Mismatched data for "Created By" in generated Purchase Requisitions

Hi,
Just wanted to ask question to all gurus that, I see some mismatched data for ‘created by’ for system generated Purchase requisitions. As if I do MRP run using MD40(MPS scheduling run) then system is showing PR created by 'MRP controller' but if I run MRP using MD41(single item multi level), then system is showing the user ids name(the person on whose id MRP run is executed) is showing in the PR.
As both the MRP runs being executed in the same user id, then there should not be such kind of diffrent data. Due to this mismathced data we are gettting some difficulties in the reporting. 
Thanks in advance.
Regards
Amit

Hi!
It's solved. The mistake was on the connection of the tables:
BUT000 - BUT020 - ADRC
Thanks and regards,
Mon

Similar Messages

  • M7279- Data for creating a delivery is incomplete (Vendor)

    Dear All,
    i am getting below error while processing Goods receipt.
    "M7279- Data for creating a delivery is incomplete (Vendor)" 
    1.I am doing Goods receipt with mvt type 521( GR without ref to prod order).
    2.storge location is WH manged + HU managed.
    3.Material master is assinged with sales org / distribution channel- sales view.
    4.maintained for Transportation Group . loading group - sales gen/plant data.
    5. Maintaine for shipping data for Storage location ( customisation -SPRO-LE-Shipping-Basic shipping function- Shipping points and goods receiving points determination-Assign goods receiving points for Inbound Deliveries.)
    6. HUM- setting - LG-HUM-HU requirement for storage location and default values for deliveries)
    Why system is thowing this error message as in my case vendor does not comes in to picture ( I can cosider if a GR is with refence to PO , in that case in customer master number has to be maintained in vendor master + shipping condition entered in customer master)
    Could you pl help me on above ( as this is 521 movement , it should not have any link with vendor or customer master) then why i am getting this error.
    Appreciate your earliest response.
    Om

    I am doing simple goods receipt without reference to any document ( mvt 521 - goods receipt without ref to production order) , in that case it should not ask for any vendor or should not search for vendor code , i am not getting why it is searching for vendor.
    If i removed the setting related to HU management for storage location then it allows me to post the document without any error, but if i activate for HU managment in below path i am getting error ( even in below path if i entered any vendor code then it allows me to post the document)
    Logistics general- Handling unit management- basics-materials management - inventory management -HU requirement for storage location and default values for deliveries
    plant     Storage location      Partner storage location   Sal org  Dist chan shipping division vendor customer HU requred
    05         ZBD1                       ZPK1
    in above if i entered any vendor code then it allows me to post the doc but i remove it then i am getting above error.
    If there any alternative or other setting to overcome this error.
    Thanks
    Om

  • Problem in MRP generated purchase requisition.

    Hi Friends,
    We have run MRP via MD02 transaction for one material.
    MRP generated purchase requisition created.
    In that MRP generated purchase requisition, under item level in the status tab we are getting below field values is like below.
    Processing status : No edited
    Block ID: Blocked by requester.
    Due to above values we are not able to convert this MRP PR to PO.
    Could you please let us know is there any master setting is cause of this?
    Thanks in advance.
    Regards
    Jegen Mohan

    Hi Friends,
    After debugging MRP programme, we came to know that there is BADI implemented to block the MRP PR's intially and then z programme called for adding secondary materials/services to that MRP PR's.
    After addition of secondary materials/services to MRP PR's,  Status will be unblock automatically then save the PR.
    This is my client specific scenario.
    Thanks & Regards
    Mohan.

  • SNP Heuristics generates purchase requisition

    Hi Experts,
    I have a requriement to generates purchase requisitions start date at Monday; Im trying to use period factor but still I gets the reqs still falls in different days and also the planning calendar under the lot-size. Is there any other ways that I can apply this requirement?
    My lot-size is weekly bucket and 1 day transportation duration and 1 day GR.
    Thanks
    Regards,
    Lhon

    Thanks again for your reply; yes some of the days that didnt fall has holidays for that current week thats why it didnt schedule at the desired date but some of the Preqs generated were fall on other days even without any holidays in the calendar. Except for the calendars of the transport and handling what are the other factors thatc an affect this specified period factor settings? Other than this setting would you consider any other scenario to apply this requirement?

  • No Account Assignment when I created Planned Order to Purchase Requisition

    Hi ,
    No Account Assignment when I created Planned Order to Purchase Requisition from Funds Management , where as If i change  ( eq : PR item qty is 10 , i just changed to 0 , enter then replace back that 10 ) any thing in the PR , Account Assingment is populated and list of accountin  documents are attached to PR.
    Please suggest me , what might be the problem .
    Thanks in adv

    Hi,
    a) When you convert the PldOrd into PurReq it disappears from table PLAF, it ceases to exist. There will be no PldOrd-reference in PurReq (you will not find such field in EBAN). (if you check field RSNUM in PLAF before converting the PldOrd and you check field RSNUM in EBAN after converting the PldOrd into PurReq, you wlll find the same number)
    b) It's not easy to say. You can check PLAF-PSTMP and PLAF-PUSER and compare these with data you get from trx STAD. But this is also not an exact methode since these field are in connection with the last date of change.
    Firming indicator cannot help also since you can remove it manually... - even though the PldOrd was changed manually, no firming indicator will be seen...
    (Of course, generally firming indicator helps if the user doesn't remove it intenionally)
    Regards,
    Csaba

