Minimum and max lot size

Hai All,
           Can anyone please tell exactly from which table we can get the data "Minimum and max lot size".
Is it "MAST" or "PLKO" or "MARC"?

Hi Kavitha,
check with the table MARC and the fileds BSTMI (Minimum lot size ) BSTMA  ( Maximum lot size )
for more info
Re: Table for Lot size.......
hope it helps you.
Thanks!
Edited by: Prasanth on Mar 7, 2009 7:26 PM

Similar Messages

  • Min max lot size time based for use with SNP and PPDS

    Hi all, Is there anyway to set up time based min and max lot sizes? ie we want to have a Max lot size which is small for use with the first 3 months of our plan which starts life in SNP and then converts to PPDS and into blocks for block planning, but months 4 to 36 we want to leave as large max lot sizes as there is no need to have the small max lot sizes for the different horizon.
    As far as I can see there is only a material/plant lot size  and Max lot size and no way to have a different setting in a different time period.
    Thanks
    j

    Hi John,
    As you know, in the product master, the lot size maintenance is time-independent, so that obviously can not be used for your scenario. As per my understanding, to meet this using standard functionality, you can maintain multiple product specific t-lanes (for STRs) and PDSs (planned orders) with required lot size ranges and validity dates (for short or long term horizon). But, again since the validity of t-lanes and PDSs will not be automatically rolling forward so the updating the validities will be a challenge.
    The other option could be to enhance the heuristic functionality at lot size selection step while creating order.
    Regards,
    Umesh

  • Rounding Value,Minimum Lot Size and Maximum Lot Siz parameters

    Hello Gurus,
           Please explain me the what is the use of the parameter Rounding Value
    ,Minimum Lot Size and Maximum Lot Size parameters in the product master and how does it in impact during the Heuristic Run?
    Thanks.

    Rounding value is the incremental quantities in which the order can be produced/procured. Eg. if orders are possible with quantities 40,60, 80, 100 etc..then rounding value is 20.
    Min lot size is the minimum quanity in which order can be produced eg. 40 in above example
    Max lot size is the maximum quanitity in which the order can be produced/procured. eg. 100 in our example
    Impact on Heuristic run: heuristics takes all the above parameter to plan supply order. eg. if requirement is 55, it will supply plan for 60. If requirement is 120, it will produce two orders - one for 100 and the other for 20. if the reuqirement is 10, the order size will be 40.
    Hope this helps.

  • Report for Reorder point, safety stock, current stock and fixed lot size

    Hi,
    Purchasing Dept. is looking for a report which can give list of materials falling below the reorder point, so that they can go ahead and create procurement proposals for those materials.
    They also want to see the Reorder Point, Safety Stock, current stock and fixed lot size in the same report.
    Let me know if there ia any standard report availbale which displays the same or any approach to get the same.
    Thanks in Advance.
    Regards,
    Shankar Goud.

    Hi,
    There is no standard report because this is meant to be managed by the MRP run.
    The MRP lists show all materials that have a problem (such as stock below reorderpoint) but MRP generates requirements for these anyway and so all you need to do is to look for the MRP generated requirements (requisitions?) and you have your list?
    Are you using MRP?
    If so then please use the standard functions in MRP to get this.
    If not, then WHY NOT?
    Steve B

  • SharePoint - Error_1_Error occurred in deployment step 'Add Solution': Timeout expired. The timeout period elapsed prior to obtaining a connection from the pool. This may have occurred because all pooled connections were in use and max pool size was rea

    Hi,
    I am Shanmugavel, SharePoint developer, 
    I am facing the below SharePoint 2013 deployment issue while deploying using VS2012.
    If i will deploy the same wsp or existing wsp
    (last build) using direct powershell deployment, the solution adding properly, but the same timeout exception coming while activation the features.  Please find the below error.
    I tried the below activists:
    1. Restarted my dev server, DB server. 
    2. tried the same solution id different server
    3. tried existing wsp file (last build version)
    4. Deactivated all the features, including project Active deployment configuration.... but still i am facing the same issue.
    I hope this is not coding level issue, because still my code is not start running, before that some problem coming.
    Please help me any one.....  Last two days i am struck because of this...

    What you need to understand is the installation of a WSP does not do much. It just makes sure that you relevant solution files are deployed to the SharePoint farm.
    Next comes the point when you activate the features. It is when the code which you have written to "Activate" certain features for your custom solution.
    Regarding the error you are getting, it typically means that you have more connections (default is I guess 100) open for a SQL database then you are allowed to.
    If you have a custom database and you are opening a connection, make sure you close it as well.
    Look at the similar discussion here:
    The timeout period elapsed prior to obtaining a connection from the pool. This may have occurred because all pooled connections were in use and max pool
    size was reached[^]
    I would suggest further to look at the
    ULS logs[^] to get better insight.
    Manas Bhardwaj's Stream : www.manasbhardwaj.net

  • Coverage profile and fx lot size.

