Mismatch of qty in subcontracting challan reconcilliation

Hi,
When we issue the material using subsequent adjustment.During the reconciliation of subcontracting challan,
1) Challan quantity is not getting updated,
2) Material sent to item in subsequent adjustment  is getting added in GR quantity, in subcontracting challan
E.g.
Subcontract PO qty: 10
Qty sent to vendor using subsequent adjustment: 5
After reconciliation of subcontracting challan,challan qty remains same i.e. 10. 
GR qty in the challan is 5.
Please help.
Your quick response will be a great full.

It has been resolved at the author side.

Similar Messages

  • In J1IFR-List subcontracting challans, system showing Zero Quantity pending although Qty is pending

    In J1IFR-List subcontracting challans, system showing Zero Quantity pending although Qty is pending at MASOP vendor. After reconciliation of challan, the Qty sent=250 , Qty received= 113. system must show Qty pending = 137. But when we check in J1IF12, Qty sent=250 and Qty received=113. Why J1IFR report is showing incorrect output.
    I am facing this problem after Ehp7 upgrade in SAP ECC 6.0 version.
    Thanks & Regards,
    Neeraj.

    Are you using the same number ranges for different series group. This can cause inconsistency. Also check table J_1IGRXSUB whether right material documents are attached to your Challan.
    Also refer to these notes which is only applicable for EHP6.
    1753000 - Wrong output displayed for status in report selection-
    J1IFR
    and
    1674607 - Duplicate entries while displaying Annexure IV in
    J1IFR
    Regards
    Binoy

  • Subcontracting challan issue for end product with scrap.

    Hi All,
    I have one issue let me know how the system act in case of subcontracting challan process,
    In our company we use one component and received two end product( one is final product and other one is scrap product)
    My problem is how to treat this scrap in challan process.
    Pl help me out.
    Regards,
    Zafina

    Hi, Please use the exit to define how you want the system to consider Scrap in the subcontracting process.
    Refer below exit for your problem,
    1084323 USER-EXIT to update challan status if scrap is calculated
    1103537 Correction to note 1084323 for ECC 6.0 Release
    Please note the user exit will be accessed only if you were to write a code for it and you assigned/made 545 O as relevant to subcontracting
    subcontracting scrap will work if the scrap percentage is defined for the component which is sent to the job worker. If you have a completely new material for scrap then this is not going to work as the system will never be able to assign the qty (mismatch of material code between the scrap material & the challan material).

  • Referance of subcontracting challan at time of GR

    Hi Experts ,
    i m not getting excise tab for refering subcontracting challan
    Receiving  material is semifinish material - all details r maintained in j1id
    child material is raw material -all details maintained in jild
    j1id details r -
    plant -chap combination , cenvat determination , accessible value for both material
    in cenvat dete input raw and output semifinish maintained
    All Cin -subcontracting config is also done - subcontracting attributes in bussiness transactions and movement type groups r maintained
    Now problem is that if i maintain Receiving  material ( which is semifinish ) as RAw material in J1id(chapid-material combination ) then only i m getting excise tab in which there is refering subcontracting challan option available ..................but if i maintain Semifinish material as a RG1 in J1id then i dont get excise tab ............it is wrong ............how i can maintain semifinish material as a raw in J1id .it will create problem
    so my requirement is although if i m maintaining semifinish material as a RG1 in J1id Which is i m going to receive from subcontractor , subcontracting tab should appear while making GR . Then only i will be able to reconsile the challan after making GR .
    Please help me
    Regards
    Chandan

    Please use the exit to define the way you want the system to consider Scrap in the subcontracting process.
    1084323 USER-EXIT to update challan status if scrap is calculated
    1103537 Correction to note 1084323 for ECC 600 Release
    Please note the user exit will be accessed only if you were to write a code for it and you assigned/made 545 O as relevant to subcontracting
    subcontracting scrap will work if the scrap percentage is defined for the component which is sent to the job worker. If you have a completely new material for scrap then this is not going to work as the system will never be able to assign the qty (mismatch of material code between the scrap material & the challan material).

