Migration of cube in Grid

Hi all,
Can we change the data source for the grid in FR?

I can see the database connection,but there is no option available to change it.I have to change the connection by selecting each row & for column values it is not allowing to change database connection.

Similar Messages

  • Migrate cognos cubes to essbase

    Hi,
    Does anyone know the steps to migrate Cognos cubes to Essbase 11? I've no idea where to start from other than doing it manually from scratch, like building the outline & loading data.
    Can we export metadata & data from Cognos in a format which can be loaded to Essbase w/o much tedious manual task?
    Any suggestions?
    Thanks

    Hi Srinivas,
    Thank you for quick reply.
    could you explain me process little bit clearly.
    can you explain how to extract the data from cognos cubes to the relational layer?are there any third party tools for doing the same?
    How do you compute complex calculation in cognos.can we do scripting in cognos as we do it is essbase using calculation scripts.
    for eg :do you incorparate if else st in cognos(thinking in terms of reusability).
    How can a security be migrated from cognos to essbase.
    Have you used any third party tools for migration.
    What is "report matrix " I don't have idea about cognos.
    and some more things you followed
    Thanks!

  • Migrating Essbase cube across versions via file system

    A large BSO cube has been taking much longer to complete a 'calc all' in Essbase 11.1.2.2 than on Essbase 9.3.1 despite all Essbase.cfg, app and db settings being same (https://forums.oracle.com/thread/2599658).
    As a last resort, I've tried the following-
    1. Calc the cube on the 9.3.1 server.
    2. Use EAS Migration Wizard to migrate the cube from the 9.3.1 server to the 11.1.2.2 server.
    3. File system transfer of all ess*.ind and ess*.pag from 9.3.1\app\db folder to 11.1.2.2\app\db folder (at this point a retrieval from the 11.1.2.2 server does not yet return any data).
    4. File system transfer of the dbname.esm file from 9.3.1\app\db folder to 11.1.2.2\app\db folder (at this point a retrieval from the 11.1.2.2 server returns an "unable to load database dbname" error and an "Invalid transaction status for block -- Please use the IBH Locate/Fix utilities to find/fix the problem" error).
    5. File system transfer of the dbname.tct file from 9.3.1\app\db folder to 11.1.2.2\app\db folder (and voila! Essbase returns data from the 11.1.2.2 server and numbers match with the 9.3.1 sever).
    This almost seems too good to be true. Can anyone think of any dangers of migrating apps this way? Has nothing changed in file formats between Essbase 9.x and 11.x? Won't not transferring the dbname.ind and dbname.db files cause any issues down the road? Thankfully we are soon moving to ASO for this large BSO cube, so this isn't a long term worry.

    Freshly install the Essbase 11.1.2.2 on Window server 2008 r-2 with the recommended hardware specification. After Installation configure 11.1.2.2 with the DB/Schema
    Take the all data back up of the essbase applications using script export or directly exporting from the cube.
    Use the EAS Migration wizard to migrate the essbase applications
    After the Migrating the applications successfully,reLoad all the data into cube.
    For the 4th Point
    IBH error generally caused when there is a mismatch in the index file and the PAG file while e executing the calculation script .Possible solutions are available
    The recommended procedure is:
    a)Disable all logins.
    alter application sample disable connects;
    b)Forcibly log off all users.
    alter system logout session on database sample.basic;
    c)Run the MaxL statement to get invalid block header information.
    alter database sample.basic validate data to local logfile 'invalid_blocks';
    d)Repair invalid block headers
    alter database sample.basic repair invalid_block_headers;
    Thanks,
    Sreekumar Hariharan

  • SAP BW on HANA: Error when migrating standard cube to the In-Memory Cube

    Hello,
    When migrating an standard infocube from a recently migrated BW to BW on HANA in-memory optimized cube, there is an error, for all the cubes.
    Implemented few notes, though luck yet. Appreciate if those, who saw and resolved it can help.
    Error while executing stored procedure for data implementation
    Message no. RSDRI_HDB041
    Diagnosis
    The InfoCube data to be migrated is processed using a stored procedure. This procedure reported an error.
    System Response
    Error code: 257
    Error text: sql syntax error: line 1 col 14 (at pos 14)
    Regards
    Manish Madhav

