MM Configuration material

Dear Mani,
Could you please send the document to the following my login ID. [email protected]
Thanks in advance,
Rajesh kaliya

Dear Rajesh,
Pl check the following link:
http://www.sap-basis-abap.com/sapmm.htm
Regards,
Mani

Similar Messages

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Issue in consumption of forecast for configurable material

    Hi,
    we have a issue in consumption of forecast by sales order for a configurable material.
    Please find the below details for the settings maintained and the steps followed.
    Please let me know how we can overcome this issue.
    settings in R/3
    1. Class and characterisitcs are created in R/3
    2. standard material was created and class assigned
    3. planning strategy used is 56
    4. material, class, characteristics,ATP check, ATP customizing , sales order were integrated to APO
    Settings in APO
    1. CBF table, CBF profile, Consumption group were created in APO
    2. Consumption group is attached to the product master
    following steps were followed.
    1. Forecast was created in DP for a certain characterstics ansd relaesed to SNP/PPDS
    2. forcast is visible in product view
    3. sales order was created in R/3
    4. slaes order is visible in APO but it is not consuming the foreacast for the same set of characteristics.
    Please let me know how we can overcome this..are we missing any customization ...?
    Thanks
    Ram

    Hi Srinivas,
    thanks for your response.
    The forecast consumption problem was solved after correcting the entries in requirement strategy.
    have one more query.
    when the sales order for a configurable material is transferred from R/3 to APO, we should be able to see the values under "descriptive characteristics tab" in APO product view.(when we click on the green triangle representing the configuration).
    However, we could see the values under "descriptive characteristics tab" for some of the characterisitcs and not for other characteristics.
    we tried comparing the characteristics but could not figure out the reason.
    any pointers / clues to come over this issue would be helpful.
    thanks
    Ram

  • Error message while creating configurable material for variant configuration.

    Dear All,
    I want to create configurable material for the purpose of variant configuration. When trying to create configurable material using mm 01 or mm k1, it is displaying an error message that internal number assignment is not possible for the material type configurable materials as well in using external number also. Can anyone specify the steps to be done in creating the configurable material. Thank you all.
    Regards
    Akula Sivaji Kumar Madhu Kiran

    If you want to set these material type to another group (Which has a internal number and external number range), then you can do it.
    In MMNR, Click on the Edit Group.
    Then select the material type and click select element.
    Then mark a tick option in another group and then press Element/Group.
    Then you can see the material type will come under this group.
    Now save your entry, and create a material with this material type.

  • Configurable Material : error while creating value contract

    First snapshot of our Configurable Material  'Material 01'
    In MM03 > Basic Data 2
    under Client specific configutarion
    Cross-Plant CM : (material 01)
    Varient (checkbox checked)
    In MM03 > MRP1
    MRP Type: PD
    In MM03 > MRP3
    Plant-specific configuration
    Configurable Material : Material 01
    Varient (checkbox checked)
    Planning Varient (checkbox checked)
    When we are raising value contract, we are getting error
    'Material 01 has status: Configure to Order'
    In Item category assignment we have assigned Zw1 (value contract doc type) on lines of 'OR doc' type  as follows
    SaTy ItCGr Usg   HLevltCA Difftc MltCa
    Zw1  0002  blank blank    TAC    TAM
    Zw1  0002  blank TAC      TAE   
    Zw1  0002  blank TAE      TAE   
    Zw1  0002  blank TAM      TAC   
    Still we are getting same error .how to resolve this.
    Thanks
    Rohit

    closing...

  • Make to Order for Configurable Material & Error in Confirmation

    Hello, PP Gurus,
                       I am doing one MTO for Fabric business but during the confirmation I am getting error that
    SALES order Stock does not Exist as well Please inform me Costing procedure in this scenario.
    *is it necessary to run MRP in this scenario?*
    Please see the all Details of Business so that U can give answer properly.
    One is raw fabric (Raw material) which has to passed different process to convert Colored fabric as my Finish product as well I can sale Raw fabric also.
    is it possible to maintain raw fabric and Colored fabric with same mat.code?
    I have configured the material as well all pricing BOM, Recipe its working properly.
    How can I assign the material to Operation? I am getting GRAY field in New Assignment in change recipe mode ..
    Is it possible to use Material type other than KMAT? I want to use Finish material type. If yes How?
    Right now I can create Process order from the Sales order but I am facing error in confirmation that Sales Order stock does not exist than I have to transfered stock to Sales order and error get solved temporarily but  I want to avoid this manual transaction to remove this error. Any configuration is required please inform.
    My configuration is given below.
    MRP Type : PD
    BOM item Category:  L Stock Item.
    In dependency & Profile I have set radio Button as Single level Bom explosion.
    Order Bom selection in profile.
    Strategy : 25 make to order for configure material.
    How can I do ? please suggest any changes
    I have only 9 months of SAP experience within short time I have gain lot knowledge from this site and other reading material as well my learning Learning thirst.
    thanks to all SAP gurus..
    THANKS IN ADVANCE .... Definitely I will reward points even if my some questions get solved...
    Regards,
    Bhavik dangi.