  • Document type for MRP generated Purchase Requisition selection

    Hi,
    when I  run MRP ,for externlal procurement items system is creating Purchase Requisition with Document type NB.How to make system to take different Document type automatically with MRP.
    Thanks and Regards
    Raghavendra Pai

    Dear,
    Follow below steps to fullfill your requirements:
    1) Go to Tcode OMDT.
    2) Click on MRP group
    3) In front of your plant  maintain your  doc.type purchase requisitions for standard purchase ord which you want to generate at the time of MRP --PR generation.
    4) Go to Tcode MM02---maintain MRP group  same as above parameter in MRP-1 view .
    Now run MRP..it will pick the defaulted Document type for PR generation via MRP.
    Regards
    Utsav

  • FM or BAPI for  date and time for the creation of a Purchase Requisition

    Hi people:
    Does anybody knows about a FM, BAPI or table in which i have de detail for the date and hour of the creation of a Purchase requisition?
    Points for helpfull answers.
    Thanks in advanced

    Hi,
    If you want to get the time along with the creation date then use the tables CDHDR and CDPOS, but be careful while passing the data need to pass the entire primary fields data else it will fail in the performance test.
    Reward points if useful.
    Regards,
    Suman

  • MRP is not generating purchase requisitions consistently for MRP type VB

    Issue: When executing consumption based MRP in ECC 6.0 using the following parameters; purchase requisitions are not created for all material with stocks below max stock levels. In other words  requisitions are  created incase of some materials and requisitions are not created for others.  
    u2022     MRP type VB ( manual reorder point) with reorder point qty
    u2022     Lot size HB with Max stock level
    u2022     Procurement type F (external procurement).
    Additional info: Some of these materials are batch managed and results are inconsistence whether it is batch managed or not.
    Regards
    Sai

    I checked that and planning file entry is created.
    Example 1: MRP is not working. 
    MRP type = VB
    Lot size =HB
    Procurement type= F
    Material # = 1200045
    Reorder point =30
    Max stock level = 300
    Available qty = 139
    No PRs are existing before MRP.
    MRP is expected to create PR  for qty 161 (300-139= 161)
    Example 2 : MRP is working. 
    MRP type = VB
    Lot size =HB
    Procurement type= F
    Material # = 1200052
    Reorder point =100
    Max stock level = 1000
    Available qty = 87
    MRP created PR qty of 913 and results are as expected.
    MRP is expected to create PR  for qty 161 (1000-87= 913
    NOTE: I am directly creating Purchase requisitions by selecting creation Purchase Requisitions Indicator =1  during MD01/MD02 trxs . Not creating any planned orders.

  • Where can i find the license subscription end dates for the licenses we've purchased?

    I am the admin for our Cloud team.  Is there a place under my login where i can see the start/end dates of the licenses we've purchased?
    Thanks.

    https://www.adobe.com/account.html for your Adobe orders page... or
    manage your team account http://forums.adobe.com/thread/1460939?tstart=0

  • Document type selection for MRP generated Purchase Requisition

    Hi,
    when I  run MRP ,for externlal procurement items system is creating Purchase Requisition with Document type NB.How to make system to take different Document type automatically with MRP.
    Thanks and Regards
    Raghavendra Pai

    Dear,
    Go to SPRO-Materials Management--Purchasing Purchase RequisitionDefine Document types
    Copy the NB and create and New Document type
    You can default the document type from the MRP group.
    Customizing is done in OPPZ transaction.
    Once you have entered the MRP group to your material master MRP view, then next MRP run will create the requistions using the document types maintained to the MRP group.
    Please refer the OSS Notes- 46919 and this thread,
    Purchase req doc type in MRP
    Regards,
    R.Brahmankar

  • Cutoff date for tading/exchanging your recently purchased 3G for 3Gs...

    Just a heads up. I spoke with an AT&T sales rep at a corporate store and he showed me documentation from AT&T that stated that you may exchange your 3G if it was purchased from May 9, 2009 forward for just the restocking fee. I count myself lucky as I purchased my 3G on the 10th.
    I did some digging and found that the cutoff date for exchange of the original iPhone to the 3G was from May 27th. The 3G was then released on July 11th. This accounts for 45 days, yet the May 9th date given for the 3Gs exchange and it's actual release (June 19th) is 41 days. Kind of strange. Anyone else get this same info??
    Please post as many people would love to be informed.
    Thanks everyone!

    Lastson: You are lucky that you bought yours after the cutoff date, I received mine s a gift on the 7th and it was purchased that day too. We just spent a very long time on the phone with ATT asking them what could be done about this to no avail. If it had been extended the 45 days like last year, it would be no problem.
    Also, we had heard the rumors that a new phone was to be released this summer and would have waited until it was released to purchase it, but the clerk at the ATT store told us there would be no new iphone, just the OS update. So here I am stuck with this phone because of TWO days. Thanks for being inconsistent apple.