    Hi Mahish,
    I see this post is from March. I understand you have got some solution to it already.
    If yes, could you please share the solution.
    Thanks and regards,
    Aaloka

  • Tools to migrate Essbase cubes to SSAS and Hyperion reports to SSRS

    Hi,
    Is there any tool available to migrate 
    1)Essbase cubes to SSAS
    2) Hyperion reports into SSRS
    I appreciate your guidance here.
    Thanks
    Naveen

    Hi Naveen,
    I provided the following articles for your reference.
    1)Essbase cubes to SSAS
    http://blogs.msdn.com/b/mtcdata/archive/2008/06/17/migrating-essbase-shared-members-to-sql-server-analysis-services.aspx
    2) Hyperion reports into SSRS
    Using SQL Server 2005 Reporting Services with Hyperion Essbase
    http://go.microsoft.com/fwlink/?LinkId=81970
    Hyperion Essbase Connection Type (SSRS)
    https://msdn.microsoft.com/en-us/library/dd207026.aspx

  • MIgration of Cubes to BO XI

    Hi,
    We have Cube on essbase 9.3 and now we need to migrate them to BO XI.
    is there any way to do this other then manually?
    please let me know if any one had gonr through this scenario or have any idea.
    it will be great help.
    Thanks in Advance

    Hi,
    Try this resource as a starting point, http://wiki.sdn.sap.com/wiki/display/BOBJ/HowtoplanandimplementyourXI3.1SP2upgradeproject
    will give you some things to think about.
    also, a migration best practice guide http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0d937fa-1261-2e10-6388-e71afb6b5ff6?QuickLink=index&overridelayout=true     although this is bi4.0, it's granular detail
    then of course you have the documentation / user guides from help.sap.com
    https://websmp208.sap-ag.de/~sapidb/011000358700000718962008E
    https://websmp108.sap-ag.de/~sapidb/011000358700000718992008E
    Everthing else will have to be dealt with on an adhoc basis as you encounter it.
    To answer you original requirement, there is no documentation which lists "all of the things which may possibly go wrong"
    Regards,
    H

  • Installing New Grid & Copy/Migrate Jobs From New Grid

    Existing Setup:_
    EM Grid Control: 10.2.0.2 Hosted on Windows 2003
    Repository Database: 10.2.0.3 Hosted on AIX 5.1
    Agent: 10.2.0.2
    Monitored Databases/servers: About 90 servers/databases are monitored which are on AIX and having 10g DB version and agant installed in 10.2.0.2
    Proposed Setup:_
    EM Grid Control: 10.2.0.5 Will be hosted on AIX 6.1
    Repository Database: 10.2.0.4 Will be hosted on AIX 6.1 (different server from EM Grid control server)
    Agent: 10.2.0.5
    Monitored Databases/servers: All the existing servers + Oracle E-business Application
    We are planing to install a new grid with option of installing with existing database(New 10.2.0.4 database will be installed). Once new grid start working properly, we will stop old grid.
    During this process we don't want to stop/modify/change the existing grid jobs..
    So, My questions are:
    1) Can we have two agents (both with different OS users and having different AGENT_HOMES) on each server, which will feed to different grids? Old one will be stopped eventually.
    2) How we can copy/migrate existing jobs from old grid to new grid ?

    >
    >
    We are planing to install a new grid with option of installing with existing database(New 10.2.0.4 database will be installed). Once new grid start working properly, we will stop old grid.
    During this process we don't want to stop/modify/change the existing grid jobs..
    ---- When you the existing database option , new repository will be created with user SYSMAN.
    So, My questions are:
    1) Can we have two agents (both with different OS users and having different AGENT_HOMES) on each server, which will feed to different grids? Old one will be stopped eventually.--- You have two different agents home on each server as source to different grids.
    2) How we can copy/migrate existing jobs from old grid to new grid ?--- You can clone the database and use the cloned database jobs for your new grid. Even cloned database can be used for your new grid.

