MM Release Strategy with Cost Centre

My characteristics for the release strategy is Accnt Assigmnt (KNTTP), Cost Centre (KOSTL) and Amount (GSWRT). I link all to the ceban straucture, and for the cost centre, I entered in the value tab the cost centres that I am using, and I entered the cost centres in the release strategy. Everything seem OK for the release strategy, but the release strategy is only selecting the strategy according to the values and not considering the cost centre, what can I do let it consider the cost centre and the value. I have been struggleing with this problem more than a week now. I tried everything that I can think of. Can someone assit me in this matter. I am on ECC 6.
Thank you.

Refer OSS Note :: 52225
Solution ::
Summary
Symptom
Purchase requisition release strategy with classification does not work as expected when the characteristic for cost center KOSTL is included.
Message  ME297 is displayed.
Additional key words
CEBAN-KOSTL, KOSTL, Cost center, Release strategy, OMGQ, ME297
ME51, ME52, ME53
Cause and prerequisites
Numeric values used for the cost center characteristic in the purchase requisition release strategy with classification is not recognized. CEBAN-KOSTL is a CHAR field of length 10.
Solution
Enter leading zeros for the cost center value in the release strategy. eg. If the cost center value is 123456, while entering this value for the cost center in the release strategy, enter it as 0000123456.
Cheers !!!!!!
Biswajit

Similar Messages

  • Release stratgey on Cost Centres

    I want to make release strategy with Cost centre on purchase orders.but in CEKKO table there is not filed of cost centre..How i make characterstics of cost centere? More over I want to know that is it necessary to enter table name and field name while making characterstics.? How system know for cost centres if no linkage is made.?

    Hi,
    Create characteristic CEKKO  with KONNR,
    Use user exit enhancement M06E0004 to populate value for KONNR based on the cost centers & for the value in EKPO - KOSTL ,get the department name from custom table and pass to CEKKO-KONNR.
    For more check SAP Note: 493900
    Or
    You can thought of keeping purchasing group as release characteristic & create  purchasing group  as department and create a cost center & assign department to cost center in KS02 in basis data TAB.
    Regards,
    Biju K

  • Rel. strategy is not triggered while creation of PR with cost centr

    Hi Gurus,
    While creation of PR release strategy is not getting triggered with cost centre BCWSV870. But release strategy of PR triggered for cost centre BCWSV852 (In PR changed only cost centre as BCWSV852 instead of BCWSV870). Both cost centres are similar and the both cost centres are exist in characteristics value in CL20N for the same release strategy.
    My question is why for one cost centre triggers release strategy triggers and for other cost centre release strategy is not triggered. Can you please tell how come this and rewarded for answer this.
    With regards,
    C. Sundar Rajan

    Hi,
    In regard to problematic PR with cost center BCWSV870, was your PR maintained with only one line item? or multiple line items?.  In additions, when defining cost center as part of the release strategy structure, did you enter all cost centers with leading zeros?  Tak a further look into OSS Note 365604 for your further investigation.
    Cheers,
    HT

  • Creating Roles for Purchase Req. release strategy with classification

    Hi friends,
    Since I have created Purchase req rel strategy where I have four release strategy
    1. For Plant 1 When value <= 5000 (Officer) will release , release code 01 release release strategy r1 and rel code L1
    2 For Plant 1 When value >= 5000 (Manager) will release , release code 01 release release strategy r2and rel code L2
    Now the manager will have 2 release code,if  officer is absent he could release the requisition.
    Same has to be done for plant 2
    The release Group and code needs to be assigned to the Roles , could anybody tell  me  where i could know about roles and will be able to create roles and assign authorisation objects to the Roles , and release group and code to the enduser.
    though its a basis job , since I have no idea , I mean I have never worked with Roles ,as now I have created the Release strategy with classification I need to assign authorisation objects to the Roles as I have four release strategy
    1. For Plant 1 lower value of requisition 1 codeL1(Officer)
    2  For higher value of requisition 2 code say Li and L2(Manager)
    Manager should have 2 codes if  officer is absent he could release
    Same has to be done for Plant 2
    Thanks N Regards
    Siddhartha

    Hii,
    Steps:
    1) Create a Role
    2) Add the authorization Object  M_EINK_FRG by taking the manual option
    3) Assign Release Code and Release Grp
    4) Assign the Role to the User ID which has the authorization of the Release Code and Grp.
    Regards,
    Kumar

  • Tranposrt - Purchase Requisition Release Strategy with Classification

    Gurus!
    Tell me if I want to Transport the Purchase Requisition release strategy with classification. The Data in each charisteristics in each PR Strategy that I have set in Dev is not getting transported to Quality.
    Do I have to enter the data in characteristics again in Quality and the same procedure I have to apply for Production.
    If yes, in this scenario, Can I make Production modifiable.
    Regards
    Sajid

    Hello,
    Create a special ID in PRD with access to change characteristics. This ID should be released for specific purposes and with approval (project manager/SAP support manager). You can also turn on auditing so that all activites performed are logged which can be used to satify auditors.
    Cheers !