  • Reconcilation of subcontracting challan

    All SAP Gurus,
    We are having following error while reconcilation of subcontracting challan.
    Material XXXXXXXX is not assigned fully, short by 1.000 NO
    Message no.: 8I574
    Why this error may be coming?
    Regards,

    my query is -
    challan raised for how many qty (MENGE).
    and
    how many qty is in Gr qty field(MENGA) of J1IFQ screen.
    are they equal ?
    Second query
    is there two line items in challan for reconcilliation?
    regards,
    sujit

  • Re -Reconcillation of subcontracting challan against "102" mov type mat doc

    Dear All,
    While we are doing the reconcilliation of the Material document (mov type-"102" ) against the subcontracting challan (ALREADY fully reconcilled against 101 material document, but not compeleted), then system is NOT allowing us to do the reconcillation, requirement is to reduce the qty assignment  in already reconcilled challan, as we have reversed the material document
    1.) When we have assigned the 102 movement type to movement type group to 0001( Issue movement type group)
    then system is giving an error message : 8I567-Challan not valid, Material doc. is valid for another scenario during J1IFQ.
    2.) and when we are assigning the 102 movement type to movement type group 0002( Receipt movement type group) , then system gives error message : 8I574 -Material XXX is not assigned fully, short by YYY KG
    Please suggest the right way of doing it.
    Thanks & Regards
    Nitin Chhabra

    Hi
    If a challan is reconciled it should not be opened again. That is illegal. You need to do subsequent adjustment if you want to alter your consumption in subcontract. If you do 102 and reverse your consumed material,You need to include 544 movement type in your movement type grouping then You need to create a new 45a challan.
    Regards
    Antony

  • Subcontract Challan closure

    Dear Sir,
    We have a following scenario :
    We prepared a Subcontract Purchase Order of 3 nos qty and made a Subcontract Challan of 3 nos qty of the Material .
    Subsequently Vendor processed the 1 number quantity and we did the GR for 1 number qty . We did the Challan Reconciliation against this GR for 1 number qty .
    Later on due to some problem at Vendor site , Vendor has returned 2 numbers qty of the Material without any processing (ie same Material has been returned which was given to Vendor ) .
    We have short closed the PO .
    Our Problem is that there is still Pendency appaering of 2 nos qty against this Challan .
    Kindly guide us as what steps need to be followed so that Challan has no pendency of the Material .
    With Thanks and Rgds
    Sonia

    Hi,
    This is can be changed in to customizing.
    In customizing,
    logistics general->Tax on goods movement->India->business transactions->suncontracting->subcontracting attributes->
    EI items change the number of line items per challan. Whatever the value you maintain here (This information is used to split the transfer postings' items into multiple subcontracting challans), challan will contain those many line items.
    Regards,
    Krishna A S V

  • Subcontracting Challan !!

    Hi,
    In subcontracting subsequent adjustment ( overuse/underuse)
    How do we supply more material to the vendor and how we take back  excess material from the vendor. How do we deal with such a situation  if subcontracting challan is to be made.Are we supposed to make a seperate  challan for excess material and do we reconcile such a challan.
    Any idea friends...
    Thank You

    Hi,
    For Case 1:
    Seperate physical mvt of 20 kg means seperate challn for sure, now to correct the consumption u have two opstions either correct the Component qty in MIGO (GR itself) or do a subsequent adjsutment
    challans will get reconcilled through J1IFQ if you have made 541/542/543/544 relevent to SC
    case2) we supplied 100 kg for 100 items. at GR we find tht 20 kg less consumed. how to take back this extra 20kg and how to reconcile the challan and qty.
    same as stated above
    Rgds
    Dheeraj