  • Migration to CUBE and SIP

    Hi all,
    I will be migrating from MGCP PRI over to SIP in the coming month and was trying to find out if I can use my 3945 to do both the CUBE and the PRI gateway functions at the same time while I'm doing the migration. I can always revert to an old 2811 if needed, but was wondering if it was possible.
    CUCM version is 8.6 and router IOS is 15.0(1r)M16,

    I will have the license before I start. Thanks muchly for the answer... there may be more questions coming!

  • Migrating standard cube to hana optimize cube trigger Error

    HI ,All :
       referance to HANA information ,it can use T_code : rsmigrhanadb or use program :RSDRI_CONVERT_CUBE_TO_INMEMORY  to migrate.but execute to t_code ,trigger some errors , as follow :
    Workbench Environment : NW 7.4 SP 6 .
    SAP_BW
    740
    0006
    SAPKW74006
    SAP 业务仓库
    740
    0006
    SAPKB74006
    SAP 基础组件
    ST-PI
    2008_1_710
    0009
    SAPKITLRE9
    SAP 解决方案工具插件
    Who encountered this problem, please share your solution?please ,sharing ! Thanks !

    Hi,
    You need to use RSDU_TABLE_CONSISTENCY(store issues and repair).
    Also look at note 1957634 - Conversion to SAP HANA-optimized InfoCube fails

  • Cubes migration between NW BWs

    Hi gurus,
    I want to migrate/transfer cube from a NW BW 7.02 to BW 7.01 SP6.
    is it possible? Could you please enlighten me on the process.
    Thanks in advance.
    Kind regards,
    Xiaojun

    Hi,
    Thanks again for all your tipps.
    It seems the transport works also between different NW version. i can work with the transported BW cubes in the new lower version system.
    nevertheless i get error messages (see below) during import process.
    Copy File Between Transport Groups       28.10.2010 23:32: (0) Successfully Completed
    Import                                   28.10.2010 23:32: (4) Ended with Warning
    Check Versions                           28.10.2010 23:32: (0) Successfully Completed
    Method Execution                         28.10.2010 23:33: (8) Ended with errors
    Execution of programs after import (XPRA)
    Version and release: 372.04.40 701
    Execution of programs after import (XPRA)
    End date and time : 20101028233306
    Ended with return code:  ===> 8 <===
    and i cant find any more detailed logs, could you please help.
    Regards,
    Xiaojun

  • Migrating cubes using export/import

    Dear All,We need to migrate a cube (approx 6 gig) to another server. We are running Essbase 6.1p3. I have done a "save as" to copy the outline to the other server and performed an export of "all data" from the source db (export file is approx. 6 gig). With the limitation of 2 Gig in import, I am having problem migrating the data. The option of exporting at input level/ level 0 and then reaggreating the db will not work as all aggregation were performed using dynamic calc scripts.Please help.

    You might try the parallel export. We use the command:PAREXPORT "-threads 8" -IN "D:\HYPERION\ESSINTEGRATION\APP\INTEXP.TXT" "1" "0"; In the file - INTEXP.TXT, we have 8 filenames for it to write the exports to.We are also running 6.1 patch 3a. We use this to get around the 2 gig limit. It breaks the exports into 8 files. However, it doesn't break them evenly so you may still run into the 2 gig limit.

  • Migration cognos to HFM / Hyperion Planning

    Hi,
    Does anyone know the steps to migrate Cognos cubes to HFM 11/Hyperion Planning 11? I've no idea where to start from other than doing it manually from scratch, like building the outline & loading data.
    Can we export metadata & data from Cognos in a format which can be loaded to HFM/planning w/o much tedious manual task?
    Please give me suggestions?
    Thanks in advance.

    Hi S.P.,
    i read your post. How looks your migration concept from Cognos to OHP 11?
    Pls write me a mail [ noahface[at]gmx.de ] or give a post.
    Thxs in advance.

  • How to export Oracle 10g Enterprise Manager Grid jobs?

    I need to save all current Oracle 10g Enterprise Manager Grid jobs before our migration. We are running Oracle 10.1.0.4 on Solaris 9. How can I save off the jobs to a file and re-import these after our migration into the new Grid server?
    Thanks,
    Ben Prusinski

    Hi!
    Have you been able to export your jobs? If you have, I would appreciate it if you could share it with me..
    Thanks!!

