MM LSMW extending materials to new plant

Hi Experts,
I got a requirement, where I need to create a LSMW for extending the materials for a new plant. Should I use MM01 or MM02 Direct Input Method of LSMW(RMDATIND). Kindly help me with this.
Regards,
Riya

why dont you try it yourself manually before you try to do it with a load program.
Just execute MM02 in your system and try to extend it to a new plant, you will immediatly have your answer.
Change: you can only change what exists
Create: you create something that does not exist.
Can you change the plant data that does not yet exist in material master?

Similar Messages

  • Create/extend materials for new plant with new profit centers

    Hi.
    We have created a new plant and want to create/extend the materials from an existing plant to the new plant (with new profit center). Can this be done via MM17?
    Regards,
    Kjettern

    Hi Kjettern,
    To extend the existing material to a new Plant/Profit centre, pls follow the following steps: -
    1. Copy down the material number (i.e XYZ) you want to extend.
    2. Go to t-code MM01.
    3. Enter the material number (i.e. XYZ) you copied from (1) into the Material field and hit ENTER.
    4. You will get an information on the bottom that "the material type XXX and the industry sector YYY has been copied from master record".
    5. Pls note that Basic Data 1 & 2 is not changeable as the same set of material data will be used when a material is extended.
    6. Hit ENTER again. To change other details other than Basic Data 1 & 2, select the views that you want.
    7. You will be prompted to enter a Plant. Here you must enter the new Plant that you want to extend the material to and hit ENTER.
    8. You will get a confirmation stating that the material already existed and will be extended (to the desired Plant u entered in (7)).
    9. Ensure that all the data in all the important tabs are maintained, for the right Storage Location, Warehouse Num, Moving Average Price, Standard Price etc. before proceed further.
    10. Hit Save. You will get a msg that "Material XYZ created".
    Now you are able to use this material number in the new Plant you created.
    Hope this helps.
    Rgds.

  • Mass Extn. of materials to new plants(MM17 or any other T Code)

    Hi can you guys advise me on the following:-
    I havve materils A,B,C,D and so on which are let us say present in plant P1, P2,P3 and P4.
    My requirement is to do a mass extension of these materials to new plants which could be say P1A,P2A,P4 and say P3
    Kindly advise.
    I tried MM17 but could not complete the same as it the field WERKS of MARC does not come inthe search fields
    Thanks in anticipation
    Rajeev

    Hi,
    Use MMZ1 t.code for extension of material.
    Regards,
    Biju K

  • LSMW for extending materials to new set of plants

    Hello All,
    Our requirement is to extend some hundreds of materials to a set of few plants. Can this be done in LSMW? Or should BDC be used??
    Please elaborate on this.
    Regards
    Mahesh

    Hi Girish,
    How can I extend materials to a new plant and Sales Org.  through LSMW?
    I use the Standard Batch Object 0020, program RMDATIND for creating new Materials the first time (this qworks fine), but there is no option 'Extend to existing material'  or there is no field called Reference Material...
    Maybe it is because we use internal numbering of the new Materials that makes it unpossible to extend materials to existing material-numbers?
    Thank you, regards, Walter.

  • Error while extending material for new plant

    Dear All,
    We have created new plant  through  copying old plant.
    But when I try to extend the material to the newly created plat system giving error message
    Tables TCURM and T001w inconsistent : notify your system administrator
    Msg no M3820
    Diagnosis
    Valuation is at plant level. However, inconsistencies have arisen because of the way in which the plant was configured in Customizing or because plants have not been assigned to a company code.
    kindly help me out to over come this issue as early as possible.
    Regards,
    murali.

    hi
    check following links
    [link1|Tables TCURM and T001W inconsistent; notify  your systems administrator;
    [link2|Tables TCURM and T001W Inconsistent;

  • Extending Material to new plants - Legal Control

    Hi All.
    I am extending a material to new plants by copying the data froma particular plant.
    Whats happening is for some plants the LEGAL CONTROIL data (Foreign Trade Import view) is automatically getting copied and populated but for some plants it is not.
    What could be the reason?
    Poitns are assured !!!

    Hi , Thanks for the reply.
    But the plants for which data is automatically getting populated , I am selecting only the Foreign Trade view and not all the views.
    Regards

  • Extending material in new plant

    I have mainteined the mm related views (basic data 1,2,Plnt storage data 1,purchasing accounting)for some materials and want to add FICO related views for the same material.But after gouing to MM02 ,im getting an error msg' Material not fully maintained for this transaction/event'.plz help as soon as possible.