  • Problem while reconciling subcontracting challan

    hi friends,
    issue:  while reconciling a challan im getting a msg saying that some qty of the material is not assigned fully.
    but actually all the material was received.the only thing is in GR the mateerial was received in 2 batches so 2 line items. but while posting the GR itself i got a msg that po qty is deficit by the quantity i specified in the 2nd line item.but it was just warning . after posting the GR qty updation was for the whole 2 line items qty.
    but what i understand is system takes the the 1st lineitem qty in GR, while reconciling the challan and says that the 2nd lineitem qty is still to be assigned.
    any ideas to solve this pls
    raja

    hi, Raja just try reading this and do accordingly i think there should not be an error .
    Once a subcontractor has processed your materials and returned them to you, you match the items in the challan against those that have been returned.
    You have posted the goods receipt (or any other material document) for the returned goods.
    1.From the SAP Easy Access screen, choose Indirect Taxes -.>Procurement -> Subcontracting -> Subcontracting Challans -> Reconcile Quantity.
    2.Enter the following data:
    a)In the Material Doc. and Mat. Doc. Year fields, enter the number of the goods receipt document and the year in which it was created.
    b)In the table below, enter the challan numbers and the years in which they were created.
    If the material document is a goods receipt document with movement type 101, you can enter the challans that were not captured when the goods receipt was posted. However, if all the relevant challans were entered during goods receipt, they need not be entered here
    3.Choose   Reconcile.
    A new screen appears. At the top is the information about the goods receipt (or other document); at the bottom is the information from the challans that you have entered.
    4.Specify which challans the materials in the goods receipt originated from:
    a)If you have sent a subcontractor a number of different challans, all containing the same material, you can automatically specify that the materials should come from the oldest challans first, by choosing  .
    b)Otherwise, for each challan, enter manually the quantity of materials has been returned, and choose  to refresh the display.
    5.Once you have accounted for all the materials in the goods receipt, save the challan.
    Result
    The system changes the challans' status as follows:
    1.)If you have accounted for all of the materials in a challan, the system sets its status to Fully Reconciled. In this case, you can complete the challan.
    2.)If you have accounted for only some of the materials, it sets the status to Assigned. In this case, you must assign the remaining quantity of materials to another goods receipt later on.
    3.)Scrap generated is assigned to a challan only if the percentage component scrap is specified in the bill of material for the parent material and this bill of material is assigned to the subcontracting purchase order.

  • Subcontracting Challan Reconciliation

    Hi,
    I am facing a problem during reconciliation of Multiple Subcontracting Challan with respect to Material document Number.In the initial screen i am referring to challans but after i execute it the challan is automatically changed to the first Challan i had refered.
    After Execution
                System is changing both the challan numbers. Please do provide me some solution for reconciliation of multiple challan for same (GRN) material Document.
    Thanks in Advance

    Is there any issue if you do J1IFQ partially ie. challan 81 first and then challan 82.
    Also refer these two notes relevant for multiple challan J1IFQ.
    1627982 - Error 8A-327 while partial challan item qty
    reconciliation
    and
    1305772 - Error 8I575: J1IFQ -reconciliation of subcontracting
    challan
    Regards
    Binoy

  • Regarding  Subcontract Challan

    Dear Gurus . ,
    The 57F4 Subcontract Challan is posted  with reference to  541 Movement type material document number.
    We know that the subcontract Challan can be posted using using    either   J1IF or   J1IF01 Transaction code.
    I am not able to identify whether this challan is posted through  J1IF  or J1IF01 .
    I want to know very urgently regarding,
    I am not able find how the challan is posted.
    Kindly please help in this regard.
    Rgds
    Surya

    if you have mantained 7 child itemin PO and S/C for only 6 items and done 541 movement for all 7 items then while doing migo
    system will do 543 for all the 7 child item till here there is no problem then you need to capture the S/C at the header level for all the 6 child items.
    Now while doing the Reco in J1IFQ you need to mantain the qty you have actually consumed for making the FG.
    Just give there the qty you have mantained in the migo document in each chile line item.
    Hope it helps
    Reward if usefull
    Regards
    Sujoy

  • Subcontracting challan reconciliation error

    hiii
    when i m using j1ifq for reconcile the subcontracting challan qty. than system showing a error....
    "Challan 0000000001  Material SFG200KPLP009 is assigned more quantity by 20,000 NOS"
    how it will be reconcile?