  • PR overall release strategy with acc. assignment category characteristics

    Hi,
    Here is my issue : i created an Overall release strategy but the characteristic is on item level. In some precise cases, no release is generated.
    see below more details :
    I have created the following PR release strategy with classification.
    PR type concerned " NB": overall release
    Rlease group concerned : overall release
    In this release group i have 1 class
    in this class i have 2 characteristics : PR type and Account assignement category.
    Release strategy 1 :
    PR type = NB
    Acc. assignment cat = P, W
    Release strategy 2:
    PR type = NB
    Acc. assignment cat = K, V
    TEST 1 : PR type NB, 1 item with P category
    OK the release strategy 1 is generated
    TEST 2 : PR type NB, 1 item with W category
    OK the release strategy 1 is generated
    TEST 3 : PR type NB, 2 items with P category
    OK the release strategy 1 is generated
    TEST 4 : PR type NB, 2 items with P and W category
    TEST KO, no release strategy is generated
    => what should i do to solve this issue ?
    Thank you in advance for your quick answers,
    Isabelle

    What is the specific requirement for Overall release strategy?
    Besides, once you go for Overall release strategy, you cannot have another release strategy at item level.
    Every line item generates a PO, so logically should be set to a release strategy.
    Bottomline is use release strategy at line item level Unless a specific reason exists.
    Regards,
    Sameer

  • Release Strategy with Workflow for PR & PO

    Hi Experts,
    I have configured the PR & PO Release strategy and it is working fine. My client wants the Workflow concept in Releases.
    So User should get the information about the releases for PR & PO.
    But I don't have much idea on Workflow, how it works for Release strategy. Can anybody give information on how to configure the Release strategy with Workflow in PR & PO.
    Points will be awarded .
    thanks & rgds
    Swamy

    Hi Swamy,
    The release workflow is configured by MM functional consultant. As for the workflow determination (i.e. which level should approve first and so forth) depends solely/mainly on the Finance of the company. It differs from one company to another. And the level of approval also differ from one company to another. Hence, like you mentioned, this would be provided by the user, so it is okay. I have replied to someone on another thread asking about workflow, and this is how it works.
    How it works? For example, for a PR release strategy, once the PR is raised by a user for a certain value, the PR raised that matched the classification of the release strategy configured will be triggered. In this sense, once the release strategy is triggered, the releaser holding the release code to release this PR will receive a workflow in their SAP inbox (Not Outlook) for their execution, which is sent automatically by SAP system. These is accessible via the t-code SBWP. Each releaser have a unique login ID and password.
    Assuming the release strategy required 3 levels of release, for example A3, A2 and finally A1 (final release), A3 will first receive this workflow in his/her inbox. After A3 has released, A2 will subsequently receive workflow in his/her inbox for this same PR. In the PR, you will be able to see that A2 release is now possible. This flow will continue until the final releaser, A1 and then, the status of the PR will be unblocked for issuance of PO.
    How is it configured in SPRO? In the Workflow for PR release strategy, you are able to assign a unique ID (usually employee ID) to a particular release code, which these release codes are tied to one or more release strategies. The workflow determines who is to release for a release strategy with that particular release code via the assignment of the ID to that particular release code. Each assignment is only possible for one Plant, and you have to assign the same for many other Plants for the same ID in the workflow if you want him/her to have the authority to release purchasing docs in more than one Plant.
    How to configure?
    Before that, you need to obtain the following information - User ID of the releaser for the specified release code, Plant to be released by the user, and finally of course the Group and Release code (which you already have).
    For PR: IMG>MM>Purchasing>Purchase Requisition>Release Procedure>Procedure with Classification>Set Up Procedure with Classification-->Workflow
    For PO: IMG>MM>Purchasing>Purchase Order>Release Procedure for Purchase Orders>Define Release Procedure for Purchase Orders>Workflow.
    Maintain the details u already have in hand:
    For PR: Group (PR or PO), Code (release code), Plant (you have to maintain the same details for each of the Plant that the same release code releases) Object (US) and Agent ID (the user's ID used to login to SAP system and SBWP).
    For PO: Group (PR or PO), Code (release code), Object (US) and Agent ID (the user's ID used to login to SAP system and SBWP).
    Please note that PO is not Plant specific, and is usually one releaser to release the PO for GR. It is the PR that during the initial stage has the most level of release (up to max. 8 level) before a PR can be converted to PO.  After the PO is converted, it is usually deemed accepted, hence only one release code is usually required to release the PO.
    Hope this will give you an idea how the workflow works and how to configure it.
    Rgds.

