Missing raw material position (from BOM) in process order

Hello to all,
Please help me on my issue on missing raw material position (from BOM) in process order.
On transaction CS11, for a particular formula/plant/BOM application, the BOM was produced.  It was found that this BOM has 20 positions (from 0010 to 0200). 
Now, when the user proceed on the process order for this, the position 20 is missing into the order.  What checks should be needed to proceed on checking why the item is missing into the process order?
Thanks.
Regards,
Patrick

Patrick,
The last check what i would suggest is to check the "Plant-Spl- material status" of the material in line item 0020. You have to check this using transaction "MM03" and in MPR1 - view.
You can check the defination of the status in the customizing transaction "OMS4", here check under "Production Section".
I definately think that there was a error message which should have popped up and ignored by the user due to this defination of the status.
Regards,
Prasobh

Similar Messages

  • Concept of Alternate BOM in Process Order.

    Hi,
    We are having Process order Scenario & we watn following options.
    1.       Having 2-3 BOM of the same FERT/HALB with alternate Raw Materials.
    2.       Selection of Specific BOM for Process Order depending on the Availability / Requirement.
    3.       Creating Issue Slip / Reservation for the Specific BOM.
    4.       Issuing Material accordingly.
    5.       Booking consumption accordingly.
    Thanks in advance.
    DON

    Dear
    Please find below the answers of your question ;
    1.Having 2-3 BOM of the same FERT/HALB with alternate Raw Materials. ; Goto CS01-Enter Plant-Enter Material -Enter Usage and List down all the items in frist Alternative .Again to create Alternative 2 and so on , you need to go CS02 with same menu path -System will automatically take the Alternative 2  or you can copy Alternative 1 if you have similar items with additional new items..
    2. Selection of Specific BOM for Process Order depending on the Availability / Requirement ; As far as MRP is concern , BOM selection  and explosion of BOM for depdent , needs to have BOM Selection methods  Blank , 1,2,3 in MRP4 view .If you have maintained Producton version with all those aternative  with proper validity and lot size , then MRP will explode as per lot size and valididrt depeding on the order qty  or you can also create demand MD61 with Production Version based on the avalabity of BOM [MD61-Enter User parametes -Scheculie Tab -Goto Settings-Production Version -Enter PV with spefic BOM based on availablity ]   and then run MRP in MD02-NETCH ,3,1,1,3,2 .Howver , you can also select this production version manually while creation of Process order  based on the Order Type Depent Parameters in OPL8-Select Process Order Type-Goto Detals-Here Master data tab -Select Production Version -Keep it 1-Manula Selection .Remember , as sequence , MRP will select the frist PV listes in MRP4 view of Material master if it does not find proper lot size and validity.
    3.Creating Issue Slip / Reservation for the Specific BOM. ; Generally , MMD/Store will be given Reservation Number  and they will chekc in MB51 for open reservation for Goods Issue and carry out MIGO-261.Frosm Shop Fllor you can try Pick List  or you can print Process Order Print out in COP1 or MD4C print out also .Otherwise develope customs Forms as per the information permissible from you business to store .
    4. Issuing Material accordingly.; It will happen in MIGO-261 or automatcally based on Backflkashing in MRP2 view -Always back flash so that at the confirmation time in co15/c011 , you can automatically goods issue the material .
    5.Booking consumption accordingly ; It is Process Order Cycle from Releasing of Process order to till Goos Recipt of Process Order in MIGO-101.You can also use Auto GR based on the Control Key set up in Master Recipe which triggers the Auto GR.
    Regards
    JH

  • Material Availablity check of the Process Order......

    Hi there,
                  If the reservations of material  are made against the process order & the material is not available and the stock is expected in near future........ then during the material availablity check of the process order........will it show that the material is available............
    Please elucidate me.......
    Thanks
    Kaushik

    Hi Kaushik,
    Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date.
    Therefore the system checks the current available quantity of stocks.........
    but, for example imagine if the available stocks are not sufficient to meet the order............then the system checks replenishment lead time of the material i.e. time taken for the material to become available either internally (in house production) or externally (from a vendor) and then issues a material availability date.........i.e. date on which material would be available for delivery.
    Depending on the above checks, the systems issues the delivery date.
    <b>Reward if helps</b>
    Regards
    Sai

  • Reg. Raw material sales from unresticted to out side vendor

    Dear Friends
    1. I want to sale 100kg of  raw material to outside vendor ,what is the MM part.
    2. I want to return the old material to the vendor and get back new materials,what are the prerequisites.
    3. We don't want release stretagy for one particular vendor out of 500 vendors how to configure this
    Kindly advise me
    Thanks
    Rajakumar.K

    1. I want to sale 100kg of raw material to outside vendor ,what is the MM part.\
    - extend material to sales view and create a sales order - PGI and billing. you also need to create that vendor as a customer
    2. I want to return the old material to the vendor and get back new materials,what are the prerequisites.
    - many options are there.. 1. refer the old PO and return through 122 movement type. 2. create a return PO and return with 161 movement type. or create return delivery and return with outbound delivery(it involves lot of config)
    3. We don't want release stretagy for one particular vendor out of 500 vendors how to configure this
    what are your criteria's for release?

