Mile stone billing for  service contract

Hi gurus,
can you help me for the following:
i want to configure mile stone billing for service contract in my client business process,
can any one send me the complete configuration process steps for mile stone billing.
I'll reward you full marks,
Thanks in advance
nitchel

Hiya...
Billing Plan for Milestone Billing
Milestone billing means distributing the total amount to be billed over multiple billing
dates in the billing plan.
As each milestone is successfully reached, the customer is billed either a percentage of
the entire project cost or simply a pre-defined amount.
During sales order processing, the system determines from the item category whether a
billing plan is required and, if so, which type of plan
The type of billing plan that is determined at this point is set up in Customizing and
cannot be changed in the sales document.
Billing plans for periodic billing and milestone billing plans for project-related milestone
billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
IMG configuration requires :-
1.  Maintain billing plan types for milestone billing in OVBO.
2.  Define date description in SM30 - V_TVTB.
3.  Maintain Date Category for Billing Plan Type IN OVBJ.
4.  Allocate date category in SM30 - V_TFPLA_TY.
5.  Maintain date proposal for Billing Plan Type in OVBM.
6.  Assign Billing Plan Type to Sales Documents Type in OVBP.
7.  Assign Billing Plan Type to Item Categories in OVBR.
8.  Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones
are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System
confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed quantities.
The connection between the project and the sales document item is made in the individual
schedule lines of the item. Each schedule item can be assigned to a network in a project.
To display the project-related data for a schedule line, proceed as follows:
In one of the overview screens of the sales document, select
1.  Item -> Schedule lines.
2.  Mark the schedule line and select Procurement details.
The following figure shows an example of milestone billing where only the Contract have
been billed :
Order  Item  Turbine    100,000
Billing Plan
Billing date Description    %  Value  Billing Block   Milestone   Billing Status
01-10-94     Contract      10  10,000      -             x           x 
01-03-95     Assembly      30  30,000      x             x          
01-04-95     Maintenance   30  30,000      x             x
01-05-95     Acceptance    30  30,000      x             x
01-06-95     Final invoice ..    ..        x
Network/Activities
Milestone    Estimate      Actual
Assembly     01-03-95      01-03-95
Maintenance  01-04-95     
Acceptance   01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1.  fixed
2.  always updated with the actual date of the milestone
3.  updated with the actual date of the milestone, if the date is earlier than the
    planned billing date for the date
Keep Sapping
Regards

Similar Messages

  • How to conf mile stone billing for contract sales

    Dear Gurus,
    I want to config sales of Residential flats through contract with mile stone billing.could u pls send the conf steps reg this senario.
    Steps
    1.Contract agreement
    2.sales order
    3.Mile stone billing.
    These r the 3 steps in this process.I hope better solns from u.
    Regards
    Rams

    Dear rams,
    Milestone billing : Normaly used in projects , means, payment released as work progreses .
    Goto *VOV8* and select your order type and click on details ,  Goto Billing , keep billing plan type as 01 , (if billing plan not available , create u2013 Goto VOB0 and create an new billing plant for milestone billing ).
    Then create sales order u2013 Goto header -- Billing --- billing plan --- plan your billing date and Define date description , % of billing and billing type .
    Now, system will allow you to make the billing as per your plan
    saravanan

  • Resuls Analysis for Service Contracts - Revenue in Excess of Billing.

    Dear Experts,
    We are running RA for Service Contracts.
    COntract period is 01/11/2010 to 30/10/2011.   Montlhy Value is 1000, Yearly value 12000
    1) The Billing Plan is Quarterly Billing (deferred).If we Run RA in KKA3.  Planned revenue showing is 12000 / 4 quarters = 3000 .
                                 If we Run RA in KKA3 , the planned revenue shown is 3000 instead of 12000.
    2)                          We have incurred some cost for the month of  November 2010.   If we RUN RA on KKA3 for the month of november 2010 , we should get 1000  as Actual Revenue and 2000  Should be shown in Revenue in Excess of Billing(REB). But it is not showing as Revenue in Excess of Billing.
    Please help.
    Regards,
    Shareeq
    Edited by: K M AHAMED SHAREEQ HUSSAIN on Oct 28, 2010 2:55 PM
    Edited by: K M AHAMED SHAREEQ HUSSAIN on Nov 4, 2010 4:18 PM