  • PR release strategy with classification

    As part of a rollout, we are migrating an instance of SAP to the template SAP. Both the SAP instances are following u2018PR release strategy with classificationu2019.
    The limitation is that I can configure only two release group in PR release strategy with classification. One for overall release and one at item level release. Also, I cannot assign two different release class for the same release group. If I add additional characteristics in the existing class and keep other irrelevant characteristics as blank the release strategy doesnu2019t works. the release strategy does not triggers.
    Any pointers to solve this will be highly appreciated.

    Hi Ashish,
    If your requirement is to have release strategy with more or different characteristics than in the existing system,you may create a new release group and assign the same to release class.There no restriction for having multiple release groups for same release class.Then create new release strategies for the newly created release group and so on.
    Regards,
    Edited by: Dayanandan Kamath on Oct 20, 2010 7:52 AM

  • Release Strategy With Classification

    Hey All,
    I would like to get some information about release strategy with classification for purchase requisation and purchase order.
    Please send me some information  regarding this.
    Thanks
    Kawal

    hi,
    To see the all the linkages firstly see the classifcation and class defined in the sap system at:
    SAP easy access --> Cross application components --> classification system --> master data --> characteristics and classes(CT04 and CL02)...
    TO see the customisation, check:
    Spro --> MM --> Purchasing --> PO/PR etc --> Release procedure --> Rel procedure with classification --> Here check for all the different transactions...like Relase codes, release stategy, access sequence, schema etc...
    Also one important point abt it is:
    PR is possible to release at header as well as at item level...
    But PO and other external docs are only possible to release at header level only...
    In the customisation check all the linkages you will get best out of it....
    Regards
    Priyanka.P

  • Purchase Requisition Release Strategy with classification

    Hi there,
    Please help,
    I have the release strategy and workflow working. (Overall Release)
    Problem is that Org Structure is not updated so workflow has been configure going to (US) user. As i am using workflow option 1 which is resolved via Group, Code & Plant, I have to have a code for every region and manager to resolve the workflow. I am not using plant as business requirement is overall release.
    Scenario is that there are 8 regions with 1 senior region manager and 1 executive.
    The region managers can each release up to 20k. Senior region manager must release from 20k - 50k. Executive must release from 50k -250k.
    Release Codes:
    Regions = L1 - L8
    Senior Region Manager = SR
    Executive = X1
    Characteristics are:
    DocType = NB
    AccAsingment = K (Cost Centre requisitions)
    Purchasing Group = (Each region has own group)
    TotValue = 0k -20k, 20k - 50k, 50k - 250k.
    Now the release strategies.
    Even though it is the same senior manager and executive why do i have to create a new strategy for every region's escalation above 20k taking into account that the business requirement is that the correct region manager has to release before the senior manager can release? It just seems so pedantic when i would rather just add the correct Purchasing Group everytime.
    This is only one leg of the Org Structure there are over 40 depts, and managers that will create and release. Do i really need a strategy for every single scenario?
    Thanks for taking the time to read.

    Hello,
    Create a special ID in PRD with access to change characteristics. This ID should be released for specific purposes and with approval (project manager/SAP support manager). You can also turn on auditing so that all activites performed are logged which can be used to satify auditors.
    Cheers !

  • Issue: Purchase order release strategy with storage loaction.

    Hi Friends,
    I have created release strategy for purchase order considering following characteristics.
    1. Plant
    2. Purchase organization
    3. Purchase group
    4. Document type
    Hence the release strategy is working fine.
    Now the requirement is changed, PO approves should be picked depending on the storage location wise. So i tried to create characteristic for storage location with table name CEKKO and with field LGORT. However system not allowing to create, telling that field LGORT not found in table CEKKO.
    Can any one tell me how to maintain this LGORT filed in structure CEKKO.
    Thanks in advance
    Shashidhar

    HI Shashi ,
      Thanks for your quick response,
    I have Appended a structure to Standard Structure CEKKO with Field LGOBE.
    Also we written the code :move:  i_cekko = e_cekko, in user User-Exit M06E0004 function exit
    FUNCTION EXIT_SAPLEBND_002.
    However, the release strategy is not triggering when PO is saved,
    also the user-exit is not getting triggered , even though i have included the statement ' Break-Point'
    in it.
    Kindly reply.
    Thanks  ,
    Shashidhar

  • GL account posting error with cost centre

    Hi experts
    I am trying to post Goods issue with the combination of GL account and cost centre...
    The system throwing an error message saying " GL account XXXXX not valid for cost centre XXXXX or order entered"
    what could be the mistake i have done... kindly reply
    Thanks
    Alex

    Hi
    Z message means you have a custom validation in Place
    Go to OB28 and check which validation is causing this issue..
    you need to either change it so that this posting goes through or use a proper GL account in accordance with the validation
    Regards
    SAPFICO

  • PR to be deleted after PO release strategy with pr.