    Hi,
    You can use variant configuration for selling the colored fabric. Use the basic fabric as raw. and maintain variant configuarations to have many variants.
    Please use strategy 25. When you run MRP the planned orders will be generated and will be assigned to the sales orders. You can see it on the account assignment tab.
    In material master pleasse maintain Individual collective requirement indicator to 1-individual in the MRP-4 view.
    Then the stocks will be reserved to the specific sales orders.
    Thanks and regards
    Murugesan

  • Configurable material in scheduling agreement

    When I use DS scheduling agreement with LPN as item category with configurable material, I cannot input value for configuration. But if I use normal TAN instead of LPN, I can input value for configuration.
    Why?
    Does SAP do not allow configurable material in scheduling agreement or quantity contract?
    Thanks in advance for any suggestion.

    Deat Amy,
    Please check the item category settings related  to configuration through VOV7 transaction.
    Go to VOV7 transaction then select item category LPN then go in to the detain here you check the configuration related settings under Bill Of Material /Configuration tab.
    If want you refer the standard Config.at Mat.Levl itemcategory TAC settings, same way you can do settings for your item category then try.
    Note:- Not advaisable to change the standard one, so you copy the standard itemcategories do the changes,
    I hope this will help you,
    Regards,
    Murali.
    Edited by: Murali Mohan.Tallapaneni on Nov 13, 2008 5:20 AM

  • Material variant replacement in sales order for Configurable Material

    HI
    I am using variant configuration. In this i have created material A as configurable material and have Preconfigured Material B as its variant by assigning configurable material in MRP 3 view.
    Now when i am creating Order for material A i.e. Configurable material and the characteristics values are same as that of Preconfigured material system is not replacing Configurable material with Preconfigured material.
    Please help me out.
    Regards,
    Anand.

    Even after maintaining the item category MTAC(Mills Make to order config at mat level), the configurable material is not getting replaced in the sales order (va02). It is just showing material variant exists for the configurable material.
    The setting in item category for configuration is.
    Config. Strategy     01(Sales Order Strategy (TAC, TAM))
    Mat. Variant Action  4 (Replace configurable material (Append and change))
    ATP material variant 2 (Do not substitute if not completely available)
    Structure scope      D (Configuration, poss. with BOM explosion)
    I have maintained the stock for material variant as well to take care of ATP material varinat setting shown above.
    Please suggest if missing something.

  • Configurable Material as BOM component in SALES Order BOM

    Hi Gurus
    I have following
    1. Material ABC is a configurable material (variant)
    2. BOM of this ABC has further configurable materials
    Is it possible to maintain requried charasterstic of the compoents which are configurble at the time of SALES ORDER BOM CREATION.
    If yes, how. please explain.
    Thanks in advance
    sunil

    Dear Sunil,
    Please refer to the following link:
    http://sap-img.com/sap-sd/sales-bom-implementation.htm
    I will suggest you to visit  http://sap-img.com/sap-sd.htm. It will give you the overview of SAP SD module.
    Moreover there is a separate section of FAQs with answers which will help you in great deal.
    Do let me know in case of any queries.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Configurable material - Error converting plan order to production order CO6

    While I am coverting planned order to production order with configurable material, I am getting the follwoing error:
    You cannot make an assignment to make-to-order stock
    Message no. CO684
    As read in previous forum messages I am check settlement profile assigned for  new order type (ZSD01) with standard sett profile (SD1) at OKO7 and set "Valid receivers" with value "1" in Order, Material, Profit.segment, Sales order and Order item.
    Configurable material have item category group "0002", MRP type "PD", Lot size "EX", Strategy group "25" and "Individual requirements".
    Sales order with configurable materiale have item category "TAC".
    Where is the problem?
    Thank you in advance
    Oscar

    Hi,
    There are some OSS Notes to address this problem..(OSS Note: 311651, 432109 etc..)
    But all ae for older versions of SAP.
    Regards,
    Siva

  • Create a configurable material with reference to another config material

    Hi,
    I want to create a configurable material with reference to another configurable material from different system.
    Please tell me what data i need to check to see if that material has been created (copied manually) successfully.
    Thanks.

