    Best regards,
    Desiré

    Hi,
    According to Note:814834
    #Note that there is currently no 64-bit support for the x86_64 platform
    for Oracle 9.2 because Oracle does not provide a 64-bit DB client for this purpose,
    and, in addition, 64-bit operation of the DB server is not supported.
    This means that this DB version can only be used in conjunction with SAP components on
    Windows 32-bit on x86_64 hardware in 32-bit mode.
    For more information, refer to the "Oracle" section in the note.
    Furthermore, it states 32bit SAP instance can connect ot a 32 bit Oracle 9.2 or 10.2 database instance.
    So for your case, its better to upgrade your current database to Oracle 10.2 and then proceed with migration.

Maybe you are looking for

  • Suggest me the link to any Pdf file having form builder process flowcharts

    Hi people, In form builder 6i ,in help topics, i find "process flowcharts" describing various default process of form builder is there. I want to take it printout. But first what i have to do is copy it into microsoft word and then format the same et

  • Launching Illustrator from browser/c# doesn't display AI desktop

    I have written code to interface Adobe Illustrator CS4 with Microsoft CRM. When the user chooses to create artwork for an order an approval template is opened, product and order info is added to the doc, and it is sent to the customer for approval. A

  • Add device cdrom non global zone

    Hi All , how to add device cdrom to non global zone ? many thanks

  • Entity question

    Hy, I have a simple question regarding entities. Are entity relationships retrieved from the database? For example, if I have two entities: EntityA.java @Entity public class EntityA {     private EntityB b;     @OneToOne(mappedBy="a")     public Enti

  • Select distinct from an infoset query

    Hello I need to select distinct / delete duplicate from an infoset query created thru SQ02. Please let me to know how this can be done? Many thanks in advance! regards Sanjyot