MM Configuration Materials Required

Hello Gurus,
I am new MM and i would like to have some configuration documents in MM.
Please send me the documents to my mail ID [email protected]
I appreciate your help and i will award you points.
with regards,
mahesh

Material Management
configuration for creating a material
we have to create material type :
spro
logistic general
material master
basic setting
define attributes for the material type
configuration for creating a vendor
spro
logistic general
business partner
vendor
control
Define Transaction-Dependent Screen Layout
Purchasing cycle:
     1. purchase inforecord
spro
material management
purchasing
purchase inforecord
create number ranges
make the require configurations for purchase inforecord
2.purchase requisition
spro
material management
purchasing
purchase requisition
create number ranges
make the require configurations for purchase requisition
     3.  Request for Quotation
spro
material management
purchasing
request for quotation
create number ranges
make the require configurations for request for quotation
       4.   Purchase order
spro
material management
purchasing
purchase order
make the require configurations for purchase order
Release procedure
we can create “Release procedure”for RFQ,purchase requisition,purchase order,contracts,schedule agreement.
We will create configuration  for Release procedure for purchase order
spro
material management
purchasing
purchase order
Release procedure for purchase order
      1.edit character
     in this field we will create a character
      2.edit class
     in this field we will create class
3.define Release procedure for purchase order  here will define
    Release Groups
    Release Codes
    Release indicator
    Release Strategies
Pricing Procedure
spro
material management
purchasing
conditions
define price determination process
1.define access sequence
2.condition type
3.define calculation schema

Similar Messages

  • Alternate Lot Sizing for KMAT (configurable) materials

    Hi friends,
    We are using KMAT(configurable) materials.
    During MPS/MRP run, SAP plans KMAT production with Lot-to-Lot production(EX) by default!
    We have some capacity planning situations, due to which, we need the lot sizing options like u2018Fixed lot (FX) sizeu2019 or u2018Fixed lot size with splitting(FS)u2019 or even use of u2018Min-Max lot sizeu2019... so that the large requirements are transferred in smaller lots to the plant.
    But, when we use any of these lot- sizing procedures in MRP1 screen of the material master, we do not find any difference in MRP resultsu2026 system just triggers the planned order exactly matching the Sales order quantity (as if we still use EX)!
    SAP notes 437098 and 724235 hint that the alternate lot sizing procedures are possible to set up for configurable materials... but we are struggling to crack this.
    If any of you have had an opportunity to work on alternate or custom lot sizing procedures with KMAT (configurable) materials, it would be wonderful to hear the suggestions and results.
    Thanks in advance.
    Best Regards,
    Senthil

    Hi Dario,
    Thanks for the response.
    We use ECC6.0; I could not find the inidicator you've referred (customer requirement)... in transaction OMI4 : Check Lot Sizing Procedure --> MRP Lot Size...
    Kindly advise if you were referring to any other version or any other transaction...
    Best Regards,
    Senthil

  • CIN-MM Configuration steps required for First Stage Delaer purchases.

    Hi,
    I am looking for CIN-MM Configuration steps required for First Stage Delaer purchases.
    We have steps Configured for CIN-MM from Manufacturer for purchase of Materials and Capital Goods.
    Thanks in advance.
    Regards,
    Purna.

    Hi Purnachandrarao...  ,
    There is no seperate configuration required in dealer's case.
    For this you have to use zero Tax code.Material should be maintained in J1id.
    So that Tax % will be picked up from there.
    But at the time of GR you have to tick MRP indicator in excise tab.
    And also you have to change values of BED and cess as per vendor's invoice.
    So that value will be fetched at the time of invoice verification.
    Regards,
    Gitesh

  • My total process is mto process, all materials configurable  materials ,

    hi
    i am working steal company ,
    my total process is mto process, all materials configurable  materials , its bases on characteristic , how to configure the r/3 and apo , what is the main parts and settings , how trigger the global atp with based on characteristic , and what configurations
    how to create the production order,
    i create the 10 sale orders with one production order , how to configure this , what are the settings needs, how to system internal settings
    please help him
    regards
    sankar

    Sankar,
    It is contrary to forum rules to place email addresses in posts.
    Creating a new implementation for APO is not a trivial matter.  Most companies will hire a consulting company experienced in such matters to assist them. 
    However, if you wish to tackle this yourself, a good starting point for documentation is Best Practices. Your business requirements are unclear, but I will assume you wish to configure Global ATP, and I will further assume you wish to implement some kind of planning (either PP or SNP).  Here are the required modules:
    Connectivity
    http://help.sap.com/bp_scmv250/BBLibrary/HTML/B02_EN_DE.htm
    Replication
    http://help.sap.com/bp_scmv250/BBLibrary/HTML/B05_EN_DE.htm
    GATP
    http://help.sap.com/bp_scmv250/BBLibrary/HTML/ATP_EN_DE.htm
    PP
    http://help.sap.com/bp_scmv250/BBLibrary/HTML/S16_EN_DE.htm
    SNP
    http://help.sap.com/bp_scmv250/BBLibrary/HTML/B06_EN_DE.htm
    For general info about GATP, refer to SAP help
    http://help.sap.com/saphelp_SCM700_ehp02/helpdata/en/04/5e7237412a5249e10000009b38f842/frameset.htm
    Best Regards & Good luck,
    DB49