    Hi,expert some pr to be deleted as release strategy already trigered as well as po had been done.
    Pls help.Any suggestion?

    Hi,
    You can use transaction SARA with the archiving object  MM_EBAN.
    You can follow the instructions from help.sap.com:
    http://help.sap.com/saphelp_46c/helpdata/en/8d/3e5c48462a11d189000000e8323d3a/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/8d/3e4f1d462a11d189000000e8323d3a/frameset.htm
    Best Regards,
    Arminda Jack

  • Purchase Order Release Strategy with Dependency Condition

    Hi
    We have a scenario where we have to set up Purchase Order Release based on a combination of the following
    Vendor + Purch Org + Dollar Value.
    We have successfully set up the release strategy for which we have done the following
    1) Create Characterstics for Vendor, Purch Org and Net Order Value
    2) Assign the above characterstics to a Class
    3) Assign Class to the Release Strategy in SPRO.
    So far everything is good.
    Now we try to define a Condition. With a Fourth Characterstic (TRIG_RELEASE ) attached to the same class.
    And attached a Dependency condition to it.
    $SELF.TRIG_RELEASE = 'Y' IF VENDOR = '1000' and PURC_ORG ='8500' and NET_VALUE > 1000.
    When this dependency is set, the release doesnt trigger.
    but modifying the condition to
    $SELF.TRIG_RELEASE = 'Y' IF VENDOR = '1000' and PURC_ORG ='8500' .
    Trigger the Release for that condition.
    How can we base the dependency on Net Value also ? What are we doing wrong or missing ?
    Regards
    Aju Paul

    Hi Paul,
    I'm not sure why you really need that fourth characteristics. In my opinion, the three characteristics are good enough to achieve the desired release strategy. Why don't you just create a strategy that has those specifc characteristics value in your classification.
    You can do that from SPRO or CL24N.
    Define a new strategy in SPRO e.g "Vendor 1000 Porg 8500 > 1000"
    In CL24N, enter the class name; e.g Z_PO_RELEASE.
    class type 032
    Hit the enter key for existing release strategies to be displayed. Select the one you one just created above. Then click on detail and your characteristics/Value is displayed below.
    Then maintain the different values for the charateristics and then test with PO creation
    Xtic                  Value
    Vendor                1000
    P.Org                  8500
    Value                  > 1000

  • Purchase order release strategy with multiple characteristics

    Hi All,
    We have Purchase order release strategy based on the following characteristics:
    Total Net Order Value
    Purchasing Organization
    Release strategy Type
    a few other custom fields
    We would like to have PO's with release strategy based on a particular Material Group [say X]. I have created a new Characteristic with respect to CEKKO-MATKL and added this characteristic to the same class.
    I have created a new release code [HR] [we need a different person to sign off] and a new release strategy [TR] for which I have assigned the release code HR. In this release strategy, I have set it to get activated for a particular Material Group that does seem to work, but the remaining PO's are not getting triggered for other material groups. For other release strategies, I have left the material group field blank, because they need to be triggered for any material groups except X.
    Could you please let me know if I am missing something  or is there an alternate approach to this ?
    Thank you,
    Satish

    Hi,
    Obviously system will not trigger release strategy in ur case since in the classification data for other strategies u have left it blank excepting X for one strategy.
    Since u have added a new characteristic Material group  and assigned it to class then system expects an input for Material group for triggering release tab.If this is left blank then system by default will not trigger release strategy tab.
    Solution:
    First add all existing material groups in values tab of mat group characteristic then maintain the required set of material groups except X in other strategies in classification data.
    Hope this is clear to you.
    Regards,
    Uzair

Maybe you are looking for

  • How to use database link to create table in other database?

    e.g., java jdbc is connected to the database A. i want to create one table (Table1)in database B, and then insert data into Table1 select ....from Table2 which is in database A. i used the create database link (database name) connect to (database) in

  • Strategy to reference a file system in the application?

    Hello, I am working on a web application which has a file system[d:/appname/images] on the application server where images upload by the application are saved. The file system is referenced in the application code at two different places. One on file

  • How to find client disconnected when client lost net connection?

    Hi,      Can anyone help how can I find on fms server that client disconnected if if client disconnected due to power cut off. I client manually close the application then onDisconnect on server is called but if due to power cut off it does not calle

  • Quality issue MTS files in Premiere Pro

    When I import and work with .mts video files moving objects look very jagged. When I view them in lets say Windows Media player they look fine The screen shot on the left is from the Program monitor of Premiere the right side is from Windows media. I

  • [SOLVED] Applying bottom stack patch to dwm

    I have finally moved to a tiling window manager and am finding it equal parts rewarding and frustrating. I'm using dwm-5.6.1-1. I would like to apply the bottom stack patch but, after having read the instructions on the dwm site I get the following e