  • Migration and Shared Services

    Currently thinking about migrating two cubes: one in version 6 and one in version 7 to 11.1.2. Here are the steps I am considering following:
    - Recreated the applications in EAS version 11.1.2.
    - Copy over .otl, .rul, .csc etc files.
    - The .cfg files in 11.1.2 - not sure what to do about this one. Do they have to be the same as in the previous versions? What do I do about the configuration settings that have changed from the old versions to new versions.
    - Security. Version 6 and 7 dont have shared services. So does security have to be recreated from scratch?
    I found a wealth of info on migrations on these forums, but these two particular questions evaded me.

    For security have a look at the Advanced security manager, free tool :- http://www.appliedolap.com/free-tools/advanced-security-manager
    Failing that you could look at extracting the security information using maxl/esscmd then pushing it into 11.1.2 using maxl or LCM
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Tiger 10.4.5 on a Cube: add Classic?

    I have a 450MHz Cube, which had the drive reformatted and the Retail Tiger 10.4.4 installed; this is updated to 10.4.5. I have a 'Power Mac G4 Software Install' disk, part#691-2996-A, with OS 9.2.
    Can I get from here to a working Classic environment? If so, how? Does OS 9.2 install with Tiger running, as an application, or do I boot from the installation disk and proceed from there?
    While Apple has done it's damndest to pretend that OS 9 has just gone away, those of us with major software investments in the old system can't afford to just dump everything. My updated PM 7300 is dying of old age, I need to migrate!
    Cube 450   Mac OS X (10.4.5)  

    I don't think you can use that disk, Edward.
    You should use either a white generic retail or a grey Cube-specific OS 9 installer.
    Failing those you could use a Restore, but not an install disk from most Macs to get Classic that will work with your X, but if the disk came from a different Mac, the 9 system Folder should be stuck with Classic, and not boot in pure OS 9.
    Restore disks from some Macs will try not to work with other models, including the cube, but you would get round that by opening the disk and depending on the version, either manually drag-copying the System Folder from inside a folder with a name like Configurations, or using Disk Utility to mount a .img disk image from inside a folder with a name like Configurations and dragging out a System Folder from that…
    Either way, remember you are looking for a System Folder that's hidden inside a folder with a name like Configurations, not the System Folder on the root level of the Restore disk, which is a cut-down version that won't work from a normal hard drive.
    If you're running a 9 Install or Restore utility, you would be booted from the CD; if you're trying the manual extraction you be booted normally in X
    Please remember also that not everything that works in pure OS 9, works in Classic - happily your Cube can boot in pure 9 instead of X for Classic, but you'd still have to choose one for each session…
    You might like to work with separate 9 System Folder copies for pure and Classic 9, so you can keep different configurations that don't interfere with each other

Maybe you are looking for

  • HT5815 Problem with update..

    When i press Update button, it said to "waiting" and the ask me to restart. After reboot and check for update, it always ask to restart again and again without do anything. What's wrong with my MAC. Thank you.

  • OpenGL not working on Mac OSX 10.5.6 Intel 2 Duo

    I was assured that OpenGL was installed correctly on my Mac but it doesn't work in PS. I was told it must be an Adobe issue. In preferences the OPENGL drawing is grayed out. I've ran Adobe updates and restarted my Mac and still get errors "only works

  • Pricing at product category level

    Hi Experts, I am not able to determine pricing at product category level.These prod. categories r downloaded by standard functionality from ECC.I am getting an error "mandatory condition prod. cat. price (ZPH1) is missing". I am not able to figure ou

  • G505s Dual Graphics

    Is there a possibility to use only the GPU instead of the CrossfireX because GPU-Z shows the video ram being very limited when it is in dual graphics and the card is supposed to have 2gb of ram for the card.' Here is a screenshot of the program showi

  • Iphone mail menu icons

    I pressed an unknown button while reading an email on my iPhone and now I can't find the email. I can't figure out what happened to an email I was reading. I was in the iPhone's email, I was reading the email in it's own window, when I accidentally p