    Hi,
    Some Material views extended through T.code MM50 provide the following input datas are
    Maintenance Status             :    ___ ( select drop down menu & select require material view )
    Material code                       :   ___________
    Plant                                    :   ___________
    after provided input datas and then executed. Now, one line item show and first small box tick mark and press maintenance button. The  view extended to the particular material.
    Hope, it is useful for you.
    Regards,
    K.Rajendran

  • Reg:T-CODE for open and close period for materials(new plant).

    hi sap guru's
    T-code for following process
        can anybody send me , how to create calendar to new plant . and what is the T-code to be use for open and close period of materials for new plant.
    thanks
    sakthi..

    Hi Sakthi,
    I am assuming that you are asking about the factory calendars which are assigned while difing the plant.
    Factory calendars are created through transaction "SCAL".
    Opening and closing of MM periods can be done through transaction MMPV.This is based on the company code.Before using MMPV ,you can look the last opened period in the transaction MMRV.
    Reward points if it helps.
    Regards
    Karan

  • Material Data Extend to New Plant

    Hi,
    This is understandable how to extend data to new plant; however, is there any way material master can be extended with whole range or material group or material can be extended individually only.
    Thanks

    hi
    See you have to record the values through SHDB. The recording is send to ABAPER for BDC programme. This prog needs CSV, or tab delimited file with values which can be uploaded

  • Mass Extension of Materials to various Plants

    Hi there,
    I have a Material NO. 11205 creted in Plant A001.  I have 30 Plants ranging from A001 to A010 then B001 to B010 and so on.  Is there a Transaction in SAP thru which I can extend Material 11205 in all the Plants at one shot?
    Please assist.
    Many Thanks

    Hello,
    There isn't a simple transaction to extend plants as there is for storage locations. In my experience, there are usually significant differences in the setup of materials in the different plants so you need to take account of these when extending plants. If this is something you do on a regular basis you can either set up an LSMW to create the new plant views or have an ABAP'er write you a custom program to do this.
    Sorry I couldn't give you something more positive.
    John.

  • What settings we need to check in SD module while creating the new plant.

    Dear Friends,
    If we extending(creating) the new plant what all the things that we need to check in sales and distribution module, what all the configuration that needs to be performed.
    But it is not a manufacturing plant. All the service processes are takes place from this plant.
    While creating the plant if we are copying from the existing plant, is that the all assignments are copying to the new plant or not?
    Regards,
    Hari

    Hi,
    Check the below check list
    SD Activities     path
    creation of plant      IMG>ES>def>log gen>define copy delete check plant
    define locations in plant     IMG>ES>def>log gen>define location
    Assign Business Area to Plant/Valuation Area and Division     IMG>ES>***>log gen>Assign Business Area to Plant/Valuation Area and Division
    Assign sales organization - distribution channel - plant     IMG>ES>***>sd>Assign sales organization - distribution channel - plant
    Assign Business Area To Plant And Division     IMG>ES>***>sd>buss area acct asst-->*** buss area to palnt and divison
    Assign shipping point to plant     
    Shipping Points  determination      plant required for shipping point determination
    Checking Rule For Updating Backorders     AC
    Define Checking Groups Default Value     combination of material type plant and Ac
    Assign Organizational Units By Plant     in STO 's
    Material and plantwise chapter id combination     tcode J1ID for excise maintainence
    Materail assessable value     
    In CENVAT determination     
    Excise indicator for palnt     
    Exceptional material excise rates     
    Quantity based AED, SED, NCCD     
    Maintain Excise Registrations     IMG>log gen>tax on goods moments>INDIA->Basic settings
    Maintain Plant Settings     
    Maintain Excise Groups     
    Maintain Default Excise Groups and Series Groups     
    Specify Printers for ARE documents     
    Regards,
    kishore.

  • Extend material to another plant

    hi all,
    I want to extend materials to another plant using copy from...  Someone knows  which BAPI  Can I  use
    to do  this?
    thanks.
    marisol

    u can use "BAPI_MATERIAL_SAVEDATA".
    Suppose u have to Extend material from 1000 to 1100 plant.
    so ur template will be like this:
    Material Number,Current_Plant,extend_plant,valuation area ,Type
    Using Material Number,Current_Plant , valuation arear , Type and pass it to
    BAPI_MATERIAL_GET_DETAIL
    u will get all data 4 , BAPI_MATERIAL_SAVEDATA.