    Dear Experts,
    The Planned Revenue problem is solved now. We will have to run a Program(OSS Note). The Revenue in Excess of billing is there. Please help.
    Regards,
    Shareeq
    Edited by: K M AHAMED SHAREEQ HUSSAIN on Nov 7, 2010 4:32 PM

  • Mile stone billing with Down payment clearing

    Hi,
    Urgent help needed.
    I need to set up mile stone billing plan at item level with down payment getting automatically offset with Invoice
    ie,
    I have 10% down payment (FAZ).
    And mile stone invoicing of 40% and 60% each.
    I have raised down payment request and the incoming payment is posted.
    Now, when I raise the invoices, I want the down payment received auotomatically deducted from the invoice amount and shown as separate line item in the invoice. What settings need to be done?
    ie, if 10000 EUR is the total amount, down payment is 1000 EUR.
    My first invoice should show 4000 - 400 = 3600 EUR due from the cutomer and second invoice shud have 6000-600=5400 EUR due.
    The item category is ZTAO
    I have maintained the following settings:
    1. Condition type AZWR in the pricing procedure with requirement as 2 (item with pricing) and the calculation formula 48
    2. Copy control set up for Order type TA with billing type FAZ for the item category ZTAO with Copying requirement 20
    3. Copy control set up for Order type TA with billing type F2 for the item category ZTAO with Copying requirement 23
    But the invoice is not showing the down payment amount. Can any one tell me what is that I am missing? This is in ECC6.0
    Thank You,
    Resmi.

    Yes, Shripad thats the problem I faced too.. unfortunately didnt get any solution so far.. and I had been focussing on some other area off late..
    Any one who come across a solution, pls mail us!!
    Thanks,
    Resmi.

  • Regarding mile stone billing

    once u raise the sales order, how you will do milestone billing (this is for order related billing) billing will be done reference to with slaes order numbers so help me how we will do mile stone billing.

    Dear Emmanuel,
    Please read the link on milestone billing-
    http://help.sap.com/saphelp_46c/helpdata/en/31/03953401024735e10000009b38f83b/frameset.htm
    Regds
    MM

  • Automatic invoice generation for service contract

    Hello,
    I want to create the  automatic invoicce generation for service contract based on the order.
    whenever i raise service contract order system should create the invoice automatically.
    could please let me know the settings?

    Hi JP Reddy
    You can schedule VF04/VF06 for your requirement, such that VF06 will run every 15/30 minutes and will generate billing document for your contracts automatically.
    Else go for Z extension development which will assign as output type to your contract and once triggered it will create invoice.
    try and revert

  • RA for Service Contracts.

    Dear Experts,
    We are running RA for Service Contracts.
    The Contract period is 01/11/2010 to 30/10/2011. The Montlhy Value is 1000, so the Total  value of the Contract  is12000
    The Billing Plan is Quarterly Billing (deferred).             We have incurred some cost for the month of November 2010. If we RUN
    RA on KKA3 for the month of november 2010 , we should get 1000 as Actual Revenue and 2000 Should be shown in Revenue
    in Excess of Billing(REB). But it is not showing as Revenue in Excess of Billing.
    Please help.
    Regards,
    Shareeq

    Patch Updated.

  • How to create service items and sales order for service contracts.

    Hi,
    I have created item using Purchased Item template and one more item(service item) using service /warranty program template. Then I have used these items to create sales order with service item in it and closed that order , but Iam not getting this order in service contracts. Is this right way to create sales order for service items. I
    item name:- personal_computer
    copied from purchased order template. service is enabled and install base is checked and enable service coverage is enabled.
    item name:- service_item
    copied from service /warranty program template
    service is selected to inactive,
    service type: service
    duration: 1 year
    template: Gold
    and saved the item.
    Then I have used these two items in sales order for service contracts. But that sales order is not hitting in service contracts. Is there any error with item creation.
    Thanks,
    Bharat G.

    Following SAP Notes to be referred for Service Tax:
    1.     778976 u2013 Service Tax and Ecess on Service Tax
    2.     1032265 - SEcess on Service Tax
    Regards
    AK

  • How do I "run" an ldt file for Service Contracts?