    Dear All
    I have a material with coverage profile (MRP2 view)
    I have an issue during MRP run in MD03 with this material.
    IN material there are folowing parameters
    MRP type : PD
    Lot size : FX
    Fixed lot size : 24
    So, In MD03 I get the following:
    Per./segmt     PldIndReqs     Requirements      Receipts     Avail. quantity      ATP quantity      Actl cov.     Stat. cov.     Daily reqs      Trget cvge      MaxCv     Min.covge      Target stck Minimum stock     Maximum stock
    30.10.2011     0     -10,421      0     120,457      0      14     11,6     10,421      17      20     9      177,157     93,789     208,42
    31.10.2011     0     -10,421      0     110,036      0      13     10,6     10,421      17      20     9      177,157     93,789     208,42
    01.11.2011     0     -8,445      0     101,591      0      12     12,4     8,164      17      20     9      138,788     73,476     163,28
    02.11.2011     0     -8,445      0     93,146      0      11     11,4     8,164      17      20     9      138,788     73,476     163,28
    03.11.2011     0     -8,445      0     84,701      0      10     10,4     8,164      17      20     9      138,788     73,476     163,28
    04.11.2011     0     -8,445      72     148,256      0      18,6     18,2     8,164      17      20     9      138,788     73,476     163,28
    05.11.2011     0     -8,445      0     139,811      0      17,6     17,1     8,164      17      20     9      138,788     73,476     163,28
    06.11.2011     0     -8,445      0     131,366      0      16,6     16,1     8,164      17      20     9      138,788     73,476     163,28
    07.11.2011     0     -8,445      0     122,921      0      15,6     15,1     8,164      17      20     9      138,788     73,476     163,28
    08.11.2011     0     -8,445      0     114,476      0      14,6     14     8,164      17      20     9      138,788     73,476     163,28
    Link: [imageshack.us/photo/my-images/33/35632293.jpg]
    <a href="http://imageshack.us/photo/my-images/33/35632293.jpg/">[IMG]http://img33.imageshack.us/img33/7832/35632293.jpg[/IMG]</a>
    MD03 generated purchase requisition on 04.11.2011 for 72 pcs.
    As you can see the available quantity of material on 04.04.11 will be 84,701 - 8,445 = 76,256. That is more than Minimum stock( 73,476)
    Can you suggest why system creates purchase requisitions on 04.11.2011 but not on 05.11.2011
    I can only assume that it's a one more feature of MRP. It calculates dates and quantitys to be procured as lot size EX was set in material master record and doesn't take into account increasing of stock due to FX lot size.
    P.S. When I clear coverage profile in material master , SAP generates pur.requisitions correctly.

    OK, now it is more clear.
    First you should know that only target is doing a real impact. Min and Max are just for display.
    Since you have period as month, looking at it on daily resolution is not relevant, you should look at months. You can also see on your daily display that target stock level will only change at month turn.
    Hope that it makes it now easier for you to understand the system's calculation.

  • Combination of Fixed Lot size and Period lot size

    Dear all
    I have scenario as follows:
    1. My supplier's standard packing size of a raw material is 1000 EA.
    2. I want to follow period based lot size to optimise my order and inventory cost. But I don't want to use dynamic lot size which will propose dynamic quantity.
    So my requirement is like I want to fix lot size as 1000 at material master and Period is Week. My proposal quantity must be 5000 EA for the following demand pattern:
    Week 1:1200
    Week 2: 1000
    Week 3: 1100
    Week 4: 1000
    System must consider period as well as fixed quantity.
    Kindly throw some light on this.
    Advance thanks.

    Hi
    1.As you are looking for Weekly demand demand quanityt , you have to assign Weekly Lot Size : WB.
    2. Goto OWD1   and Create a Rounding Profile which will rounds into Weekly Demand quantity for that plant and simulate .
    3.Assign this rounding profile in MMR in MRP1
    3.DO NOT assing  rounding valu as 1000 .Rather keep it blank
    Hope this will solve the problem
    Regards
    JH

  • Restore dvd and MAX HDD size

    Hi, I assume I have a HDD with a problem, someone gave me this powerbook without DVD s. Used to boot fine but now it just does not. On the apple site I dont see links to buy older (pre intel) OSX disks so I can not run disk utilities or reinstall. Where can I buy and download OSX images that I can create a bootdvd with, from my PC.
    Suppose the HDD is broken, what s the maximum HDD size. Smallest I can get here is 180Gb, originall disk is 60Gb. Here s what is written in battery bay:
    1.3ghz/256Mb/60Gb/Combo/BT/APX