  • Error: No data for binding key while generating WSDL

    Hello users,
    I have converted a custom rfc to webservice using Wizard tool. While generating WSDL file using Open WSDL document for selected binding of SOAMANAGER, i'm getting the error message 'No Data for Binding Key'.
    Can anyone let me know the solution to resolve this issue? Also, I could note that the Object Status for this sevice reads Services: 0 / Endpoints: 0
    Strangely, I tried to generate WSDL for another Custom Webservice and it did get generated but with 403 error page. and for this the Object Status read Services: 1 / Endpoints: 1.
    Any information with respect to this is appreciated.
    Thanks in advance.
    Regards,
    Naresh

    Hi Naresh,
    You have posted the question in the wrong forum, it should have been posted in Webdynpro.
    Cheers,
    Bhavana

  • Sufficient stock but MRP create planned order and purchase requisition .

    Hi Expert,
    After MRP run planned order and purchase requisition created . but the problem is for child material sufficient is there but still PR and plnd order is created .
    MRP type PD, LOT size EX,Strategy group 10, for testing purpose I made safety stock 0, min lot size 0 , max lot size 0.
    I cant find the cause why MRP create PR and Pland order for the material which has sufficient stock. Please help.

    Dear Anirban
    could you check the following master data value:
    Lot size -> MB Monthly ( only for test)
    Rounding value -> null
    Strategy 40 MTS.
    You can try with this setting in order to figure out what is the problem.
    You can check also orizzon planning and re-scheduling (set to 999).
    Let me know if i have been useful for you
    Daniele

  • Production order that generate purchase requisition

    Hi!
    I  need to now from where in SPRO I set the purchase requisition type that the system generate when I use MD02 transaction. The thing is that the system generates an NB type, and I would like to generate an PURE type. Can this be done?How?
    Also, when I use MD04, and try to convert a purchase requisition (type NB) in purchase order, the system generates an NB Purchase order and not an PUOR Purchase order. Can this be changed, as the system generate a PUOR Purchase order instead of NB, and if yes, where?
    Thanks

    Hello,
    For MRP to create a certain requisition document type, try assigning this to the MRP group for the material in OMDT, so in "doc.type purchase requisitions for standard purchase ord" enter the type you want. Assign the MRP group to the materials appropriate.
    Then for a PO type you need to configure settings in MM>Purchaing>PO-->Define document types. Here, for the PO document type assign the correct link to purchase req, meaning only the PO type you want can created from the reqs.
    Hope that helps.
    Thanks.

  • Differentiate between SNP Deployment generated Purchase Requisition in R/3

    Hi
    We are implementing SNP with Deployment. Purchase Requisitions are being generated from both SNP Heuristic run and Deployment heuristic run and they are transferred to R/3. So using TC MD04 in R/3, we can see both Purchase Requistion coming from the same requirement. We want to convert the Purchase Requisition generated from Deployment to Purchase Order using ME59/ ME59N in the background. Currently, there is no difference between both PReqs in R/3, so system is incorrectly picking up both the PReqs.
    It will be great help if anyone can suggest a way to differentiate them in R/3.
    Thanks,
    Prasun

    You can identify PR  by category
    Category :
    EA     SNP: PReq     SNP: Purchase requisition
    EF     DEP: PReq     Deployment: Purchase requisition
    you can use user exit APOCF013  on APO side to put some flag for SNP PR and use the same in R/3.
    You need to identify one field in PR data that you can use in R/3 to identify SNP or DEP PR and by user exit you can put flag in that field .
    Hope it will help you further.
    Manish

Maybe you are looking for

  • Select specific row after a refresh

    I can not find this in the documentation. I have a table which list all my records from an XML. I then have a detail region that allows me to update the data in the CURRENT record. Upon submitting the updated data to the server, I need the record lis

  • Itunes artwork problems

    Hi All, Just copied my iTunes Library over to my new laptop. All of the library is there, everything is ok except it wont sync the artwork. When I click 'get album artwork' all I get is a message saying 'artwork could not be found an unknown error oc

  • May be answered, but can anyone confirm for sure?

    This question has had some responses so far, but can anyone confirm for sure, that with iWeb '08, you still need to publish to a folder if you are not publishing to .mac? What exactly is the "personal domains" feature, if publishing from within iWeb

  • Old versions of Pc Suite ? help

    Hi im Jay and my Q: is what version of Pc Suite would work with eaither Fedora 9 and or Window's Xp pro [SP1](build 2600.xpsp2/030422-1633ervice Pack 1) " Not willing to update to Sp2,Sp3 " any one know of any versions that worked with sp1 ? or is it

  • Text is all gobbledegook!

    Hello, Can anyone help this wee damsel in distress? I've got a Powerbook G4 which doesn't always want to display text correctly, but often throws up random computer code, which looks a bit like Greek, instead. This usually happens when I'm trying to