    Ref. BugNo. 4450150
    How do I “run” an .ldt file for Service Contracts?
    Do I use FNDLOAD and if so is this the way to do it
    FNDLOAD apps/apps_password 0 Y UPLOAD @FND:OKS_TOP/patch/115/import/US/okskfinv.ldt
    Thanks

    See Note:142483.1
    Subject: How to Define the ORACLE_SERVICE_ITEM_FLEXFIELD

  • BOM IN CRM Only for Service  Contract

    Hello
    We want have a BOM explosion working in CRM for service contracts
    Here are the details :
    We have replicated the materials from ECC to CRM. We are not maintaining any BOMu2019s in ECC.
    The idea is that we maintain the BOM Structure in CRM only, as we donu2019t want to have the Items as a billable item in a position, only for information purposes (or later on for metering)
    We have maintained the product category for the header product in CRM so we are able to maintain depended components
    (Relationship type SCDEC  S Dependent Components (DC) )
    Not we are able to assign dependent component to the header material
    Item category groups:
    We understand that the standard item category groups that should be used are ERLA for the header product and LUMF for the Item product.
    In order to support the same functionality for the given item category group , maintained at the product level in ECC we copied the same setting for the item category group from the standard to
    our settings.
    Standart
    Tx type     Item Cat Group          item category     structure scope
    TA             ERLA                TAQ           A single level Explosion of Structured Product     
    TA         LUMF                TAP                   A single level Explosion of Structured Product     
    So we have copied TAQ to ZTAQ and TAP to ZTAP.
    ZS01 is a copy of SC (service contract)
    Tx type     Item Cat Group          item category     structure scope
    ZS01     ZLEI                       ZTAQ          A single level Explosion of Structured Product     
    ZS01     LEIS                       ZTAP          A single level Explosion of Structured Product     
    But when we use a header product in the service contract, we cannot see the BOM is exploding.
    We have also created some products in CRM with exactly the same Item Category groups as the standard and when we create a standard order (TA) in CRM, the BOM is NOT exploding.
    Questions:
    Is it possible to have the BOM setup only in CRM, like we try to do it?
    Is it possible to use our own item category groups in CRM more is the functionality only working with ERLA and LUMF?
    Is it possible to use the BOM Explosion in Service contracts as well ?
    What steps are we missing to get the BOM explosion in CRM ?
    Thank you for your help
    Frank
    Edited by: Frank Foerstner Foerstner on Dec 9, 2011 12:34 PM

    Thanks Nablan, I could do that for multiple header coming in file. But I have a question for you on BAdI ALM_ME_006_GOODSMVT. I have implemented this BAdI , and this BAdI is called by a function Module ALM_MEREP_006_CREATE. When I test this FM giving the Material , Orderid and Movement type entries, this BAdI is triggered when giving a breakpoint. I've given this code for changing the movement type to 961. Cause the stanadrd scenario does not maintain Movement type 961 in Mobile Asset Management. The Movement type 961 for unplanned Materials comes to SAP and changes to 261 as maiantained by TCOKO table. To bypass this & retain the movement type 961 in SAP I'm using this BAdI. Currently this is what I'm doing and am stuck in the method interface how do I call the method.
    method IF_EX_ALM_ME_006_GOODSMVT~CREATE .
    break-point.
    *DATA : i_ce_goodsmovement TYPE REFERENCE
              ALM_ME_CUSTOMER_ENHANCEMENT.
    DATA : lr_badi_goods_movement TYPE REF TO if_ex_alm_me_006_goodsmvt.
    DATA : ls_user_data TYPE ALM_ME_USER_DATA-USERID.
    *DATA : goods_movement TYPE ALM_ME_MATERIAL_MOVEMENT.
    CALL METHOD lr_badi_goods_movement->create
      EXPORTING
           ce_goodsmovement = ce_goodsmovement
      IMPORTING
           user_data        = ls_user_data
           custom_user_data = ls_ce_user_data
           goods_movement   = goods_movement
      changing
           return           = return[].
    CALL FUNCTION 'ALM_ME_COMMIT_OR_ROLLBACK'
           TABLES
                return = return.
    endmethod.
    Please help me to get the data in this method. How do I call this.