  • Non-configurable materials with EK02 costing

    Hi all,
    We have a range of non configurable manufactured materials which, when used in standard sales orders, generate a production order and BOM. Presently the cost is automatically generated from the material master and is populated as a VPRS cost.
    As these materials have a BOM we want the cost to pick up from the BOM instead, ie as an EK02 cost. If we enter such a material and do a manual recost the EK02 populates in the sales order item conditions but we cannot get it to populate automatically as it does with configurable materials with BOMs.
    In the define item categories section in SPRO we have removed the determine cost tick. This has the desired effect of removing the VPRS cost but the EK02 cost still doesn't pull through. In the Bill of Material / Configuration section of the item category we tried setting the structure scope to A (Explode single-level bill of material) and B (Explode multi-level bill of material) but this didn't work. If we set it to D (Configuration, poss. with BOM explosion), then we get the "item can be configured but there is no configuration" error when used in a sales order which is expected as these products have no configuration.
    We also tried deleting the standard cost held in the material master to see if, as that value was now blank, it would pick up the EK02 instead but, alas, this also ddn't work.
    Any help / suggestions would be most appreciated.
    Kind regards, Rob

    HI,
    We are maintaining the Service masters for the services we render, there is no valuation of Inventory as only service is being rendered.
    But we have maintained BOM and Routings for the services we render.
    Even there is no valuation class in the serivice masters as this is non valuated.
    Can you guide me more on this pls.
    Thanks,
    Ravi

  • Blocked field in Sales Order when using configurable materials

    Hi everyone,
    I have noticed that every time I insert a configurable material in a Sales Order Line, after pressing ENTER and having valuated the associated characteristics, the Material and Position Type fields stay blocked so I cannot change the material in this position.
    According to the process I am implementing, I would need in certain cases to change the material (replacing the configurable for a non-configurable one).
    I would be very grateful if someone could help me to avoid that these fields get blocked or at least to know the reason.
    Thanks in advance and best regards.
    Ben.

    I don't have any experience with configurable materials, but it seems that in this case you'll need to delete the line (or the lines) and re-enter them with the proper type of material.

  • In Apple Configurator, can I set up different sets of iPads with different apps loaded? Or will all iPads synced with Configurator be required to have the same build?

    In Apple Configurator, can I set up different sets of iPads with different apps loaded? Or will all iPads synced with Configurator be required to have the same build?

    Hi jshira86,
    You can definitely have different sets of iPads with different apps loaded. When you "supervise" your iPads, you will see that on the left side of the Configurator window there is a "+" sign in the lower left corner. Click it to create a new device group. With this new device group you can choose what apps and configuration profiles you want to install on that group of iPads. Create as many groups as you want to customize the apps and profiles you want on them.
    Hope this answers your question!
    ~Joe

  • Configuration steps required in ID

    Hello Experts,
    I am new in XI/PI. Can anyone explain me the configuration steps required when we have one sender and multiple receiver.
    I have a scenario having file as a sender and JDBC,File and JMS on receiver side.
    If anyone have the screenshot for similer scenario will be more helpful.
    Regards,
    Jay.

    Hi,
      in ID, you will need...
    1) 1 receiver determiantion
    2) 3 interface determination
    3) 3 receiver agreement
    4) 1 sender agreement
    5) 1 sender and 3 receiver channel
    Regds,
    Pinangshuk.

  • Disable delete icon in the Materials requirement form

    hi
    can anyone tell me how to disable the delete icon in the materials requirements form, using form personalization...
    reply
    thanks & regards
    anandc

    Hi Kuldip,
    if you're trying to hide the Save Button in the Adobe toolbar, then you can place the following code in the wdDoModifyView method to hide the whole toolbar.
    // Get interactibe form handler.
            IWDPDFDocumentInteractiveFormHandler iFormHandler = WDPDFDocumentFactory.getDocumentHandler(wdThis.wdGetAPI(), "<name of your form>");
    //     Get appearance setter. 
          IWDPDFDocumentAppearance appearance = iFormHandler.getDocumentContext().getAppearance();
         // Hide menu bar.
         appearance.hideMenuBar(true); 
         // Hide tool bars.
         appearance.hideToolBars(true);
    hope this helps,
    harman

  • There was start up glitch on desktop, which changed the computers configuration, which requires activation on Adobe Photoshop CS, but am not able to get throug activation system and phone support has been disconnected.

    here was start up glitch on desktop, which changed the computers configuration, which requires activation on Adobe Photoshop CS, but am not able to get throug activation system and phone support has been disconnected. How should I activate my software.