    There are several possibilities if you're in the US - don't know about Italy.
    Get original replacement system discs - You can call Apple Customer Support 1-800-767-2775, provide the Serial Number and specifications of the Mac, and for a fee, a replacement set of system discs (if available), can be ordered. However, the discs will be for the original version of OS, that was pre-installed, when the Mac was manufactured.
    Tiger install DVDs are in short supply. Tiger is no longer available at the Apple Store *but may be available for $129 by calling Apple Phone Sales @ 1-800-MY-APPLE (1-800-692-7753)*. For other sources, do a Google search for MA453Z/A (10.4.6), MA190Z/A (10.4.3) and M9639Z/A (10.4) . Also look on eBay. Be sure & buy a retail version (black with silver X) and not a model specific version (gray) (See Can I use another Mac's system restore disc on my Mac? ). Expect to pay (possibly a lot) more than the Apple list price of $129.
    After you install the base 10.4.x, update to the final Tiger version 10.4.11. Here's the link for the 10.4.11 combo update http://support.apple.com/kb/TA24901?viewlocale=en_US
    Look at this link Mac OS X v10.4 Tiger Installing Software Support Page
    http://www.apple.com/support/tiger/install/
    You can also download the Tiger Installation and Setup Guide
    http://manuals.info.apple.com/en/TigerInstall_SetupGuide.pdf
    When you upgrade the OS, do it via Archive & Install. See About the Archive and Install feature http://support.apple.com/kb/HT1710
    Be sure to select Preserve Users & Settings. Also, repair permissions before and after the install.
    Leopard is the max OS you can install, but Leopard is no longer available at the Apple Store *but may be available by calling Apple Phone Sales @ 1-800-MY-APPLE (1-800-692-7753)*.
    Installing Mac OS X 10.5 Leopard
    http://support.apple.com/kb/HT1544
    Mac OS X 10.5 Leopard Installation and Setup Guide
    http://manuals.info.apple.com/en/leopard_install-setup.pdf
    After you install the base 10.5, download & install the 10.5.8 combo update at http://support.apple.com/downloads/MacOS_X_10_5_8_ComboUpdate
    You can use the larger HD.
     Cheers, Tom
    Another possibility - contact an Apple User Group near you http://appleusergroups.com/locator/find/locate.cgi?country=31
    Message was edited by: Texas Mac Man

  • Looking for average and max redo size generated per second

    Please,
    I'm implementing Dataguard physical standby on Oracle 10g R2 on Windows 2003.
    My issue is now how could I get redo size generated per second to compare with the actual bandwidth between primary and standby database.
    I know I can use the Database Console, but It wasn't installed at the database production.
    There's any link or script or view that I could use to resolve this issue?Thanks

    It depends on the statmemnst and the datatpyes that are inserted or update or deleted
    select b.name,a.value from v$sesstat a, v$statname b where a.statistic#=b.statistic# and b.name = 'redo size' and a.sid=<your SID>;
    courtesy to Daljit

  • Slow FTP throughput using solaris 9 and max window size question

    I am working on a solution where we are trying to FTP at a high rate across the WAN on OC-12 links. We have been doing some TCP tuning with consideration to the Bandwidth Delay Product. Ping results in a 90ms RTT.
    I have been told that we will not see any increase in performance above window sizes of 64k without certain patches for Solaris 9. I know that high speed transfers are possible if tuned up correctly with other operating systems.
    Does anyone have any knowledge or experiences that they could share with me?
    Thanks

    You will have to format your disk with the help of the WRT350N and after that you will have creat Share with same "Storage" tab on the linksys router.

  • Cisco 3560G and max MTU Size

    Hello
    I have an Cisco 3560G with an version 15.0(1)SE2 IOS. I want to forward Jumbo frames (ISCSI packets) through this switch.
    On my SAN, each interface have been configured on 9000 bytes.
    On this switch, I have this output :
    Sw1#sh system mtu
    System MTU size is 1500 bytes
    System Jumbo MTU size is 9000 bytes
    System Alternate MTU size is 1500 bytes
    Routing MTU size is 1500 bytes
    Sw1#
    I would like to know how to increase, if possible, the Jumbo MTU to 9198 bytes. I want to do that because the 9000 bytes ISCSI packets normally will been encapsuled using vlan so the ethernet packet will increase to 9022 (Ethernet 18bytes and extra 4 bytes for vlan).
    If the Jumbo MTU reconfiguration is not possible, the ISCSI packets will be fragmented each time it forwarded through the switch isn't it ??
    Thanks in advance for your help.
    Have a nice day
    Matt