    Hi,
    In case of configurable material most important thing is configuration so please check weather the configuration is copied perfectly with all characteristics or not. Similarly check the valuation class and price control is proper or not.
    Regards,
    Umesh

  • BAPI_SALESORDER_CREATEFROMDAT2 with configurable material

    Hello everybody.
    I have been looking for information and I can't find how to do it. I can create the sales order, but without any configuration value.
    Please, Can anyone tell me who I have to call BAPI_SALESORDER_CREATEFROMDAT2 with configurable material?
         lv_configid = ld_itm_number1."item position
          lv_inst_id = lv_inst_id  + 1.
          CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
            EXPORTING
              input  = lv_inst_id
            IMPORTING
              output = lv_inst_id.
          lv_root_id = lv_root_id + 1.
          CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
            EXPORTING
              input  = lv_root_id
            IMPORTING
              output = lv_root_id.
          li_order_cfgs_ref-posex = ld_itm_number1.
          li_order_cfgs_ref-config_id = lv_configid.
          li_order_cfgs_ref-root_id = lv_root_id.
          APPEND li_order_cfgs_ref.
          li_order_cfgs_part_of-config_id  = lv_configid.
          li_order_cfgs_part_of-parent_id  = lv_inst_id.
          li_order_cfgs_part_of-inst_id    = lv_inst_id.
          li_order_cfgs_part_of-obj_type   = 'MARA'.
          li_order_cfgs_part_of-class_type = '300'.
          li_order_cfgs_part_of-obj_key    = it_pedidos_pos-matnr.
          APPEND li_order_cfgs_part_of.
          li_order_cfgs_refinst-posex     = ld_itm_number1.
          li_order_cfgs_refinst-config_id = lv_configid.
          li_order_cfgs_refinst-inst_id   = lv_inst_id.
          APPEND li_order_cfgs_refinst.
          li_order_cfgs_inst-config_id = lv_configid.
          li_order_cfgs_inst-inst_id   =  lv_inst_id.
          li_order_cfgs_inst-obj_type      = 'MARA'.
          li_order_cfgs_inst-class_type    = '300'.
          li_order_cfgs_inst-obj_key = it_pedidos_pos-matnr.
          li_order_cfgs_inst-quantity = 1.
          CONDENSE  li_order_cfgs_inst-quantity.
          li_order_cfgs_inst-complete      = 'T'.
          li_order_cfgs_inst-consistent    = 'T'.
         li_order_cfgs_inst-persist_id_type = 'G'.
         li_order_cfgs_inst-quantity_unit = 'ST'.
          APPEND li_order_cfgs_inst.
          li_order_cfgs_value-config_id = lv_configid.
          li_order_cfgs_value-inst_id = lv_inst_id.
          li_order_cfgs_value-charc = 'Z_MC_NOMBRE'.
          li_order_cfgs_value-value = it_pedidos_pos-nombre_serigr.
          APPEND li_order_cfgs_value.
          li_order_cfgs_value-inst_id = lv_inst_id.
          li_order_cfgs_value-charc = 'Z_MC_LETRA'.
          li_order_cfgs_value-value = it_pedidos_pos-tipo_letra.
          APPEND li_order_cfgs_value.
    Thank you in advance.
    Regards.

    Hi REIS did you get any answer to your pb I have exactly the same request .
    these internal id for instance and configuration are confusing .
    Thanks for your return if your pb has been solved since .
    Rgards
    Yvon

  • How to do the Partial delivery for configurable material ?