    Challan 0000000001 Material SFG200KPLP009 is assigned more quantity by 20,000 NOS"
    how it will be reconcile?
    While doing J1IFQ, you are assigning a material document number with this challan number 000000001,
    This error comes because, I hope that the material document number which you are assigning, is a GRN number (101 and 543 movement). While doing challan reconciliation through J1ifq. System will check only the 543 movement line items quantity.
    That is you have done a GRN for 100 pc, assume the 101 will happen for 100 pc and 543 is also made for 100 pc.
    But the challan balance quantity is  98 pc.
    here the 543 movements quantity is more than the challan quantity, and you will get the error message as
    Challan 0000000001 material XXXX is assigned more quantity by 2  No's.
    Solution: You have to add some more challan numbers, until it meets that 543 quantity.
    Hope you got some clue.
    Thanks and Regards,
    S.Vijay

  • Printing of Output material in Subcontracting challan

    Hi all,
            We are creatinjhg the subcontracting challan(India) with reference to the transfer posting document(541 Movment type). and then printinng the same. In print output only the material and quantity supplied to subcontractor only comes in  the challan. But we want to print the output material(after process) and the relatinve quantity in the challan.
               How do I get the output material with refernce to the input material and the corrosoponding quantity. Is there any table with reference to the Purchase order where output(finished component) and input(component supplied) is stores so than we can get the corrosponding output material with reference to input material?
        Please provide me how to get the above?
    with regards,
    Vivek Swarnapuri

    Hi,
    I am facing one problem  agianst the PO of 450 nos finish good materials  for 450 nos one raw material required is 900  and we have send 900 material  and have made 5 GRs  4 of 100 each and one GR of 50,  in all 4 GR of 100 it has use 200 qty. in each  but in GR of 50 Qty. in MIGO it is showing as it has use only 98 qty.  short fall of 2 qty.  also it is showing as no matreial is pending with vendor  now how to do the seetlement agaisnt that PO  as it is not alowing to close the challan due to short fall qty.  and how to do the analysis of this 2 qty whcih is not in GR and not pending  with vendor too.
    regards,
      zafar

  • Reconcilation of Subcontracting Challans

    Dear Expert,
    We have Created Subcontracting PO ( SFG -100 EA)and Provided raw material ( paint) to Vendor,we have maintain BOM quantity for Paint as 10 kg /EA,thus we have provided Paint of 1000 Kg to vendor ,we have received SFG of 100 Qty against PO but after Stock take it is Observed that Out off 1000 kg Only 900 is Consumed and 100 Kg still remain at Vendor
    Please advice How to do Qty Reconciliation for Subcontracting Challans ? and how to bring back 100 Kg material to our own stock in System
    Please Advice
    Regards,

    Hi Shyam,
    Seems this is more related to MM module and should be posted under MM forum.
    1.     I assume, you have inwarded 100EA against PO by 101 movement.
    2.     The moment you do GR, raw material (entire 1000kg paint in your case) must get automatically consumed at vendoru2019s end by 543 movement and ideally there should not be any material lying at vendoru2019s end.
    3.     Check the material document of GR. It should contain 2 movements, 101 and  543.
    4.     Check for how many quantities 543 movement is done. THEN only conclusion can be drawn.
    5.     May possible that somebody has changed BOM relation in PO before GR.
    Regards
    Anand Rao

  • Subcontracting Challan 57F4 details

    Hi All,
    I want to display a report for the subcontracting challans with pending status.
    like if i issue a challan for 1000 qty, then i have done a GR for 500 qty, now i want to see the report for challan number, issue qty, received qty and pending.  like that.
    Please help??
    Thanks
    Pankaj Garg

    Hi,
    Goto J1IFR, select the option Display Annexure IV option.
    You will get the required report.
    Regards,
    Piyush