    Hi Bilal
    Thanks for your reply.
    In the document, Cisco add note on the top of the webpage on the Components Used : "Note: In all the examples in this document, unless specifically mentioned, all values that quote MTU in bytes omit the 18 bytes for the Ethernet header and Frame Check Sequence (FCS)."
    So In my mind, the 3560G switch will not drop 9018 ethernet bytes but will normally drop the vlan Jumbo frames (9022 ethernet bytes).
    I think Cisco will included the Ethernet header and FCS on the document because networks admins included it and not think to on payload data.
    Matt

  • MRP run with lot size as per prod. version and capacity levelling

    Dear PP experts,
    Hi, We are working with strategy 10. For SFG and FG produced inhouse we have created BOM and recipe with production version.
    For example:
    I have a production version with batch size as 100 Kg.
    I load PIR for 500 Kg in MD61.
    I have maintained lot size as EX in the material master but I have not defined mini. and max. lot size.
    Is it possible during the MRP to consider the production version batch size if the mini. and max. lot size is not maintained in the system and create 5 Planned Order of 100 Kg each.
    I know, how it can be done by using lot size in material master or by maintaining schedule lines in MD61 or by maintaining quota. But if nothing is maintained is it possible for the system to create 5 Planned orders as per the production version batch size.
    Pl. check if this is possible and revert back.
    Regards,
    Prashant

    Hi
    No, system will not consider the size that maintained in the production version  for the creation of planned order while the mrp run .
    This lost size is used to validate the bom/ routing combiation for the particular  pv of the material

  • Reg: lot size and replenishment lead time

    1. please explain about lot size and replenishment lead time.
    2. please also explain about consumption based planing and in steps explain how to perform manual and automatic reorder point(transc code please)

    You use the lot-sizing procedure to determine how the system is to calculate the reorder quantity in the planning run.                                                                               
    A lot size defining the lot-sizing procedure is assigned to every material master record applicable to materials planning.                                                                               
    The lot size is defined in Customizing by the combination of the lot-sizing procedure and the lot-sizing indicator.                                                                               
    Three procedures for lot sizing are available:                                           
    o  static lot-sizing procedures                                                          
    o  period lot-sizing procedures                                                          
    o  optimizing lot-sizing procedures                                                                               
    You use the lot-size indicator to define the procedure.                                                                               
    The following parameters are also available for controlling the lot-sizing procedure:                                                                    
    o  Short-term and long-term lot size                                                     
       You can split the lot-sizing procedure into a short-term and a long-term period. This means that you can select one lot-sizing procedure in the near future and a different one in the distant future.                                                                               
    You define the periods in the section of the screen entitled "End of the short-term period/start of the long-term period".                                 
       The valid from date of the long-term lot size area is defined via:                    
       -  a periodicity                                                                      
       -  a number of periods                                                                
       The beginning of the long-term period is calculated by taking today's date and adding the number of periods in the future; the long-term planning period then starts on the next complete period.                              
       Note                                                                               
    For materials that are planned using the short and long-term lot size,                
       it is recommended that you define a maximum MRP period. Defining the                  
       MRP period has the effect that materials after a certain period are                   
       included in planning even if no changes relevant to the planning run                  
       have occurred. This avoids a situation where order proposals created                  
       with the long-term lot size move into the short-term period because no                
       changes relevant to MRP have occurred for the material.                               
       You define the maximum MRP period in the step, "Define maximum MRP                    
       period". A material that is planned on a regular basis should also be                 
       provided with an MRP type that contains the indicator for regular MRP.                
    o  Scheduling indicator                                                                  
       For period lot sizes, you can use the indicator for scheduling to                     
       determine whether the availability date;                                              
    o  is to be set to the first requirements date in the period                             
    o  or is to be set to the beginning of the period                                        
    o  is to be set to the end of the period                                                 
    o  or whether the period start represents the beginning of the planned                   
       order and the period end represents the availability date (repetitive                                                                               
    manufacturing)                                                        
      Interpretation of the delivery times                                  
      For the lot-sizing procedure, you can also define whether the period  
      start is to be interpreted as the delivery date or as the availability
      date using the indicator, "interpretation of the calendar times".     
      NOTE                                                                  
      The indicators, Scheduling and Interpr.deliv.times are mutually       
      exclusive.                                                            
      Indicator for the splitting quota                                     
      For the quota arrangements, you can determine whether the requirements
      quantities are to be distributed to several items, that is, whether   
      they are to be split. With the splitting quota arrangement,           
      requirement quantities are not simply allocated to the smallest quota 
      rating. Instead, they are distributed among various sources using the 
      following formula:                                                    
      Quantity for source of supply X = Quota of source X * reqmts quantity                                                                               
    Sum of all quotas          
      Overlapping indicator                                                 
      The overlapping indicator along with the cycle time in the material   
      master record are used to split the planned orders into several       
      partial quantities whereby the in-house production time overlaps by   
      the cycle time.                                                       
      Lot-sizing procedure for make-to-order production                     
      In make-to-order production, you can use the indicator, Lot size for  
      make-to-order production to determine whether,                        
      the order quantity is to be calculated using the exact lot size       
      the order quantity is to be calculated using the exact lot size and   
      the system is also to take the rounding quantity or the minimum and   
      maximum lot size into account                                         
      the order quantity is to be calculated using the lot-sizing procedure 
      defined for the short-term area                                       
      Maximum stock level variant                                           
      The system only displays the Maximum stock level variant field in the 
      lot-sizing procedure, Replenishing to maximum stock level. The        
      indicator only has an effect in connection with reorder point planning
      taking external requirements into account and in connection with      
      material requirements planning and controls how the system calculates 
      lot sizes.