  • Returns from production against Process order

    Hai
    Can anyone suggest, how to intimate to stores department from  production to receive the shop floor returns when any process order is cancelled.
    Note: Here stores department should know through wich process order/reservation the material to be received. based on the reservation / intimation, stores department shall receive the material. (This transaction can be done in two steps)
    Regards/Ramu

    Hi Ramakrishna,
    You can have a cancel form which contains the Process / Production Order nos. In this form you can intimate your store whether to receive back the entire components or only selected components.
    The store can then post a reversal for this using MB1A, cancel w.r.t the order specified in the form.
    I hope this meets your requirement, if not revert.
    If helpful award points
    Regards,
    Vivek

  • Setting for "Exploding BOM in Process order"

    Hello All,
    I have a requirement where I want to create BOM for sales order using CS61 and then I want to explode this BOM automatically in Process order(Production order) and it should happen automatically.Please let me know the settings for the same.
    Regards,
    Rohit

    Hi  Subhro,
    I thought you are talking about the BOM material for the ref technical object say functional location or equipment in the service order. If you have maintained the BOM for the equipment you can pull the all the component list in the component tab.
    In the component tab click on the List button available in the component tab. You will see the list of BOM material.
    DP

  • Report on raw material to wip for a production order

    Hi,
    Is there a report which has a list of " issue of raw materials to a production order"?
    Or how to know how much raw material is issued to WIP on a production order.
    i nee dto have a report which has material cost and material overhead an dtotal.
    how to build this report ?
    Thanks,
    Sai.

    Hi Sai,
          You can try using MB51, use filter movement type 261. Add a filter for the posting date coverage.
    Then proceed. Click on the icon DETAIL LIST.
    Then click on the SUBTOTAL, add MATERIAL as a Criteria. The click the column AMOUNT IN LC.
    You should see the total issuances to per material.
    I hope this helps.
    Heinrick Palad

  • Costing data from Tables of Process Order Confirmation.

    Dear Friends,
    In which table is the Costing relevent data for process order confirmation stored.
    We are developing a report for which we require  material specific-
    Target quantity / Actual quantity
    Target costs / Actual costs
    Thanks in advance.
    Regards,
    Vikrant Sood

    Hi,
    Using the Table : AUFM you can get the data.
    VVR

  • Ugent: How to restrict a Material Type for a Specific Process Order Type

    Hi All
    Can any one please tell me how to restrict material type for specific process order type
    We have Process Order type ZPBS for finished materials but while creating process order
    if i give the material of semi finished material type the system let me create the process order
    it should not as we have a separate process order type for semi finished materials that is ZPBS.
    And vice versa
    Please help me how to restrict these material types for specific Process Order Types.
    Points ll be awarded accordingly
    Bilal Athar

    Hy Ghulam Mohammad,
    Good Morning,
    Pls go through below link
    [http://www.sap-img.com/abap/what-is-user-exits.htm]
    [http://www.sap-basis-abap.com/sapab013.htm]
    Now regarding How to place your checks in User Exit, then pls explain your requirements to your Abaper , so that he or she can write it into programeble language.
    Regards,
    Dhaval

  • Printing UDF from BOM on Production Order

    I have added some UDF's on my BOM that I'd like to print on the Production Order. How do I get BOM UDF info onto the Production Order?
    Sal

    Sal,
    BOM and Prod Order are 2 different documents and therefore do not share the UDF.  You will need to create similar set of UDF on the Production Order Header / rows (as required) and create formatted seach to copy the data from the UDF.
    Please give me an example of the data in the UDF and I will walk you through
    Suda

  • Document Flow from BOM to Production Orders

    Dear SAP Gurus,
    I have attached a few documents at header level of the BOM. I have also attached document at item level in the BOM. When I create a production order these documents are not flowing to Production Order. Is there any way to do that. I also want to see them in CS11 and CS12 reports.
    In OPKP I have already checked Document Links-BOM "On Creation" and "On Release" for my production scheduling profile.
    Thanks and Regards
    Geravine

    I have three documents. One is attached at the BOM header level under the documents tab. The second with item category D is entered as a line item in the BOM Items. The third is in the Item Level under the item's documents tab in the item details. All have same document type.
    When I create the production order the second document is copied in the document overview of production order. First and Third are nowhere to be seen.
    Is there any config or user exit to achieve the same?