  • Extending Materials one plant to another plant

    Dear Friends
    while extending material through LSMW to another plant  we facing problem :
    Sales : Sales Org 1 showing more fields mandatory like  1,valid from;  2. X-distr Chain Status  3. Sales Unit of Mesasure etc.  LSMW programme was OK   i did more times through this programme to extended. i maintained the below fields only in LSMW.  BUT while i extending material through MM01 there is no problems showing.  please advice how to solve this.  i want to extend more than 10K material in to new plants.
    TABNAME     Table Name
    TCODE     Transaction Code
    MATNR     Material
    MBRSH     Industry sector
    MTART     Material Type
    WERKS     Plant
    LGORT     Storage Location
    VKORG     Sales Organization
    VTWEG     Distribution Channel
    MAKTX     Material Description (Short Text)
    SKTOF     Cash discount indicator
    MTPOS     Item category group from material master
    MTVFP     Checking Group for Availability Check
    LADGR     Loading Group
    PRCTR     Profit Center
    DISGR     MRP Group
    DISMM     MRP Type
    DISLS     Lot size (materials planning)
    PERKZ     Period Indicator
    BKLAS     Valuation Class
    PEINH     Price Unit
    VERPR     Moving Average Price/Periodic Unit Price
    EKALR     Material Is Costed with Quantity Structur
    HKMAT     Material-related origin
    LOSGR     Lot Size for Product Costing

    if you used this program successfully before, and now it is complaining about new mandatory fields, then I would say that someone has changed the field selection for your material masters.
    Try to extend one material (that making problems in LSMW) using the manual way with MM01. LSMW does not really do anything different, so I expect that you face the problems with MM01.
    Then you either need to ask to the person who changed the settings  to reset them or you need to extend your LSMW  so that it can run with the new settings.

  • Extending the existing functional locations to a new plant?

    Hi Sapiens,
    The following is my concern:
    Q1) I have a set of functional locations(roughly around 5000 records) assigned to say Plant A.
    I would like to extend these existing functional locations to Plant B. I am not permitted to do this using LSMW. I should execute this operation in one shot.
    How to accomplish this?
    Q2) After attaching all the functional locations to Plant B, i should replace the first 4 characters of the functional location structure with the Plant Code itself. Again not through an lsmw. How to accomplish this in one shot?
    Please let me know the procedure of doing it with some guidelines.
    Thanks in Advance,
    Vijaya

    Hi
    1. You can extentd to the other plant with SCAT ,BDC etc
    2. But You can not replace the first four letters from the FL with the New plant code.Remember this is a master data
    Regardas
    Jignesh

  • How to extend commodity codes list to a new plant?

    Dear friends,
    I've created a new plant in our organization.
    I would like to use the same commodity codes we use for the other plants.  It means thousands commodity codes.
    I guess there is a way in SAP to copy commodity codes from one plant to another one.
    Could you please let me know how to do that?
    Thank you very much.

    Hi,
    You can use LSMW for this purpose.
    You can use standard LSMW or do recording for this.
    In the LSMW, enter only plant specific data for input file.
    Regards,
    Prashant

Maybe you are looking for

  • Call forward to Unity Connection Fails

    I have CUCM7.1 and UCXN 7.0 and have done sip integration.  When phones call their voicemail it works fine.  When a call to phone is forwarded to vm the main greeting is announced and not the personal greeting.  RTMT port monitoring indicates the cor

  • Error Message in RWB for Receiver JDBC

    Hi Everyone, We are getting the following error with Receiver JDBC scenario: Received XI System Error. ErrorCode: NO_BACK_SYSTEM_IN_HOPLIST ErrorText:   ErrorStack: Legacy system to which acknowledgment message is to be sent is missing in hoplist (wi

  • When I go to crop a photo, the entire iPod shuts down. What's the problem?

    When I take a screenshot of something, then go to my photos to crop it, the entire iPod shuts down. Does anyone know what's going on?

  • Oracle 8i Lite for Linux, Is it available?

    Hi all, Wanted to know if Oracle 8i Lite is available for Linux. Thanks

  • Routing Consistency Check in batch ?

    Hey folks! A business requirement has been raised to perform a consistency check for all Routing Task Lists for a specific plant.  I'm aware of the consistency check within the Routing that can be performed online.  Anyone know of a batch/background