  • SNP Discrete Opt .... Lot Size is not correct

    Dear Experts ,
    I need some help with SNP Optimization execution ...... Actually i am executing discrete optimization , using weekly buckets.
    For i.e
    I have a demand with  100 pc ..... minimum lot size is 60 and max lot size is 62 .....
    SNP should create two lots with 60 pc each one , but it is creating one lot with 60 and a second lot with 40 ..... It is considering last lot exact to fulfill demand .....
    All PDS have discretization flag  and the relevant parameters for discretization are set on OPT profile .....
    I some setting missing ?
    Please i need some help asap .....
    Kind Regards
    Mauricio

    Dear Nandhu ,
    Thanks for you help.
    At OPT Profile , Discret Constraints tab at  Minimun PDS Lot Size and Integral PDS i am maintaining 90 D ..... and when i execute the optmizer i am using 60 days . The  Planning Book Horizons is 3 months in weekly buckets.
    Kind Regards
    Mauricio

  • CTM min max lot

    Hello,
    In CTM , we want to create lots with Minimum and Maximum lot size as in Product / Location master and/ or Transaportation lane.
    This setting is done in CTM profile. ( Use : Lot size) and in Product Location master.
    A typical scenarios is like :
    Product         Min Lot         Max Lot
    A                   5  days        12 days
    B                   3 days           5 days
    If CTM plans with daily capacity :  500  on one resources.
    Based on the demand, CTM should plan the daily qty considering the Min Max lot.
    If A has a demand of 300,  system should planned for 5 days production ( 2500 ).
    Its observed that if we put Min lot size more than 500 (daily capacity), CTM does not plan at all.
    Is there any setting so that CTM will consider the Min Lot size in more than 1 day, as per the requirement.
    Thanks in advance,
    regards,
    ssbhagwat

    Hi,
    CTM uses all lot sizes in the location product master except the periodic lot size and the reorder point method. However, CTM uses the lot sizes only for the main output product and not for input products and co-products. For demands in make-to-order production, CTM  does not consider lot sizes.
    If you are checking it at input product it doesnt work.
    Regards,
    MJ

Maybe you are looking for

  • Service order creation condition

    Hi, Could anyone please tell me how can we insert a condition so that one type of service order can not be created after creation of service order of another type. Suppose if A and B type of service orders(sub-order of C) are to created sequentially.

  • Still getting sync errors with photos

    After syncing I get a message that "Some photos such as CIMG0094 were not synced because they won't play on the iPad" I had this before and it was some photos had been corrupted by iPhoto. I deleted them and moved all my photos out of iPhoto to ~/Pic

  • Some NEF files and also JPG's Not showing up in Bridge CS4

    I have purged the Cache, restarted my computer..ect... yet the previews DO NOT SHOW UP for some of my images. It is random so I am unsure of what to do to recify this problem Message was edited by: SueBarrPhotography

  • Poor Overclocking -- Any Help?

    I have a 6800U, I have flashed to the [email protected] bios. Are they the best, could you advise me which ones are, and when MSI are going to release new ones. Now I can't overclock the card any further than 460/1170, this is dissapointing, I have w

  • Call selection screen from DYNPRO

    I created a report with std selection screen 1000... From this selection screen we reach Dynrpro 9000 with a table control etc etc Once a line has been selected and the user click on a specific button a selection screen is called... SELECTION-SCREEN