  • Double billing for service period july6th-

    Does anyone else have this issue?...I am being DOUBLE BILLED for service period july6th- august 5th. I already paid my bill online well before the due date, and did get a confirmation number for the payment made. The payment was deducted from my bank. However, today, I logged in to my account to see that I have a huge outstanding balance for the service period july 6th- august5th. The amount of the bill is even different than the bill that I paid for that service period.

    Yes I saw that on my account also. I did notice that the pmt due was past the due date (actually due the same time period as the last bill that was pd). How can that be when it shows my bill was pd in full at that time?  Also in reviewing this so called "bill" I noticed that they raised the rate again even after I changed my services to a newer oneand less expensive one. Going to call them in the morning as I should be billed once a month around the same time each month not twice for something I have already pd.  Also for the past several months internet, tv, phone and actual apps for this company have been very crappy too.  Moving so I'm sure this will not be my service provider after my move. Its getting worse not better.

  • Mile stone billing & down payment

    i want to configure mile stone billing and down payment i was configured in the sales order milestone billing is working and the downpayment amount is also comming after raising downpayment invoice it was showing errror document is blocked i was checked there is no block how to do this problem please specify. and also specify the whole process of milestone billing & downpayment process.
    Regards,
    Kishore.

    Dear Kishore
    Milestones needs confirmation of an activities to invoice that milestone. Else the block will be there. You can manually release the block
    Path -- VA02 (double click on item) Billing plan tab, block you can see 02 will be there. Remove it & save the sales order. Then bill it
    Thanks
    Deepu Pillai

  • Conditions for service contract

    hello,
    I am creating service contract containing one line item ( i.e.activity) and no. of services in that line item. in the change mode i wanna put some condition on the activity level but not on service code level, but system is not showing the condtion in change mode. for activity level . pls advice

    Hi,
    For service contract you can not assign any condition type.
    You can assign at service level.
    Hope it will help you.
    Regards,
    Manish Agarwal

  • How  to  generate  Billing   for   Service Order   ?

    how  to  generate  Billing   for   Service Order   ?

    Hello,
    You may do a resource related billing from the service order,  but you need to maintain Resource Related billing profile in Service order --> Control tab. Once it is set you may generate the billing document (debit memo) from service order through DP90, provided the config is right.
    Prase

  • Mile stone billing plan - issue

    Hi sap experts
    i have a probleme in creating mile stone billing plan. in MS Bill plant if my billplan exceeds my order quantity system is accepting without showing any error message or bloking the billing. i.e if my plan exceeds more than 100 % system should block the bill without creating but in my case system is allowing.
    Kindly Advise

    hi
    goto delivery item category TAO in tcode OVLP and maintain "check overdelivery" field as "B"
    hope this helps you in solving
    regards
    prashanth

Maybe you are looking for

  • Need help opening a pdf?

    I uninstalled and reinstalled my adobe reader x and i am still getting the error message File does not begin with '%pdf-" (then my file name it is trying to open.) I used it all morning and now am unable to open a pdf. Please advise

  • Flash audio bug on Firefox Mozilla on PC

    - Quoted from Bugzilla@mozilla: https://bugzilla.mozilla.org/show_bug.cgi?id=289873 To see the problem, go to http://www.spellingcity.com User-Agent: Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.7.6) Gecko/20050317 Firefox/1.0.2 Build Identif

  • Help. Need code for string verification

    I am trying to create a swing program that will verify a string then move a directory from a CD to the users hard drive. I have tried many different combinations of code with no success. I simply need a window with a text pane and a button that when

  • MOSS 2007 SP1 & SQL Server 2008 upgrade plan into MOSS 2010 and SQL Server 2008 R2 ?

    Hi All, I've got the following setup in one single server: Windows Server 2008 Standard SQL Server 2008 Standard SharePoint Server 2007 Enterprise SP1 that I'd like to upgrade into the following: Windows Server 2008 R2 Standard SQL Server 2008 R2 SP1

  • [CS3, AS] Setting assorted preferences

    I am writing a script that will set my preferences to my preferred settings. I have been able to define most of the preferences but there are a few I cannot figure out. How do I: -specify snippets are to be placed in original location -specify which