    You are entitled to the CS2 version that will work without activation, since the activation servers were taken offline. Read the instructions and follow them on this page.
    Error: Activation Server Unavailable | CS2, Acrobat 7, Audition 3

  • Problem of configuration the requirement output control ?

    Hi ,
    i am now in a very urgent situation that is the system does not create the message type after executing the transaction VL31N.
    In detail :
       I have used the transaction NACE to configure the "Requirements output control" and i have created 3 message type (Z1 , Z2, Z3)  ( type V6 : handling unit) and i have coded for each of them to check the requirements for creating the messsage type ( the message type will be created if the sy=subrc = 0 after the forms are executed.
    FORM KOBEV_Z1.
    Check condition from the structure  komkbv6
    if cond Ok
      sy-subrc = 0.
    endif.
    ENDFORM KOBEV_Z1.
      FORM KOBEV_Z2.
    Check condition from the structure  komkbv6
    if cond Ok
      sy-subrc = 0.
    endif.
      ENDFORM KOBEV_Z2.
      FORM KOBEV_Z3.
    Check condition from the structure  komkbv6
    if cond Ok
      sy-subrc = 0.
    endif.
      ENDFORM KOBEV_Z3.
    But in fact , even if i have put the sy-subrc = 0 for each of them or for all , the message type was not created as i need .
    Result :
      if the message type is created automatically after executing the KOBEV or KOBEV , a printing program will be called to print the SAPscript form , but till now , i can not do that , to print the form i have to created the message type by hand ..
    Is the something wrong in the system ? How can i configure them to run well ?
    Please help me .
    PS : I will reward immediately and i am waiting
    Thank you very much

    Hi,
    If you are supposed to bring across characteristic values to your target, then you will not be able to jump from the result line. The configuration expects that the values of the characteristic marked as being used in the jump are filled with unique values. When you use the result line as a source for your jump, the values in the result line will most likely be based on the sum of multiple characteristic values.
    Hth,
    -Jacob

  • Error "Invalid or Could not find module configuration" and "Required application module HyperionPlanning.planning is not configured

    Dear
      I use version 11.2.1, try to open an application one by planning and workspace is the error below.
      "Invalid or Could not find module configuration" and "Required application module HyperionPlanning.planning is not configured"
    I checked the oracle site, but the suggested solution is not possible because using the OHS and found the file HYSLWorkers.properties.
    Solution
    On the server que hosts the Apache component:
    1. Navigate to HYPERION_HOME%% \ common \ httpServers \ Apache \ 2.0.59 \ conf
    2. Edit the file named HYSLWorkers.properties,
    3. Locate the entry starting with "worker.HP__8300.port"
    4. Set its value to the value of the Planning web application's listening port incremented by two,
    5. Save and close
    6. Restart Apache only
    Anyone have any suggestions?

    If restarting the services does not help, run the EPM configurator again and configure foundation web server again then restart services and try logging into workspace
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • How to configure the requirements for output control ?

    Hi ,
    I have some problems in configuring the requirements for output control like following :
    My aim is to make a condition check when i create an inbound delivery ( VL31N)  or MIGO ...., as default in the requirement check for output , a message type will be created automatically if the it satisfies the condition in the KOBEV .....KOBEV( each sub routine was defined with a message type ( V6 )  ( if sy-subrc = 0) . And then a printing program will be triggered to print the SAPscripts form in the table "tnapr"  but even if i have put sy-subrc in ( KOBEV...KOBEV ) always = 0 the printing was not executed , and in this case i do not understand the reason why , If you please to help me this .
    Thanks ,

    Hi,
    it seems that the requirement you made is not the reason why it's not printed. If you set sy-subrc to 0, this code should have no effect.
    Cheers,
    Stefan.

  • Variant Configuration Materials Costing Scenario

    Hi All,
    Any one explain me Variant Configuration Materials Costing Scenario in descrete manufacturing?
    any help is appreciated.
    Thanks,
    Anusha

    Hi,
    Can any one explain me step by step configuration in Controlling(CO) for Variant configuration materials? and Explain me process steps in Controlling(CO) module for variant configuration?
    Any help is appreciated.
    Thanks,
    Anusha

  • What are the configuration changes required to deploy OEM from one VM host to other?

    Hi,
    I have oem setup on one host and corresponding database is on another host. Now i want to deploy both EM and database setup on another host, so what are the configuration changes required to run the setup.

    Check this link, this may be helpful
    http://docs.oracle.com/cd/E25178_01/doc.1111/e24473/ha_outages.htm

Maybe you are looking for