  • Process order issue on conformation

    Hi
    I have conform process order through cork... at the conformation all raw material are issued automaticallt..throgh backflush...
    it ok.. but heer some times ... rawmaterial not available in the storage location  ..means insufficent qty  availble for the process order ...at thatb suituation process order conformed.. but raw material was not issued aginst process order... rawmaterial qty goes to COGI...
    how can i contorl to order conformation ....means order not conformed... if insufficent raw material is avaiable for that order...pls giude in this issue...thanks in adavnce
    thanks and regards
    sesi

    Dear
    Did you try with COR6N ? Even if you do not have suffiecent  qty of material  required in Process Order , you can go ahead with the confirmation in COR6N where you need to tick the "Clear Reservation option" which will allow you to do the confirmation posting  .The indicator is only set for the open reservations of the components that are not to  backflushed and
    In standard production order , CO11N , this option is available .Same will be in COR6N.I hope this can be utilised .
    Please try and revert
    Regards
    JH

  • Assign documentation as BOM item in a BOM of Raw material

    Hi Everyone,
    My customer used to assign documentation as BOM item... even for raw material in their old ERP system, that means for raw material, they will also have BOM, the BOM item will be documentation.
    For SAP, normally we assign the documetation to the material master data. If we also assign the documetation as BOM item for raw material BOM... will there be any impact for the other business process?
    Thanks,
    Bin

    Hy,
    Documents are not play any crucial parts in PP Scenarios.I think it is good practice to assign Document to the Materials or BOM.Its provides one type of physical proof/Identity to the Material and Explains the BOM details.
    You can assign Documents to the Raw material as below.
    - Create BOM of Raw material through CS01 and assign Documents over there (Document screen - Item category D).Then assign Raw material to the BOM of Product.You will find Assembly tick for that material in BOM which represent the Documents attached to that Material.
    Regards,
    Dhaval

  • How to enter / Post Goods receipt of Raw Material from subcontractor

    Dear Experts,
    As standard subcontracting procedure, Raw Material Transfer posting is made to Subcontracting Vendor
    and the Semi finished material [Assembly] is received from the subcontractor.
    If in case extra or by any reason, raw material stock is with subcontractor, he want to return the raw material stock.
    How to receive raw material stock from subcontracting vendor and how to handle subcontracting challan transactions in SAP ?
    Thanks in Advance !

    Hi,
    >>Receive the RM using MB1B / 542
    >> Reconcile using J1ifq
    >> Complete challan using J1if13
    Thanks,
    Rajoo

  • Missing one material from Mobile Client

    Hello
    We are running CRM 4.0 and Mobile 4.0 and one of the laptops is missing a material number from its local database. Other laptops have the material and I can see the material online. Is it possible to push the material number from the CDB to this one site. I did try creating a request under Synchronize and ran it but that also goes to everyones out bound queue and it did not solve the issue.
    Thanks for the help.
    David Humphrey
    Functional BA CRM Middleware

    Hi,
    first you should check whether there is some inconsistency in the lookup
    table for products. For this please check table PASRRL (e.g.
    /1CRMG0/CGPASRRL or /1CRMGC/HTPASRRL, depends from your template) whether
    there is an entry for the particular site and product.
    These entries are created when assigning a subscription to sites.
    If not (anymore) then also a request or an extract doesn't have any effect.
    Normally in this case it helps to de-assign the product subscription from
    the site, wait until R&R (Tx smohqeue) has been finished and then re-assign
    it again. Of course this is not practicable with a large material master.
    Therefore what you can do is to try to create a similar product subscription
    based on the same publication and the same criteria value and assign it to
    the particular site. What the system will do then is analyzing the related
    products and comparing with the entries in the lookup table mentioned above.
    This will result finally in extracting and sending of only the missing
    product to the site but not of the complete material master.
    Regards,
    Wolfhard

Maybe you are looking for

  • Not able to view data and song folders/files in my ipod

    Hi All, I have a 30 GB Video iPod which I have been using since the past 6 odd months. Recently, my iPod was infected with a virus. I managed to clean up the virus but since then I am not able to view the data and song files or folders stored in the

  • How to control a digital output signal using the DAQ assistant?

    I am using a USB 6251 DAQ board and would like to control a switch. I am gathering airflow, pressure, and acoustic data on the same board (analog input) and would like the switch to trigger when the airflow value is within a pre-determined range. Fin

  • Can anyone help with a dynamic graph question?

    Post Author: eseidel CA Forum: .NET I have a subreport that I'm having a lot of difficulty with and I dont know if I've hit the limitations of CR or I just don't know how to do it.  I need to set the subreport graph parameters on the fly and I can't

  • Hp g62 Black screen caps lock on and wifi button on

    Hello, My friend is having a problem with his laptop hp g62 which is 1 1/2 years old. This happened out of no where and have no idea why. Here is what happens: We power it up, fans turns on, caps lock stays on and Screen stays blank. Again we have no

  • PDF in-browser will not show attachments panel

    Hi. I'm working with a PDF with attachments. I created it to open with the attachments panel visibile. It works fine except for in Chrome, it shows the PDF in-browser but the attachments panel is not visible. This is causing some problems for our sit