    Hi All,
    I am creating a sales order  for a configurable material and is trying to do the partial delivery for the same. But, after the outbound delivery the status of the sales order is shown as completed although I have done the partial delivery.
    Here are the steps I followed.
    1. material I used here is a configurable material.
        Main settings.
      a. In Basic Data tab, marked as configurable
      b. Procurement type='E' in MRP 2 tab
      c. Strategy group as 82 in MRP 3 view.
    2. I created a sales order for quantity 10
    3. Created a production order followed by goods Movement thereby increasing the stock.
    4. Did the outbound delivery for  quantity 5.
    Now if I checked for the status of the sales order using VA02, the status for the line item as well as for the sales order was "Completed" although I had done partial delivery.
    I have checked for setting in Customer master record, item category in VOV7. Everything seems to be fine.
    I checked for all the information in the FORUM without any help.
    Can you please help me?
    Kind Regards,
    Anupama

    Hi,
    For Info, I am creating a sales order for Item category TAC.
    1. In my case, after completing the partial delivery, in the document flow for Order, the status is shown as completed.
    2. In status overview for this item, delivery status indicator is set as  'Fully delivered'.
    I did check in the customer master record and the field
    Partial delivery per item  is set to Blank(  Partial delivery allowed)                
    3. I did run the report RIBELF20  and I am getting this error for all the sales order I created for partial delivery for configurable material.
    For Normal item, the status is showing properly.
    Is there any other settings I have to check?
    I needed this to be working. Please help

  • Standard cost update for configurable material- CU50

    Hi,
    I am trying to update standard cost for a configurable material using CU50 with reference to the sales order.
    System gives a warning message :- Configuration of raw material still not included in price determination
    Message no. CK784
    Also the save tab is greyed out.
    this is the case with all config material
    A solution to this would be highly appreciated.
    Thanks

    Hi,
       Refer note 362193 and check if that helps.
    regards
    Waman

  • Incompletion Log for Configurable Material

    Hi,
    The client wants to restrict the creation of sales order whenever a configurable material does not result in a material variant.
    Is it posible to meet this requirement by standard SAP config in Incopletion Procedure or Status Profile?
    Please advice.
    Thanks
    Sinduja

    Make the item category that you are using for the Configurable Material as 'Not relevant for Pricing'
    Then in your Sales order Header Incompletion procedure, add VBAK-NETWR field.
    Now the order has to have a net value which is possible only if you have a material variant that would be relevant for pricing.

  • STO for Configurable material

    Dear All,
    We require to configure the STO process for a configurable material, but as per the present system configurable material production in supplying plant triggers by sales order. this resulting in non availability of material to dispatch against the STO purchase order.
    Please help me to resolve this issue.
    your inputs are awaited!!!
    thanks & regards,
    Anup
    Edited by: anupam sharma on Jun 27, 2010 3:59 PM
    Edited by: anupam sharma on Jun 30, 2010 8:49 AM

    Maintain the correct MRP parameter for the material, i.e., special procurement type for stock transfer in MRP2.
    So, you have set this up and it generates the stock transfer requests.
    Note that the STO will have the account assignment for sales order stock.
    Check following links for hints:
    Re: Material xxxxx in plant xxxx is configurable and will not be costed
    CK11N:Costing  done for Configurable material is throwing error
    Hope this can assist you.
    Thanks & Regards
    JP

Maybe you are looking for

  • Inserting data from one table to another in different format

    Hello, I would like to know what I am doing wrong with the following code when I write a data from one another to another table in a different format. I am now learning PL/SQL and am using this as a test problem. I have a table called students which

  • Disable login prompt for SAP NW based Xcelsius Dashboard

    Hi all, Need assistance to understand what needs to be done in the below case: Current scenario: 1. Developed Xcelsius Dashboard based on SAP NW Connectivity on BO XI 3.1 SP2+. 2. Configured trust between SAP BW server and BO Server using steps outli

  • Stalling and Freezing

    I run Indesign CS4. It use to run perfectly for months, but in the last few weeks it has started to stall and freeze when I open old documents or even start new ones. I have tried to un/reinstalling useing the cleaning tool per trouble shoot. I have

  • Help With HelloWorld

    I am new to Java Programming. I am still trying to run my first programming "Hello World". While I do my first application and it is not work. C:\java>java HelloWorldApp Exception in thread "main" java.lang.ClassFormatError: Truncated class file at j

  • Apple ipad shuts down when about to start restore

    ok , my ipad crashed it was stuck on the apple logo now im trying to restore it , when i restore it goes to the step were it says "waiting for ipad"  and on the ipad it has the apple logo and a loading bar(empty) a few seconds after my i pad just shu